ROADWORKS SUMMARY
Homesfield, LONDON, NW11 6HL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Homesfield, NW11 6HL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Homesfield, LONDON, NW11 6HL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Homesfield are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 18 Dec 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.

Thames Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:03.

Thames Water logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:50.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Pert Close

Thames Water are carrying out Utility asset works on Pert Close, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Alexandra Road

Thames Water are carrying out Utility asset works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 10:20 and could run through until 23 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 08:13.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 16:28.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

Thames Water logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Station Road

Thames Water are carrying out Utility asset works on Station Road, Southgate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:45.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Greencroft Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 09:00 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 07:08.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 1 May 2024 at 07:27.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 07:13.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 14 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 11:56.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 14 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 11:58.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Greville Road

HS2 are carrying out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 11:00 and could run through until 14 December 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 12:00.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are carrying out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 00:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 08:43.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 11:40 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 07:51.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

London Borough Of Camden logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Randell's Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Randell's Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Jun 2024 at 07:05.

London Borough Of Camden logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway repair and maintenance works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 14:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Jul 2024 at 14:28.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 July 2024 at 09:49 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:19.

London Borough Of Barnet logo
LONG TERM
Until
12 Apr 2025
Details
View Map
Share
Follow
Hampden Way

London Borough Of Barnet are carrying out Highway improvement works on Hampden Way, Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 10:40.

Thames Water logo
LONG TERM
Between
4 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 May 2024 at 10:30.

Thames Water logo
LONG TERM
Until
16 Mar 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are carrying out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 08:00 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:16.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

London Borough Of Camden logo
LONG TERM
Between
2 Sep and 20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Jul 2024 at 08:02.

London Borough Of Camden logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 14:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 15:45.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 14 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 12:05.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 14 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 12:08.

HS2 logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 September 2024 at 00:01 and could run through until 14 December 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 2 Dec 2024 at 12:04.

London Borough Of Barnet logo
LONG TERM
Between
10 Sep 2024 and 22 Feb 2025
Details
View Map
Share
Follow
Chase Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Chase Way, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 22 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

London Borough Of Camden logo
LONG TERM
Between
16 Sep and 13 Dec 2024
Details
View Map
Share
Follow
Richardson's Mews

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 21 Jun 2024 at 16:21.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 16 September 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:58.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 13:02.

Transport for London (TfL) logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Cooper Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cooper Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 September 2024 at 11:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 14:17.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.

Thames Water logo
LONG TERM
Between
7 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:08.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are carrying out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:37.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Fonthill Road

Thames Water were proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 10:51.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are carrying out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:04.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.

London Borough Of Camden logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hermit Place

London Borough Of Camden are carrying out Highway repair and maintenance works on Hermit Place, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 11 Oct 2024 at 14:10.

Network Rail logo
LONG TERM
Between
19 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.

Network Rail logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
21 Oct 2024 and 3 Jun 2025
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

London Borough Of Brent logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 18 Oct 2024 at 22:19.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Kilburn Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 22 Oct 2024 at 08:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:54.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

London Borough Of Brent logo
LONG TERM
Between
21 Oct 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2024 at 09:55.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 21 October 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:25.

Thames Water logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Palmers Road

Thames Water are carrying out Utility asset works on Palmers Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:45 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 10:25.

Thames Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Barnet Road

Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are carrying out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:28.

London Borough Of Camden logo
LONG TERM
Between
29 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 15 Nov 2024 at 12:15.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:06.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Northdown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2024 at 05:57.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.

London Borough Of Camden logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Kilburn High Road

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 12:36.

Thames Water logo
LONG TERM
Between
4 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are proposing to carry out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Cadent Gas logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are carrying out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:39 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 07:19.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Kilburn High Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 3 Dec 2024 at 14:11.

London Borough Of Barnet logo
LONG TERM
Between
6 Nov 2024 and 13 Mar 2025
Details
View Map
Share
Shirehall Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.

London Borough Of Barnet logo
LONG TERM
Between
7 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:56.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:03.

Transport for London (TfL) logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:57.

London Borough Of Camden logo
LONG TERM
Between
8 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:21.

London Borough Of Camden logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are carrying out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Nov 2024 at 09:11.

Thames Water logo
LONG TERM
Between
11 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:54.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 19:03.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:25.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 09:54.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are carrying out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:23.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are carrying out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:26.

London Borough Of Brent logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Park Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Park Lane, Wembley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 25 Nov 2024 at 12:53.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Vale Of Health

Thames Water are carrying out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 07:45 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 14:54.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 14:45.

