ROADWORKS SUMMARY
Ensign Street, LONDON, E1 8JA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Ensign Street, E1 8JA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Ensign Street, LONDON, E1 8JA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ensign Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 12:25.

Thames Tideway Tunnel logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2020 at 09:00 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 29 Oct 2024 at 11:45.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Yeoman Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.

Thames Tideway Tunnel logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
West Lane

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.

These works are categorised as Major.

The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:32.

London Borough Of Southwark logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Croft Street

London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.

London Borough Of Southwark logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bianca Road

London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 08:37.

Thames Water logo
LONG TERM
Between
31 Oct 2022 and 30 Jan 2025
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Ellis Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Pont Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Harriet Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Transport for London (TfL) logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 12 January 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 19:08.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Havelock Terrace

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Bradmead

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

Transport for London (TfL) logo
LONG TERM
Between
30 Mar 2023 and 25 Mar 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Cadogan Gardens

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 07:01.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 8 May 2024 at 09:17.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 18:14.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:58.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 30 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:33.

London Borough Of Southwark logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.

LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2023 at 08:00 and could run through until 30 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:39.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Queens Market

London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 September 2023 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2024 at 11:59.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:36.

LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 21 Oct 2024 at 12:05.

London Borough Of Southwark logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Bankside

London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 29 November 2023 at 06:11 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Nov 2023 at 06:14.

Transport for London (TfL) logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Tunnel Avenue

Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:26.

London Borough Of Southwark logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Albion Street

London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2023 at 19:28 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Jul 2024 at 10:06.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Thames Road

London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Booth Road

London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.

LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.

LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Burt Road

London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Charles Street

London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.

Thames Water logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Wilton Road

Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 08:37.

City Of London Corporation logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are carrying out Highway improvement works on Leadenhall Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Oct 2024 at 14:57.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 16:28.

LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 25 Oct 2024 at 11:37.

Thames Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:36.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hobart Place

Thames Water are carrying out Utility asset works on Hobart Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 08:31.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

London Borough Of Southwark logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Deal Porters Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 15 Dec 2023 at 16:25.

London Borough Of Southwark logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 00:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 15:10.

London Borough Of Southwark logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2024 at 00:00 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 15:10.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:29.

London Borough Of Hackney logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Queensbridge Road

London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 28 Oct 2024 at 10:20.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:00.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Taymount Rise

Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 15:17.

Transport for London (TfL) logo
LONG TERM
Between
14 Feb 2024 and 12 Feb 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2024 and could run through until 12 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 15:58.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

City Of Westminster logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Mortimer Street

City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 February 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Mar 2024 at 12:01.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.

Thames Water logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Shakespeare Road

Thames Water are carrying out Utility asset works on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:20 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:46.

Transport for London (TfL) logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Monnow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.

LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.

LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2024 at 09:54.

Thames Water logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:25.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:51.

LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 21 Jun 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.

Thames Tideway Tunnel logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Aug 2024 at 13:53.

LONG TERM
Between
27 May 2024 and 1 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.

LONG TERM
Between
27 May 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.

Thames Water logo
LONG TERM
Until
13 Feb 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.

Thames Water logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Manchester Road

Thames Water are carrying out Utility asset works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 June 2024 at 16:00 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:53.

London Borough Of Hackney logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 28 Oct 2024 at 14:47.

London Borough Of Southwark logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Borland Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.

London Borough Of Southwark logo
LONG TERM
Until
12 Mar 2025
Details
View Map
Share
Follow
Limesford Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Culmore Road

London Borough Of Southwark are carrying out Highway improvement works on Culmore Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 00:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Aug 2024 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

UK Power Networks Eastern & London logo
LONG TERM
Until
27 Nov 2024
Details
View Map
Share
Follow
Galleywall Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:45 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2024 at 08:46.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Grosvenor Gardens

Thames Water are carrying out Utility asset works on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2024 at 11:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:52.

London Borough Of Wandsworth logo
LONG TERM
Between
24 Jun 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Randall Close

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Jul 2024 at 14:24.

London Borough Of Camden logo
LONG TERM
Between
24 Jun and 6 Dec 2024
Details
View Map
Share
Follow
Randell's Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Randell's Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Jun 2024 at 07:05.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Rembrandt Road

Thames Water are carrying out Disconnection or alteration of supply on Rembrandt Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:06.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Murillo Road

Thames Water are carrying out Disconnection or alteration of supply on Murillo Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:07.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Manor Park

Thames Water are carrying out Disconnection or alteration of supply on Manor Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:09.

Thames Water logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Weardale Road

Thames Water are carrying out Disconnection or alteration of supply on Weardale Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2024 at 10:38.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

City Of London Corporation logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 10:58.

City Of Westminster logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Great Titchfield Street

City Of Westminster are carrying out Highway improvement works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 11:33.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

London Borough Of Camden logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway repair and maintenance works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 14:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Jul 2024 at 14:28.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Kennington Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kennington Park Road, Kennington, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2024 at 04:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 13:27.

Thames Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.

London Borough Of Southwark logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Heber Road

Thames Water are carrying out Disconnection or alteration of supply on Heber Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 16:30.

London Borough Of Southwark logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Station Terrace

London Borough Of Southwark are carrying out Highway repair and maintenance works on Station Terrace, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 13:02.

London Borough Of Southwark logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell New Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Jul 2024 at 08:10.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Lower Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Lower Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Jul 2024 at 07:51.

London Borough Of Southwark logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are carrying out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2024 at 06:51 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Jul 2024 at 05:55.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2024 at 08:48.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2024 at 08:47.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are carrying out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2024 at 08:48.

London Borough Of Southwark logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are carrying out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Jul 2024 at 08:48.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

Thames Water logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Victoria Street

Thames Water are carrying out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 16:45.

Thames Water logo
LONG TERM
Until
11 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:46.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ivydale Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Kempsford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kempsford Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Wincott Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wincott Street, Kennington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.

Thames Water logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Neathouse Place

Thames Water are carrying out Utility asset works on Neathouse Place, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2024 at 10:30 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 16:14.

Thames Water logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Wilton Road

Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 July 2024 at 10:30 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:16.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

Thames Water logo
LONG TERM
Between
4 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 May 2024 at 10:30.

London Borough Of Lewisham logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Lewisham High Street

London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 11 Oct 2024 at 14:33.

Thames Water logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are carrying out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 08:00 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:16.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Hamlets Way

Thames Water are carrying out Utility asset works on Hamlets Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility repair and maintenance works on Burdett Road, London.

These works are categorised as Major.

The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:24.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.

Transport for London (TfL) logo
LONG TERM
Between
12 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 22 Jul 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 09:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 14:53.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

Thames Water logo
LONG TERM
Today
Details
View Map
Share
Burdett Road

Thames Water carried out Utility asset works on Burdett Road, London.

These works were categorised as Major.

The works were originally planned between 16 Aug 2024 and 30 Oct 2024 and were actually completed between 16 Aug 2024 (09:13) and 30 Oct 2024 (12:30). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:42.

City Of Westminster logo
LONG TERM
Between
19 Aug 2024 and 12 Feb 2025
Details
View Map
Share
Follow
Rupert Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 12 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 29 May 2024 at 08:38.

City Of Westminster logo
LONG TERM
Until
12 Feb 2025
Details
View Map
Share
Follow
Rupert Street

City Of Westminster are carrying out Highway repair and maintenance works on Rupert Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 19 Aug 2024 at 08:42.

Cadent Gas logo
LONG TERM
Between
19 Aug and 17 Nov 2024
Details
View Map
Share
Lever Street

Cadent Gas were proposing to carry out Utility asset works on Lever Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 17 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 15:51.

Transport for London (TfL) logo
LONG TERM
Between
19 Aug and 12 Nov 2024
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out roadworks on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 12:34.

London Borough Of Hackney logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Marvin Street

London Borough Of Hackney are carrying out Highway improvement works on Marvin Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:03 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 19 Aug 2024 at 08:03.

Southern Gas Networks logo
LONG TERM
Between
19 Aug and 22 Nov 2024
Details
View Map
Share
Follow
Fair Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2024 at 14:41.

Southern Gas Networks logo
LONG TERM
Between
19 Aug and 22 Nov 2024
Details
View Map
Share
Follow
Fair Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 09:12.

Southern Gas Networks logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Fair Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 09:35 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2024 at 09:59.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.

Thames Tideway Tunnel logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 22:00 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 26 Aug 2024 at 06:46.

Thames Tideway Tunnel logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Creek Road

Thames Tideway Tunnel are carrying out roadworks on Creek Road, Deptford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 22:00 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 26 Aug 2024 at 06:46.

Thames Water logo
LONG TERM
Between
26 Aug and 29 Nov 2024
Details
View Map
Share
Ramsay Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ramsay Road, Forest Gate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:06.

City Of Westminster logo
LONG TERM
Between
27 Aug 2024 and 27 Jan 2025
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 1 May 2024 at 08:04.

LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Bradfield Road

London Borough Of Newham are carrying out Section 50 on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 10:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 11:25.

City Of Westminster logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Carrington Street

City Of Westminster are carrying out Highway repair and maintenance works on Carrington Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2024 at 08:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 09:43.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Landcroft Road

Thames Water are carrying out Disconnection or alteration of supply on Landcroft Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2024 at 17:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:17.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.

London Borough Of Southwark logo
LONG TERM
Between
30 Aug and 18 Dec 2024
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.

Cadent Gas logo
LONG TERM
Until
17 Nov 2024
Details
View Map
Share
Follow
Farringdon Road

Cadent Gas are carrying out Utility asset works on Farringdon Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:14 and could run through until 17 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 15:35.

LONG TERM
Between
1 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Auriga Mews

London Borough Of Islington are proposing to carry out Highway improvement works on Auriga Mews, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2024 at 14:44.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Jul 2024 at 08:02.

London Borough Of Camden logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 2 Sep 2024 at 08:06.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 14:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 15:45.

London Borough Of Camden logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Hungerford Road

London Borough Of Camden were proposing to carry out Highway improvement works on Hungerford Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 3 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Aug 2024 at 16:54.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
King Henry's Walk

London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:51.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Grove North

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:53.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
St Jude Street

London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:54.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Queen Margaret's Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:52.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:55.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:50.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Crossway

London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:49.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Wolsey Road

London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:57.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:39.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:56.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Park

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:40.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Shellgrove Road

London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:48.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:38.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:45.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:35.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:37.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:41.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Pellerin Road

London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:47.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:43.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:42.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Barretts Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:44.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:46.

London Borough Of Lambeth logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Elm Park

London Borough Of Lambeth are carrying out Highway improvement works on Elm Park, Brixton Rush Common, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:30 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 08:49.

Southern Gas Networks logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Greenwich Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 14 Jun 2024 at 11:02.

London Borough Of Southwark logo
LONG TERM
Between
2 Sep and 8 Nov 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2024 at 11:33.

London Borough Of Southwark logo
LONG TERM
Between
2 Sep and 8 Nov 2024
Details
View Map
Share
Alberta Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 15:00.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Draycott Avenue

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Draycott Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Sep 2024 at 09:00.

London Borough Of Southwark logo
LONG TERM
Between
2 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Slippers Place

London Borough Of Southwark are proposing to carry out Highway improvement works on Slippers Place, London.

These works are categorised as Major.

The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Quebec Way

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Quebec Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:30 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:54.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Hackney are carrying out Highway improvement works on Brownlow Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 07:08 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Sep 2024 at 09:33.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Shrubland Road

London Borough Of Hackney are carrying out Highway improvement works on Shrubland Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2024 at 12:36 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Sep 2024 at 09:29.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Newman's Court

Cadent Gas are carrying out Utility repair and maintenance works on Newman's Court, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 20:36 and could run through until 4 November 2024. The works will impact the footway and verge.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 12:22.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.

Thames Water logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Vesta Road

Thames Water are proposing to carry out Utility asset works on Vesta Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:25.

Thames Water logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Ashby Road

Thames Water are proposing to carry out Utility asset works on Ashby Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:20.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:23.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.

City Of London Corporation logo
LONG TERM
Between
9 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Southwark Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 21 Aug 2024 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.

Thames Water logo
LONG TERM
Between
9 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:50.

Thames Water logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are carrying out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 11:15 and could run through until 18 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 16:17.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.

London Borough Of Southwark logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 00:00 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 30 Oct 2024 at 14:54.

London Borough Of Lambeth logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are carrying out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2024 at 08:00 and could run through until 3 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 8 Oct 2024 at 15:28.

Southern Gas Networks logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Camberwell New Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 11:09.

City Of Westminster logo
LONG TERM
Between
12 Sep and 7 Nov 2024
Details
View Map
Share
Follow
Great Newport Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 29 May 2024 at 06:18.

LONG TERM
Between
14 Sep 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 16:05.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
16 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Voltaire Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Voltaire Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 09:15.

London Borough Of Southwark logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Howbury Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Howbury Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Sep 2024 at 09:29.

London Borough Of Southwark logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Kimberley Avenue

London Borough Of Southwark are carrying out Highway repair and maintenance works on Kimberley Avenue, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Sep 2024 at 09:28.

London Borough Of Southwark logo
LONG TERM
Until
21 Nov 2024
Details
View Map
Share
Follow
Evelina Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Evelina Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Sep 2024 at 09:27.

Thames Water logo
LONG TERM
Until
6 Feb 2025
Details
View Map
Share
Follow
Gilbert Road

Thames Water are carrying out Disconnection or alteration of supply on Gilbert Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 13:50 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:37.

