ROADWORKS SUMMARY
Thorncliffe Road, LONDON, SW2 4JG
Introduction
View current and future planned roadworks and road closures for Thorncliffe Road, SW2 4JG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Thorncliffe Road, LONDON, SW2 4JG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thorncliffe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2020 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Dec 2024 at 11:40.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.
Monday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.
These works are categorised as Major.
The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.
31 Dec 2024
Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 March 2021 at 14:50 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 1 Jul 2024 at 10:28.
24 Feb 2026
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.
25 Apr 2025
Thames Water are carrying out roadworks on Vulcan Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2021 at 10:00 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:46.
1 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.
Friday
London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.
Friday
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 September 2022 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 08:37.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
17 Feb 2023 and 30 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.
17 Feb 2023 and 30 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.
30 Mar 2023 and 25 Mar 2025
Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 07:01.
30 May 2025
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 May 2023 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 4 Dec 2024 at 09:17.
11 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 18:14.
20 May 2025
London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.
These works are categorised as Major.
The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.
6 Sep 2023 and 3 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.
7 Feb 2025
Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:36.
17 Jan 2024 and 14 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:19.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:20.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:11.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:13.
14 Feb 2024 and 12 Feb 2025
Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2024 and could run through until 12 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 15:58.
28 Feb 2025
Network Rail are carrying out Works for Rail Purposes on Sydenham Road, Croydon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 February 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Nov 2024 at 07:10.
Friday
City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 February 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 15:00.
28 Feb 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 10:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 11:24.
15 Apr 2024 and 23 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:45.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:51.
24 May 2024 and 21 Jun 2025
Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.
10 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.
13 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.
5 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.
12 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.
10 Jun 2024 and 13 Apr 2026
Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.
18 Jun 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.
24 Jun 2024 and 1 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 4 Jul 2024 at 14:24.
31 Jul 2025
Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.
30 Apr 2026
City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.
Today
City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 16 Dec 2024 at 14:50.
Friday
City Of Westminster are carrying out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 14:59.
2 Jul 2024 and 27 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.
These works are categorised as Major.
The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.
7 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.
15 Jul 2024 and 13 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerley Street, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 08:07.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornsett Road, Earlsfield, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 13:11.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:11.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:12.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:08.
28 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 12:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:48.
29 Jul 2024 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Kempsford Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Wincott Street, Kennington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
12 Aug 2024 and 22 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.
19 Aug 2024 and 12 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 12 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 29 May 2024 at 08:38.
12 Feb 2025
City Of Westminster are carrying out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 19 Aug 2024 at 08:42.
28 Feb 2025
London Borough Of Merton are carrying out Highway improvement works on Streatham Road, Mitcham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 3 Sep 2024 at 15:24.
27 Aug 2024 and 27 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 1 May 2024 at 08:04.
Friday
City Of Westminster are carrying out Highway repair and maintenance works on Carrington Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Dec 2024 at 15:22.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:17.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:16.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
Today
London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.
7 Mar 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Draycott Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Sep 2024 at 09:00.
2 Sep 2024 and 2 Jun 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Slippers Place, London.
These works are categorised as Major.
The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 16:30.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:21.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:23.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.
30 Jun 2025
London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:10.
Friday
Thames Water are proposing to carry out roadworks on Northstead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:29.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:11.
Friday
Thames Water are proposing to carry out roadworks on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:28.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.
6 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gilbert Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 13:50 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:37.
16 Sep 2024 and 31 Jan 2025
City Of London Corporation are proposing to carry out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 5 Sep 2024 at 14:11.
31 Jan 2025
City Of London Corporation are carrying out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 16 Sep 2024 at 08:20.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 11:56.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 13:27.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:05.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 09:10.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:07.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.
17 Sep 2024 and 30 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:41.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.
18 Sep and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2024 at 13:34.
Friday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:49.
27 Apr 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:01.
Friday
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Putney High Street, Putney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2024 at 13:25.
23 Jun 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.
30 Sep 2024 and 1 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:00 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 13:43.
6 Oct 2024 and 31 Mar 2026
City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.
12 Oct 2024 and 12 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:45.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway improvement works on Piccadilly, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:50.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 30 Aug 2024 at 13:52.
15 Oct and 30 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Portland Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 09:42.
19 Oct 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on De Laune Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Braganza Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:50.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
Friday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 12:40.
Friday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:34.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
28 Oct 2024 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Truslove Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:24.
27 Jan 2025
Thames Water are carrying out Utility asset works on Truslove Road, Knight's Hill, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 10:30 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:59.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:54.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Penwith Road, Southfields, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:38 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:55.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Garratt Lane, Tooting, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:54.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Duntshill Road, Southfields, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:55.
28 Oct 2024 and 31 Jan 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:31.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:20.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 10:23.
28 Oct 2024 and 23 May 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Hogarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 23 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Sep 2024 at 16:21.
23 May 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hogarth Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:31.
29 Oct 2024 and 12 May 2025
City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.
29 Oct 2024 and 12 May 2025
City Of London Corporation were proposing to carry out Highway improvement works on Whittington Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2024 and run through until 12 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 18 Dec 2024 at 07:07.
Tuesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Common North, Streatham Common & Vale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 7 Jun 2024 at 07:27.
Tuesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 07:57.
23 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 08:35.
4 Nov 2024 and 10 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
3 Mar 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 09:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 09:11.
5 Nov 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.
10 Feb 2025
Thames Water are carrying out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.
5 Nov 2024 and 15 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.
15 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.
8 Nov 2024 and 28 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 15:23.
11 Nov 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:24.
11 Nov 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 12:01.
Today
Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works started on 11 November 2024 at 12:20 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:23.
11 Nov 2024 and 9 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:54.
11 Nov 2024 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.
17 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:10.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:48.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 13:55.
Saturday
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:26.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:18.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:22.
11 Nov 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.
Saturday
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:00.
Saturday
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:43.
Saturday
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:46.
Saturday
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:00.
Saturday
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:39.
Monday
Cadent Gas are carrying out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 16:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 18:27.
Monday
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 17:10.
Saturday
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:02.
30 Apr 2025
Thames Water are carrying out roadworks on Portland Road, Mitcham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 09:00 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:48.
12 Nov 2024 and 29 Apr 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Mitcham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 22:55.