Thames Water logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Brookhill Road

Thames Water are carrying out Utility repair and maintenance works on Brookhill Road, New Barnet, Barnet.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 10:30 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:18.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Eaton Road

London Borough Of Barnet are carrying out Highway improvement works on Eaton Road, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 14:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 15 Nov 2024 at 14:37.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Gower Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Gower Street

Transport for London (TfL) are carrying out Highway improvement works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:01.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Gordon Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Gordon Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:01.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Upper Woburn Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Woburn Place, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.

Transport for London (TfL) logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Upper Woburn Place

Transport for London (TfL) are carrying out Highway improvement works on Upper Woburn Place, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 08:44.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Endsleigh Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:47.

Transport for London (TfL) logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Endsleigh Gardens

Transport for London (TfL) are carrying out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:02.

Transport for London (TfL) logo
Between
18 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:59.

Transport for London (TfL) logo
LONG TERM
Until
21 Dec 2024
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are carrying out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:00.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.

Murphy Power Distribution logo
Finishing
Friday
Details
View Map
Share
Follow
Central Way

Murphy Power Distribution are carrying out New service connection on Central Way, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:53 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:59.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Chatsworth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chatsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 13:24.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Chatsworth Road

Thames Water are carrying out Utility repair and maintenance works on Chatsworth Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:25.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Lydford Road

Thames Water are carrying out Utility asset works on Lydford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:24.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Willoughby Road

Thames Water are proposing to carry out Utility repair and maintenance works on Willoughby Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:20.

London Borough Of Haringey logo
Finishing
Monday
Details
View Map
Share
Follow
Bounds Green Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 30 Oct 2024 at 16:39.

London Borough Of Haringey logo
Finishing
Monday
Details
View Map
Share
Follow
Bounds Green Road

London Borough Of Haringey are carrying out Highway improvement works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 18 Nov 2024 at 09:26.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:26.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are carrying out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:48 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:48.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are carrying out Utility repair and maintenance works on High Road, Wembley.

The works started on 19 November 2024 at 14:18 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 10:30.

London Borough Of Haringey logo
LONG TERM
Between
19 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Jun 2024 at 11:56.

ESP Electricity logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Bramshill Road

ESP Electricity are carrying out Utility repair and maintenance works on Bramshill Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:11 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Dec 2024 at 11:04.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Gloucester Place

Thames Water are carrying out Utility repair and maintenance works on Gloucester Place, Bryanston & Dorset Square, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 13:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 11:47.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hamilton Terrace

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:31.

UK Power Networks Eastern & London logo
Between
22 Nov and 17 Dec 2024
Details
View Map
Share
High Street

UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 15:59.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lovett Way

Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.

The works started on 23 November 2024 at 09:54 and could run through until 10 December 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:30.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Marylebone Road

Thames Water are carrying out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:32 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:32.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Wrottesley Road

Thames Water are carrying out Utility repair and maintenance works on Wrottesley Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 12:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 18:35.

London Borough Of Camden logo
Between
25 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:57.

London Borough Of Camden logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are carrying out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 25 Nov 2024 at 09:33.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:44.

Cadent Gas logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are carrying out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 16:13 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 09:06.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:32.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 5 Jan 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Burnt Oak Broadway

London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.

London Borough Of Barnet logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Great Field

London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 11:24.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Northdown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 09:45.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 11:24.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are carrying out Utility repair and maintenance works on Edgware Road, Hyde Park, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 09:24 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 10:37.

City Of Westminster logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hyde Park Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.

City Of Westminster logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Hyde Park Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 16:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Dec 2024 at 16:10.

City Of Westminster logo
Between
28 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Somers Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.

City Of Westminster logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Somers Crescent

City Of Westminster are carrying out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 16:00 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Dec 2024 at 16:10.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:45.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 12:08.

City Of Westminster logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lisson Grove

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Nov 2024 at 15:58.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Culworth Street

Cadent Gas are carrying out Utility repair and maintenance works on Culworth Street, Regent's Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 06:58 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 12:21.

Thames Water logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Franklyn Road

Thames Water are carrying out Utility repair and maintenance works on Franklyn Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 12:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 18:49.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Andrews Road

Thames Water are carrying out Utility repair and maintenance works on St Andrews Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 16:34 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:51.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Hardy Passage

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hardy Passage, Wood Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 12:33 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:15.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
Fairmead Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Fairmead Crescent, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2024 at 12:39.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 12:00 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 12:30.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 18:00 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 08:54.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lough Road

Thames Water are carrying out Utility repair and maintenance works on Lough Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 07:27 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:34.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Hardy Passage

Thames Water are carrying out Utility repair and maintenance works on Hardy Passage, Wood Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 08:09 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:32.

