ROADWORKS SUMMARY
Belgrave Road, HA0 1AZ
Introduction
View current and future planned roadworks and road closures for Belgrave Road, HA0 1AZ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Belgrave Road, HA0 1AZ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Belgrave Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
18 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.
19 Dec 2022 and 18 Dec 2024
Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.
30 Sep 2024
HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 09:00 and could run through until 30 September 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 2 Sep 2024 at 15:12.
1 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.
9 Dec 2023 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:46 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2024 at 12:55.
Friday
HS2 are carrying out Utility asset works on Victoria Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 February 2024 at 00:01 and could run through until 20 September 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 12 Aug 2024 at 09:30.
24 Sep 2024
City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 12:30 and could run through until 24 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 15 Jan 2024 at 14:17.
Friday
HS2 are carrying out Utility asset works on Wales Farm Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 February 2024 at 00:01 and could run through until 20 September 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 12 Aug 2024 at 09:31.
1 Mar 2025
London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.
These works are categorised as Major.
The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
Friday
London Borough Of Richmond Upon Thames are carrying out Highway repair and maintenance works on Kitson Road, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2024 at 08:00 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 30 Aug 2024 at 14:09.
15 Oct 2024
HS2 are carrying out Utility asset works on Western Avenue, Perivale.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 11 March 2024 at 09:30 and could run through until 15 October 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by HS2 on 12 Aug 2024 at 15:38.
15 Oct 2024
HS2 are carrying out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 00:01 and could run through until 15 October 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 28 Aug 2024 at 16:08.
28 Oct 2024
HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.
28 Oct 2024
HS2 are carrying out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.
28 Oct 2024
HS2 are carrying out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 28 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:31.
5 Nov 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 22:00 and could run through until 5 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 14:26.
14 Nov 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 08:00 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Apr 2024 at 07:01.
3 Nov 2024
Thames Water are carrying out Utility asset works on College Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 09:10 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:40.
5 May and 1 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 10:20.
11 Oct 2024
HS2 are carrying out Section 50 on Oxford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 29 Jul 2024 at 14:48.
11 Oct 2024
HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 29 Jul 2024 at 13:33.
11 Oct 2024
HS2 are carrying out Section 50 on Greville Road, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 11:00 and could run through until 11 October 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 29 Jul 2024 at 14:28.
10 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.
24 Dec 2024
London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 10:16.
23 Nov 2024
London Borough Of Barnet are carrying out Highway improvement works on Station Road, Hendon, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 June 2024 at 09:23 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Jun 2024 at 07:18.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
10 Nov 2024
Thames Water are carrying out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2024 at 07:35.
1 Jan 2025
London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.
1 Jan 2025
London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.
31 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.
13 Mar 2025
Cadent Gas are carrying out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 09:11 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 08:14.
19 Oct 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 June 2024 at 11:40 and could run through until 19 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 07:20.
25 Oct 2024
London Borough Of Barnet are carrying out Highway improvement works on Hampstead Way, Golders Green, London.
These works are categorised as Major.
The works started on 1 July 2024 at 10:46 and could run through until 25 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Jul 2024 at 09:48.
12 Dec 2024
London Borough Of Ealing are carrying out Highway improvement works on Ruislip Road, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 4 Jul 2024 at 09:17.
11 Oct 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Gascony Avenue, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 July 2024 at 08:00 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2024 at 07:12.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.
Wednesday
HS2 are carrying out Utility asset works on Lynwood Road, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 07:00 and could run through until 18 September 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 5 Sep 2024 at 14:42.
31 Oct 2024
Thames Water are carrying out Utility asset works on Greenhill Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 14:35 and could run through until 31 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Aug 2024 at 07:01.
1 Oct 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 July 2024 at 09:49 and could run through until 1 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jul 2024 at 09:53.
6 Oct 2024
HS2 are carrying out Section 50 on Western Avenue, Ealing.
These works are categorised as Major.
The works started on 17 July 2024 at 22:00 and could run through until 6 October 2024. The works will impact the footway, carriageway, cycleway, parking place and bus stop or stand.
This roadwork event was last updated by HS2 on 31 Jul 2024 at 12:35.
Wednesday
ESP Electricity are carrying out Utility asset works on Bashley Road, Park Royal.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 July 2024 at 13:00 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 13 Sep 2024 at 12:13.