29 Apr 2025
Thames Water are carrying out Disconnection or alteration of supply on Western Road, Mitcham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 13:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 16:27.
12 Nov 2024 and 7 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 17:12.
31 Jan 2025
Thames Water are carrying out roadworks on Balham Park Road, Balham, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:54.
31 Jan 2025
Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.
Sunday
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.
Today
Thames Water are carrying out Utility repair and maintenance works on Arundel Road, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 09:02 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:42.
30 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Lavender Road, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 15:50 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:44.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 21:04.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.
18 Nov 2024 and 30 Mar 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Little Trinity Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 23 Oct 2024 at 10:23.
30 Mar 2025
City Of London Corporation are carrying out Highway repair and maintenance works on Little Trinity Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 18 Nov 2024 at 08:03.
20 Nov 2024 and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:21.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 09:14.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 11:46.
20 Feb 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:11.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.
23 Nov 2024 and 5 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 09:21.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:18.
8 Feb 2025
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:30 and could run through until 8 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 25 Nov 2024 at 09:25.
25 Nov 2024 and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Dec 2023 at 14:51.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:14.
Friday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Christchurch Road, St Martin's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:52.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hardel Rise, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:48.
Friday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Hardel Rise, St Martin's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:53.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:46.
Friday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Tulse Hill, St Martin's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:53.
14 Jan 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Wye Street, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:00 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 08:08.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 08:46.
Friday
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Montford Place, Kennington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 5 Dec 2024 at 11:21.
Friday
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Montford Place, Kennington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 5 Dec 2024 at 11:21.
26 Nov and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:50.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.
27 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 16:00 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Dec 2024 at 16:10.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.
27 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 16:00 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 3 Dec 2024 at 16:10.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:16.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:42.
31 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 13:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 15:37.
6 Jan 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Seward Road, Beckenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:30 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 12:19.
5 Mar 2025
Thames Water are carrying out Disconnection or alteration of supply on Northstead Road, St Martin's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 11:30 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 11:46.
Today
Southern Gas Networks are carrying out roadworks on Cader Road, Wandsworth, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:15 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:00.
Friday
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.
Friday
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 28 Nov 2024 at 15:32.
2 Dec 2024 and 10 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:05.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.
Today
Thames Water are carrying out Utility repair and maintenance works on Aubrey Walk, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:27.
Friday
Thames Water were proposing to carry out roadworks on Northstead Road, St Martin's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.
Friday
Thames Water were proposing to carry out roadworks on Kingsmead Road, St Martin's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.
4 Dec 2024 and 7 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.
4 Dec 2024 and 7 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.
Tomorrow
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.
Tomorrow
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.
Tomorrow
Thames Water are carrying out New service connection on Bell Green, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 December 2024 at 10:49 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 10:50.
27 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Whitehorse Lane, South Norwood, Croydon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 09:10 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 10:27.
27 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Farnley Road, South Norwood, Croydon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 09:10 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:57.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.
Friday
Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.
Today
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 12:49.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 15:35.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 11:30.
Monday
Virgin Media were proposing to carry out Utility asset works on Hans Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 10 Dec 2024 at 09:08.
Friday
Murphy Power Distribution are proposing to carry out New service connection on Copperfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 11 Oct 2024 at 11:32.
Friday
Murphy Power Distribution are carrying out New service connection on Copperfield Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 09:05 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Dec 2024 at 09:59.
Friday
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:31.
Friday
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 08:24.
Today
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 08:10.
Friday
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Voss Court, Streatham Common & Vale, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Dec 2024 at 13:44.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:21.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.
9 Dec 2024 and 6 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:39.
Friday
Thames Water are carrying out Utility repair and maintenance works on Oakley Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:45 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:44.
9 Dec 2024 and 9 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Grove Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 9 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 09:23.
9 Dec 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Summerley Street, Earlsfield, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:47.
Saturday
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:08.
Saturday
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:07.
Saturday
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:06.
Saturday
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:04.
10 Dec 2024 and 25 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.
10 Dec 2024 and 28 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:13.
Tomorrow
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Oct 2024 at 00:39.
Tomorrow
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Nov 2024 at 13:15.
Tomorrow
BT are carrying out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:10 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 09:10.
Saturday
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 15:57.
Saturday
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Dec 2024 at 08:33.
Friday
Thames Water are carrying out Utility repair and maintenance works on Ogle Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 10:08 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 13:21.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Ridgway, Wimbledon.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 11:20 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:49.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Prioress Road, Knight's Hill, London.
The works started on 12 December 2024 at 08:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:30.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 08:00 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 08:23.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Harleyford Road, Vauxhall, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 12:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:59.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Richmond Road, Putney, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 16:03.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Settrington Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 09:48 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 13:27.
Friday
Thames Water are carrying out Utility repair and maintenance works on Perrymead Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 22:54 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Dec 2024 at 07:59.
Friday
Thames Water are carrying out Utility repair and maintenance works on Heathman's Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 16:40 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Dec 2024 at 09:33.
Friday
Thames Water are carrying out Utility repair and maintenance works on Fulham Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 17:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 13:00.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Harriet Walk, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 08:45 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 09:17.
13 Dec 2024 and 31 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Omeara Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Great Windmill Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 00:22 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 12:37.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Wood Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 00:54 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:53.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Cock Lane, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 12:59 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 10:54.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
Friday
Thames Water are carrying out Utility repair and maintenance works on Oxford Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 December 2024 at 09:17 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 11:55.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Blakeney Avenue, Beckenham.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 December 2024 at 21:43 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 14:10.
31 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Raleigh Gardens, Mitcham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 11:40.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:51.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 15:44.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 09:37.
16 Dec 2024 and 11 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 16:10.
16 Dec 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:46.
16 Dec 2024 and 11 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:52.
16 Dec 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 15:55.
Monday
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.
Monday
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.
Monday
Southern Gas Networks are carrying out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 09:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 09:54.
Saturday
Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Common South Side, Clapham East, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 13:30 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 07:50.
Saturday
Southern Gas Networks are carrying out Utility repair and maintenance works on Long Road, Clapham Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 13:30 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 07:51.
Saturday
Southern Gas Networks are carrying out roadworks on The Pavement, Clapham Town, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 13:30 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 07:50.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:31.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:53.
Friday
Thames Water are carrying out Utility repair and maintenance works on Cromwell Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 08:31 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 12:02.