City Of London Corporation logo
LONG TERM
Between
16 Sep 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Monument Street

City Of London Corporation are proposing to carry out Highway improvement works on Monument Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 5 Sep 2024 at 14:11.

City Of London Corporation logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Monument Street

City Of London Corporation are carrying out Highway improvement works on Monument Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 16 Sep 2024 at 08:20.

London Borough Of Camden logo
LONG TERM
Between
16 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Richardson's Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 21 Jun 2024 at 16:21.

London Borough Of Camden logo
LONG TERM
Between
16 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Richardson's Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 29 November 2024. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 9 Aug 2024 at 11:51.

London Borough Of Hackney logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Scriven Street

London Borough Of Hackney are carrying out Highway improvement works on Scriven Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:11.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 30 May 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 11:56.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 13:27.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 09:10.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:07.

Transport for London (TfL) logo
LONG TERM
Between
18 Sep and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2024 at 13:34.

City Of Westminster logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Whitehall Place

City Of Westminster are carrying out Highway repair and maintenance works on Whitehall Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Oct 2024 at 08:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.

City Of Westminster logo
LONG TERM
Between
20 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Great Newport Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 07:01.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Omeara Street

Thames Water are carrying out Utility repair and maintenance works on Omeara Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 14:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 10:15.

City Of Westminster logo
LONG TERM
Between
22 Sep and 6 Dec 2024
Details
View Map
Share
Follow
Charing Cross Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 15 Aug 2024 at 09:28.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Jennings Road

Thames Water are carrying out Disconnection or alteration of supply on Jennings Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 September 2024 at 13:20 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:59.

London Borough Of Lambeth logo
LONG TERM
Between
23 Sep and 16 Nov 2024
Details
View Map
Share
Follow
Hercules Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 16 November 2024. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Oct 2024 at 13:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Sep and 2 Dec 2024
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 15:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:49.

Southern Gas Networks logo
LONG TERM
Between
25 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Tunnel Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:40.

Southern Gas Networks logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Tunnel Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 September 2024 at 07:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:02.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Kennington Lane, Kennington, London.

These works are categorised as Major.

The works will start on or after 30 September 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 12:11.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Elizabeth Street

Transport for London (TfL) are carrying out Highway improvement works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:16.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Eaton Square

Transport for London (TfL) are carrying out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Lyall Street

Transport for London (TfL) are carrying out Highway improvement works on Lyall Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 20:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 09:15.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 13:00 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 13:43.

Transport for London (TfL) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are carrying out Highway improvement works on Orchard Place, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 14:39.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Snow Hill

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Snow Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2024 at 11:34.

Thames Water logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Lloyd Square

Thames Water are proposing to carry out Utility asset works on Lloyd Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:34.

Thames Water logo
LONG TERM
Between
30 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Lloyd Baker Street

Thames Water are proposing to carry out Utility asset works on Lloyd Baker Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:48.

Transport for London (TfL) logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are carrying out Highway improvement works on Bow Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:05.

Transport for London (TfL) logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.

Transport for London (TfL) logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:04.

Transport for London (TfL) logo
LONG TERM
Until
16 Jan 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:08.

Thames Water logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Faringford Road

Thames Water are carrying out Utility asset works on Faringford Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 11:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:21.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.

ESP Electricity logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Carteret Street

ESP Electricity are proposing to carry out Utility asset works on Carteret Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 09:02.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 13:45 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 13:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 09:24.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out roadworks on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 09:44.

Thames Water logo
LONG TERM
Between
3 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Roman Way

Thames Water are proposing to carry out Utility asset works on Roman Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:25.

Thames Water logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Roman Way

Thames Water are carrying out Utility asset works on Roman Way, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:37.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Redriff Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 09:40.

Thames Water logo
LONG TERM
Between
4 Oct and 11 Dec 2024
Details
View Map
Share
Hillsboro Road

Thames Water were proposing to carry out roadworks on Hillsboro Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:10.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Victoria Embankment

Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 5 November 2024. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:05.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

Electricity Network Company logo
LONG TERM
Between
7 Oct and 13 Nov 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 7 Aug 2024 at 16:46.

LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Sep 2024 at 11:47.

LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Oct 2024 at 12:42.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Luxborough Street

City Of Westminster are carrying out Highway improvement works on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 11:50.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:15 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 13:25.

Thames Water logo
LONG TERM
Until
14 Apr 2025
Details
View Map
Share
Follow
Cephas Street

Thames Water are carrying out Utility repair and maintenance works on Cephas Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 14 April 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:53.

London Borough Of Hackney logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Eleanor Road (North)

London Borough Of Hackney are carrying out Highway improvement works on Eleanor Road (North), Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:25 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:25.

London Borough Of Hackney logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are carrying out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:25 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:25.

Transport for London (TfL) logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 20:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Siebert Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Siebert Road, Blackheath.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:33.

Transport for London (TfL) logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Siebert Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Siebert Road, Blackheath.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 20:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:07.

London Borough Of Lambeth logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:12 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 Oct 2024 at 09:12.

Finishing
Friday
Details
View Map
Share
Follow
Montford Place

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Montford Place, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Oct 2024 at 09:23.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:13.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:38.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are carrying out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:38.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:14.

Transport for London (TfL) logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:37.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Jul 2024 at 06:50.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 06:57.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
7 Oct and 1 Dec 2024
Details
View Map
Share
Follow
Redriff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 12:31.

London Borough Of Southwark logo
LONG TERM
Between
7 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Jun 2024 at 08:02.

London Borough Of Southwark logo
LONG TERM
Between
7 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Tanner Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 30 November 2024. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Jul 2024 at 07:57.

London Borough Of Southwark logo
LONG TERM
Between
7 Oct and 11 Nov 2024
Details
View Map
Share
Follow
London Bridge Street

London Borough Of Southwark are proposing to carry out Highway improvement works on London Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 15:37.

London Borough Of Southwark logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
London Bridge Street

London Borough Of Southwark are carrying out Highway improvement works on London Bridge Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 14:00 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 14:54.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Braydon Road

Cadent Gas are proposing to carry out Utility asset works on Braydon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 13:55.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Clapton Terrace

Cadent Gas are proposing to carry out Utility asset works on Clapton Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:07.

Cadent Gas logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Braydon Road

Cadent Gas are carrying out Utility asset works on Braydon Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:45.

Cadent Gas logo
LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are carrying out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 14:17 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 19:09.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are proposing to carry out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:50.

Thames Water logo
LONG TERM
Between
7 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Cadent Gas logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Clapton Terrace

Cadent Gas are carrying out Utility asset works on Clapton Terrace, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:22 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 10:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 13:23.

City Of London Corporation logo
Finishing
Sunday
Details
View Map
Share
Follow
Shoe Lane

City Of London Corporation are carrying out Highway improvement works on Shoe Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 19 Oct 2024 at 08:22.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
London Wall

Thames Water are carrying out Utility repair and maintenance works on London Wall, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 08:00 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:51.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:08.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are carrying out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:37.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are carrying out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:04.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Fonthill Road

Thames Water were proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 10:51.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lee High Road

Thames Water are carrying out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 October 2024 at 17:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:16.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:50.

Transport for London (TfL) logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:37.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:51.

Transport for London (TfL) logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:37.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 11:09.

Transport for London (TfL) logo
Between
13 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:37.

Transport for London (TfL) logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 October 2024 at 22:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 08:38.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Pear Tree Street

Cadent Gas are proposing to carry out Utility asset works on Pear Tree Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 08:26.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are carrying out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:56 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 20:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Snow Hill

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Snow Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 12:49.

UK Power Networks Eastern & London logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Snow Hill

UK Power Networks Eastern & London are carrying out Utility asset works on Snow Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 08:10.

Cadent Gas logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Pear Tree Street

Cadent Gas are carrying out Utility asset works on Pear Tree Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 07:14 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:32.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Tavistock Place

London Borough Of Camden are proposing to carry out Highway improvement works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:54.

Thames Water logo
LONG TERM
Between
14 Oct and 5 Dec 2024
Details
View Map
Share
Follow
St John Street

Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:35.

Thames Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility asset works on St John Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 11:45 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 11:45.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Camden High Street

London Borough Of Camden are proposing to carry out Highway improvement works on Camden High Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 14:57.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Camden High Street

London Borough Of Camden were proposing to carry out Highway improvement works on Camden High Street, Camden Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Sep 2024 at 11:08.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Camden High Street

London Borough Of Camden are proposing to carry out Highway improvement works on Camden High Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 10:09.

London Borough Of Camden logo
LONG TERM
Between
14 Oct and 21 Nov 2024
Details
View Map
Share
Follow
St Pancras Way

London Borough Of Camden are proposing to carry out Highway improvement works on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:58.

London Borough Of Lambeth logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Crownstone Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The works started on 14 October 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 14 Oct 2024 at 08:52.

Thames Tideway Tunnel logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Hapenny Hatch Footpath

Thames Tideway Tunnel are carrying out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 14 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Oct 2024 at 08:22.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sussex Street

Transport for London (TfL) are carrying out Utility repair and maintenance works on Sussex Street, Warwick, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 09:43.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Aug 2024 at 09:48.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Westferry Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Westferry Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:46.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Westferry Road

Thames Water are carrying out Statutory Infrastructure Works on Westferry Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:56.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Byng Street

Thames Water are proposing to carry out Statutory Infrastructure Works on Byng Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2024 at 14:23.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Byng Street

Thames Water are carrying out Statutory Infrastructure Works on Byng Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 12:39.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Knightsbridge

City Of Westminster were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:45.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Piccadilly

City Of Westminster were proposing to carry out Highway improvement works on Piccadilly, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:50.

City Of Westminster logo
LONG TERM
Between
14 Oct 2024 and 31 May 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Aug 2024 at 13:52.

Thames Water logo
Between
14 Oct and 12 Nov 2024
Details
View Map
Share
Victoria Embankment

Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 12 November 2024. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:39.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Victoria Embankment

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 17:16.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Victoria Embankment

Thames Water are carrying out Utility repair and maintenance works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 21:00 and could run through until 4 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 07:34.

London Borough Of Southwark logo
LONG TERM
Between
15 Oct and 9 Dec 2024
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 11:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Oct and 30 Dec 2024
Details
View Map
Share
Portland Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Portland Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 09:42.

Transport for London (TfL) logo
Between
16 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 13:48.

Transport for London (TfL) logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are carrying out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 10:00 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 10:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 16:06.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Oct 2024 at 14:56.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:30.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Bayswater Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 12:05.

Thames Water logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Denbigh Street

Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 11:45 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 13:20.

Thames Water logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Omeara Street

Thames Water are carrying out Utility repair and maintenance works on Omeara Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 11:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:21.

Thames Water logo
LONG TERM
Until
19 Nov 2024
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:20 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:46.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Commercial Road

Cadent Gas are carrying out Utility repair and maintenance works on Commercial Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 12:54 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 16:30.

Its Technology Group logo
Finishing
Friday
Details
View Map
Share
Follow
Gower Mews

Its Technology Group are proposing to carry out Utility repair and maintenance works on Gower Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 10 Oct 2024 at 18:34.

Its Technology Group logo
Finishing
Friday
Details
View Map
Share
Follow
Gower Mews

Its Technology Group are proposing to carry out Utility repair and maintenance works on Gower Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 17 Oct 2024 at 13:44.

UK Power Networks Eastern & London logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 15:30 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 16:12.

London Borough Of Lambeth logo
LONG TERM
Between
19 Oct 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.

Transport for London (TfL) logo
Between
20 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 13:00.

Transport for London (TfL) logo
Between
20 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 16:46.

Transport for London (TfL) logo
Between
20 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:42.

Transport for London (TfL) logo
Between
20 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 16:45.

London Borough Of Southwark logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
De Laune Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on De Laune Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 11:38.

London Borough Of Southwark logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Braganza Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Braganza Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 11:38.

London Borough Of Southwark logo
LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 11:37.

London Borough Of Southwark logo
LONG TERM
Between
21 Oct and 27 Nov 2024
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2024 at 16:04.

London Borough Of Southwark logo
Between
21 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 08:56.

London Borough Of Southwark logo
Until
16 Nov 2024
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:35 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 19:45.

London Borough Of Southwark logo
Between
21 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 08:56.

London Borough Of Southwark logo
Between
21 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Oct 2024 at 07:32.

London Borough Of Southwark logo
Until
18 Nov 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 14:30 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Oct 2024 at 15:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lynton Road

Thames Water are carrying out Disconnection or alteration of supply on Lynton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:30 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:41.

Finishing
Friday
Details
View Map
Share
Makins Street

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Makins Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 13:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2024 at 11:38.

London Borough Of Southwark logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Mar 2024 at 14:26.

London Borough Of Southwark logo
LONG TERM
Between
21 Oct and 14 Dec 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 13:01.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 07:08.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct and 23 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 23 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:37.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:55.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
North Audley Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on North Audley Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:19 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:51.

Thames Water logo
LONG TERM
Between
21 Oct 2024 and 24 Feb 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:03.

Thames Water logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 21 October 2024 at 08:22 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 08:22.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Silk Street

Cadent Gas are proposing to carry out Utility asset works on Silk Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:10.

Cadent Gas logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Silk Street

Cadent Gas are proposing to carry out Utility asset works on Silk Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 11:04.

Cadent Gas logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Silk Street

Cadent Gas are carrying out Utility asset works on Silk Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 07:42 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 08:13.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:58.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
White Lion Street

Transport for London (TfL) are proposing to carry out Highway improvement works on White Lion Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:57.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Upper Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:44.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:55.