29 Oct 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 11:31 and could run through until 29 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:10.
8 Oct 2024
Cadent Gas are carrying out Utility asset works on Tentelow Lane, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 July 2024 at 07:16 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 14:28.
23 Sep 2024
Cadent Gas are carrying out Utility asset works on Finchley Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 15:10 and could run through until 23 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 14:25.
20 Oct 2024
Cadent Gas are carrying out Utility asset works on Cotman Gardens, Edgware.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 July 2024 at 08:41 and could run through until 20 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 10:04.
13 Oct 2024
Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2024 at 23:00 and could run through until 13 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2024 at 10:34.
5 Aug and 25 Sep 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 25 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2024 at 12:52.
27 Sep 2024
Cadent Gas are carrying out Utility asset works on Chaplin Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 09:43 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 09:27.
Friday
London Borough Of Ealing are proposing to carry out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 20 September 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 11:16.
Friday
London Borough Of Ealing are carrying out Utility asset works on Osborne Road, Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:39 and could run through until 20 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 Aug 2024 at 11:55.
Friday
Affinity Water are carrying out Utility asset works on Avenue Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:33 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 11 Sep 2024 at 12:58.
Friday
Affinity Water are carrying out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:33 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 12 Aug 2024 at 09:33.
12 Aug and 15 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Harrow on 1 Aug 2024 at 10:39.
15 Nov 2024
London Borough Of Harrow are carrying out Highway improvement works on Greenhill Way, Harrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 09:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:32.
12 Aug and 15 Nov 2024
London Borough Of Harrow were proposing to carry out Highway improvement works on Greenhill Way, Harrow.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 12 Aug 2024 at 09:27.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Park Parade, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 August 2024 at 11:30 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 07:52.
15 Aug 2024 and 24 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.
25 Oct 2024
Thames Water are carrying out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
The works started on 19 August 2024 at 08:00 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 09:52.
Tomorrow
HS2 are carrying out Works for Rail Purposes on Oldfield Lane North, Greenford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 15 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 19 Aug 2024 at 08:14.
19 Aug and 7 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Stuart Avenue, South Harrow.
These works are categorised as Major.
The works will start on or after 19 August 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 14:47.
25 Feb 2025
London Borough Of Harrow are carrying out Highway improvement works on College Road, Harrow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 19 Aug 2024 at 08:23.
14 Oct 2024
Thames Water are carrying out Utility asset works on Fairlight Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 August 2024 at 13:00 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:35.
21 Aug and 31 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 22 May 2024 at 08:02.
27 Oct 2024
Thames Water are carrying out Utility asset works on Westwick Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2024 at 13:45 and could run through until 27 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:40.
24 Aug and 22 Sep 2024
Thames Water are proposing to carry out Utility asset works on Mortimer Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 August 2024 and could run through until 22 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:19.
Friday
Affinity Water are carrying out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 14:47 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 Aug 2024 at 14:48.
Friday
Affinity Water are carrying out Utility asset works on Boyd Avenue, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 14:47 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 Aug 2024 at 14:47.
6 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Inverness Terrace, Lancaster Gate, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 15:00 and could run through until 6 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:00.
7 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Willow Road, Hampstead Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 08:50 and could run through until 7 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 11:23.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Deborah Close, Isleworth.
These works are categorised as Major.
The works will start on or after 1 September 2024 and could run through until 19 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2024 at 14:07.
Friday
Cadent Gas are proposing to carry out Utility asset works on Deborah Close, Isleworth.
These works are categorised as Major.
The works will start on or after 2 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 16:36.
22 Sep 2024
Scottish Hydro Electric Power Dis are carrying out New service connection on Great West Road, Brentford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 07:00 and could run through until 22 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Sep 2024 at 12:39.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2024 at 10:23.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:33.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Holland Park Roundabout, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:32.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 11:31.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:16.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:12.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 13:13.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Holland Park Roundabout, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 15:27.
2 Sep and 12 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 12:09.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Maida Vale, Maida Vale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Jul 2024 at 11:02.
Friday
Thames Water are carrying out Utility repair and maintenance works on District Road, Wembley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 15:00 and could run through until 20 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 09:03.
2 Sep and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 2 September 2024 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 09:50.