Tomorrow
Thames Water were proposing to carry out New service connection on Lambeth Walk, Kennington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 13:47.
Tomorrow
Thames Water were proposing to carry out New service connection on Denman Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 15:56.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Cornhill, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 21:56 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:40.
Saturday
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Sep 2024 at 14:35.
Monday
Thames Water are carrying out Utility repair and maintenance works on Wesley Street, Marylebone High Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 10:50 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:35.
Monday
Thames Water are carrying out Utility repair and maintenance works on Station Road, Penge.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 11:46 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:45.
Sunday
Southern Gas Networks are carrying out Utility repair and maintenance works on Rushey Green, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 09:00 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:33.
Tomorrow
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.
Tomorrow
Hyperoptic were proposing to carry out Utility asset works on Grimston Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 14 Nov 2024 at 11:39.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:05.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:29.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:46.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:07.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:23.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 1 Oct 2024 at 14:38.
Tomorrow
UK Power Networks Eastern & London were proposing to carry out roadworks on Sondes Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:16.
Tomorrow
UK Power Networks Eastern & London are proposing to carry out New service connection on Sondes Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
Monday
Thames Water are carrying out Utility repair and maintenance works on Albert Embankment, Vauxhall, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 11:31 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 12:04.
Monday
Thames Water are carrying out Utility repair and maintenance works on Kennington Road, Kennington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 17:58 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 18:01.
18 Dec 2024 and 19 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:52.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.
Friday
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 09:46.
18 Dec 2024 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cole Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 13:35.
23 and 31 Dec 2024
Thames Water were proposing to carry out New service connection on Bruton Place, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:15.
23 Dec 2024 and 8 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Parkfield Road, Clapham Park, London.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 12:05.
23 Dec 2024 and 2 Jan 2025
Thames Water were proposing to carry out New service connection on Carnwath Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 15:40.
23 and 30 Dec 2024
Thames Water were proposing to carry out New service connection on Carlyle Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 30 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 13:12.
23 and 30 Dec 2024
Thames Water are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:56.
24 Dec 2024 and 9 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 10:14.
26 Dec 2024 and 10 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 11:49.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 07:28.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:22.
27 Dec 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:42.
27 Dec 2024 and 10 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:43.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 13:30.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:01.
28 Dec 2024 and 11 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 16:16.
28 Dec 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracefield Gardens, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.
28 Dec 2024 and 11 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracefield Gardens, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:01.
2 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:11.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:50.
2 Jan and 30 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:59.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:17.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:00.
2 Jan and 27 Apr 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:17.
2 Jan and 2 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 09:44.
2 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.
2 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:51.
2 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:47.
2 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:50.
2 and 5 Jan 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on King Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:14.
2 and 5 Jan 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on King Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:21.
3 and 5 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:07.
3 and 5 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 5 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.
3 Jan and 28 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.
These works are categorised as Major.
The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.
3 and 5 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 14:45.
4 and 6 Jan 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 6 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 10:54.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 12 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 14:12.
4 and 5 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:05.
5 Jan and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:16.
6 and 26 Jan 2025
Thames Water are proposing to carry out Utility asset works on Guildhouse Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:51.
6 and 26 Jan 2025
Thames Water are proposing to carry out Utility asset works on Guildhouse Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:14.
6 Jan and 31 May 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 17:29.
6 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 16:08.
6 and 31 Jan 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Ebury Street, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Stark Infra – Electric on 11 Nov 2024 at 12:12.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:33.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 06:41.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:05.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:53.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:36.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 06:43.
6 Jan and 15 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Great College Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 13:01.
6 Jan and 15 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.
6 Jan and 15 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:41.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:43.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 18:43.
6 Jan and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:16.
6 Jan and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 12:38.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:40.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 13:51.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:41.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:54.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 12 Dec 2024 at 16:17.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 08:28.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:14.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:31.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:30.
6 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 17:38.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 11 Sep 2024 at 09:49.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 1 Oct 2024 at 11:13.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 8 Oct 2024 at 08:33.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:34.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Dec 2024 at 08:41.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:13.
6 and 10 Jan 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 11:42.
6 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hillgate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 09:48.
6 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hillgate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:18.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 16:09.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Church Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:22.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:23.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 11:47.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 07:22.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Lower Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 25 Oct 2024 at 10:26.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Upper Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:14.
6 and 9 Jan 2025
Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:05.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:50.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:52.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:51.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 08:54.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:18.
6 and 10 Jan 2025
Thames Water are proposing to carry out Permanent reinstatement on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 06:10.
6 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:15.
6 and 31 Jan 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 3 Nov 2024 at 18:01.
6 Jan and 14 Feb 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 17 Dec 2024 at 20:45.
6 Jan and 14 Feb 2025
Stark Infra – Electric are proposing to carry out roadworks on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Stark Infra – Electric on 13 Dec 2024 at 11:42.
6 and 15 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 10:02.
6 and 15 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:09.
6 and 15 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:26.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 13:14.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 14:57.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:53.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 14:57.
6 and 8 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Nov 2024 at 08:33.
6 and 26 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Gracechurch Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Dec 2024 at 10:54.
6 and 26 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Gracechurch Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 09:56.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:13.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:54.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 13:09.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 08:46.
6 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 11:34.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:10.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 14:26.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:40.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:38.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 10:15.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 26 Sep 2024 at 14:14.
6 Jan and 6 Mar 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 09:12.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 13:28.
6 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 12:21.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:24.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 08:39.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Wimpole Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2024 at 17:47.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:31.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 23 Oct 2024 at 08:11.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:28.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 13:04.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:17.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 13:04.
6 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on West Smithfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 10:31.
6 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:50.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:10.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:15.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 15:10.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility asset works on Harley Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:00.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Howland Street, Bloomsbury, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Sep 2024 at 09:04.
6 and 27 Jan 2025
Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:03.
6 and 27 Jan 2025
Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:45.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:59.
6 and 17 Jan 2025
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 12:24.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 13:57.
6 and 27 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Ampere Way, Beddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:56.
6 and 27 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:54.
6 Jan and 30 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitcham Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:07.
6 Jan and 30 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:45.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 10:58.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:00.
6 and 10 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 17:35.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.
6 Jan and 1 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 15:27.
6 Jan and 1 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 12:43.
6 Jan and 1 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:58.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:47.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 08:05.