Thames Water logo
Between
29 Nov and 24 Dec 2024
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility repair and maintenance works on Station Road, The Hale, Edgware.

These works were categorised as Major.

The works were originally planned to start 29 November 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:39.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Gibson Square

Thames Water are carrying out Utility repair and maintenance works on Gibson Square, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2024 at 13:36 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 07:50.

UK Power Networks Eastern & London logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Devonshire Row Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:39.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
William Road

UK Power Networks Eastern & London were proposing to carry out New service connection on William Road, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:04.

Thames Water logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 08:00.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 10:35 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:35.

Electricity Network Company logo
Between
2 and 25 Dec 2024
Details
View Map
Share
Follow
Fernhead Road

Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Sep 2024 at 16:01.

London Borough Of Camden logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Nov 2024 at 10:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Brewery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brewery Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 14:28.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Brewery Road

Thames Water are carrying out Utility repair and maintenance works on Brewery Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:53.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Monks Park

UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.

Thames Water logo
Between
2 and 22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are proposing to carry out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
Until
22 Dec 2024
Details
View Map
Share
Follow
Buxton Road

Thames Water are carrying out Utility asset works on Buxton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:36.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are proposing to carry out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.

Thames Water logo
LONG TERM
Until
25 May 2025
Details
View Map
Share
Follow
Chapter Road

Thames Water are carrying out Utility asset works on Chapter Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:30 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:55.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:16.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Harefield Road

Thames Water were proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 13:16.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Harefield Road

Thames Water are carrying out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:23 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:39.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Tenterden Grove

Thames Water were proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:05.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Gladstone Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Gladstone Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 12:58.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Gladstone Avenue

Thames Water are carrying out Utility repair and maintenance works on Gladstone Avenue, Wood Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:00 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 11:04.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Follow
Lyndhurst Road

Virgin Media are proposing to carry out Utility asset works on Lyndhurst Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 12:08.

London Borough Of Enfield logo
Finishing
Today
Details
View Map
Share
Follow
Green Lanes

London Borough Of Enfield are proposing to carry out Highway improvement works on Green Lanes, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 5 Sep 2024 at 14:50.

London Borough Of Enfield logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Whitmore Close

London Borough Of Enfield are carrying out Highway improvement works on Whitmore Close, Southgate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 07:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 2 Dec 2024 at 10:02.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Highwood Hill

Cadent Gas are carrying out Utility repair and maintenance works on Highwood Hill, Marsh Lane To Totteridge Common, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 20:00 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:25.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Southam Street

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Southam Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:36.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Adair Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Adair Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:39.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Golborne Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Golborne Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:33.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Kensal Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensal Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:32.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Caledonian Road

Thames Water are carrying out Utility repair and maintenance works on Caledonian Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 11:53 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:36.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Walm Lane

Cadent Gas are carrying out Utility repair and maintenance works on Walm Lane, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 17:11 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 18:36.

Cadent Gas logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Cricklewood Broadway

Cadent Gas are carrying out Utility repair and maintenance works on Cricklewood Broadway, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 09:46 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 11:04.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Oakington Way

Thames Water are carrying out Utility repair and maintenance works on Oakington Way, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 08:31 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:27.

Affinity Water logo
Between
3 and 11 Dec 2024
Details
View Map
Share
Borthwick Road

Affinity Water were proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 10:14.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 16:20.

UK Power Networks Eastern & London logo
Between
4 and 11 Dec 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:32.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Fourth Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 15:44.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Drylands Road

Thames Water are carrying out Utility repair and maintenance works on Drylands Road, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 08:41 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 08:41.

London Borough Of Brent logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
Nicoll Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.

London Borough Of Brent logo
Between
5 and 19 Dec 2024
Details
View Map
Share
Follow
Nicoll Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Park Avenue

BT are proposing to carry out Utility asset works on Park Avenue, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Oct 2024 at 14:56.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Ranelagh Road

BT are proposing to carry out Utility asset works on Ranelagh Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Oct 2024 at 14:13.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:58.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 13:48.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 07:58.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 07:56.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 11:27.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Stroud Green Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 December 2024 and run through until 7 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 11:46.