26 Nov 2024
Transport for London (TfL) are carrying out Highway improvement works on Brent Cross Roundabout West Bound Slip From North Circular, Hendon, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 2 September 2024 at 22:00 and could run through until 26 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 10:13.
Monday
Thames Water are proposing to carry out Utility asset works on Allen Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Aug 2024 at 16:06.
Monday
Thames Water are proposing to carry out Utility asset works on Allen Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 16:02.
11 Oct 2024
HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 4 Sep 2024 at 11:30.
11 Oct 2024
HS2 are carrying out Section 50 on Kilburn High Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 4 Sep 2024 at 11:31.
11 Oct 2024
HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 11 October 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 4 Sep 2024 at 10:32.
Thursday
UK Power Networks Eastern & London are carrying out Utility asset works on Kingsgate Road, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 08:00 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 08:11.
9 and 22 Sep 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Star Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 22 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 5 Sep 2024 at 12:33.
9 and 22 Sep 2024
London Borough Of Hammersmith & Fulham were proposing to carry out Highway improvement works on Star Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 22 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 6 Sep 2024 at 15:38.
9 and 26 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Meade Close, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:53.
9 and 26 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Meade Close, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:00.
9 Sep and 29 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
9 Sep and 29 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:09.
Today
Thames Water are carrying out New service connection on Grove Road, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 07:00 and could run through until 14 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 08:13.
28 Sep 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Porchester Gardens, Lancaster Gate, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 28 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 08:56.
Wednesday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monmouth Road, Bayswater, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2024 at 13:51.
Thursday
UK Power Networks Eastern & London are carrying out Utility asset works on Monmouth Road, Bayswater, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2024 at 10:30 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 06:05.
10 Nov 2024
London Borough Of Ealing are carrying out Highway improvement works on Broadmead Road, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Ealing on 13 Sep 2024 at 15:03.
4 Oct 2024
Electricity Network Company are carrying out Utility asset works on Albert Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 09:00 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 09:13.
9 Sep and 7 Oct 2024
Thames Water are proposing to carry out Utility asset works on Mill Lane, Fortune Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:46.
7 Oct 2024
Thames Water are carrying out Utility asset works on Mill Lane, Fortune Green, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 10:30 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 10:38.
9 Sep and 16 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 09:50.
Monday
Transport for London (TfL) were proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 16 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:25.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 08:30.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 14 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 15:00.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 14 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 08:39.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 14 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:22.
Tomorrow
Transport for London (TfL) were proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From Roundabout To North Circular, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 15 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2024 at 16:16.
9 and 30 Sep 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 30 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:23.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:06.
9 Sep and 2 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Aug 2024 at 09:16.
9 Sep and 6 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:59.
9 Sep and 17 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 17 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 10:52.
29 Nov 2024
Electricity Network Company are carrying out Utility asset works on Booth Road, Colindale, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 9 Sep 2024 at 08:09.
10 Sep and 2 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 17:18.
Monday
Thames Water are carrying out Utility repair and maintenance works on Churchill Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2024 at 08:23 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 08:50.
Monday
Thames Water are carrying out roadworks on Deacon Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2024 at 08:33 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:28.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Helena Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2024 at 07:15 and could run through until 19 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:37.
24 Sep 2024
Thames Water are carrying out Utility asset works on Rockley Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 10:00 and could run through until 24 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:16.
11 Sep and 16 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 15:02.
Monday
Thames Water are carrying out Utility repair and maintenance works on Maida Vale, Maida Vale, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 16:33 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:56.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Granville Road, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 10:17 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Sep 2024 at 12:31.
Tuesday
Thames Water are carrying out roadworks on Gascony Avenue, Kilburn, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 09:22 and could run through until 17 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:53.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Leinster Terrace, Lancaster Gate, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 10:00 and could run through until 20 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 15:23.
Monday
Thames Water are carrying out Utility repair and maintenance works on Wellington Road, Regent's Park, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 11:15 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:38.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Perrin's Court, Hampstead Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 08:57 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:41.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Great North Way, Hendon, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 17:47 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 08:01.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Jul 2024 at 08:19.
Monday
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Aug 2024 at 11:49.
Monday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:32.
Monday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:23.
13 and 30 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:29.
Monday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:31.
Monday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 September 2024 and could run through until 16 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:22.