6 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 17:00.
6 and 10 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 15:52.
6 Jan and 17 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 4 Dec 2024 at 16:52.
6 and 9 Jan 2025
Thames Water are proposing to carry out New service connection on Voss Court, Streatham Common & Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:59.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:55.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 10:12.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 15:46.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 08:10.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 14:45.
6 Jan and 6 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kirkdale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:11.
6 Jan and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2024 at 08:52.
6 Jan and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 10:25.
6 Jan and 23 Mar 2025
Thames Water were proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works were categorised as Major.
The works were originally planned to start 6 January 2025 and run through until 23 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:19.
6 Jan and 23 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwith Road, Southfields, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 23 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:07.
6 Jan and 2 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:08.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Elborough Street, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:33.
6 Jan and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 13:46.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:13.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 08:44.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 11:18.
6 Jan and 28 Feb 2025
Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 12:58.
6 Jan and 28 Feb 2025
Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 15:17.
6 Jan and 28 Feb 2025
Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 12 Dec 2024 at 16:08.
6 Jan and 28 Feb 2025
Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Dec 2024 at 13:08.
6 and 8 Jan 2025
Thames Water are proposing to carry out New service connection on Cottage Grove, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:52.
6 Jan and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Linden Grove, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:03.
6 Jan and 17 Feb 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Malpas Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Dec 2024 at 10:23.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rowditch Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 14:37.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Rowditch Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 15:22.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.
6 and 24 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:50.
6 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:05.
6 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 08:44.
6 Jan and 19 Mar 2025
London Borough Of Wandsworth are proposing to carry out Section 50 on Elcho Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 11 Dec 2024 at 10:59.
6 Jan and 19 Mar 2025
London Borough Of Wandsworth are proposing to carry out Section 50 on Elcho Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 11 Dec 2024 at 11:00.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 08:15.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:29.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 10:56.
6 and 19 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:26.
6 and 19 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:43.
6 and 14 Jan 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Tite Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Dec 2024 at 10:27.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 11:52.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:00.
6 Jan and 4 Apr 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Way, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 14:34.
6 Jan and 26 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 16:12.
7 and 9 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Becmead Avenue, Brixton Windrush, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:21.
7 and 9 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Becmead Avenue, Brixton Windrush, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:01.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:13.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:55.
7 and 10 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Bear Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 3 Dec 2024 at 11:05.
7 and 9 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 13 Sep 2024 at 15:45.
8 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out roadworks on Avonmore Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:29.
8 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 07:59.
8 and 11 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 06:16.
8 and 10 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Hestercombe Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 11 Nov 2024 at 11:58.
9 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 10:08.
9 Jan and 24 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 January 2025 and run through until 24 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 08:44.
9 and 12 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pendennis Road, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.
9 and 12 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pendennis Road, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:00.
9 and 12 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Leigham Avenue, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.
9 and 12 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Leigham Avenue, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:00.
9 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.
9 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:36.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 16:15.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:27.
9 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 10:06.
9 and 29 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:23.
9 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:51.
9 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 13:14.
9 and 16 Jan 2025
Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:09.
9 and 15 Jan 2025
Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 10:45.
9 Jan and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.
10 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Hammersmith Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:19.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:52.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Foster Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:34.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:06.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on St Martin's-le-grand, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:09.
10 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 18:02.
10 and 13 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:33.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 22:52.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.
10 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.
10 Jan and 8 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
11 and 16 Jan 2025
Thames Water are proposing to carry out New service connection on Willett Place, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:15.
11 and 16 Jan 2025
Thames Water are proposing to carry out New service connection on Willett Place, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 16:34.
11 and 19 Jan 2025
Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 13:14.
11 and 19 Jan 2025
Thames Water were proposing to carry out New service connection on Clapham Park Road, Clapham East, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 January 2025 and run through until 19 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.
11 and 19 Jan 2025
Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 13:29.
11 and 19 Jan 2025
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:39.
11 and 19 Jan 2025
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:17.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 13:55.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 08:37.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 11:42.
11 Jan and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
11 and 12 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:26.
12 Jan and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 10:34.
13 and 24 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 11:52.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:37.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 16:03.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.
13 Jan and 2 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.
13 Jan and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.
13 Jan and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.
13 and 17 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 12 Nov 2024 at 16:45.
13 and 17 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 15 Nov 2024 at 08:51.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, Sydenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:31.
13 and 30 Jan 2025
Thames Water were proposing to carry out Utility asset works on Carlwell Street, Tooting, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:51.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Utility asset works on Carlwell Street, Tooting, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 13:16.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homecroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:50.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:16.
13 and 26 Jan 2025
Thames Water are proposing to carry out roadworks on Brudenell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:35.
13 and 26 Jan 2025
Thames Water are proposing to carry out roadworks on Beechcroft Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:29.
13 Jan and 14 Feb 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Heber Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:49.
13 Jan and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Heber Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:50.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:47.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Culvert Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:25.
13 and 31 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 08:39.
13 Jan and 1 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Oct 2024 at 14:41.
13 Jan and 1 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:23.
13 and 15 Jan 2025
Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 20 Nov 2024 at 10:26.
13 and 15 Jan 2025
Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:41.
13 and 15 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Rostrevor Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:44.
13 and 15 Jan 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Smith Terrace, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:59.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wellington Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:42.
13 and 15 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Gerald Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 24 Oct 2024 at 14:49.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:32.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 08:51.
13 Jan and 10 May 2025
Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:11.
13 Jan and 10 May 2025
Thames Water were proposing to carry out Highway improvement works on Drummond Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:39.
13 Jan and 10 May 2025
Thames Water were proposing to carry out Highway improvement works on Drummond Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:23.
13 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Margaret Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:39.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:19.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:14.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Pitt Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:51.
13 Jan and 14 Mar 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:13.
13 and 17 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:20.
13 and 17 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:33.
13 and 27 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:24.
13 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 08:19.
13 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:47.
13 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 08:00.
13 and 26 Jan 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:25.
13 and 26 Jan 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:49.
13 Jan and 3 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.
13 Jan and 3 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 6 Dec 2024 at 12:37.
13 Jan and 3 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 17 Dec 2024 at 06:06.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:32.
13 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 10:08.
13 and 17 Jan 2025
Vorboss are proposing to carry out Utility repair and maintenance works on Long Acre, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vorboss on 17 Oct 2024 at 08:13.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Old Quebec Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:13.