London Borough Of Barnet logo
Finishing
Sunday
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Oct 2024 at 13:23.

London Borough Of Barnet logo
Finishing
Sunday
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

London Borough Of Barnet logo
Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
St James Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Nov 2024 at 09:33.

London Borough Of Barnet logo
Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
St James Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Nov 2024 at 15:48.

London Borough Of Camden logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2024 at 10:25.

Transport for London (TfL) logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.

Transport for London (TfL) logo
Between
8 and 20 Dec 2024
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.

City Of Westminster logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.

City Of Westminster logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 15:23.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Adelaide Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:02.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:05.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Nov 2024 at 10:42.

London Borough Of Camden logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Sep 2024 at 12:17.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grange Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Grange Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:23.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Nassington Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Nassington Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Nassington Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Nassington Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Oct 2024 at 15:51.

London Borough Of Camden logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Well Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Well Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

London Borough Of Camden logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Grove Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grove Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Archway Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 11:45.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 11:20.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Archway Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 14:33.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 14:53.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 9 Sep 2024 at 07:55.

Between
9 and 13 Dec 2024
Details
View Map
Share
Stroud Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Stroud Green Road, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 13:58.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:07.

Cadent Gas logo
Between
9 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 08:28.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:02.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:19.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Haringey Park

Thames Water are proposing to carry out Utility repair and maintenance works on Haringey Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 07:44.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Haringey Park

Thames Water are proposing to carry out Utility repair and maintenance works on Haringey Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:45.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hampstead Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:31.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Varley Parade Service Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:38.

London Borough Of Barnet logo
LONG TERM
Between
9 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Stockwell Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Sep 2024 at 14:32.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 14:47.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Torrington Park

Thames Water were proposing to carry out Utility asset works on Torrington Park, North Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:24.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Friary Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Way, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 12:22.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Uphill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 14:45.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:01.

Thames Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Uphill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uphill Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:19.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Chelmsford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 18:11.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Chelmsford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:23.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 09:16.

BT logo
Between
10 and 25 Dec 2024
Details
View Map
Share
Agar Grove

BT were proposing to carry out Utility asset works on Agar Grove, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 December 2024. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by BT on 9 Sep 2024 at 12:37.

London Borough Of Camden logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Fortune Green Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

Thames Water are carrying out Utility repair and maintenance works on Stroud Green Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:10 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2024 at 14:17.

London Borough Of Barnet logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2024 at 17:25.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Sep 2024 at 15:24.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:07.

City Of Westminster logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Delamere Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:06.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Oct 2024 at 13:24.

Affinity Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Langland Crescent

Affinity Water are proposing to carry out Utility asset works on Langland Crescent, Stanmore.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 15:35.

BT logo
Between
13 and 17 Dec 2024
Details
View Map
Share
Lower Terrace

BT were proposing to carry out Utility asset works on Lower Terrace, Hampstead Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 22 Oct 2024 at 11:10.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Bristol Gardens

Thames Water were proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:58.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
St Pancras Way

Network Rail were proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 11:07.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Sep 2024 at 18:04.

Network Rail logo
Between
16 and 30 Dec 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 08:52.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Aylmer Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 11:13.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Aylmer Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 13:46.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

UK Power Networks Eastern & London logo
Between
17 and 26 Dec 2024
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 09:51.

Cadent Gas logo
Between
18 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Gloucester Road

BT were proposing to carry out Utility asset works on Gloucester Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 16:24.

Network Rail logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Camden Square

Network Rail are proposing to carry out Works for Rail Purposes on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:17.

Network Rail logo
Between
21 and 24 Dec 2024
Details
View Map
Share
Follow
Camden Square

Network Rail are proposing to carry out Works for Rail Purposes on Camden Square, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 December 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 08:47.

Thames Water logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:48.

Thames Water logo
Between
23 and 28 Dec 2024
Details
View Map
Share
Follow
Langham Road

Thames Water are proposing to carry out New service connection on Langham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 16:20.

Thames Water logo
Between
23 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Carlingford Road

Thames Water are proposing to carry out New service connection on Carlingford Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 07:59.

London Borough Of Barnet logo
Between
24 and 31 Dec 2024
Details
View Map
Share
Woodside

London Borough Of Barnet were proposing to carry out Highway improvement works on Woodside, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:55.