London Borough Of Hackney logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Sheep Lane

London Borough Of Hackney are proposing to carry out New service connection on Sheep Lane, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 10 Oct 2024 at 10:01.

London Borough Of Hackney logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Sheep Lane

London Borough Of Hackney are carrying out New service connection on Sheep Lane, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 24 Oct 2024 at 11:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jackman Street

Thames Water are carrying out Utility repair and maintenance works on Jackman Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 09:05.

Thames Water logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Avenue Road

Thames Water are proposing to carry out Utility repair and maintenance works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 11:24.

Thames Water logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Avenue Road

Thames Water are carrying out Utility repair and maintenance works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:44.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are carrying out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are carrying out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:21 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:21.

London Borough Of Hackney logo
LONG TERM
Until
18 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are carrying out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.

London Borough Of Camden logo
LONG TERM
Between
21 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Baynes Street

London Borough Of Camden are proposing to carry out Highway improvement works on Baynes Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Sep 2024 at 18:01.

London Borough Of Camden logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Baynes Street

London Borough Of Camden are carrying out Highway improvement works on Baynes Street, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Oct 2024 at 09:55.

Transport for London (TfL) logo
Between
21 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Canonbury Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Canonbury Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 07:55.

City Of Westminster logo
LONG TERM
Between
22 Oct and 17 Dec 2024
Details
View Map
Share
Follow
Great Newport Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 18 Sep 2024 at 09:31.

City Of Westminster logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Great Newport Street

City Of Westminster are carrying out Highway repair and maintenance works on Great Newport Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 30 Oct 2024 at 09:11.

London Borough Of Camden logo
LONG TERM
Between
22 Oct and 24 Dec 2024
Details
View Map
Share
Follow
Tavistock Place

London Borough Of Camden are proposing to carry out Highway improvement works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Oct 2024 at 15:04.

Thames Water logo
Until
19 Nov 2024
Details
View Map
Share
Follow
Caledonian Road

Thames Water are carrying out Utility repair and maintenance works on Caledonian Road, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 11:00 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 11:39.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Long Road

Thames Water are carrying out Utility repair and maintenance works on Long Road, Clapham Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:45 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Clapham Common South Side

Thames Water are carrying out Utility repair and maintenance works on Clapham Common South Side, Clapham East, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:45 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:13.

UK Power Networks Eastern & London logo
Between
23 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Browning Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jun 2024 at 16:24.

UK Power Networks Eastern & London logo
Between
23 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Browning Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 11:13.

Cadent Gas logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Lambeth Palace Road

Cadent Gas are carrying out Utility repair and maintenance works on Lambeth Palace Road, Waterloo & Southbank, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 13:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 09:36.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Motcomb Street

Cadent Gas are carrying out Utility repair and maintenance works on Motcomb Street, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 16:00 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:43.

London Borough Of Southwark logo
LONG TERM
Between
23 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 08:32.

London Borough Of Southwark logo
LONG TERM
Between
23 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Oct 2024 at 10:50.

London Borough Of Southwark logo
LONG TERM
Between
23 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Shad Thames

London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 08:25.

London Borough Of Southwark logo
LONG TERM
Between
23 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Shad Thames

London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Oct 2024 at 10:50.

Electricity Network Company logo
LONG TERM
Between
23 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 7 Aug 2024 at 10:35.

Cadent Gas logo
Friday
Details
View Map
Share
Burdett Road

Cadent Gas carried out Utility repair and maintenance works on Burdett Road, London.

A lane was closed for some or all of the period.

The works were originally planned between 23 Oct 2024 and 1 Nov 2024 and were actually completed between 23 Oct 2024 (09:00) and 30 Oct 2024 (12:41). The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:57.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Rupert Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Rupert Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 08:31.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Rupert Street

UK Power Networks Eastern & London are carrying out Utility asset works on Rupert Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 10:00 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 13:27.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Moorfields

Thames Water are proposing to carry out New service connection on Moorfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 13:13.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Moorfields

Thames Water were proposing to carry out New service connection on Moorfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 07:58.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Moorfields

Thames Water are carrying out New service connection on Moorfields, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:21 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:04.

Thames Water logo
Today
Details
View Map
Share
Willow Bridge Road

Thames Water carried out Utility repair and maintenance works on Willow Bridge Road, Islington, London.

The road was closed for some or all of the period.

The works were originally planned between 23 Oct 2024 and 30 Oct 2024 and were actually completed between 23 Oct 2024 (12:25) and 30 Oct 2024 (15:27). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:59.

Thames Water logo
Finishing
Today
Details
View Map
Share
Long Road

Thames Water were proposing to carry out Utility repair and maintenance works on Long Road, Clapham Town, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 10:02.

Thames Water logo
Finishing
Today
Details
View Map
Share
Greenwich High Road

Thames Water were proposing to carry out Utility repair and maintenance works on Greenwich High Road, Greenwich.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Oct 2024 at 15:18.

UK Power Networks Eastern & London logo
Between
24 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 08:50.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Gilkes Crescent

London Borough Of Southwark are carrying out Highway improvement works on Gilkes Crescent, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 10:30 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 12:19.

UK Power Networks Eastern & London logo
Between
25 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Larkhall Rise

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Larkhall Rise, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:54.

London Borough Of Southwark logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are carrying out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 13:39 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 13:45.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dean Farrar Street

Thames Water are carrying out Utility repair and maintenance works on Dean Farrar Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 07:30 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:10.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Trebeck Street

City Of Westminster are proposing to carry out Highway improvement works on Trebeck Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 14:11.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Trebeck Street

City Of Westminster are carrying out Highway improvement works on Trebeck Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 15:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 15:52.

City Of Westminster logo
LONG TERM
Between
25 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Jun 2024 at 12:23.

Virgin Media logo
Between
25 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Queen Square

Virgin Media are proposing to carry out Utility asset works on Queen Square, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Jul 2024 at 14:02.

Virgin Media logo
Between
25 Oct and 8 Nov 2024
Details
View Map
Share
Queen Square

Virgin Media were proposing to carry out Utility asset works on Queen Square, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:44.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Effra Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Effra Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:03.

Transport for London (TfL) logo
Today
Details
View Map
Share
Effra Road

Transport for London (TfL) carried out Highway repair and maintenance works on Effra Road, Brixton Rush Common, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 26 Oct 2024 and 30 Oct 2024 and were actually completed between 26 Oct 2024 (20:00) and 30 Oct 2024 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:58.

ESP Electricity logo
Finishing
Friday
Details
View Map
Share
Follow
Silverthorne Road

ESP Electricity are carrying out Utility asset works on Silverthorne Road, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 October 2024 at 08:44 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 29 Oct 2024 at 08:08.

UK Power Networks Eastern & London logo
Between
26 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Buckingham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Buckingham Palace Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 15:20.

UK Power Networks Eastern & London logo
Between
26 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Grosvenor Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 16:16.

Cornerstone Telecommunications Infrastructure logo
Between
27 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Gray's Inn Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 28 Aug 2024 at 10:13.

Cornerstone Telecommunications Infrastructure logo
Between
27 Oct and 11 Nov 2024
Details
View Map
Share
Gray's Inn Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Oct 2024 at 14:17.

Cornerstone Telecommunications Infrastructure logo
Between
27 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Acton Street

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Aug 2024 at 17:28.

Cornerstone Telecommunications Infrastructure logo
Between
27 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Acton Street

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Oct 2024 at 11:08.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Adams Row

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Adams Row, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 20:23 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 13:31.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Greenfield Road

Thames Water are proposing to carry out New service connection on Greenfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:47.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Greenfield Road

Thames Water are proposing to carry out New service connection on Greenfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:33.

UK Power Networks Eastern & London logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 09:25.

UK Power Networks Eastern & London logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are carrying out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:03 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 09:04.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Ashfield Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Oct 2024 at 14:51.

Until
8 Nov 2024
Details
View Map
Share
Follow
Ashfield Street

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Ashfield Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:52.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Ford Square

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Ford Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Oct 2024 at 14:50.

Until
8 Nov 2024
Details
View Map
Share
Follow
Ford Square

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Ford Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:51.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Halcrow Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Halcrow Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Oct 2024 at 14:51.

Until
8 Nov 2024
Details
View Map
Share
Follow
Halcrow Street

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Halcrow Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:52.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:53.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Beckton Road

Cadent Gas are proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 10:57.

Cadent Gas logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Beckton Road

Cadent Gas are carrying out Utility asset works on Beckton Road, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:18 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:23.

City Of London Telecomms logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaumont Street

City Of London Telecomms are carrying out Utility asset works on Beaumont Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 28 Oct 2024 at 08:28.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

City Of London Telecomms logo
Finishing
Today
Details
View Map
Share
Follow
Central Street

City Of London Telecomms are proposing to carry out Utility asset works on Central Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 23 Sep 2024 at 07:29.

City Of London Telecomms logo
Finishing
Today
Details
View Map
Share
Follow
Central Street

City Of London Telecomms are carrying out Utility asset works on Central Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 28 Oct 2024 at 09:02.

Thames Water logo
Between
28 Oct and 16 Nov 2024
Details
View Map
Share
Manor Road

Thames Water were proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 16 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:50.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are carrying out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:37.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are carrying out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:29.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
White Lion Street

Transport for London (TfL) are carrying out Highway improvement works on White Lion Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are carrying out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:30.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Duncan Street

Transport for London (TfL) are carrying out Highway improvement works on Duncan Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:30.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Upper Street

Transport for London (TfL) are carrying out Highway improvement works on Upper Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:26.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Camden Passage

Transport for London (TfL) are carrying out Highway improvement works on Camden Passage, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:29.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Charlton Place

Transport for London (TfL) are carrying out Highway improvement works on Charlton Place, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:28.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Berners Road

Transport for London (TfL) are carrying out Highway improvement works on Berners Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Islington Green

Transport for London (TfL) are carrying out Highway improvement works on Islington Green, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:27.

Transport for London (TfL) logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Camden Walk

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 07:55.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Camden Walk

Transport for London (TfL) are carrying out Highway improvement works on Camden Walk, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:37.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
St Alban's Place

Transport for London (TfL) are carrying out Highway improvement works on St Alban's Place, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Collins Yard

Transport for London (TfL) are carrying out Highway improvement works on Collins Yard, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Theberton Street

Transport for London (TfL) are carrying out Highway improvement works on Theberton Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Gaskin Street

BT are carrying out Utility repair and maintenance works on Gaskin Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 12:01 and could run through until 30 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Oct 2024 at 13:52.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Cross Street

Transport for London (TfL) are carrying out Highway improvement works on Cross Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Almeida Street

Transport for London (TfL) are carrying out Highway improvement works on Almeida Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:34.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Waterloo Terrace

Transport for London (TfL) are carrying out Highway improvement works on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:34.

Hyperoptic logo
Finishing
Tomorrow
Details
View Map
Share
Liverpool Road

Hyperoptic were proposing to carry out Utility repair and maintenance works on Liverpool Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Oct 2024 at 13:10.

Hyperoptic logo
Finishing
Tomorrow
Details
View Map
Share
Barnsbury Street

Hyperoptic were proposing to carry out Utility repair and maintenance works on Barnsbury Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Oct 2024 at 13:10.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Florence Street

Transport for London (TfL) are carrying out Highway improvement works on Florence Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Barnsbury Street

Transport for London (TfL) are carrying out Highway improvement works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Richmond Grove

Transport for London (TfL) are carrying out Highway improvement works on Richmond Grove, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Tyndale Lane

Transport for London (TfL) are carrying out Highway improvement works on Tyndale Lane, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:32.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are carrying out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:32.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Canonbury Lane

Transport for London (TfL) are carrying out Highway improvement works on Canonbury Lane, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:31.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Laycock Street

Transport for London (TfL) are carrying out Highway improvement works on Laycock Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:31.

Transport for London (TfL) logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Canonbury Road

Transport for London (TfL) are carrying out Highway improvement works on Canonbury Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:27.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Lanes

Thames Water are carrying out Utility asset works on Green Lanes, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:07 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:17.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Seven Sisters Road

Thames Water were proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:08.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Lanes

Thames Water are proposing to carry out Utility asset works on Green Lanes, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:00.

UK Power Networks Eastern & London logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 13:41.

Thames Water logo
Until
11 Nov 2024
Details
View Map
Share
Follow
Seven Sisters Road

Thames Water are carrying out Utility asset works on Seven Sisters Road, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:11.

UK Power Networks Eastern & London logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 08:01.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manor Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 10:47.

UK Power Networks Eastern & London logo
Between
28 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 10:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Alexandra Road

Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 15:59.

London Borough Of Hackney logo
Finishing
Today
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are proposing to carry out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:23.

London Borough Of Hackney logo
Finishing
Today
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are carrying out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:36 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 28 Oct 2024 at 08:36.

UK Power Networks Eastern & London logo
Until
19 Nov 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are carrying out Diversionary works on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 11:00 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 11:31.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Melford Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Melford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2024 at 06:20.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Melford Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:55.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carver Road

Thames Water are proposing to carry out New service connection on Carver Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 12:26.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Carver Road

Thames Water are carrying out New service connection on Carver Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 12:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 12:03.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Effra Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Effra Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2024 at 08:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:02.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Rise

Thames Water are carrying out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:14.

Southern Gas Networks logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Landor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Landor Road, Clapham East, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 13:20.

Southern Gas Networks logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Landor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Landor Road, Clapham East, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:53.