13 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:07.
13 and 18 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Shoe Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:22.
13 and 20 Jan 2025
Thames Water were proposing to carry out Works for road purposes on Great Cumberland Place, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:37.
13 Jan and 30 Apr 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kingsway, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 16 Dec 2024 at 12:10.
13 Jan and 30 Apr 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kingsway, Holborn And Covent Garden, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 17 Dec 2024 at 10:41.
13 and 15 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 26 Nov 2024 at 11:29.
13 and 26 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hayne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 14:06.
13 and 26 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hayne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:12.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Cowcross Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:00.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Cowcross Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:04.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:44.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:02.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:10.
13 Jan and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:30.
13 Jan and 14 Feb 2025
Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:04.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 2 Oct 2024 at 14:06.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:46.
13 and 24 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 13:42.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 11:33.
14 Jan and 28 Feb 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 15:35.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Lyndhurst Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:47.
14 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Park Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 15:14.
14 and 17 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Merrow Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:32.
14 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Merrow Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
14 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 09:12.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Drayson Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:04.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Drayson Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 08:43.
15 and 17 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 11:33.
15 and 17 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 17 Dec 2024 at 11:19.
15 Jan and 16 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 19:25.
16 and 19 Jan 2025
Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:25.
17 and 19 Jan 2025
Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:03.
17 Jan and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.
17 and 25 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 10:06.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:13.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Dec 2024 at 07:07.
17 and 25 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:26.
18 Jan 2025
Telefonica UK are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 18 January 2025 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 15 Nov 2024 at 18:12.
18 Jan 2025
Telefonica UK are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 18 January 2025 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 17 Dec 2024 at 14:21.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Wilfred Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Catherine Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 09:33.
20 and 22 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 13:22.
20 Jan and 3 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:35.
20 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 06:43.
20 and 22 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Hill, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:28.
20 and 22 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Way, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:27.
20 and 23 Jan 2025
Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:25.
20 and 23 Jan 2025
Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:38.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:17.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:28.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 16:04.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 16:13.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:03.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:17.
20 and 24 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Poppins Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 09:44.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on D'arblay Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:52.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on D'arblay Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 15:31.
20 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:23.
20 and 24 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Little Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:43.
20 and 27 Jan 2025
Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 16:57.
20 and 28 Jan 2025
Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.
20 and 28 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Leander Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:52.
20 and 28 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Leander Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:19.
20 and 31 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.
20 and 31 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 16:06.
20 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.
20 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:43.
20 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:50.
20 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:46.
20 and 22 Jan 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 07:41.
20 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 16:47.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:59.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Sangora Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:08.
20 and 22 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Grimston Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 26 Nov 2024 at 14:55.
20 and 31 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Peterborough Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:31.
20 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 11:40.
20 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 10:57.
20 Jan and 12 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 13:59.
20 Jan and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:43.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:46.
21 and 24 Jan 2025
Thames Water are proposing to carry out Utility asset works on Holbein Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:40.
21 and 29 Jan 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Edwardes Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 17 Dec 2024 at 12:12.
21 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:36.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Park Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 16:05.
21 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:38.
21 Jan and 5 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:51.
22 Jan and 4 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 14:53.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 10:06.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:02.
22 Jan and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.
22 Jan and 5 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 11:40.
22 and 27 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Burton Grove, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:33.
22 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burton Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:57.
22 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elystan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:44.
23 and 25 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 06:26.
25 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.
26 Jan and 28 Oct 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.
27 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 15:56.
27 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Dec 2024 at 11:09.
27 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.
27 Jan and 28 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Central Road, Morden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:46.
27 Jan and 7 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:16.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.
27 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.
27 Jan and 7 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 15:20.
27 Jan and 7 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:39.
27 Jan and 7 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:27.
27 Jan and 7 Feb 2025
London Borough Of Merton were proposing to carry out Highway improvement works on Friday Road, Mitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 6 Dec 2024 at 14:57.
27 Jan and 7 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:28.
27 Jan and 7 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 15 Nov 2024 at 08:40.
27 Jan and 7 Feb 2025
London Borough Of Merton were proposing to carry out Highway improvement works on Crusoe Road, Mitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 2 Dec 2024 at 16:49.
27 Jan and 7 Feb 2025
London Borough Of Merton were proposing to carry out Highway improvement works on Crusoe Road, Mitcham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 6 Dec 2024 at 14:54.
27 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 15:13.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:38.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:12.
27 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:25.
27 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:49.
27 Jan and 4 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:58.
27 Jan and 7 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 18 Nov 2024 at 14:12.
27 Jan and 7 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 29 Nov 2024 at 15:12.
27 Jan and 5 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 14:32.
27 Jan and 10 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
27 and 29 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:36.
27 and 29 Jan 2025
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Nov 2024 at 15:11.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:28.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:22.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:03.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:22.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:04.
27 and 29 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Oct 2024 at 07:25.
27 Jan and 17 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.
27 Jan and 4 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 06:23.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:32.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:31.
27 Jan and 4 Feb 2025
ESP Electricity are proposing to carry out Utility asset works on Carteret Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 12 Dec 2024 at 06:47.
27 and 31 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 10:12.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 08:12.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Maiden Lane, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 08:29.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 14:38.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:04.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 and 30 Jan 2025
City Of London Telecomms were proposing to carry out Utility asset works on Brewer Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 16 Oct 2024 at 09:32.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 Jan and 1 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:16.
27 and 30 Jan 2025
Vodafone are proposing to carry out Highway repair and maintenance works on Binney Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 23 Oct 2024 at 13:55.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 14:53.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 5 Nov 2024 at 10:51.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:04.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 08:38.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 14:52.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Foster Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 10:29.
27 Jan and 14 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Martin's-le-grand, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 14:01.
27 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:21.
27 and 29 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.
27 and 29 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 4 Nov 2024 at 09:40.
27 Jan and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:28.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 18:14.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 08:13.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:15.
28 Jan and 1 Feb 2025
City Of London Corporation were proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 13 Aug 2024 at 11:53.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:17.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 2 Aug 2024 at 16:01.
28 Jan and 2 Feb 2025
City Of London Corporation were proposing to carry out Highway improvement works on Tower Bridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 12 Aug 2024 at 07:14.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:43.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:02.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 16 Aug 2024 at 12:20.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 23 Aug 2024 at 16:30.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:42.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:00.