London Borough Of Barnet logo
Until
26 Dec 2024
Details
View Map
Share
Follow
Claverley Villas

London Borough Of Barnet are carrying out Highway improvement works on Claverley Villas, Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 00:00 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2024 at 09:19.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Rectory Lane

London Borough Of Barnet carried out Highway improvement works on Rectory Lane, Edgware.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 24 Dec 2024 and 26 Dec 2024 and were actually completed on between and . The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 12:56.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Follow
Granville Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2024 at 11:08.

Murphy Power Distribution logo
Between
26 Dec 2024 and 19 Jan 2025
Details
View Map
Share
Follow
Glengall Road

Murphy Power Distribution are proposing to carry out New service connection on Glengall Road, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 14:47.

BT logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Green Lanes

BT were proposing to carry out Utility asset works on Green Lanes, Hornsey, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Oct 2024 at 08:35.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.

Network Rail logo
LONG TERM
Between
28 Dec 2024 and 29 Mar 2025
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 18:36.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 16:22.

Thames Water logo
Between
1 and 6 Jan 2025
Details
View Map
Share
York Mews

Thames Water were proposing to carry out New service connection on York Mews, Kentish Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:25.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Bewdley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Bewdley Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 07:31.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:55.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:47.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:01.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:48.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 08:04.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 10:43.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Dollis Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 11:50.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Nether Street

Thames Water are proposing to carry out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:51.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Winchmore Hill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winchmore Hill Road, Southgate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 07:27.

Thames Water logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Thames Water logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Etheldene Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Etheldene Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:07.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:52.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:07.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:15.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Devonshire Street

Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 15:10.

Thames Water logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Harley Street

Thames Water are proposing to carry out Utility asset works on Harley Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:57.

Thames Water logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:04.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:03.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Portland Place

Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:45.

Thames Water logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Portland Place

Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:59.

Thames Water logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:35.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:15.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:19.

Thames Water logo
LONG TERM
Between
6 Jan and 25 Mar 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:58.

Thames Water logo
Between
6 and 11 Jan 2025
Details
View Map
Share
Follow
Maida Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Maida Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:20.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 19:07.

Between
6 and 15 Jan 2025
Details
View Map
Share
Follow
Randolph Avenue

G. Network Communications are proposing to carry out Remedial works on Randolph Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 9 Oct 2024 at 09:07.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 21:52.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 16:06.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 2 May 2025
Details
View Map
Share
Follow
Northdown Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 11:24.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tolhurst Drive

City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:39.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Circus Road

Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
6 Jan and 13 Apr 2025
Details
View Map
Share
Follow
Wellington Road

Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:59.

UK Power Networks Eastern & London logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Goods Way

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Goods Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 08:38.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:45.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.

Thames Water logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:13.

UK Power Networks Eastern & London logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Willesden Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Willesden Lane, Kilburn, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 08:03.

Thames Water logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:50.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Balmoral Road

Thames Water are proposing to carry out Utility asset works on Balmoral Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Mulgrave Road

Thames Water were proposing to carry out Utility asset works on Mulgrave Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 07:28.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:46.

Thames Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Vale Of Health

Thames Water are proposing to carry out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:52.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Myddleton Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:47.

T-Mobile (UK) logo
Between
6 and 17 Jan 2025
Details
View Map
Share
The Avenue

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Avenue, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 18 Oct 2024 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rotherwick Road

Cadent Gas are proposing to carry out Utility asset works on Rotherwick Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 09:07.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 09:27.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 16:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

London Borough Of Barnet logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 28 Nov 2024 at 13:25.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
The Hyde

Cadent Gas were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:59.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Edgware Road

Cadent Gas are proposing to carry out Utility asset works on Edgware Road, Kingsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 20:57.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Grove Park

Cadent Gas are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 09:52.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:13.

Affinity Water logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Tewkesbury Gardens

Affinity Water are proposing to carry out Utility asset works on Tewkesbury Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:05.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 08:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Ecclesbourne Gardens

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:04.

London Borough Of Enfield logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
The Limes Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on The Limes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Broomfield Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 11:50.

London Borough Of Enfield logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Nov 2024 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Arlington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Arlington Road, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:34.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:04.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:17.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:37.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:01.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:38.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:02.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 11:05.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 13:52.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:38.

Transport for London (TfL) logo
Between
7 and 30 Jan 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 13:08.

Transport for London (TfL) logo
Between
7 and 30 Jan 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 10:32.

Virgin Media logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brandon Road

Virgin Media are proposing to carry out Utility asset works on Brandon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2024 at 07:48.

London Borough Of Barnet logo
LONG TERM
Between
7 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Cool Oak Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Oct 2024 at 08:45.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:58.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:18.