Southern Gas Networks logo
LONG TERM
Until
8 Dec 2024
Details
View Map
Share
Follow
Clapham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 14:58.

ESP Electricity logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 11:50.

ESP Electricity logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 9 Oct 2024 at 10:45.

ESP Electricity logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 15:23.

ESP Electricity logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are carrying out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 28 Oct 2024 at 08:50.

ESP Electricity logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:12.

ESP Electricity logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are carrying out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 28 Oct 2024 at 08:51.

ESP Electricity logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 11:51.

Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Paradise Road

GTC Pipelines were proposing to carry out Utility asset works on Paradise Road, Stockwell West & Larkhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 10 Oct 2024 at 09:06.

London Borough Of Southwark logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Southampton Way

London Borough Of Southwark are carrying out Highway repair and maintenance works on Southampton Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 09:25.

Royal Borough Of Greenwich logo
Finishing
Monday
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 10 Jul 2024 at 06:11.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Queenstown Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 15:41.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:31.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Albert Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Oct 2024 at 15:34.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Follow
Albert Bridge Road

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Albert Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:32.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Lordship Place

Thames Water are proposing to carry out New service connection on Lordship Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:33.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Lordship Place

Thames Water are carrying out New service connection on Lordship Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:20.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 10:23.

Thames Tideway Tunnel logo
Finishing
Saturday
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 2 Oct 2024 at 10:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 8 Dec 2024
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:39.

London Borough Of Lambeth logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Gilbert Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Gilbert Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Jul 2024 at 07:32.

Transport for London (TfL) logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Blackwall Lane

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Lane, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 15 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2024 at 15:25.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Queen's Gate Terrace

Thames Water are proposing to carry out New service connection on Queen's Gate Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 16:00.

Thames Water logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Cole Street

Thames Water are carrying out Utility repair and maintenance works on Cole Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 12:50 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 12:54.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Janeway Street

Thames Water are carrying out Disconnection or alteration of supply on Janeway Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:26.

ESP Electricity logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Carteret Street

ESP Electricity are carrying out Utility asset works on Carteret Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 28 Oct 2024 at 09:19.

London Borough Of Southwark logo
LONG TERM
Between
28 Oct and 30 Nov 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:47.

London Borough Of Southwark logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 11:42.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bermondsey Wall East

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Bermondsey Wall East, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.

London Borough Of Southwark logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 12:40.

London Borough Of Southwark logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:34.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Loftie Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Loftie Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Shand Street

London Borough Of Southwark are carrying out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 00:00 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 13:23.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Shand Street

London Borough Of Southwark are carrying out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 13:19 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 13:23.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:38.

Network Rail logo
Finishing
Today
Details
View Map
Share
Shand Street

Network Rail were proposing to carry out Works for Rail Purposes on Shand Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Oct 2024 at 10:22.

Network Rail logo
Between
28 Oct and 12 Nov 2024
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 31 Jul 2024 at 14:56.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Great Suffolk Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:08.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Great Suffolk Street

London Borough Of Southwark are carrying out Highway improvement works on Great Suffolk Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 06:19 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Oct 2024 at 06:26.

City Of Westminster logo
LONG TERM
Between
28 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 14:03.

City Of Westminster logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are carrying out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 08:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jermyn Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 14:33.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Jermyn Street

Thames Water are carrying out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:55 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:14.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Blenheim Gardens

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Blenheim Gardens, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 10:03.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
St Saviour's Road

Transport for London (TfL) were proposing to carry out Highway improvement works on St Saviour's Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 10:04.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Lambert Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Lambert Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 10:02.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Trent Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Trent Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 31 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Aug 2024 at 10:04.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Acre Lane

Thames Water were proposing to carry out New service connection on Acre Lane, Brixton Acre Lane, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:13.

Southern Gas Networks logo
Between
29 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Rainton Road

Southern Gas Networks are proposing to carry out New service connection on Rainton Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 06:43.

Southern Gas Networks logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Rainton Road

Southern Gas Networks are carrying out New service connection on Rainton Road, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 11:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 11:44.

Finishing
Saturday
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Oct 2024 at 19:14.

Finishing
Saturday
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:30 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Oct 2024 at 08:40.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Hans Crescent

Thames Water were proposing to carry out Utility repair and maintenance works on Hans Crescent, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:48.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Pavilion Road

Thames Water are carrying out Utility repair and maintenance works on Pavilion Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 10:51 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:26.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Savoy Place

Thames Water are carrying out Utility repair and maintenance works on Savoy Place, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 07:16 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 07:52.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.

City Of London Corporation logo
LONG TERM
Between
29 Oct 2024 and 12 May 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 20 Aug 2024 at 09:25.

Hyperoptic logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Herbal Hill

Hyperoptic are proposing to carry out Utility repair and maintenance works on Herbal Hill, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 17 Jul 2024 at 15:27.

Hyperoptic logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Herbal Hill

Hyperoptic are proposing to carry out Utility repair and maintenance works on Herbal Hill, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 17 Oct 2024 at 14:48.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Shoreditch High Street

Thames Water are carrying out roadworks on Shoreditch High Street, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:53 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:07.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hackney Road

Thames Water are carrying out Utility repair and maintenance works on Hackney Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:53 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:25.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Hackney Road

Thames Water were proposing to carry out Utility repair and maintenance works on Hackney Road, Hackney, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:30.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Kingsland Road

Thames Water are carrying out roadworks on Kingsland Road, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:53 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:10.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jedburgh Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jedburgh Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:08.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Central Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Central Park Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2024 at 08:29.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Central Park Road

Thames Water are carrying out Utility repair and maintenance works on Central Park Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:22.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:47.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 14:58.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are carrying out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Terrace Road

Thames Water are proposing to carry out Utility repair and maintenance works on Terrace Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:56.

London Borough Of Camden logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 Sep 2024 at 18:10.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Henrietta Street

Thames Water were proposing to carry out New service connection on Henrietta Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 5 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 14:58.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Moorgate

Thames Water are carrying out Utility repair and maintenance works on Moorgate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 10:24 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hilda Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hilda Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:14.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Penfold Street

Thames Water are carrying out Utility repair and maintenance works on Penfold Street, Church Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:31 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:44.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Elia Street

UK Power Networks Eastern & London are carrying out Utility asset works on Elia Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 08:00 and could run through until 5 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 08:01.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ainsworth Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:17.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Well Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 15:47.

London Borough Of Hackney logo
LONG TERM
Between
30 Oct 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:31.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Barnsbury Street

BT are proposing to carry out Utility asset works on Barnsbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2024 at 08:32.

London Borough Of Hackney logo
Finishing
Saturday
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:39.

London Borough Of Hackney logo
Finishing
Saturday
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 23 Aug 2024 at 14:31.

London Borough Of Hackney logo
Finishing
Saturday
Details
View Map
Share
Follow
Victoria Park Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Victoria Park Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 12:06.

London Borough Of Southwark logo
Between
30 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Oct 2024 at 09:43.

London Borough Of Southwark logo
Between
30 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 16:28.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Pavilion Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:53.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Sep 2024 at 16:14.

Network Rail logo
Finishing
Friday
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Oct 2024 at 14:01.

Thames Water logo
Between
31 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Jonathan Street

Thames Water are proposing to carry out New service connection on Jonathan Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:57.

Thames Water logo
Between
31 Oct and 8 Nov 2024
Details
View Map
Share
Jonathan Street

Thames Water were proposing to carry out New service connection on Jonathan Street, Vauxhall, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 12:34.

Vodafone logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Thames Street

Vodafone are proposing to carry out Remedial works on Upper Thames Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Aug 2024 at 12:25.

Vodafone logo
Finishing
Monday
Details
View Map
Share
Follow
Cousin Lane

Vodafone are proposing to carry out Utility asset works on Cousin Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 6 Aug 2024 at 12:23.

Thames Water logo
LONG TERM
Between
31 Oct 2024 and 16 Mar 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 31 October 2024 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:09.

Thames Water logo
LONG TERM
Between
31 Oct 2024 and 16 Mar 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 31 October 2024 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 15:28.

Thames Water logo
Between
31 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Queen Anne Street

Thames Water are proposing to carry out New service connection on Queen Anne Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:29.

Thames Water logo
Between
31 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Queen Anne Street

Thames Water are proposing to carry out New service connection on Queen Anne Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:29.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whites Row

Thames Water are proposing to carry out Utility repair and maintenance works on Whites Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Whites Row

Thames Water are proposing to carry out Utility repair and maintenance works on Whites Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:11.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Canonbury Grove

Thames Water were proposing to carry out Utility repair and maintenance works on Canonbury Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 October 2024 and run through until 4 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 13:23.

Between
31 Oct and 23 Nov 2024
Details
View Map
Share
Follow
Faraday Road

London Borough Of Newham are proposing to carry out Highway improvement works on Faraday Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Oct 2024 at 12:01.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 08:17.

Between
1 and 14 Nov 2024
Details
View Map
Share
Follow
Carr Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Carr Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Oct 2024 at 13:20.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:15.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Beckton Road

Cadent Gas were proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:48.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:38.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:36.

UK Power Networks Eastern & London logo
Between
1 and 8 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2024 at 14:04.

Thames Water logo
Between
1 and 8 Nov 2024
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out New service connection on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 14:21.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Deal Porter Square

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Aug 2024 at 18:25.

London Borough Of Camden logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2024 at 10:25.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Sandrock Road

Thames Water are proposing to carry out New service connection on Sandrock Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 10:43.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Sandrock Road

Thames Water were proposing to carry out New service connection on Sandrock Road, Ladywell, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 15:46.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Sandrock Road

Thames Water were proposing to carry out New service connection on Sandrock Road, Ladywell, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:14.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 23 May 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:52.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Randall Close

Thames Water are proposing to carry out New service connection on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:29.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Randall Close

Thames Water are proposing to carry out New service connection on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 09:56.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Randall Close

Thames Water were proposing to carry out New service connection on Randall Close, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:13.

London Borough Of Southwark logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Hyndman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Hyndman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 12:33.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Hyndman Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Hyndman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:16.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Hyndman Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Hyndman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:52.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Hyndman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Hyndman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:45.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 10:31.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 07:29.

UK Power Networks Eastern & London logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
Albany Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:13.

UK Power Networks Eastern & London logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Albany Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 13:38.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Flood Street

Thames Water are proposing to carry out New service connection on Flood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:10.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Flood Street

Thames Water are proposing to carry out New service connection on Flood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 14:59.

Between
4 and 26 Nov 2024
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 13:16.

Thames Water logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

London Borough Of Lambeth logo
LONG TERM
Between
4 Nov 2024 and 18 Jan 2025
Details
View Map
Share
Follow
Hercules Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 7 Oct 2024 at 08:57.

UK Power Networks Eastern & London logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Follow
Buckingham Palace Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Buckingham Palace Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:11.

UK Power Networks Eastern & London logo
Between
4 and 30 Nov 2024
Details
View Map
Share
Follow
Grosvenor Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:12.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Virgil Street

Thames Water were proposing to carry out New service connection on Virgil Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 7 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 10:58.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:52.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:58.

Transport for London (TfL) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 15:00.

London Borough Of Southwark logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:42.

London Borough Of Southwark logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:42.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Prestons Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Prestons Road Roundabout, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 09:45.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Duke Street St James's

Thames Water were proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 08:33.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Duke Street St James's

Thames Water were proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Aug 2024 at 09:56.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Victoria Dock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:07.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:25.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Aug 2024 at 12:30.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 5 Sep 2024 at 14:10.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 Oct 2024 at 14:28.

Electricity Network Company logo
LONG TERM
Between
4 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Abchurch Lane

Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 Oct 2024 at 16:18.

BT logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Burslem Street

BT are proposing to carry out Utility asset works on Burslem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Aug 2024 at 16:36.

BT logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Burslem Street

BT are proposing to carry out Utility asset works on Burslem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Oct 2024 at 13:07.

Cadent Gas logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Strand

Cadent Gas are proposing to carry out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 08:25.

City Of Westminster logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 08:15.

City Of Westminster logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Oct 2024 at 13:57.

Murphy Power Distribution logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Great Chapel Street

Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 13 Sep 2024 at 14:22.

City Of Westminster logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Upper Berkeley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2024 at 10:47.

City Of Westminster logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Upper Berkeley Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Oct 2024 at 09:36.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
High Holborn

Thames Water are proposing to carry out Utility repair and maintenance works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 11:57.

Thames Water logo
Between
4 and 10 Nov 2024
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Between
4 and 10 Nov 2024
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 11:46.

LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Wodeham Gardens

London Borough Of Tower Hamlets are proposing to carry out roadworks on Wodeham Gardens, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:19.

LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:25.

LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 13:24.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:34.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 14:42.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Boscobel Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boscobel Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 08:51.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Frampton Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 08:53.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Orchardson Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchardson Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Oct 2024 at 14:12.

Transport for London (TfL) logo
Between
4 and 16 Nov 2024
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 14:53.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Wren Street

London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Oct 2024 at 08:56.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Wren Street

London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Wren Street

London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Frederick Street

London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Oct 2024 at 08:53.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Frederick Street

London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.

London Borough Of Camden logo
LONG TERM
Between
4 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Frederick Street

London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:06.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Northdown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2024 at 05:57.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Charlton Place

Thames Water are proposing to carry out New service connection on Charlton Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Aug 2024 at 08:28.

Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Cloudesley Place

London Borough Of Islington are proposing to carry out Highway improvement works on Cloudesley Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 28 Oct 2024 at 09:03.