28 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 16:01.
28 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 16:09.
28 Jan and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:55.
28 Jan and 15 Apr 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 11:37.
28 Jan and 11 Mar 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by T-Mobile (UK) on 16 Dec 2024 at 16:43.
28 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:25.
28 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.
28 Jan and 30 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 13:50.
29 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:27.
29 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
29 Jan and 1 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Dec 2024 at 08:11.
29 and 31 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Chelsea Manor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 6 Dec 2024 at 18:53.
29 and 31 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Chelsea Manor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 9 Dec 2024 at 10:31.
30 Jan and 1 Feb 2025
Thames Water are proposing to carry out Utility asset works on Sutherland Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:49.
30 Jan and 20 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 13:52.
30 Jan and 24 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bruton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:59.
30 Jan and 12 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Cleveland Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 10:55.
30 Jan and 12 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 08:19.
31 Jan and 1 Apr 2025
Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:35.
31 Jan and 1 Apr 2025
Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:09.
31 Jan and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.
31 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Sunnydene Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:09.
31 Jan and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normanhurst Road, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:51.
31 Jan and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuthurst Avenue, Streatham Hill East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:52.
31 Jan and 2 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Talgarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 16:30.
1 and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Landcroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
1 and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Landcroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:51.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 12:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 09:45.
1 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:26.
1 and 9 Feb 2025
Thames Water were proposing to carry out New service connection on Prince's Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 9 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:21.
1 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on Prince's Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.
3 and 20 Feb 2025
Thames Water are proposing to carry out Highway repair and maintenance works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:42.
3 and 25 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:20.
3 and 6 Feb 2025
Thames Water were proposing to carry out New service connection on Horselydown Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 13:57.
3 Feb and 13 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 9 Dec 2024 at 15:58.
3 Feb and 23 May 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 9 Dec 2024 at 15:15.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:36.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:14.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 09:34.
3 and 5 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 14:37.
3 Feb and 8 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 06:47.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:40.
3 and 12 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Cleveland Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 11:58.
3 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chenies Mews, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 15:16.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.
3 Feb and 12 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:49.
3 Feb and 12 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:46.
3 and 5 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 18 Nov 2024 at 13:55.
3 and 6 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Lennard Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 and 7 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 and 6 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:00.
3 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.
3 Feb and 27 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:57.
3 Feb and 27 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:02.
3 and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.
3 and 6 Feb 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:41.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:01.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:40.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 09:58.
3 and 10 Feb 2025
Thames Water are proposing to carry out New service connection on Camborne Road, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 08:53.
3 and 6 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Dec 2024 at 09:46.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Buckhold Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 12:59.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wandsworth High Street, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 10:26.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wandsworth High Street, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 09:02.
3 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
3 and 8 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.
3 and 5 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Lots Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 14:25.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 08:02.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Dec 2024 at 05:36.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Dec 2024 at 16:40.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 12:19.
3 and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 14:31.
3 and 21 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Ebury Bridge Road, Churchill, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:52.
3 Feb and 31 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 10:15.
4 and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Dec 2024 at 09:23.
5 and 11 Feb 2025
Thames Water are proposing to carry out New service connection on Exeter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 07:35.
5 and 11 Feb 2025
Thames Water are proposing to carry out New service connection on Exeter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:35.
5 and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Coptic Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:14.
6 and 8 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on First Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 14:40.
6 and 8 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Lennox Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 15:12.
6 Feb and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:02.
6 and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jennings Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:52.
6 and 11 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 08:28.
7 and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jennings Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
8 Feb and 2 Apr 2025
Thames Water are proposing to carry out roadworks on Trevelyan Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:32.
8 Feb and 2 Apr 2025
Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:55.
8 Feb and 2 Apr 2025
Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:45.
8 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:25.
8 Feb and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 10:51.
10 Feb and 14 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:23.
10 Feb and 24 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 26 Nov 2024 at 15:41.
10 and 14 Feb 2025
Hyperoptic are proposing to carry out Utility asset works on Chadwick Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 10 Dec 2024 at 07:08.
10 and 12 Feb 2025
Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:32.
10 and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Dec 2024 at 15:29.
10 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
10 Feb and 28 Apr 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on White Horse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 08:42.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 12 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 15:10.
10 and 13 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 27 Nov 2024 at 11:32.
10 and 13 Feb 2025
G. Network Communications were proposing to carry out Utility asset works on Brewer Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 13 Dec 2024 at 11:55.
10 and 14 Feb 2025
Cadent Gas were proposing to carry out Remedial works on Mercer Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 08:48.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Mercer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:33.
10 and 15 Feb 2025
Thames Water are proposing to carry out New service connection on St George Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:53.
10 and 15 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Princes Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Nov 2024 at 14:48.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 06:42.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Wimpole Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 14:54.
10 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Noble Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:53.
10 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Noble Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Nov 2024 at 13:41.
10 and 19 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 18:24.
10 and 13 Feb 2025
Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lumen Technologies on 26 Nov 2024 at 19:20.
10 and 14 Feb 2025
Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:49.
10 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Dec 2024 at 11:59.
10 and 14 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Sumner Road South, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 09:02.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:17.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:27.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thornton Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:17.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:19.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.
10 and 27 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 11:04.
10 and 25 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:23.
10 and 25 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:21.
10 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.
10 Feb and 24 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:54.
10 and 14 Feb 2025
Thames Water are proposing to carry out Remedial works on St Julian's Farm Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 08:32.
10 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 14:06.
10 and 14 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 13:16.
10 Feb and 4 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:01.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:07.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:05.
10 and 14 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 08:43.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 May 2024 at 06:16.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Aug 2024 at 13:00.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 11:24.
10 Feb and 23 Mar 2025
Thames Water were proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 23 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 15:07.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2024 at 16:52.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Elborough Street, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:17.
10 Feb and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.
10 Feb and 10 Mar 2025
Thames Water were proposing to carry out roadworks on Barry Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.
10 Feb and 9 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.
10 and 22 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Nov 2024 at 15:05.
10 and 22 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 13:19.
10 and 14 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Mendip Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:21.
10 and 14 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Chatfield Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:24.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:52.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:05.
10 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Palace Road, Warwick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:19.
10 Feb and 4 May 2025
Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:57.
10 Feb and 6 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
11 and 13 Feb 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Westbury Road, Penge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 08:13.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility asset works on Longley Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:39.