Thursday
Thames Water are carrying out roadworks on Nursery Walk, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 September 2024 at 08:30 and could run through until 19 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 10:03.
16 and 24 Sep 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Star Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 12 Sep 2024 at 14:28.
16 Sep and 2 Nov 2024
London Borough Of Ealing are proposing to carry out Utility asset works on Merrick Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2024 at 15:24.
16 Sep and 2 Nov 2024
London Borough Of Ealing are proposing to carry out Utility asset works on Merrick Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 11 Sep 2024 at 15:45.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Peel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Aug 2024 at 13:46.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Peel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 15:18.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Seward Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:48.
16 Sep and 4 Oct 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Jul 2024 at 13:14.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 14:13.
16 Sep and 5 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Westbourne Grove, Bayswater, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 5 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 09:44.
16 and 21 Sep 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 10 Sep 2024 at 09:33.
16 and 21 Sep 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:21.
16 and 21 Sep 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Aug 2024 at 17:09.
16 and 21 Sep 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 10:56.
16 and 27 Sep 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Carlton Vale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2024 at 15:30.
16 and 27 Sep 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Carlton Vale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 21:00.
16 Sep and 4 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on College Crescent, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 16:40.
16 Sep and 4 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on College Crescent, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 07:46.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on Iverson Road, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Jun 2024 at 15:50.
Friday
Network Rail were proposing to carry out Works for Rail Purposes on Iverson Road, West Hampstead, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 20 September 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 Sep 2024 at 15:30.
16 and 25 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 14:45.
16 and 25 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Canfield Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2024 at 15:22.
Thursday
Transport for London (TfL) are proposing to carry out Highway improvement works on Arkwright Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 07:43.
Thursday
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 19 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 10:13.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Audrey Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Affinity Water on 22 Jul 2024 at 07:47.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Oakington Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Aug 2024 at 09:20.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Oakington Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 18 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Aug 2024 at 15:44.
16 Sep and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:59.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 12:49.
16 Sep and 9 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:52.
16 Sep and 9 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Perryfield Way, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 12:49.
16 Sep and 11 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:38.
16 Sep and 9 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 12:49.
16 Sep and 22 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 09:45.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:02.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:42.
16 Sep and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 12:49.
16 and 27 Sep 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Aug 2024 at 14:17.
16 and 27 Sep 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Pinner Park Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:16.
17 Sep and 9 Oct 2024
Electricity Network Company are proposing to carry out Utility asset works on Albert Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 23 Jul 2024 at 15:30.
17 and 21 Sep 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 21 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 08:30.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 September 2024 and run through until 20 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:25.
17 Sep and 12 Oct 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jun 2024 at 13:51.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Allison Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2024 and could run through until 20 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:18.
19 and 30 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Westbourne Grove, Bayswater, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 30 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2024 at 13:52.
19 Sep and 2 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Granville Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jun 2024 at 08:58.
19 Sep and 2 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Granville Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 16:44.
20 and 24 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:32.
20 and 24 Sep 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:24.
20 and 24 Sep 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Brent Cross Roundabout West Bound Slip From Roundabout To North Circular, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2024 and could run through until 24 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:55.
22 Sep and 4 Oct 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Pavilion Way, Edgware.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 May 2024 at 10:00.
23 and 27 Sep 2024
Thames Water are proposing to carry out New service connection on Bolton Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 16:19.
23 and 29 Sep 2024
Thames Water were proposing to carry out New service connection on Lyons Walk, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 29 September 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 10:35.
23 and 27 Sep 2024
Thames Water are proposing to carry out New service connection on Peel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jul 2024 at 10:37.
23 and 28 Sep 2024
Thames Water are proposing to carry out New service connection on Lexden Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 13:38.
23 and 27 Sep 2024
London Borough Of Ealing are proposing to carry out Utility asset works on New Broadway, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 13 Aug 2024 at 13:34.
23 and 27 Sep 2024
London Borough Of Ealing are proposing to carry out Utility asset works on New Broadway, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 13 Aug 2024 at 15:52.
23 Sep and 3 Oct 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:30.
23 and 25 Sep 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Grittleton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 16:33.
23 Sep and 1 Oct 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glenilla Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Jun 2024 at 12:34.
23 Sep and 1 Oct 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Glenilla Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 1 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 15:36.
23 and 27 Sep 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lymington Road, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 07:42.