Hyperoptic logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Hertford Road

Hyperoptic are proposing to carry out Utility asset works on Hertford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 3 Oct 2024 at 11:48.

Hyperoptic logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Hertford Road

Hyperoptic are proposing to carry out Utility asset works on Hertford Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 8 Oct 2024 at 00:16.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Wallis Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 11:12.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Wallis Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:20.

London Borough Of Hackney logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2024 at 14:40.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Warren Road

Thames Water are proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 14:51.

London Borough Of Hackney logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Clissold Road

London Borough Of Hackney are proposing to carry out New service connection on Clissold Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Oct 2024 at 10:55.

London Borough Of Hackney logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Clissold Road

London Borough Of Hackney are proposing to carry out New service connection on Clissold Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Oct 2024 at 13:55.

BT logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Stanhope Gardens

BT were proposing to carry out Utility asset works on Stanhope Gardens, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 6 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Aug 2024 at 10:40.

T-Mobile (UK) logo
Between
4 and 9 Nov 2024
Details
View Map
Share
Goodall Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 9 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 19 Sep 2024 at 08:49.

T-Mobile (UK) logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Goodall Road

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 20 Aug 2024 at 13:58.

Thames Water logo
Between
5 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out roadworks on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 11:56.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 07:20.

Thames Water logo
Between
5 and 12 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:43.

Thames Water logo
Between
5 and 11 Nov 2024
Details
View Map
Share
Follow
Acre Lane

Thames Water are proposing to carry out New service connection on Acre Lane, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:24.

London Borough Of Southwark logo
LONG TERM
Between
5 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 10:40.

Vorboss logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Edgware Road

Vorboss are proposing to carry out Utility asset works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vorboss on 15 Aug 2024 at 11:29.

Vorboss logo
Between
5 and 7 Nov 2024
Details
View Map
Share
Follow
Edgware Road

Vorboss are proposing to carry out Utility asset works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vorboss on 28 Aug 2024 at 11:17.

UK Power Networks Eastern & London logo
Between
5 and 18 Nov 2024
Details
View Map
Share
Follow
Tottenham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Aug 2024 at 18:15.

Thames Water logo
Between
5 and 8 Nov 2024
Details
View Map
Share
Follow
Capper Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Capper Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 09:33.

Thames Water logo
Between
6 and 12 Nov 2024
Details
View Map
Share
Henrietta Street

Thames Water were proposing to carry out New service connection on Henrietta Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 12 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 12:04.

UK Power Networks Eastern & London logo
Between
6 and 11 Nov 2024
Details
View Map
Share
Follow
Colebrooke Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colebrooke Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 07:43.

Between
6 and 19 Nov 2024
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 09:03.

Between
6 and 19 Nov 2024
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:16.

Cadent Gas logo
Between
6 and 25 Nov 2024
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are proposing to carry out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:51.

Cadent Gas logo
Between
6 and 25 Nov 2024
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are proposing to carry out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 20:13.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:43.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Turney Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 14:42.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2024 at 16:11.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Calton Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 14:43.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:50.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Court Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 14:44.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Aug 2024 at 14:43.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 10:26.

London Borough Of Southwark logo
Between
6 and 10 Nov 2024
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 30 Oct 2024 at 06:43.

Southern Gas Networks logo
Between
6 and 22 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:28.

Virgin Media logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Black Prince Road

Virgin Media are proposing to carry out Utility asset works on Black Prince Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 14 Aug 2024 at 14:38.

London Borough Of Southwark logo
LONG TERM
Between
7 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 30 Oct 2024 at 14:47.

Thames Water logo
Between
7 and 11 Nov 2024
Details
View Map
Share
Follow
Fords Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:03.

UK Power Networks Eastern & London logo
Between
8 and 15 Nov 2024
Details
View Map
Share
Follow
Cross Keys Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cross Keys Close, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 16:20.

UK Power Networks Eastern & London logo
Between
8 and 15 Nov 2024
Details
View Map
Share
Follow
Cross Keys Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cross Keys Close, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:55.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 10:27.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:03.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 10:51.

London Borough Of Camden logo
LONG TERM
Between
8 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:21.

London Borough Of Camden logo
LONG TERM
Between
8 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 16 Oct 2024 at 09:56.

Transport for London (TfL) logo
Between
8 and 9 Nov 2024
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 9 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 16:09.

Between
9 and 17 Nov 2024
Details
View Map
Share
Follow
Greenwich Church Street

Abovenet Communications UK are proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 20 Aug 2024 at 10:05.

Between
9 and 17 Nov 2024
Details
View Map
Share
Follow
Greenwich Church Street

Abovenet Communications UK are proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 2 Sep 2024 at 13:37.

Virgin Media logo
Between
9 and 12 Nov 2024
Details
View Map
Share
Follow
Black Prince Road

Virgin Media are proposing to carry out Utility asset works on Black Prince Road, Brixton Rush Common, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 12 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 16 Aug 2024 at 15:51.

London Borough Of Southwark logo
Between
9 and 10 Nov 2024
Details
View Map
Share
Follow
Deal Porter Square

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 November 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Aug 2024 at 18:31.

Thames Water logo
LONG TERM
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are proposing to carry out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:35.

UK Power Networks Eastern & London logo
Between
11 and 24 Nov 2024
Details
View Map
Share
Follow
Cubitt Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cubitt Terrace, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:41.

Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Paradise Road

GTC Pipelines are proposing to carry out Utility asset works on Paradise Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 17 Oct 2024 at 09:23.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:53.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:48.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 13:55.

London Borough Of Lambeth logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 18 Sep 2024 at 09:27.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:26.

Thames Water logo
Between
11 and 14 Nov 2024
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:13.

London Borough Of Lambeth logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Wincott Street

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wincott Street, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Jul 2024 at 07:34.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Redriff Road

Thames Water are proposing to carry out Utility asset works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:52.

Thames Water logo
LONG TERM
Between
11 Nov 2024 and 4 Mar 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:55.

London Borough Of Southwark logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Follow
Webster Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Webster Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 30 Oct 2024 at 12:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Archangel Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Archangel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2024 at 16:30.

Murphy Power Distribution logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 17 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:11.

London Borough Of Lambeth logo
LONG TERM
Between
11 Nov 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.

Between
11 and 22 Nov 2024
Details
View Map
Share
White Horse Street

Squire Energy were proposing to carry out Statutory Infrastructure Works on White Horse Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Squire Energy on 16 Oct 2024 at 10:12.

London Borough Of Southwark logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:49.

London Borough Of Southwark logo
Between
11 and 28 Nov 2024
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:49.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:47.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:53.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Pellerin Road

London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:00.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Boleyn Road

London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:58.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:57.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:55.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Warren Road

Thames Water were proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:43.

Thames Water logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Greenwood Place

Thames Water are proposing to carry out New service connection on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:18.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:48.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:54.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Barretts Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:56.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
East India Dock Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 07:13.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
East India Dock Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 14:31.

Cadent Gas logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Basinghall Avenue

Cadent Gas are proposing to carry out Utility asset works on Basinghall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:10.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Thayer Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 11:44.

City Of London Telecomms logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Moorgate

City Of London Telecomms were proposing to carry out Utility asset works on Moorgate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 07:47.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:34.

UK Power Networks Eastern & London logo
Between
11 and 19 Nov 2024
Details
View Map
Share
Cross Keys Close

UK Power Networks Eastern & London were proposing to carry out New service connection on Cross Keys Close, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:41.

UK Power Networks Eastern & London logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Cleveland Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Cleveland Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 09:41.

Thames Water logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:54.

Virgin Media logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Sycamore Street

Virgin Media are proposing to carry out Utility asset works on Sycamore Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 7 Aug 2024 at 08:21.

Thames Water logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:16.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Bryant Street

Thames Water are proposing to carry out Utility asset works on Bryant Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:32.

Thames Water logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Kingsland Road

Thames Water were proposing to carry out Utility repair and maintenance works on Kingsland Road, Hackney, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:18.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 19:03.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 07:13.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 09:54.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 07:14.

London Borough Of Hackney logo
LONG TERM
Between
11 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
London Fields West Side

London Borough Of Hackney are proposing to carry out Highway improvement works on London Fields West Side, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 23 Oct 2024 at 10:01.

London Borough Of Hackney logo
LONG TERM
Between
11 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 23 Oct 2024 at 10:06.

London Borough Of Hackney logo
LONG TERM
Between
11 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Greenwood Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Greenwood Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 23 Oct 2024 at 10:10.

London Borough Of Camden logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Camden Square

London Borough Of Camden are proposing to carry out Highway improvement works on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 11:55.

London Borough Of Camden logo
Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 Sep 2024 at 17:15.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 07:12.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
King Henry's Walk

London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:14.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Grove North

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
St Jude Street

London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Queen Margaret's Grove

London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:15.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:18.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:13.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Crossway

London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:12.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Wolsey Road

London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:20.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Road

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:19.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Mildmay Park

London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:50.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Shellgrove Road

London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:11.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:49.

City Of Westminster logo
Between
12 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Little Newport Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Little Newport Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 27 Aug 2024 at 06:13.

Vodafone logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Great Trinity Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Great Trinity Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 28 Aug 2024 at 11:58.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Bethell Avenue

Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:22.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Kimberley Road

Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:21.

Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Golden Lane

London Borough Of Islington are proposing to carry out Highway improvement works on Golden Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Oct 2024 at 09:28.

Thames Water logo
Between
12 and 23 Nov 2024
Details
View Map
Share
Follow
Nelson Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Nelson Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Canonbury Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Canonbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:17.

Royal Borough Of Greenwich logo
Between
12 Nov and 9 Dec 2024
Details
View Map
Share
Follow
John Harrison Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.

Thames Water logo
Between
12 and 25 Nov 2024
Details
View Map
Share
Follow
Great Suffolk Street

Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 06:48.

LONG TERM
Between
13 Nov and 22 Dec 2024
Details
View Map
Share
Follow
New Cross Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 14:36.

Hyperoptic logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Claylands Road

Hyperoptic were proposing to carry out Utility asset works on Claylands Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 15 Aug 2024 at 10:44.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility asset works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 10:33.

BT logo
Between
13 and 15 Nov 2024
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Oct 2024 at 07:35.

Thames Water logo
Between
14 and 17 Nov 2024
Details
View Map
Share
Follow
Camden Road

Thames Water are proposing to carry out Utility repair and maintenance works on Camden Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 10:23.

UK Power Networks Eastern & London logo
Between
15 and 19 Nov 2024
Details
View Map
Share
Follow
Rufus Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Rufus Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 22:57.

UK Power Networks Eastern & London logo
Between
15 and 19 Nov 2024
Details
View Map
Share
Follow
Rufus Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Rufus Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 12:33.

BT logo
Between
15 and 19 Nov 2024
Details
View Map
Share
Follow
Waterloo Terrace

BT are proposing to carry out Utility asset works on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Aug 2024 at 10:20.

UK Power Networks Eastern & London logo
Between
15 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Thorne Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thorne Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 14:57.

Transport for London (TfL) logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 10:09.

Thames Water logo
Between
16 and 22 Nov 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:45.

Network Rail logo
Between
16 and 18 Nov 2024
Details
View Map
Share
Charlton Lane

Network Rail were proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 18 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 11:22.

Thames Water logo
Between
16 and 18 Nov 2024
Details
View Map
Share
Follow
Elder Street

Thames Water are proposing to carry out Utility repair and maintenance works on Elder Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 16:36.

Thames Water logo
Between
17 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Law Street

Thames Water are proposing to carry out Utility repair and maintenance works on Law Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 08:54.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 07:23.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Bramhope Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.

Thames Tideway Tunnel logo
Between
18 and 23 Nov 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 11:26.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:04.

Network Rail logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Sail Street

Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 09:18.

Network Rail logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Lambeth Road

Network Rail are proposing to carry out Works for Rail Purposes on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jul 2024 at 14:48.

Network Rail logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Lambeth Road

Network Rail are proposing to carry out Works for Rail Purposes on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 08:30.

London Borough Of Southwark logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Tanner Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Tanner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Sep 2024 at 12:21.

Transport for London (TfL) logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 15:03.

Murphy Power Distribution logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 24 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:17.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Warwick House Street

Abovenet Communications UK are proposing to carry out Utility asset works on Warwick House Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Abovenet Communications UK on 18 Sep 2024 at 07:52.

Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Warwick House Street

Abovenet Communications UK are proposing to carry out Utility asset works on Warwick House Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Abovenet Communications UK on 4 Oct 2024 at 09:41.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 08:55.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Duke Street St James's

Thames Water are proposing to carry out Disconnection or alteration of supply on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:34.

Thames Water logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
New Row

Thames Water are proposing to carry out New service connection on New Row, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 14:33.

Thames Water logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Follow
New Row

Thames Water are proposing to carry out New service connection on New Row, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 08:30.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Wardour Street

Thames Water were proposing to carry out New service connection on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 13:10.

City Of London Corporation logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Little Trinity Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Little Trinity Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 23 Oct 2024 at 10:23.

City Of London Corporation logo
LONG TERM
Between
18 Nov 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Little Trinity Lane

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Little Trinity Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 26 Oct 2024 at 11:14.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Henrietta Street

Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:49.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Henrietta Street

Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 09:17.

Thames Water logo
Between
18 and 25 Nov 2024
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:42.

Thames Water logo
Between
18 and 25 Nov 2024
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:08.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:12.

Cadent Gas logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Queen Victoria Street

Cadent Gas were proposing to carry out Utility asset works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:34.