11 and 17 Feb 2025
Thames Water were proposing to carry out New service connection on Henrietta Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:54.
12 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Old Paradise Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:04.
12 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Rysbrack Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Dec 2024 at 10:37.
12 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:36.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:14.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cambridge Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:18.
13 Feb and 23 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Falcon Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:51.
13 and 28 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:40.
14 and 19 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:38.
14 Feb and 12 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Green Dale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 08:51.
15 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 14:42.
15 and 23 Feb 2025
Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 12:38.
15 Feb and 1 Mar 2025
Thames Water are proposing to carry out roadworks on Dafforne Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:30.
15 Feb and 1 Mar 2025
Thames Water are proposing to carry out roadworks on Stapleton Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:33.
15 Feb and 17 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:32.
15 Feb and 17 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:48.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:03.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:15.
15 and 23 Feb 2025
City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 4 Nov 2024 at 09:46.
15 and 23 Feb 2025
City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 25 Nov 2024 at 13:11.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.
16 Feb and 29 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 15:04.
17 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:46.
17 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Dec 2024 at 11:50.
17 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 17 Dec 2024 at 07:56.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 17:06.
17 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:46.
17 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:27.
17 Feb and 3 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:39.
17 Feb and 3 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:08.
17 Feb and 11 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.
17 and 19 Feb 2025
Thames Water are proposing to carry out New service connection on Dewey Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:47.
17 and 20 Feb 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Burntwood Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 21 Nov 2024 at 10:04.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Beechcroft Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:49.
17 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 12:29.
17 Feb and 2 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:37.
17 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.
17 Feb and 6 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Algarve Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 08:44.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:30.
17 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:01.
17 and 19 Feb 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Harbut Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Nov 2024 at 15:41.
17 and 21 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 5 Nov 2024 at 09:05.
17 and 21 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 13 Nov 2024 at 09:57.
17 and 21 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Doria Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:30.
17 and 19 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Upcerne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Apr 2024 at 05:56.
17 and 21 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Fulham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Dec 2024 at 14:11.
17 Feb and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.
17 and 25 Feb 2025
Thames Water are proposing to carry out New service connection on Jonathan Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:16.
17 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge, Churchill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:35.
17 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Tothill Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Pitt Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:43.
17 and 28 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Kensington Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:31.
17 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:25.
17 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 07:29.
17 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 14:33.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 07:48.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hopkins Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:15.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on St George Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:40.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:23.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.
17 Feb and 2 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Staining Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:58.
17 Feb and 2 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Staining Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 29 Nov 2024 at 12:22.
17 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:23.
17 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:40.
18 and 24 Feb 2025
Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 15:11.
18 and 24 Feb 2025
Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 13:12.
18 and 24 Feb 2025
Thames Water were proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:40.
18 Feb and 4 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Queen Square, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 18:09.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 08:05.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 14:40.
18 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 16:04.
18 Feb and 3 Mar 2025
Hyperoptic are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 19 Nov 2024 at 08:35.
18 and 22 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:16.
18 and 22 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 08:07.
18 and 24 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:08.
18 and 24 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:08.
19 and 27 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 07:48.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:57.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 10:55.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Triangle Place, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:58.
19 and 21 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Shortlands, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 12:22.
19 Feb and 25 Jun 2025
Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:22.
19 Feb and 30 Apr 2025
Thames Water are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:16.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 14:18.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:18.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 31 Oct 2024 at 16:07.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 08:28.
20 Feb and 5 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:18.
20 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:56.
20 and 24 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:48.
20 and 26 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 09:02.
20 and 26 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 13:25.
20 and 26 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 09:02.
20 and 26 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 14:03.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:25.
20 Feb and 12 May 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 12 May 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:42.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 14:12.
21 Feb and 12 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 13:29.
21 and 23 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:02.
21 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:48.
24 and 27 Feb 2025
Hyperoptic are proposing to carry out Utility asset works on Strutton Ground, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 28 Nov 2024 at 06:39.
24 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Great Smith Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:40.
24 and 28 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:19.
24 and 28 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 07:06.
24 Feb and 16 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:50.
24 and 28 Feb 2025
Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:27.
24 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Drury Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 08:06.
24 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Drury Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 06:17.
24 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:23.
24 Feb and 3 Mar 2025
Thames Water were proposing to carry out New service connection on Great Cumberland Place, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:47.
24 and 27 Feb 2025
Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lumen Technologies on 29 Nov 2024 at 09:11.
24 and 28 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Marham Gardens, Morden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Dec 2024 at 08:10.
24 Feb and 21 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 06:40.
24 and 28 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 23:02.
24 and 28 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:48.
24 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Georgia Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:50.
24 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Georgia Road, Thornton Heath, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:47.
24 and 27 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Leigham Court Road, Streatham Wells, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 19 Nov 2024 at 10:35.
24 Feb and 4 Mar 2025
Thames Water are proposing to carry out New service connection on Barry Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:27.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:37.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Village Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on East Dulwich Grove, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Red Post Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 and 26 Feb 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 10 Dec 2024 at 11:25.
24 Feb and 1 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 13:10.
24 Feb and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge, Churchill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:05.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:44.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:39.
25 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Buckingham Palace Road, Warwick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:51.
25 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fleet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 11:25.
26 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:56.
26 Feb and 1 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Kingston Road, Raynes Park.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:02.
26 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Dec 2024 at 07:02.
26 and 28 Feb 2025
BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 08:58.
26 and 28 Feb 2025
BT were proposing to carry out Utility asset works on Willow View, Colliers Wood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 10:18.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillworth Road, Brixton Rush Common, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:41.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillworth Road, Brixton Rush Common, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Athlone Road, Tulse Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:41.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Athlone Road, Tulse Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:59.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Claverdale Road, Tulse Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:31.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Claverdale Road, Tulse Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Craignair Road, Brixton Rush Common, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:17.
26 Feb and 18 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Craignair Road, Brixton Rush Common, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.
26 Feb and 1 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Shortlands, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Dec 2024 at 16:18.
27 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Shepherd Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Dec 2024 at 06:38.
27 Feb and 1 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Charles Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 11:42.
28 Feb and 7 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:56.
28 Feb and 7 Mar 2025
Thames Water were proposing to carry out Utility asset works on Teredo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:34.