23 Sep and 18 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 14:24.
23 and 25 Sep 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Tudor Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 25 September 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Affinity Water on 16 Jul 2024 at 08:37.
24 and 26 Sep 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Sinclair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 11:52.
24 and 26 Sep 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Sinclair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 11:15.
24 Sep and 8 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Boscobel Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:27.
24 Sep and 8 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Frampton Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:22.
24 Sep and 8 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchardson Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:16.
24 Sep and 8 Oct 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Edgware Road, Hyde Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 12:14.
24 and 26 Sep 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way Off Slip North Bound To Brent Cross Roundabout, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2024 and run through until 26 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:25.
24 and 26 Sep 2024
London Borough Of Barnet are proposing to carry out roadworks on Woodfield Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2024 at 09:25.
24 and 26 Sep 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Varley Parade Service Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 26 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2024 at 10:43.
25 Sep and 12 Oct 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on North End Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 5 Sep 2024 at 14:28.
25 Sep and 2 Oct 2024
Thames Water are proposing to carry out New service connection on Poplar Grove, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 10:38.
25 Sep and 2 Oct 2024
Thames Water are proposing to carry out New service connection on Poplar Grove, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 2 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:16.
25 Sep and 7 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Bridstow Place, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Aug 2024 at 15:28.
25 and 27 Sep 2024
Affinity Water are proposing to carry out Remedial works on Durdans Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Jun 2024 at 15:00.
25 Sep and 24 Oct 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Old Oak Lane, Park Royal.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:24.
25 and 27 Sep 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 September 2024 and run through until 27 September 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:24.
26 Sep and 2 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Playfair Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 10:04.
26 Sep and 2 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Playfair Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 2 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 08:01.
26 Sep and 19 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Eton Avenue, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 19 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 15:42.
26 and 28 Sep 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way Slip From Hendon Way South Bound To Brent Cross Roundabout, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 28 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:55.
26 and 28 Sep 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Renters Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 28 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 09:50.
27 and 30 Sep 2024
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Jul 2024 at 08:19.
27 and 30 Sep 2024
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Aug 2024 at 12:23.
27 Sep and 3 Oct 2024
Transport for London (TfL) are proposing to carry out Section 58 on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2024 at 09:55.
27 Sep and 3 Oct 2024
Transport for London (TfL) are proposing to carry out Section 58 on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 3 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 12:14.
27 Sep and 22 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jun 2024 at 11:46.
27 Sep and 4 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Canfield Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Sep 2024 at 07:32.
27 Sep and 1 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2024 at 11:32.
28 Sep and 13 Oct 2024
Thames Water were proposing to carry out New service connection on Coronation Road, Park Royal.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 September 2024 and run through until 13 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:14.
28 Sep and 1 Oct 2024
Affinity Water are proposing to carry out Permanent reinstatement on South Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 September 2024 and could run through until 1 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 25 Jul 2024 at 07:37.
30 Sep and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.
These works are categorised as Major.
The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:59.
30 Sep and 1 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.
These works are categorised as Major.
The works will start on or after 30 September 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 00:10.
30 Sep and 6 Oct 2024
Thames Water are proposing to carry out New service connection on Lyons Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 12:03.
30 Sep and 6 Oct 2024
Thames Water are proposing to carry out New service connection on Lyons Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:05.
30 Sep and 14 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 11:33.
30 Sep and 14 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:08.
30 Sep and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 10:14.
30 Sep and 8 Oct 2024
Thames Water were proposing to carry out New service connection on Pennine Drive, Cricklewood, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 8 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 09:32.
30 Sep and 8 Oct 2024
Thames Water are proposing to carry out New service connection on Pennine Drive, Cricklewood, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 8 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 09:34.
30 Sep and 2 Oct 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 2 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 11 Sep 2024 at 08:53.
1 and 3 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wood Lane, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Jul 2024 at 14:09.
1 and 3 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 3 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 11 Jul 2024 at 13:58.
1 and 28 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kensington Gardens Square, Lancaster Gate, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:42.
1 and 18 Oct 2024
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Kensington Gardens Square, Lancaster Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2024 and run through until 18 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Aug 2024 at 12:51.
1 and 6 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fairhazel Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 05:59.
1 Oct and 15 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 15:06.
1 and 6 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road Flyover, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 6 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2024 at 11:17.