Vodafone logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Bridle Lane

Vodafone are proposing to carry out New service connection on Bridle Lane, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 12 Sep 2024 at 13:11.

Vodafone logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Bridle Lane

Vodafone are proposing to carry out New service connection on Bridle Lane, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 29 Oct 2024 at 12:50.

Virgin Media logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Essex Street

Virgin Media are proposing to carry out Utility asset works on Essex Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 14 Oct 2024 at 08:26.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 12:09.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:53.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Marshall Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Marshall Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 13:07.

City Of Westminster logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Berwick Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 08:26.

City Of Westminster logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Berwick Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 Oct 2024 at 10:52.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Princes Street

Thames Water are proposing to carry out New service connection on Princes Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 15:03.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Princes Street

Thames Water are proposing to carry out New service connection on Princes Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:00.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Wigmore Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wigmore Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:40.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Hatton Garden

Cadent Gas are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 18:31.

Cadent Gas logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
Hatton Garden

Cadent Gas are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 17:45.

City Of Westminster logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Mortimer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Sep 2024 at 13:42.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Stepney Green

Thames Water are proposing to carry out Utility repair and maintenance works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 16:27.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Stepney Green

Thames Water are proposing to carry out Utility repair and maintenance works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 07:57.

Thames Water logo
Between
18 and 22 Nov 2024
Details
View Map
Share
Follow
Adpar Street

Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:17.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Gower Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Gower Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:26.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Gordon Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Gordon Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:23.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Upper Woburn Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Woburn Place, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Upper Woburn Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Woburn Place, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:14.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Endsleigh Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:47.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Endsleigh Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:30.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:59.

Transport for London (TfL) logo
LONG TERM
Between
18 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Oct 2024 at 08:19.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Ford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:44.

Thames Water logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Old Ford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 10:50.

Thames Water logo
Between
18 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Crestfield Street

Thames Water are proposing to carry out New service connection on Crestfield Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:21.

Hyperoptic logo
Between
18 and 20 Nov 2024
Details
View Map
Share
Rona Walk

Hyperoptic were proposing to carry out Utility asset works on Rona Walk, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Aug 2024 at 09:10.

LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 28 Oct 2024 at 14:57.

Thames Water logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 07:36.

Thames Water logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 10:47.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Follow
Elm Park Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Elm Park Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 15:07.

Network Rail logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Highgate Road

Network Rail are proposing to carry out Works for Rail Purposes on Highgate Road, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Aug 2024 at 10:53.

Hyperoptic logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Japan Crescent

Hyperoptic are proposing to carry out Utility asset works on Japan Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 17 Oct 2024 at 07:44.

Hyperoptic logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Japan Crescent

Hyperoptic are proposing to carry out Utility asset works on Japan Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 16 Aug 2024 at 10:21.

Network Rail logo
Between
19 and 22 Nov 2024
Details
View Map
Share
Follow
Highgate Road

Network Rail are proposing to carry out Works for Rail Purposes on Highgate Road, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 15:00.

BT logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Follow
Irving Street

BT are proposing to carry out Utility asset works on Irving Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2024 at 15:05.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.

Virgin Media logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Tottenham Court Road

Virgin Media were proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Sep 2024 at 15:53.

Virgin Media logo
Between
19 and 21 Nov 2024
Details
View Map
Share
Sycamore Street

Virgin Media were proposing to carry out Utility asset works on Sycamore Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 Oct 2024 at 10:57.

Between
20 Nov and 3 Dec 2024
Details
View Map
Share
Dyson Road

London Borough Of Newham were proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 11:54.

Between
20 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 13:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 09:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 14:12.

Thames Water logo
Between
20 and 25 Nov 2024
Details
View Map
Share
Smith Street

Thames Water were proposing to carry out New service connection on Smith Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 13:48.

Thames Water logo
Between
20 and 25 Nov 2024
Details
View Map
Share
Follow
Smith Street

Thames Water are proposing to carry out New service connection on Smith Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:10.

BT logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Gillingham Row

BT are proposing to carry out Utility repair and maintenance works on Gillingham Row, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Sep 2024 at 15:05.

BT logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Gillingham Row

BT are proposing to carry out Utility repair and maintenance works on Gillingham Row, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:09.

City Of Westminster logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Whitehall Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Whitehall Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Oct 2024 at 15:40.

City Of Westminster logo
Between
20 and 22 Nov 2024
Details
View Map
Share
Follow
Whitehall Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Whitehall Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 10:02.

Virgin Media logo
Between
20 Nov and 4 Dec 2024
Details
View Map
Share
Stanhope Gate

Virgin Media were proposing to carry out Utility asset works on Stanhope Gate, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Aug 2024 at 15:19.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 21 Oct 2024 at 12:08.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:32.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 18 Oct 2024 at 08:11.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 10:38.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Oct 2024 at 13:23.

Electricity Network Company logo
Between
21 Nov and 4 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 12:07.

Thames Water logo
Between
21 and 25 Nov 2024
Details
View Map
Share
Follow
Warren Street

Thames Water are proposing to carry out Remedial works on Warren Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 07:46.

London Borough Of Hackney logo
Between
21 and 27 Nov 2024
Details
View Map
Share
Follow
Martello Terrace

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Martello Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Aug 2024 at 13:42.

UK Power Networks Eastern & London logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Wandsworth Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Aug 2024 at 14:52.

London Borough Of Southwark logo
LONG TERM
Between
22 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Hatcham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Nov 2024 and 5 Jan 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 09:21.

Cadent Gas logo
Between
23 and 28 Nov 2024
Details
View Map
Share
Follow
Dean Street

Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 08:30.

Cadent Gas logo
Between
23 and 28 Nov 2024
Details
View Map
Share
Follow
Dean Street

Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:18.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Farringdon Road

Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:38.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Farringdon Road

Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 17:41.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Baker's Row

Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:29.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Baker's Row

Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:23.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Baker's Row

Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:39.

Thames Water logo
Between
23 and 25 Nov 2024
Details
View Map
Share
Follow
Baker's Row

Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 07:45.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
South Audley Street

Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:39.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Reeves Mews

Thames Water were proposing to carry out New service connection on Reeves Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 08:16.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Denman Street

Thames Water are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:57.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Denman Street

Thames Water are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:22.

Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bruton Place

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 25 Sep 2024 at 13:43.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Wardour Street

Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:09.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Remedial works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:10.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Wardour Street

Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:11.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Remedial works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:12.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
D'arblay Street

Thames Water were proposing to carry out New service connection on D'arblay Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:31.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Dean Street

Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:09.

Cadent Gas logo
Between
25 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Dean Street

Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:49.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Thayer Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:16.

City Of Westminster logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Mortimer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Oct 2024 at 11:38.

City Of Westminster logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Mortimer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 10:59.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:05.

Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Albany Street

G. Network Communications are proposing to carry out Remedial works on Albany Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 14 Oct 2024 at 14:25.

City Of London Telecomms logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Lever Street

City Of London Telecomms are proposing to carry out Utility repair and maintenance works on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Oct 2024 at 07:48.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:21.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Cumberland Gardens

Thames Water are proposing to carry out New service connection on Cumberland Gardens, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:50.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Regan Way

Thames Water were proposing to carry out New service connection on Regan Way, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 11:35.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Regan Way

Thames Water are proposing to carry out New service connection on Regan Way, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 12:28.

UK Power Networks Eastern & London logo
Between
25 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Coombs Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coombs Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 11:35.

London Borough Of Camden logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:57.

London Borough Of Camden logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Sep 2024 at 10:53.

Cadent Gas logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Winchester Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Winchester Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:48.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:01.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 17:04.

London Borough Of Lambeth logo
Between
25 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:11.

London Borough Of Lambeth logo
Between
25 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 15:34.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2024 at 10:02.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Calvert Road

Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 05:44.

Thames Tideway Tunnel logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 29 Oct 2024 at 15:22.

London Borough Of Lambeth logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Reedworth Street

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Reedworth Street, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Jul 2024 at 07:36.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Quebec Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Dec 2023 at 14:51.

LONG TERM
Between
25 Nov 2024 and 5 Apr 2025
Details
View Map
Share
Follow
Manilla Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Oct 2024 at 16:56.

Transport for London (TfL) logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Knightsbridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 14:29.

Murphy Power Distribution logo
Between
25 Nov and 1 Dec 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:29.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Park Street

Thames Water were proposing to carry out New service connection on Park Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:43.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Park Street

Thames Water were proposing to carry out New service connection on Park Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:40.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Cockspur Street

Abovenet Communications UK are proposing to carry out Utility asset works on Cockspur Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Abovenet Communications UK on 18 Sep 2024 at 07:54.

Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Cockspur Street

Abovenet Communications UK are proposing to carry out Utility asset works on Cockspur Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Abovenet Communications UK on 4 Oct 2024 at 09:42.

BT logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
West Bank

BT are proposing to carry out Utility asset works on West Bank, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 12:14.

Hyperoptic logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Little Green Street

Hyperoptic are proposing to carry out Utility asset works on Little Green Street, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 14 Oct 2024 at 18:10.

UK Power Networks Eastern & London logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Quernmore Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Quernmore Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:49.

BT logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 14:53.

BT logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 14:52.

Hyperoptic logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Highgate Road

Hyperoptic are proposing to carry out Utility asset works on Highgate Road, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 22 Oct 2024 at 15:52.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:44.

Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Oct 2024 at 10:19.

Thames Water logo
Between
26 and 30 Nov 2024
Details
View Map
Share
Follow
Bourdon Street

Thames Water are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 12:02.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Northdown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 09:45.

Thames Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Vivian Road

Thames Water are proposing to carry out Permanent reinstatement on Vivian Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 15:53.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Charlton Place

Thames Water are proposing to carry out New service connection on Charlton Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:08.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brownlow Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Scriven Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Scriven Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:31.

London Borough Of Hackney logo
LONG TERM
Between
26 Nov 2024 and 30 Jan 2025
Details
View Map
Share
Follow
Shrubland Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Shrubland Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:28.

City Of Westminster logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Westbourne Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Sep 2024 at 15:05.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Oct 2024 at 11:56.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

London Borough Of Lambeth logo
Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Thorncliffe Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:14.

London Borough Of Lambeth logo
Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 23 Oct 2024 at 15:12.

Between
28 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bradfield Road

Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 5 Sep 2024 at 12:59.

On
29 Nov 2024
Details
View Map
Share
Portia Way

NWP Street (formerly New World Payphones) were proposing to carry out Utility asset works on Portia Way, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 29 November 2024 The works were due to impact the footway and carriageway.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 11 Oct 2024 at 15:27.

UK Power Networks Eastern & London logo
Between
29 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Emerald Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 15:53.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Farringdon Road

Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:41.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Farringdon Road

Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:39.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Baker's Row

Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:22.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Baker's Row

Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:26.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Baker's Row

Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:39.

Thames Water logo
Between
29 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Baker's Row

Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 07:45.

Thames Water logo
Between
30 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:46.

Between
30 Nov and 8 Dec 2024
Details
View Map
Share
Greenwich Church Street

Abovenet Communications UK were proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 1 Oct 2024 at 10:05.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Lee High Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:50.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

UK Power Networks Eastern & London logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:48.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 13 Feb 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 13 Feb 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.

UK Power Networks Eastern & London logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:03.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Pavilion Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Pavilion Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:51.

Transport for London (TfL) logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 15:06.

Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:42.

Cadent Gas logo
Between
2 and 16 Dec 2024
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 13:01.

Cadent Gas logo
Between
2 and 15 Dec 2024
Details
View Map
Share
Follow
New Bridge Street

Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:56.

Vorboss logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Goodmans Stile

Vorboss are proposing to carry out Utility repair and maintenance works on Goodmans Stile, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vorboss on 4 Oct 2024 at 10:24.

Cadent Gas logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Plymouth Road

Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:46.

Thames Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Fulbourne Street

Thames Water are proposing to carry out New service connection on Fulbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:54.

Thames Water logo
Between
2 and 10 Dec 2024
Details
View Map
Share
Follow
Fulbourne Street

Thames Water are proposing to carry out New service connection on Fulbourne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:09.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Glasshouse Yard

Thames Water are proposing to carry out Utility repair and maintenance works on Glasshouse Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 07:44.

UK Power Networks Eastern & London logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Devonshire Row Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:39.

UK Power Networks Eastern & London logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
William Road

UK Power Networks Eastern & London are proposing to carry out New service connection on William Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 12:42.

Thames Water logo
Between
2 and 19 Dec 2024
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:15.

Thames Water logo
Between
2 and 19 Dec 2024
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 15:56.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Brewery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brewery Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 14:28.

Thames Water logo
Between
3 and 23 Dec 2024
Details
View Map
Share
Follow
Kingsland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kingsland Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:23.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Remedial works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 08:44.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Albyn Road

Thames Water are proposing to carry out Utility asset works on Albyn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:54.

London Borough Of Southwark logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Notley Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:18.

London Borough Of Southwark logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Notley Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:25.

Royal Borough Of Kensington And Chelsea logo
Between
4 and 14 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 14:57.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Cheval Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Cheval Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:18.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Rutland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rutland Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:19.

City Of Westminster logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Fairholt Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Fairholt Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:20.

ESP Electricity logo
Between
5 and 11 Dec 2024
Details
View Map
Share
Follow
Bramwell Place

ESP Electricity are proposing to carry out Utility asset works on Bramwell Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 12 Sep 2024 at 15:03.

Electricity Network Company logo
Between
5 and 18 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 12:49.

Transport for London (TfL) logo
Between
5 and 25 Dec 2024
Details
View Map
Share
Follow
Tower Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 12:14.