28 Feb and 3 Mar 2025
Virgin Media were proposing to carry out Utility asset works on Pembridge Gardens, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Nov 2024 at 12:45.
28 Feb and 2 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:49.
28 Feb and 3 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Charterhouse Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 15:20.
28 Feb and 2 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Peckham High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 13:32.
1 and 30 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:16.
1 and 30 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:16.
3 and 16 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:45.
3 and 23 Mar 2025
City Of London Telecomms are proposing to carry out Utility asset works on St James's Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 9 Dec 2024 at 15:56.
3 and 7 Mar 2025
Thames Water are proposing to carry out New service connection on Warwick House Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:34.
3 and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:52.
3 and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Shaftesbury Avenue, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:31.
3 and 14 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 17:03.
3 and 7 Mar 2025
Thames Water are proposing to carry out New service connection on New Row, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 08:56.
3 and 7 Mar 2025
Thames Water are proposing to carry out New service connection on New Row, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 06:13.
3 and 11 Mar 2025
Thames Water were proposing to carry out New service connection on New Row, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 08:48.
3 and 14 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hopkins Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 13:20.
3 and 16 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Dean's Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:52.
3 and 16 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Dean's Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 28 Nov 2024 at 13:18.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:12.
3 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 06:47.
3 and 14 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 12:26.
3 Mar and 28 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Melrose Avenue, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:17.
3 and 12 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:06.
3 and 12 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:46.
3 and 31 Mar 2025
Thames Water are proposing to carry out roadworks on Lessingham Avenue, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:36.
3 and 31 Mar 2025
Thames Water are proposing to carry out roadworks on Derinton Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:35.
3 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:32.
3 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:49.
3 and 12 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:03.
3 and 12 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:08.
3 and 12 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 17 Dec 2024 at 07:30.
3 and 23 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Strathville Road, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 06:46.
3 Mar and 6 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 08:45.
3 and 17 Mar 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 3 Dec 2024 at 16:04.
3 Mar and 1 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:05.
3 Mar and 1 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:53.
3 Mar and 1 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:35.
3 Mar and 4 Aug 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:58.
3 and 5 Mar 2025
London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney Bridge, Putney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 10 Dec 2024 at 11:29.
3 Mar and 2 May 2025
Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:35.
3 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 08:27.
4 and 6 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 16:49.
4 and 6 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Boyson Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 16:49.
4 and 7 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elephant And Castle, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 11:49.
4 and 7 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 12:13.
4 and 8 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Conduit Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Mar 2024 at 18:31.
4 and 8 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Maddox Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Mar 2024 at 18:32.
4 and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Mill Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 May 2024 at 13:17.
5 and 8 Mar 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Montague Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:42.
5 and 8 Mar 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.
5 and 8 Mar 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on St James's Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.
5 and 8 Mar 2025
London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.
7 and 20 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:58.
7 and 9 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:50.
8 and 21 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Whetstone Park, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 10:16.
10 and 12 Mar 2025
City Of London Telecomms are proposing to carry out Utility asset works on King Street, St James's West, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 3 Dec 2024 at 10:16.
10 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 13:08.
10 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 13:08.
10 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cornhill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:52.
10 and 14 Mar 2025
Thames Water are proposing to carry out New service connection on Old Quebec Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:51.
10 and 17 Mar 2025
UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 07:12.
10 and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 14:39.
10 and 30 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Khama Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.
10 Mar and 7 May 2025
Network Rail were proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works were categorised as Major.
The works were originally planned to start 10 March 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Dec 2024 at 14:22.
10 Mar and 10 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 12:50.
10 and 22 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 14:05.
10 and 22 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Bridge Road, Churchill, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 14:14.
10 and 22 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 14:36.
10 Mar and 21 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:40.
10 and 12 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lupus Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 14:42.
10 and 12 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 14:35.
11 and 13 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:41.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 13:28.
11 and 13 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 15:06.
11 Mar and 7 May 2025
Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.
These works are categorised as Major.
The works will start on or after 11 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Dec 2024 at 15:13.
11 Mar and 24 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 06:16.
13 Mar and 3 Apr 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 9 Dec 2024 at 15:54.
13 and 18 Mar 2025
Thames Water were proposing to carry out New service connection on Inverton Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 March 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:11.
13 and 15 Mar 2025
UK Power Networks Eastern & London are proposing to carry out roadworks on Manor Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:29.
14 and 18 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 18 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2024 at 11:13.
14 and 18 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:14.
14 and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 25 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:42.
14 and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Teredo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 25 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:39.
14 Mar and 16 May 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.
14 Mar and 16 May 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.
14 Mar and 16 May 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:14.
14 Mar and 18 Jul 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.
16 and 18 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elephant And Castle, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:11.
16 Mar and 11 Apr 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 15:35.
17 Mar and 21 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stretton Road, Croydon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2024 at 11:27.
17 Mar and 14 Apr 2025
Thames Water are proposing to carry out Utility asset works on Overhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
17 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Bethwin Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 07:31.
17 and 19 Mar 2025
BT were proposing to carry out Utility repair and maintenance works on Bethwin Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 15:28.
17 Mar and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kinglake Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:48.
17 and 21 Mar 2025
BT are proposing to carry out Utility asset works on Huntsman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 10:59.
17 and 20 Mar 2025
Thames Water are proposing to carry out Utility asset works on Sloane Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 08:35.
17 and 30 Mar 2025
City Of London Telecomms are proposing to carry out Utility asset works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 9 Dec 2024 at 15:56.
17 and 28 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Catherine Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 11:00.
17 and 23 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on St Andrew's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:56.
17 and 23 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on St Andrew's Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 29 Nov 2024 at 12:20.
17 and 21 Mar 2025
Thames Water are proposing to carry out New service connection on North Row, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:08.
17 Mar and 2 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:45.
17 Mar and 2 Apr 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 10:18.
17 and 24 Mar 2025
Thames Water were proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 13:23.
17 and 24 Mar 2025
Thames Water were proposing to carry out New service connection on Seymour Mews, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:00.
Roadworks Map near to Thorncliffe Road, LONDON, SW2 4JG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Thorncliffe Road, LONDON, SW2 4JG (69 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 21 Dec 2024)
(Scheduled: 10 Dec 2024 - 21 Dec 2024)
(Scheduled: 10 Dec 2024 - 21 Dec 2024)
(Scheduled: 10 Dec 2024 - 21 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data