1 and 3 Oct 2024
Affinity Water were proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2024 and run through until 3 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 5 Aug 2024 at 13:08.
2 and 31 Oct 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Victoria Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:36.
3 and 31 Oct 2024
Transport for London (TfL) are proposing to carry out roadworks on St John's Wood Road, Regent's Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 09:44.
4 and 7 Oct 2024
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Jul 2024 at 10:42.
4 and 7 Oct 2024
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Aug 2024 at 12:23.
4 and 7 Oct 2024
National Highways were proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 7 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Aug 2024 at 14:43.
4 and 7 Oct 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 7 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:19.
6 and 24 Oct 2024
HS2 are proposing to carry out Utility asset works on Western Avenue, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 9 Sep 2024 at 12:21.
6 Oct and 7 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 13:37.
7 and 10 Oct 2024
National Highways were proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 10 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Aug 2024 at 14:42.
7 and 14 Oct 2024
Thames Water are proposing to carry out Utility asset works on Rockley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2024 at 12:08.
7 Oct and 19 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Boscombe Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 19 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 10:45.
7 and 25 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Northfield Avenue, West Ealing.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:24.
7 and 12 Oct 2024
Thames Water are proposing to carry out New service connection on Grove Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:08.
7 and 15 Oct 2024
Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 15 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Jul 2024 at 11:48.
7 and 10 Oct 2024
Thames Water are proposing to carry out New service connection on Talbot Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jul 2024 at 14:24.
7 Oct and 7 Nov 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Wales Farm Road, Acton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:36.
7 and 9 Oct 2024
Virgin Media were proposing to carry out Utility asset works on Barlby Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 9 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:14.
7 Oct and 10 Nov 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Harrow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 08:57.
7 and 9 Oct 2024
Virgin Media are proposing to carry out Utility asset works on Kingsgate Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 9 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 25 Jul 2024 at 09:37.
7 and 10 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Priory Road, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 10 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 05:44.
7 and 20 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Jul 2024 at 10:01.
7 and 20 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hawthorn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 21:00.
7 and 11 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Arkwright Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 09:33.
7 and 20 Oct 2024
Thames Water are proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 20 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Aug 2024 at 09:12.
7 Oct and 18 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Aug 2024 at 14:09.
7 Oct and 18 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works will start on or after 7 October 2024 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2024 at 09:47.
8 and 12 Oct 2024
Thames Water are proposing to carry out New service connection on Cavendish Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Jul 2024 at 10:28.
8 and 18 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2024 at 14:14.
9 and 11 Oct 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Norwood Drive, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 08:51.
11 and 14 Oct 2024
National Highways were proposing to carry out Highway repair and maintenance works on Great West Road, Brentford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 October 2024 and run through until 14 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Aug 2024 at 14:44.
13 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:50.
13 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 11:51.
13 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 11:09.
13 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:37.
13 Oct and 25 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 14:56.
13 Oct and 25 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 16:49.
14 and 17 Oct 2024
Thames Water are proposing to carry out Utility asset works on Stratford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 13:01.
14 and 19 Oct 2024
Thames Water are proposing to carry out New service connection on Lexden Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 13:54.
14 Oct and 7 Nov 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Leamington Park, Acton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 28 Aug 2024 at 11:25.
14 Oct 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.
14 Oct and 6 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Hermit Place, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 3 Sep 2024 at 08:40.
14 and 25 Oct 2024
Affinity Water are proposing to carry out Utility asset works on Ealing Road, Wembley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 12 Jul 2024 at 09:05.
14 and 17 Oct 2024
Affinity Water are proposing to carry out Utility asset works on St James Gardens, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Jul 2024 at 14:41.
14 Oct and 8 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 07:21.
14 Oct and 8 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 11:51.
14 and 18 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lymington Road, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2024 at 08:29.
14 and 18 Oct 2024
Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 08:45.
14 and 18 Oct 2024
Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:45.
14 and 22 Oct 2024
Thames Water are proposing to carry out New service connection on Pennine Drive, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Jul 2024 at 12:30.
14 and 22 Oct 2024
Thames Water were proposing to carry out New service connection on Pennine Drive, Cricklewood, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 22 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 12:18.
14 and 19 Oct 2024
BT are proposing to carry out Utility asset works on Highview Gardens, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 19 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Sep 2024 at 13:50.