Transport for London (TfL) logo
Between
5 and 25 Dec 2024
Details
View Map
Share
Follow
Tower Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 10:01.

Transport for London (TfL) logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:03.

Transport for London (TfL) logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:08.

Thames Water logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Kings Scholars' Passage

Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:38.

Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
Bradfield Road

Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 13 Sep 2024 at 11:36.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:57.

London Borough Of Hackney logo
LONG TERM
Between
6 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:58.

Thames Water logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:03.

Thames Water logo
Between
7 and 15 Dec 2024
Details
View Map
Share
Prince's Street

Thames Water were proposing to carry out New service connection on Prince's Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:23.

Thames Water logo
Between
7 and 15 Dec 2024
Details
View Map
Share
Follow
Prince's Street

Thames Water are proposing to carry out New service connection on Prince's Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 17:19.

Cadent Gas logo
Between
7 and 21 Dec 2024
Details
View Map
Share
Brushfield Street

Cadent Gas were proposing to carry out Utility asset works on Brushfield Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:48.

Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Carr Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Carr Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Sep 2024 at 11:13.

Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Settles Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Settles Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Sep 2024 at 11:32.

Thames Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Great Winchester Street

Thames Water are proposing to carry out New service connection on Great Winchester Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:59.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Cock Lane

Cadent Gas are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:31.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Fulbourne Street

Thames Water were proposing to carry out New service connection on Fulbourne Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 14:58.

Cadent Gas logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Bale Road

Cadent Gas are proposing to carry out New service connection on Bale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:12.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Clerkenwell Road

London Borough Of Islington are proposing to carry out Highway improvement works on Clerkenwell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:14.

UK Power Networks Eastern & London logo
Between
9 and 18 Dec 2024
Details
View Map
Share
Mount Pleasant

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 08:10.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Coopers Close

Thames Water are proposing to carry out roadworks on Coopers Close, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:32.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:22.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Golden Lane

London Borough Of Islington are proposing to carry out Highway improvement works on Golden Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:25.

Network Rail logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Devons Road

Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Sep 2024 at 15:36.

Network Rail logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Devons Road

Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:37.

Between
9 and 13 Dec 2024
Details
View Map
Share
Central Street

London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:03.

City Of Westminster logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Oct 2024 at 11:45.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bancroft Road

Thames Water are proposing to carry out New service connection on Bancroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 14:16.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bancroft Road

Thames Water are proposing to carry out New service connection on Bancroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:12.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 09:45.

Thames Water logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:49.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Cloudesley Place

London Borough Of Islington are proposing to carry out Highway improvement works on Cloudesley Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:18.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.

Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:02.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:05.

London Borough Of Camden logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Sep 2024 at 12:17.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grange Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Grange Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:23.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Low Hall Lane

Thames Water were proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:44.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:07.

Between
9 and 13 Dec 2024
Details
View Map
Share
Stroud Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Stroud Green Road, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 13:58.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 9 Sep 2024 at 07:55.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.

Southern Gas Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.

London Borough Of Lambeth logo
LONG TERM
Between
9 Dec 2024 and 6 Feb 2025
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:39.

London Borough Of Lambeth logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:40.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Dec 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:38.

LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.

LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Oct 2024 at 11:39.

Virgin Media logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Hans Place

Virgin Media are proposing to carry out Utility asset works on Hans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Sep 2024 at 14:06.

Murphy Power Distribution logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Copperfield Street

Murphy Power Distribution are proposing to carry out New service connection on Copperfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Oct 2024 at 11:32.

London Borough Of Southwark logo
LONG TERM
Between
10 Dec 2024 and 25 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
10 Dec 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Miles Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:13.

City Of Westminster logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Savoy Hill

City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Hill, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 09:59.

City Of Westminster logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Savoy Way

City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Way, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 09:59.

BT logo
Between
10 and 19 Dec 2024
Details
View Map
Share
Follow
Chamber Street

BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Oct 2024 at 00:39.

BT logo
Between
10 and 19 Dec 2024
Details
View Map
Share
Follow
Chamber Street

BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:33.

BT logo
Between
10 and 25 Dec 2024
Details
View Map
Share
Agar Grove

BT were proposing to carry out Utility asset works on Agar Grove, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 December 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by BT on 9 Sep 2024 at 12:37.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

Thames Water are carrying out Utility repair and maintenance works on Stroud Green Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:10 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2024 at 14:17.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 15:57.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 16:05.

Vorboss logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Goodmans Stile

Vorboss are proposing to carry out Utility repair and maintenance works on Goodmans Stile, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vorboss on 26 Sep 2024 at 11:25.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
London Fields West Side

London Borough Of Hackney are proposing to carry out Highway improvement works on London Fields West Side, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:53.

London Borough Of Hackney logo
Between
11 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eleanor Road (North)

London Borough Of Hackney are proposing to carry out Highway improvement works on Eleanor Road (North), Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:36.

London Borough Of Hackney logo
LONG TERM
Between
11 Dec 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Greenwood Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Greenwood Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Oct 2024 at 09:02.

BT logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Follow
Great Castle Street

BT are proposing to carry out Utility asset works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 14:06.

London Borough Of Hackney logo
LONG TERM
Between
13 Dec 2024 and 14 Jan 2025
Details
View Map
Share
Follow
Richmond Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:24.

Thames Water logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Low Hall Lane

Thames Water are proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:54.

Transport for London (TfL) logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:06.

Transport for London (TfL) logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:08.

Virgin Media logo
Between
13 and 16 Dec 2024
Details
View Map
Share
Borough High Street

Virgin Media were proposing to carry out Utility asset works on Borough High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Aug 2024 at 15:14.

Network Rail logo
Between
14 and 16 Dec 2024
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:14.

Thames Tideway Tunnel logo
LONG TERM
Between
14 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Bermondsey Wall East

Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Bermondsey Wall East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.

Thames Tideway Tunnel logo
LONG TERM
Between
14 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Loftie Street

Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Loftie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.

London Borough Of Camden logo
Between
15 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Wren Street

London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
Between
15 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
Frederick Street

London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Denman Street

Thames Water were proposing to carry out New service connection on Denman Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 15:56.

Thames Water logo
Between
16 and 22 Dec 2024
Details
View Map
Share
Fulbourne Street

Thames Water were proposing to carry out New service connection on Fulbourne Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:37.

Between
16 and 20 Dec 2024
Details
View Map
Share
Central Street

London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:12.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Central Street

London Borough Of Islington are proposing to carry out Highway improvement works on Central Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 07:46.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
New North Road

London Borough Of Islington are proposing to carry out Highway improvement works on New North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:46.

Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Baring Street

London Borough Of Islington are proposing to carry out Highway improvement works on Baring Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:44.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
St Pancras Way

Network Rail were proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 11:07.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Sep 2024 at 18:04.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.

Thames Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Horseferry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 09:38.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Lambeth Walk

Thames Water were proposing to carry out New service connection on Lambeth Walk, Kennington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 13:47.

Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boxley Street

London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.

BT logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Fletcher Lane

BT are proposing to carry out Utility repair and maintenance works on Fletcher Lane, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 29 Oct 2024 at 13:35.

Virgin Media logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
High Street

Virgin Media are proposing to carry out Remedial works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 15:27.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:39.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:05.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:29.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:46.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:07.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:23.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Oct 2024 at 14:38.

UK Power Networks Eastern & London logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Sondes Street

UK Power Networks Eastern & London were proposing to carry out roadworks on Sondes Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:16.

UK Power Networks Eastern & London logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Sondes Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sondes Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Sep 2024 at 14:35.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.

Thames Water logo
Between
18 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Cole Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cole Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 13:35.

Network Rail logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Camden Square

Network Rail are proposing to carry out Works for Rail Purposes on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:17.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.

Thames Water logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Bruton Place

Thames Water were proposing to carry out New service connection on Bruton Place, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:15.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Dunlace Road

Thames Water are proposing to carry out New service connection on Dunlace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:33.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Carlyle Square

Thames Water were proposing to carry out New service connection on Carlyle Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 30 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 13:12.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:56.

ESP Electricity logo
Between
24 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 10:14.

ESP Electricity logo
Between
26 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 11:49.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 16:46.

BT logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility asset works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 26 Sep 2024 at 07:52.

BT logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Green Lanes

BT were proposing to carry out Utility asset works on Green Lanes, Hornsey, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Oct 2024 at 08:35.

BT logo
Between
30 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Grosvenor Avenue

BT are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Oct 2024 at 10:12.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 16:22.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
York Mews

Thames Water were proposing to carry out New service connection on York Mews, Kentish Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:25.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Bewdley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bewdley Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 07:31.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:00.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:47.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:48.

London Borough Of Lambeth logo
LONG TERM
Between
3 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crownstone Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.

Transport for London (TfL) logo
Between
3 and 5 Jan 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:07.

Transport for London (TfL) logo
Between
3 and 5 Jan 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:08.

ESP Electricity logo
Between
4 and 12 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 14:12.

Cadent Gas logo
LONG TERM
Between
5 Jan and 16 Mar 2025
Details
View Map
Share
Follow
New Bridge Street

Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:16.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Upper Thames Street

Virgin Media were proposing to carry out Utility asset works on Upper Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.

This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:14.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
South Audley Street

Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:05.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:50.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 15:52.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bruton Place

Thames Water are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:51.

City Of Westminster logo
Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Charing Cross Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Oct 2024 at 13:12.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Freemasons Road

Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:30.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Vine Street

Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 14 Oct 2024 at 15:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 22 Mar 2025
Details
View Map
Share
Follow
New Bridge Street

Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 12:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 22 Mar 2025
Details
View Map
Share
Follow
Tudor Street

Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:53.

City Of Westminster logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Strand

City Of Westminster are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Oct 2024 at 15:39.

UK Power Networks Eastern & London logo
Between
6 and 28 Jan 2025
Details
View Map
Share
Follow
Old Compton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:13.

UK Power Networks Eastern & London logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Old Compton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 15:35.

UK Power Networks Eastern & London logo
Between
6 and 28 Jan 2025
Details
View Map
Share
Follow
Frith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:10.

UK Power Networks Eastern & London logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Frith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 15:36.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:38.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
New Bond Street

Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 10:15.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
New Bond Street

Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 26 Sep 2024 at 14:14.

Murphy Power Distribution logo
LONG TERM
Between
6 Jan and 6 Mar 2025
Details
View Map
Share
Great Chapel Street

Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 09:12.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Henrietta Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 13:28.

UK Power Networks Eastern & London logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Henrietta Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 12:21.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:24.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Wimpole Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Wimpole Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2024 at 17:47.

City Of London Telecomms logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Great Castle Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:31.

City Of London Telecomms logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Great Castle Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 23 Oct 2024 at 08:11.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Barking Road

Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Wodeham Gardens

London Borough Of Tower Hamlets were proposing to carry out roadworks on Wodeham Gardens, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 11:14.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:21.

LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:22.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:50.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:10.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Woodside Road

BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:07.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:47.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Howland Street

Virgin Media were proposing to carry out Utility asset works on Howland Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Sep 2024 at 09:04.

Thames Water logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:04.

Thames Water logo
LONG TERM
Between
6 Jan and 25 May 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:30.

Thames Water logo
LONG TERM
Between
6 Jan and 24 May 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 14:05.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out roadworks on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:04.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:03.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:45.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Portland Place

Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:59.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:35.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Mount Pleasant

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 18:12.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Roger Street

London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 May 2025
Details
View Map
Share
Follow
Roger Street

London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:36.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.

Thames Water logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Maida Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Maida Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:20.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 May 2025
Details
View Map
Share
Follow
Compton Street

Cadent Gas are proposing to carry out Utility asset works on Compton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:34.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dongola Road

BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 17 May 2025
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are proposing to carry out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:30.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:06.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Between
6 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dove Road

London Borough Of Islington are proposing to carry out Highway improvement works on Dove Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 25 Sep 2024 at 09:36.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cottage Grove

Thames Water are proposing to carry out New service connection on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:52.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Boyne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:57.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Deptford Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Alpha Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Carroun Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 08:15.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Carroun Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Wyndcliff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 16:08.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ebury Street

Stark Infra – Electric are proposing to carry out Utility asset works on Ebury Street, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Stark Infra – Electric on 11 Oct 2024 at 19:01.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Alexander Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Feb 2025
Details
View Map
Share
Great College Street

Cadent Gas were proposing to carry out Utility asset works on Great College Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 15 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.

UK Power Networks Eastern & London logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:43.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Storey's Gate

Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Matthew Parker Street

Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:54.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tanner Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 08:28.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Gray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:14.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 11 Sep 2024 at 09:49.

City Of London Telecomms logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Half Moon Street

City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 1 Oct 2024 at 11:13.

City Of London Telecomms logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Half Moon Street

City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 8 Oct 2024 at 08:33.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Oct 2024 at 12:05.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
South Street

Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 11:42.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Jermyn Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 07:22.

Virgin Media logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Lower Thames Street

Virgin Media were proposing to carry out Utility asset works on Lower Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.

This roadwork event was last updated by Virgin Media on 25 Oct 2024 at 10:26.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dames Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dames Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 13:37.

City Of London Telecomms logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Pickard Street

City Of London Telecomms were proposing to carry out Utility asset works on Pickard Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 25 Sep 2024 at 11:47.

Virgin Media logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brandon Road

Virgin Media are proposing to carry out Utility asset works on Brandon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2024 at 07:48.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:55.

City Of Westminster logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Trafalgar Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 07:59.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:36.