Vodafone logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Barnet Lane

Vodafone are proposing to carry out Utility asset works on Barnet Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 5 Nov 2024 at 14:11.

Vodafone logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Barnet Lane

Vodafone are proposing to carry out Utility asset works on Barnet Lane, Borehamwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 3 Dec 2024 at 09:52.

UK Power Networks Eastern & London logo
Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Goldhurst Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 14:45.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:37.

Thames Water logo
LONG TERM
Between
9 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.

BT logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Glendale Avenue

BT are proposing to carry out Utility asset works on Glendale Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:29.

Thames Water logo
Between
10 and 12 Jan 2025
Details
View Map
Share
Follow
Waterfall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waterfall Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:06.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 22 Oct 2024 at 14:25.

T-Mobile (UK) logo
Between
11 and 18 Jan 2025
Details
View Map
Share
Follow
Corringham Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Corringham Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 18 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 23 Oct 2024 at 15:48.

Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 26 Nov 2024 at 11:29.

Thames Water logo
LONG TERM
Between
13 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:30.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Paddington Street

Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:04.

UK Power Networks Eastern & London logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Devonshire Row Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 13:42.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Frampton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:16.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Lisson Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:07.

Thames Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 14:34.

City Of Westminster logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 15:27.

Thames Water logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Caledonian Road

Thames Water are proposing to carry out Utility repair and maintenance works on Caledonian Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 07:58.

Thames Water logo
Between
13 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Caledonian Road

Thames Water are proposing to carry out Utility repair and maintenance works on Caledonian Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:42.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.

Thames Water logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
High Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on High Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Harrow Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Harrow Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 4 Oct 2024 at 10:43.

London Borough Of Brent logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 24 Nov 2024 at 22:17.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Apr 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:54.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:14.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:42.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

London Borough Of Barnet logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Leeside Crescent

London Borough Of Barnet were proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 14:17.

Thames Water logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fairbourne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairbourne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 11:26.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 08:25.

London Borough Of Barnet logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 13:03.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Aerodrome Road

Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Edith Road

Thames Water are proposing to carry out New service connection on Edith Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Holden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 14:33.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 28 Oct 2024 at 11:20.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 15:48.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
The Ridgeway

T-Mobile (UK) were proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Oct 2024 at 11:45.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Corri Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Corri Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:47.

UK Power Networks Eastern & London logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 19:08.

Cadent Gas logo
LONG TERM
Between
14 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.

G2 Energy IDNO logo
Between
15 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Oak Tree Road

G2 Energy IDNO are proposing to carry out Utility asset works on Oak Tree Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 08:50.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 09:26.

Thames Water logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.

City Of Westminster logo
Between
17 and 20 Jan 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.

UK Power Networks Eastern & London logo
Between
18 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.

City Of Westminster logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 14:30.

Thames Water logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Luxborough Street

Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.

UK Power Networks Eastern & London logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 14:02.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Adelaide Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 18:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:16.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:54.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 07:51.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Llanover Road

Thames Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:38.

Transport for London (TfL) logo
Between
20 and 21 Jan 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 09:26.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Thames Water logo
Between
22 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.

Thames Water logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Greenwood Place

Thames Water are proposing to carry out New service connection on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:24.

National Highways logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Chalk Farm Road

National Highways were proposing to carry out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:14.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Chalk Farm Road

Network Rail were proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:38.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 15:55.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Eastbourne Terrace

Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:04.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.

Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Gloucester Place

G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 4 Nov 2024 at 09:40.

Thames Water logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Baker Street

Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:28.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 06:40.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Kentish Town Road

Thames Water are proposing to carry out Utility repair and maintenance works on Kentish Town Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 17:00.

Thames Water logo
LONG TERM
Between
27 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Willesden Lane

Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:53.

Thames Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Queens Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queens Drive, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:43.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:13.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Coles Green Road

Thames Water are proposing to carry out New service connection on Coles Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 19:29.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chesterfield Gardens

Thames Water are proposing to carry out New service connection on Chesterfield Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:09.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 16:19.

Affinity Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 12:14.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

London Borough Of Barnet logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 09:17.

Affinity Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 15:48.

London Borough Of Barnet logo
Between
29 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 15:55.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Blandford Street

Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:40.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Oct 2024 at 11:26.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Southam Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Adair Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Golborne Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Kensal Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Nov 2024 at 15:13.

UK Power Networks Eastern & London logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:24.

City Of Westminster logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Elgin Mews South

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:36.

City Of Westminster logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Elgin Mews South

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 10:47.