14 Oct and 1 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Heybourne Crescent, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 08:38.
14 Oct and 1 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.
14 Oct and 1 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Clayton Field, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2024 at 14:03.
15 and 17 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Copley Close, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 14 Aug 2024 at 16:33.
15 and 17 Oct 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 17 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 18 Jul 2024 at 09:10.
17 and 19 Oct 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 19 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:24.
18 Oct and 5 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2024 and could run through until 5 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jul 2024 at 15:31.
21 and 26 Oct 2024
Thames Water are proposing to carry out New service connection on Epworth Road, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 13:52.
21 and 26 Oct 2024
Thames Water are proposing to carry out New service connection on Epworth Road, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:17.
21 and 26 Oct 2024
Thames Water were proposing to carry out New service connection on Sulgrave Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 26 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:52.
21 and 26 Oct 2024
Thames Water were proposing to carry out New service connection on Poplar Grove, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 26 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Aug 2024 at 13:11.
21 and 23 Oct 2024
Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 23 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 15 Jul 2024 at 07:15.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Sep 2024 at 13:58.
21 and 24 Oct 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Well Walk, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Aug 2024 at 15:56.
21 and 24 Oct 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Well Walk, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 11:50.
21 and 24 Oct 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Park Lane, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 29 Jul 2024 at 15:28.
21 and 24 Oct 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Peterborough Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 13 Aug 2024 at 14:52.
21 and 28 Oct 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Hermitage Way, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Aug 2024 at 09:21.
23 and 29 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:53.
24 and 30 Oct 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Playfair Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 08:32.
25 Oct and 8 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:16.
26 Oct and 2 Nov 2024
Thames Water are proposing to carry out Statutory Infrastructure Works on Chiswick High Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 13:42.
26 and 28 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Aintree Road, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2024 and could run through until 28 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2024 at 12:28.
26 Oct and 3 Nov 2024
Thames Water were proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 16:07.
26 Oct and 3 Nov 2024
Thames Water were proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 October 2024 and run through until 3 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 15:59.
26 Oct and 3 Nov 2024
Thames Water are proposing to carry out Statutory Infrastructure Works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 16:02.
28 Oct and 1 Nov 2024
Cadent Gas are proposing to carry out Remedial works on Wood Lane, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 13:57.
28 Oct and 4 Nov 2024
Thames Water were proposing to carry out New service connection on Enfield Road, Acton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 4 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:26.
28 and 30 Oct 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 15:40.
28 Oct 2024 and 20 Mar 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 10:17.
28 Oct and 15 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Leopold Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 16:30.
28 Oct and 8 Nov 2024
Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 13 Sep 2024 at 15:56.
28 Oct and 15 Nov 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 Aug 2024 at 16:17.
28 and 30 Oct 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Jul 2024 at 17:18.
28 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on North End Way, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jul 2024 at 12:53.
28 Oct and 1 Nov 2024
Thames Water were proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:00.
28 Oct and 1 Nov 2024
Thames Water are proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Aug 2024 at 10:07.
28 Oct and 1 Nov 2024
Thames Water are proposing to carry out New service connection on Golders Manor Drive, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 12:20.
28 and 30 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 08:10.
28 and 30 Oct 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Masons Avenue, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Sep 2024 at 14:36.
28 and 31 Oct 2024
Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 10:22.
28 and 31 Oct 2024
Virgin Media are proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 9 Sep 2024 at 07:58.
28 and 30 Oct 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Weston Drive, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 6 Sep 2024 at 10:20.
28 and 30 Oct 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:07.
29 Oct 2024 and 21 Jan 2025
Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.
30 Oct and 1 Nov 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Brook Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Aug 2024 at 09:07.
31 Oct and 2 Nov 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Clifden Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 13 Sep 2024 at 16:30.
31 Oct and 3 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on College Hill Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:08.
1 and 3 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Seward Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 14:36.
1 and 3 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Allison Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:50.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:58.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.
4 and 8 Nov 2024
Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 14:14.
4 and 6 Nov 2024
Virgin Media are proposing to carry out Utility asset works on Holland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 6 Sep 2024 at 09:04.
4 and 8 Nov 2024
Thames Water were proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 15:50.
4 and 8 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:59.
4 and 8 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Green Man Lane, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:00.
4 and 6 Nov 2024
Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 09:51.
