ROADWORK EVENT SUMMARY
East India Dock Road, Canning Town, London between 1 Oct 2023 and 10 Oct 2025

For local roadworks happening in your street and local area, enter your postcode for a detailed report
Type your postcode

Works Description for East India Dock Road, Canning Town, London

This is a PAA (Provisional Advance Authorisation) permit that has been granted before final details of an activity have been finalised. A full permit will be required before activities can commence.


Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

The information for these works was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.


Share
Follow

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Works Map for East India Dock Road, Canning Town, London

Works Details

WORKS PLANNED
Major (PAA)
Transport for London (TfL) logo
These works are handled by:
Transport for London (TfL)
Transport for London (TfL) logo
Local Authority:
Transport for London (TfL)
Works Reference YG30061690483
Permit Number 01
Place Name East India Dock Road
Canning Town
London
Proposed Start 1 Oct 2023
Proposed End 10 Oct 2025
Actual Start
Actual End
Traffic Management Contra-flow
Impact Carriageway, Verge
Coordinates
Lat, Lon
51.514618
0.004243
Last Updated 25 May 2023 07:39
Contact Details for Activity YG30061690483 (East India Dock Road, Canning Town, London)

In the event that you have an issue with these works, please contact Transport for London (TfL), the works operator.

It would assist the organisation if you quote the work reference number of YG30061690483.

Transport for London (TfL)
Websitehttps://tfl.gov.uk/help-and-contact/contact-us-about-streets-and-other-road-issues
TelephoneTraffic signals faults 020 7941 2010
TelephoneRed Route Issues 020 7343 5000
Works History for Activity YG30061690483 (East India Dock Road, Canning Town, London)
Proposed
Actual
Date
Activity
Start
End
Start
End
Status
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 May 2023
08:38
Permit Submitted
1 Oct 2023
06:00
10 Oct 2025
06:00
Planned
Activity Date
Activity
Proposed Start
Proposed End
Actual Start
Actual End
25 May 2023
08:39
Permit Granted
1 Oct 2023
06:00
10 Oct 2025
06:00
Planned

Works Permits for East India Dock Road, Canning Town, London

+
NCT01a (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date or, in the case of 'immediate works', the start date contained in the application for immediate works and must end by the estimated end date provided on this permit. The proposed start date, actual start date and estimated end date will be as defined.

Applies to all permits.

+
NCT01b (Duration)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence before the proposed start date and must commence within the valid starting window period or in the case of immediate works by the actual start date contained in the application for immediate works. Once the activities have commenced, the activities must take no more than [x number of] days in total to be completed. The proposed start date, actual start date and estimated end date are as defined.

Applies to all permits.

+
NCT02b (Working hours)

For the activities hereby permitted, it is a condition of this permit that, as agreed, the following [extended] working hours will apply at this site from [start time] until [end time] on weekdays and [start time] and [end time] on (Saturday/Sunday/Bank Holiday).

+
NCT04a (Removal of surplus materials/plant)

For the activities hereby permitted, it is a condition of this permit that all remaining excavated or stored backfill materials and/or any unemployed plant must be removed from the public highway within (x hours e.g. 24) or by the stipulated time (e.g. at the end of the working day or prior to the site being un-occupied) due to (stipulate reason for application of condition).

+
NCT04b (Storage of surplus materials/plant)

For the activities hereby permitted, it is a condition of this permit that no materials and/or plant that will not be utilised within the working day are to be stored within or outside of the defined working space from (insert date) until (insert date) due to (stipulate reason for application of condition).

+
NCT07a (Road closed to traffic)

For the activities hereby permitted, it is a condition of this permit that activities shall only take place when [insert road name] or [insert description of the relevant section of the road] is closed to traffic.

+
NCT09a (Changes to traffic management arrangements)

For the activities hereby permitted, it is a condition of this permit that, if there are planned and proposed changes to the traffic management arrangements, the works promoter must notify the authority before these changes are made.

+
NCT09b (Traffic management arrangements to be in place)

For the activities hereby permitted, it is a condition of this permit that the works comprised in [specified part A/B] of the activities hereby permitted shall be subject to and shall occur only when the following traffic management measures are in place [or as attached in schedule.].

+
NCT11a (Display of Permit Number)

For the activities hereby permitted, it is a condition of this permit that activities shall not be carried out unless a site information board(s) displaying the permit reference number is on the site at all times for the duration of the works. This must be displayed in a prominent place at all times so that it may be read easily by the public, clearly displaying the correct permit reference number. For immediate works, the display of the permit reference number is required by 10.00am on the next working day after the works have started on site.

Applies to all permits.

+
NCT11b (Publicity for proposed works)

For the activities hereby permitted, it is a condition of this permit that activities shall not commence unless the promoter has publicised and/or advised all individual properties and businesses [on x roads] setting out where the works will take place; the nature of the works; the duration of the works; the intended start date [etc.] and contact details of a representative of the promoter.

Notes

Proposed Work Dates

Roadworks are planned in advance and sometimes are proposed to run over a number of days. It may well be that the roadworks start after the proposed start date due to bad weather or other operational delays. Equally, works may complete before the proposed end date as the works may have included a few extra days just in case.

Problems with roadworks?

On rare occasions, issues may occur during or after the completion of roadworks, such as:

  • Poor reinstatement of the footpath or the carriageway.
  • Rubbish and mess remaining after the works have completed.
  • Traffic management issues during the works.
  • Equipment left behind after the works have completed.
  • Any other issues or disruption that the works may be causing.

In such instances, you should try and contact the organisation carrying out the works in the first instance. If we have contact details available they are shown on the detailed roadworks page.

In the event that the organistion cannot help, then the local authority that authorised the works may be able to help and again, if their contact details are published then we have provided their contact information on our detailed roadworks page.