Thames Water logo
LONG TERM
Between
3 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Grove End Road

Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
3 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Grove End Road

Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.

Thames Water logo
LONG TERM
Between
3 Feb and 8 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.

Thames Water logo
LONG TERM
Between
3 Feb and 8 May 2025
Details
View Map
Share
Follow
Acacia Road

Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:38.

UK Power Networks Eastern & London logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Maida Vale

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Maida Vale, Maida Vale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 15:58.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:01.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
3 Feb and 18 May 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:00.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:48.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 13:36.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Finchley Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:10.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Castleton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 3 Nov 2024 at 19:10.

Cadent Gas logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are proposing to carry out Utility asset works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 13:45.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 12:12.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Fernside Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:44.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Bells Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:40.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Leicester Road

Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:19.

City Of Westminster logo
Between
4 and 17 Feb 2025
Details
View Map
Share
Follow
Ledbury Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ledbury Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 15:21.

Thames Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Harrow Road

Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:14.

Thames Water logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:44.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:40.

Transport for London (TfL) logo
LONG TERM
Between
7 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:10.

London Borough Of Barnet logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Oct 2024 at 15:18.

Lumen Technologies logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Baker Street

Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 26 Nov 2024 at 19:20.

City Of Westminster logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.

Thames Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Bristol Gardens

Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:26.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Nov 2024 at 11:32.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Annette Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 15:06.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Neasden Lane North

Cadent Gas are proposing to carry out Utility asset works on Neasden Lane North, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:39.

Transport for London (TfL) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 15:40.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Harefield Road

Thames Water are proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 14:41.

London Borough Of Enfield logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 10:00.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:22.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 15:34.

London Borough Of Barnet logo
Between
13 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

Thames Water logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 12:46.

City Of London Telecomms logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Baker Street

City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 4 Nov 2024 at 09:46.

City Of London Telecomms logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Baker Street

City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 25 Nov 2024 at 13:11.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Hawkins Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.

London Borough Of Brent logo
Between
15 and 24 Feb 2025
Details
View Map
Share
Follow
Bridge Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:03.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:43.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 09:18.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 09:19.

Transport for London (TfL) logo
LONG TERM
Between
17 Feb and 19 May 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:40.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:58.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:58.

Thames Water logo
Between
17 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:55.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:00.

Thames Water logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:55.

Thames Water logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out Utility asset works on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:19.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Edward's Cottages

Thames Water are proposing to carry out New service connection on Edward's Cottages, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 07:39.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Edward's Cottages

Thames Water are proposing to carry out New service connection on Edward's Cottages, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 11:50.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:54.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:20.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:41.

Affinity Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Clarendon Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Clarendon Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 21:31.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gillespie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gillespie Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:49.

London Borough Of Barnet logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 13:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Bank

Thames Water are proposing to carry out New service connection on The Bank, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:20.

Thames Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Wentworth Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:05.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Hyperoptic logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Frobisher Road

Hyperoptic are proposing to carry out Utility asset works on Frobisher Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 13 Nov 2024 at 14:33.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 12:20.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
East End Road

Affinity Water were proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 14:42.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 11:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:13.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:51.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 09:22.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:31.

London Borough Of Barnet logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Leicester Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:54.

London Borough Of Barnet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Nov 2024 at 09:59.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Albert Road

BT are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 12:31.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Cadent Gas are proposing to carry out New service connection on Salisbury Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:03.

Vodafone logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Caple Road

Vodafone are proposing to carry out Remedial works on Caple Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 11 Nov 2024 at 16:25.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hadley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:41.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 15:38.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:20.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Arkley Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Arkley Lane, Arkley, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:39.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 15:47.

Transport for London (TfL) logo
LONG TERM
Between
21 Feb and 19 May 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 15:16.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

Thames Water logo
LONG TERM
Between
21 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Somerfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 15:54.

London Borough Of Barnet logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Leeside Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 14:13.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 11:16.

London Borough Of Barnet logo
Between
21 and 26 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 14:35.

Lumen Technologies logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Baker Street

Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lumen Technologies on 29 Nov 2024 at 09:11.

Thames Water logo
Between
24 Feb and 2 Mar 2025
Details
View Map
Share
Ponsard Road

Thames Water were proposing to carry out roadworks on Ponsard Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:51.

Cadent Gas logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Christchurch Avenue

Cadent Gas are proposing to carry out Utility asset works on Christchurch Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 17:30.

Thames Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:27.

Cadent Gas logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:41.