4 and 15 Nov 2024
Last Mile Gas are proposing to carry out Utility repair and maintenance works on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Gas on 16 Aug 2024 at 10:52.
4 and 8 Nov 2024
Virgin Media were proposing to carry out Utility asset works on Standard Road, Park Royal.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 8 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 29 Jul 2024 at 15:32.
4 and 8 Nov 2024
Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 22 Aug 2024 at 15:39.
4 Nov 2024 and 31 Jan 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 2 Sep 2024 at 14:49.
4 and 6 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Belmont Circle, Belmont.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 23 Aug 2024 at 15:11.
5 and 7 Nov 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 7 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:23.
5 and 22 Nov 2024
Murphy Power Distribution were proposing to carry out New service connection on Varley Parade Service Road, Colindale, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 12 Aug 2024 at 09:20.
6 and 30 Nov 2024
Thames Water are proposing to carry out Utility asset works on Connaught Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 17:53.
6 and 8 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:21.
7 and 12 Nov 2024
Thames Water were proposing to carry out New service connection on Albion Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2024 and run through until 12 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Aug 2024 at 11:25.
7 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:31.
7 and 9 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Sudbury Hill, Sudbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 9 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 27 Aug 2024 at 09:58.
7 Nov 2024 and 13 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Cool Oak Lane, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jul 2024 at 10:56.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.
11 and 14 Nov 2024
Thames Water are proposing to carry out New service connection on Kildare Gardens, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 13:26.
11 and 16 Nov 2024
Thames Water are proposing to carry out New service connection on Croxley Road, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 18:21.
11 Nov and 6 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.
11 and 15 Nov 2024
Thames Water are proposing to carry out New service connection on St Albans Lane, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Aug 2024 at 08:43.
11 and 15 Nov 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Chester Drive, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 5 Aug 2024 at 23:22.
11 and 25 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Flight Approach, Colindale, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Jul 2024 at 12:10.
12 and 15 Nov 2024
Thames Water are proposing to carry out New service connection on Enfield Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 14:06.
12 and 14 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Quex Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 13:20.
12 and 30 Nov 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Wessex Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Jul 2024 at 14:30.
18 and 22 Nov 2024
Thames Water are proposing to carry out New service connection on Station Approach Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 14:48.
18 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 16:18.
18 and 22 Nov 2024
Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 11:28.
18 Nov and 6 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.
18 Nov and 6 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 29 Aug 2024 at 15:22.
18 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:01.
18 and 21 Nov 2024
Affinity Water were proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 16 Aug 2024 at 09:51.
18 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:44.
18 and 29 Nov 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 16:02.
19 and 22 Nov 2024
Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 2 Sep 2024 at 14:38.
19 and 22 Nov 2024
Affinity Water are proposing to carry out Utility asset works on Hawthorn Farm Avenue, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Sep 2024 at 10:48.
20 and 22 Nov 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Aug 2024 at 17:46.
21 and 25 Nov 2024
BT are proposing to carry out Utility asset works on Woodheyes Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Aug 2024 at 11:55.
22 Nov and 17 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.
24 and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:39.
24 and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:41.
24 and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:40.
24 and 26 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:34.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Epworth Road, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 14:49.
25 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Enfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 16:04.
25 and 29 Nov 2024
Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Oxford Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:48.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Oxford Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 13:46.
25 and 28 Nov 2024
Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:00.
25 and 27 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Burnt Oak Broadway, Edgware.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 17 January 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 13:41.
25 Nov 2024 and 17 Jan 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Stockwell Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Aug 2024 at 16:05.
25 Nov and 20 Dec 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Great Field, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2024 at 13:52.
26 Nov and 2 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.
26 and 28 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.
27 and 29 Nov 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Sep 2024 at 16:06.
27 Nov and 3 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:36.
27 Nov and 3 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:41.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 13 Sep 2024 at 16:30.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Aug 2024 at 16:36.
27 and 29 Nov 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Broadcroft Avenue, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Aug 2024 at 09:41.
27 and 29 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wolverton Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:45.
28 and 30 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 12:25.
28 and 30 Nov 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Queensbury Circle Parade, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 2 Sep 2024 at 09:38.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 and 25 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 14:09.
2 and 4 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 10 Sep 2024 at 09:54.
2 and 6 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.
These works are categorised as Major.
The road will be close