City Of Westminster logo
Between
9 and 15 Jan 2025
Details
View Map
Share
Follow
Coventry Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2024 at 13:13.

UK Power Networks Eastern & London logo
Between
9 and 29 Jan 2025
Details
View Map
Share
Follow
Dean Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:23.

UK Power Networks Eastern & London logo
Between
9 and 24 Jan 2025
Details
View Map
Share
Follow
Dean Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 15:38.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.

Cadent Gas logo
Between
10 and 23 Jan 2025
Details
View Map
Share
Follow
Fenchurch Avenue

Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:30.

Cadent Gas logo
Between
10 and 23 Jan 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 11:30.

Cadent Gas logo
Between
10 and 30 Jan 2025
Details
View Map
Share
Follow
Gresham Street

Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:52.

Cadent Gas logo
Between
10 and 30 Jan 2025
Details
View Map
Share
Follow
Foster Lane

Cadent Gas are proposing to carry out Utility asset works on Foster Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:34.

Cadent Gas logo
Between
10 and 30 Jan 2025
Details
View Map
Share
Follow
Gresham Street

Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:06.

Cadent Gas logo
Between
10 and 30 Jan 2025
Details
View Map
Share
Follow
St Martin's-le-grand

Cadent Gas are proposing to carry out Utility asset works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:09.

UK Power Networks Eastern & London logo
Between
10 and 17 Jan 2025
Details
View Map
Share
Follow
Emerald Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 18:02.

Thames Water logo
Between
10 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Clapham Park Road

Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 13:14.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:39.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 13:55.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 08:37.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 11:42.

London Borough Of Southwark logo
LONG TERM
Between
11 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Culvert Road

Thames Water are proposing to carry out New service connection on Culvert Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:25.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sun Lane

Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 06:16.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Sun Lane

Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:14.

Network Rail logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 08:39.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 14:41.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:23.

Cadent Gas logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Smith Terrace

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Smith Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:23.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Wellington Square

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wellington Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:00.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Gerald Road

Hyperoptic are proposing to carry out Utility asset works on Gerald Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 24 Oct 2024 at 14:49.

City Of Westminster logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
St Margaret Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Margaret Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Oct 2024 at 14:01.

City Of Westminster logo
LONG TERM
Between
13 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
LONG TERM
Between
13 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 11:54.

City Of Westminster logo
LONG TERM
Between
13 Jan and 14 Mar 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:13.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
South Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:20.

Thames Water logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Sackville Street

Thames Water were proposing to carry out Highway improvement works on Sackville Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:24.

UK Power Networks Eastern & London logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Jermyn Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 08:46.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Capworth Street

BT are proposing to carry out Utility repair and maintenance works on Capworth Street, Leyton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Oct 2024 at 13:15.

Thames Water logo
Between
13 and 14 Jan 2025
Details
View Map
Share
Follow
Ermine Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ermine Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 16:30.

UK Power Networks Eastern & London logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:47.

UK Power Networks Eastern & London logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 08:00.

City Of London Corporation logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Addle Hill

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:25.

City Of London Corporation logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Addle Hill

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:49.

City Of Westminster logo
LONG TERM
Between
13 Jan and 3 Jun 2025
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Audley Street

Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:32.

Vorboss logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Long Acre

Vorboss are proposing to carry out Utility repair and maintenance works on Long Acre, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vorboss on 17 Oct 2024 at 08:13.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:07.

Thames Water logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Shoe Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Shoe Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:22.

Thames Water logo
Between
13 and 22 Jan 2025
Details
View Map
Share
Follow
Upper North Street

Thames Water are proposing to carry out Utility asset works on Upper North Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:54.

Thames Water logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Great Cumberland Place

Thames Water were proposing to carry out Works for road purposes on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:37.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Commercial Street

Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:30.

Cadent Gas logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Hayne Street

Cadent Gas are proposing to carry out Utility asset works on Hayne Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 14:06.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Cowcross Street

Virgin Media are proposing to carry out Utility asset works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:00.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Cowcross Street

Virgin Media were proposing to carry out Utility asset works on Cowcross Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:04.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Cowcross Street

Cadent Gas are proposing to carry out Remedial works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 07:24.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Turnmill Street

Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:44.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Turnmill Street

Virgin Media are proposing to carry out Utility asset works on Turnmill Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:02.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Turnmill Street

Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:10.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Benjamin Street

Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Oct 2024 at 14:06.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Benjamin Street

Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:46.

UK Power Networks Eastern & London logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Devonshire Row Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:28.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:35.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lisson Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:24.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Charles Square

Thames Water are proposing to carry out New service connection on Charles Square, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:45.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 14:34.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Rawstorne Street

Cadent Gas are proposing to carry out Utility asset works on Rawstorne Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:01.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Rawstorne Street

Cadent Gas are proposing to carry out Utility asset works on Rawstorne Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 07:52.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Paget Street

Cadent Gas are proposing to carry out Utility asset works on Paget Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:01.

Cadent Gas logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Paget Street

Cadent Gas are proposing to carry out Utility asset works on Paget Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 07:52.

City Of London Telecomms logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Hall Street

City Of London Telecomms were proposing to carry out Utility asset works on Hall Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 25 Sep 2024 at 08:08.

Thames Water logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:29.

UK Power Networks Eastern & London logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Remington Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Remington Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:10.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Nelson Place

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Nelson Place, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:09.

UK Power Networks Eastern & London logo
Between
13 and 19 Jan 2025
Details
View Map
Share
Follow
Elia Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Elia Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:07.

UK Power Networks Eastern & London logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Coombs Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coombs Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:06.

UK Power Networks Eastern & London logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Colebrooke Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colebrooke Row, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 10:20.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Charlton Place

Thames Water were proposing to carry out New service connection on Charlton Place, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:14.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:46.

Murphy Power Distribution logo
LONG TERM
Between
14 Jan and 28 Feb 2025
Details
View Map
Share
Great Chapel Street

Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 15:35.

BT logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Durham Road

BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 08:48.

BT logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Gaskin Street

BT are proposing to carry out Utility repair and maintenance works on Gaskin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:17.

UK Power Networks Eastern & London logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Merrow Street

UK Power Networks Eastern & London were proposing to carry out roadworks on Merrow Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:32.

UK Power Networks Eastern & London logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Merrow Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Merrow Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.

City Of Westminster logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Bessborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Oct 2024 at 13:28.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Union Street

Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 11:33.

Network Rail logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Strode Road

Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 11:33.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 09:26.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ronald Avenue

BT are proposing to carry out Utility asset works on Ronald Avenue, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Oct 2024 at 10:29.

London Borough Of Southwark logo
Between
17 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.

Telefonica UK logo
On
18 Jan 2025
Details
View Map
Share
Follow
Gower Street

Telefonica UK are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 18 January 2025 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 30 Oct 2024 at 08:29.

Thames Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
South Audley Street

Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:25.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:17.

Cadent Gas logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:28.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pollen Street

Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:03.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Poppins Court

Thames Water are proposing to carry out Disconnection or alteration of supply on Poppins Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 09:44.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
D'arblay Street

Thames Water are proposing to carry out New service connection on D'arblay Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:52.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:15.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Little Portland Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:43.

Thames Water logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Morwell Street

Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:55.

Thames Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Luxborough Street

Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Rotherfield Street

London Borough Of Islington are proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:26.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:25.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 11:06.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Oct 2024 at 08:03.

LONG TERM
Between
20 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are proposing to carry out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:23.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Adelaide Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 18:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:35.

Transport for London (TfL) logo
Between
20 and 21 Jan 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 09:26.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 12 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 13:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:43.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Wilfred Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Wilfred Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Catherine Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Catherine Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Buckingham Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.

City Of London Telecomms logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Colombo Street

City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 13:22.

Thames Water logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Sackville Street

Thames Water are proposing to carry out Highway improvement works on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:35.

UK Power Networks Eastern & London logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Vine Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 06:43.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
St Georges Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:25.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Holbein Mews

Thames Water are proposing to carry out Utility asset works on Holbein Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:40.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Park Street

Thames Water are proposing to carry out New service connection on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:42.

UK Power Networks Eastern & London logo
Between
21 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Vine Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:38.

UK Power Networks Eastern & London logo
Between
21 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Vine Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:51.

LONG TERM
Between
21 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Cavell Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cavell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 12:26.

LONG TERM
Between
21 Jan and 20 Apr 2025
Details
View Map
Share
Follow
Maples Place

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maples Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Oct 2024 at 12:34.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.

UK Power Networks Eastern & London logo
Between
22 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Grosvenor Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.

UK Power Networks Eastern & London logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Grosvenor Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 14:53.

UK Power Networks Eastern & London logo
Between
22 and 31 Jan 2025
Details
View Map
Share
Follow
Grosvenor Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 10:06.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.

London Borough Of Lambeth logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 11:40.

UK Power Networks Eastern & London logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Burton Grove

UK Power Networks Eastern & London were proposing to carry out roadworks on Burton Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:33.

UK Power Networks Eastern & London logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Burton Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Burton Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:57.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.

Thames Water logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Greenwood Place

Thames Water are proposing to carry out New service connection on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 15:11.

Thames Water logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Regent Street

Thames Water are proposing to carry out Utility repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 13:34.

Thames Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Fords Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:58.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:41.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Warwick Road

London Borough Of Newham are proposing to carry out Highway improvement works on Warwick Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:01.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Atherton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Atherton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Palmerston Road

London Borough Of Newham are proposing to carry out Highway improvement works on Palmerston Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Westbury Road

London Borough Of Newham are proposing to carry out Highway improvement works on Westbury Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.

Thames Water logo
Between
25 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Commercial Street

Thames Water are proposing to carry out New service connection on Commercial Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:06.

Thames Water logo
Between
25 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Wheler Street

Thames Water are proposing to carry out Utility asset works on Wheler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:09.

London Borough Of Lambeth logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.

Thames Water logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Silk Mills Path

Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Follow
Renfrew Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:01.

London Borough Of Southwark logo
LONG TERM
Between
27 Jan and 10 Mar 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.

Network Rail logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sail Street

Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 07:25.

UK Power Networks Eastern & London logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 06:23.

UK Power Networks Eastern & London logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 14:28.

UK Power Networks Eastern & London logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 14:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 13:08.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Whitehall

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 10:52.

Transport for London (TfL) logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Tidal Basin Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.

UK Power Networks Eastern & London logo
Between
27 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 08:12.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wardour Street

Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:04.

City Of London Telecomms logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Brewer Street

City Of London Telecomms are proposing to carry out Utility asset works on Brewer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.

City Of London Telecomms logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Brewer Street

City Of London Telecomms were proposing to carry out Utility asset works on Brewer Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 16 Oct 2024 at 09:32.

City Of London Telecomms logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Wardour Street

City Of London Telecomms are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.

Vodafone logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Binney Street

Vodafone are proposing to carry out Highway repair and maintenance works on Binney Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 23 Oct 2024 at 13:55.

City Of London Telecomms logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Manette Street

City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 14:53.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.

Thames Water logo
Between
27 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Tottenham Court Road

Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 18:14.

Thames Water logo
Between
27 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Tottenham Court Road

Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 08:13.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Waghorn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waghorn Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:49.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 06:40.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kentish Town Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kentish Town Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 14:31.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Canonbury Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Canonbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 06:39.


Roadworks Map near to Ensign Street, LONDON, E1 8JA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 17:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Ensign Street, LONDON, E1 8JA (347 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
CABLE STREET 
(0.2 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 29 Oct 2024 - 31 Oct 2024
0.2
Details
Share
Follow
2
Energy Assets Networks (formerly Utility Distribution Networks) logo
THE HIGHWAY 
(0.2 miles)
Energy Assets Networks (formerly Utility Distribution Networks)
New service connection - Footway - Lane closure
Planned
Scheduled: 21 Oct 2024 - 2 Nov 2024
0.2
Details
Share
Follow
3
Transport for London (TfL) logo
MAJOR
  
THE HIGHWAY 
(0.2 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 21 Aug 2024 - 13 Nov 2024
0.2
Details
Share
Follow
4
Nexfibre Networks Limited logo
THOMAS MORE STREET 
(0.2 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 28 Oct 2024 - 30 Oct 2024
0.2
Details
Share
Follow
5
Transport for London (TfL) logo
MAJOR
  
COMMERCIAL ROAD 
(0.4 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 28 Oct 2024 - 5 Aug 2025
0.4
Details
Share
Follow
6
Vodafone logo
TOWER HILL 
(0.4 miles)
Vodafone
Utility repair and maintenance works - Carriageway - Contra-flow
Complete
28 Oct 2024 08:00 - 29 Oct 2024 19:55
0.4
Details
Share
7
Vodafone logo
TOWER HILL 
(0.4 miles)
Vodafone
Utility repair and maintenance works - Carriageway - Contra-flow
Planned
Scheduled: 28 Oct 2024 - 30 Oct 2024
0.4
Details
Share
Follow
8
Vorboss logo
LEMAN STREET 
(0.4 miles)
Vorboss
New service connection - Footway - No carriageway incursion
Planned
Scheduled: 31 Oct 2024 - 2 Nov 2024
0.4
Details
Share
Follow
9
City Of London Corporation logo
MAJOR
  
AMERICA SQUARE 
(0.4 miles)
City Of London Corporation
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 24 Oct 2022 08:00
(Scheduled: 24 Oct 2022 - 31 Jan 2025)
0.4
Details
Share
Follow
10
Transport for London (TfL) logo
MAJOR
  
COMMERCIAL ROAD 
(0.4 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 24 Nov 2023 - 23 Dec 2024
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data