London Borough Of Barnet logo
Until
10 Mar 2025
Details
View Map
Share
Follow
Shirehall Lane

London Borough Of Barnet are carrying out Highway improvement works on Shirehall Lane, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:28.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Girton Avenue

Affinity Water are proposing to carry out Utility asset works on Girton Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 17:14.

Affinity Water logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
North Way

Affinity Water are proposing to carry out Utility asset works on North Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 16:05.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:50.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 11:05.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:12.

London Borough Of Barnet logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Westcombe Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Westcombe Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 15:51.

Transport for London (TfL) logo
Between
25 and 26 Feb 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:54.

London Borough Of Barnet logo
Between
25 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Leeside Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:10.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:13.

Virgin Media logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Mount

Virgin Media are proposing to carry out Utility asset works on The Mount, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Nov 2024 at 17:36.

Transport for London (TfL) logo
Between
2 and 6 Mar 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:50.

Thames Water logo
Between
3 and 9 Mar 2025
Details
View Map
Share
Follow
Ponsard Road

Thames Water are proposing to carry out New service connection on Ponsard Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 14:42.

London Borough Of Ealing logo
LONG TERM
Between
3 Mar and 6 Jun 2025
Details
View Map
Share
Follow
Acton Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Acton Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 6 Nov 2024 at 11:23.

London Borough Of Camden logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Priory Terrace

London Borough Of Camden are proposing to carry out Highway improvement works on Priory Terrace, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Dec 2024 at 15:36.

London Borough Of Camden logo
Between
3 and 29 Mar 2025
Details
View Map
Share
Follow
Abbey Road

London Borough Of Camden are proposing to carry out Highway improvement works on Abbey Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Dec 2024 at 15:35.

Cadent Gas logo
LONG TERM
Between
3 Mar and 21 May 2025
Details
View Map
Share
Follow
Stag Lane

Cadent Gas are proposing to carry out Utility asset works on Stag Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:37.

London Borough Of Enfield logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
The Limes Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on The Limes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 25 Nov 2024 at 09:25.

London Borough Of Barnet logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Westcombe Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Westcombe Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 15:59.

Thames Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Leicester Road

Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 11:22.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
King Edward Road

Affinity Water were proposing to carry out Utility repair and maintenance works on King Edward Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 12:38.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
King Edward Road

Affinity Water are proposing to carry out Utility repair and maintenance works on King Edward Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:33.


Roadworks Map near to Homesfield, LONDON, NW11 6HL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 08:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Homesfield, LONDON, NW11 6HL (74 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
EMERGENCY
  
ADDISON WAY, GOLDERS GREEN 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - Some carriageway incursion
Complete
26 Nov 2024 10:14 - 28 Nov 2024 11:46
0.1
Details
Share
2
BT logo
WILLIFIELD WAY, GOLDERS GREEN 
(0.1 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 3 Dec 2024 11:30
(Scheduled: 2 Dec 2024 - 5 Dec 2024)
0.1
Details
Share
Follow
3
Affinity Water logo
URGENT
  
BROOKLAND HILL, GOLDERS GREEN 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 1 Dec 2024 10:00
(Scheduled: 1 Dec 2024 - 4 Dec 2024)
0.2
Details
Share
Follow
4
BT logo
HOGARTH HILL, GOLDERS GREEN 
(0.2 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
30 Nov 2024 11:00 - 3 Dec 2024 08:15
0.2
Details
Share
5
Virgin Media logo
ERSKINE HILL, GOLDERS GREEN 
(0.3 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 4 Dec 2024 - 6 Dec 2024
0.3
Details
Share
Follow
6
BT logo
CHILDS WAY, GOLDERS GREEN 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Dec 2024 - 5 Dec 2024
0.3
Details
Share
Follow
7
BT logo
ASMUNS HILL, GOLDERS GREEN 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 2 Dec 2024 13:20
(Scheduled: 2 Dec 2024 - 4 Dec 2024)
0.3
Details
Share
Follow
8
UK Power Networks Eastern & London logo
URGENT
  
FINCHLEY ROAD 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
28 Nov 2024 08:53 - 2 Dec 2024 17:43
0.3
Details
Share
9
UK Power Networks Eastern & London logo
URGENT
  
FINCHLEY ROAD 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 28 Nov 2024 - 4 Dec 2024)
0.3
Details
Share
10
Transport for London (TfL) logo
NORTH CIRCULAR ROAD, EAST FINCHLEY 
(0.3 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 4 Dec 2024 - 5 Dec 2024
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data