ROADWORKS SUMMARY
Belgrave Road, HA0 1AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Belgrave Road, HA0 1AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Belgrave Road, HA0 1AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Belgrave Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Ealing logo
LONG TERM
Until
18 May 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 09:28.

Network Rail logo
LONG TERM
Until
5 Sep 2024
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:08.

Network Rail logo
LONG TERM
Until
5 Sep 2024
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 06:30 and could run through until 5 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Oct 2022 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 26 Aug 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 26 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 11:17.

HS2 logo
LONG TERM
Until
22 Jun 2024
Details
View Map
Share
Follow
Eastcote Lane

HS2 are carrying out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2023 at 08:00 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 12 Jun 2024 at 15:51.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 12:32.

Transport for London (TfL) logo
LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2023 at 23:00 and could run through until 31 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Nov 2023 at 16:30.

London Borough Of Hounslow logo
LONG TERM
Between
1 Sep 2023 and 28 Jun 2024
Details
View Map
Share
Follow
Holland Gardens

London Borough Of Hounslow are proposing to carry out Highway improvement works on Holland Gardens, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 28 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 8 Aug 2023 at 13:27.

London Borough Of Hounslow logo
LONG TERM
Between
1 Sep 2023 and 28 Jun 2024
Details
View Map
Share
Follow
Pump House Crescent

London Borough Of Hounslow are proposing to carry out Highway improvement works on Pump House Crescent, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2023 and could run through until 28 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 8 Aug 2023 at 13:26.

Transport for London (TfL) logo
LONG TERM
Until
18 Jul 2024
Details
View Map
Share
Follow
Sandycombe Road

Transport for London (TfL) are carrying out Highway improvement works on Sandycombe Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2023 at 07:00 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2024 at 10:55.

HS2 logo
LONG TERM
Until
21 Jul 2024
Details
View Map
Share
Follow
Bennetts Avenue

HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 09:00 and could run through until 21 July 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 May 2024 at 10:39.

HS2 logo
LONG TERM
Until
21 Jul 2024
Details
View Map
Share
Follow
Uneeda Drive

HS2 are carrying out Utility asset works on Uneeda Drive, Greenford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 10:30 and could run through until 21 July 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 May 2024 at 10:39.

HS2 logo
LONG TERM
Until
21 Jul 2024
Details
View Map
Share
Follow
Rockware Avenue

HS2 are carrying out Utility asset works on Rockware Avenue, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 September 2023 at 08:00 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 May 2024 at 10:39.

HS2 logo
LONG TERM
Until
21 Jul 2024
Details
View Map
Share
Follow
Greenford Road

HS2 are carrying out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2023 at 06:00 and could run through until 21 July 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 28 May 2024 at 10:38.

London Borough Of Hounslow logo
LONG TERM
Until
1 Aug 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are carrying out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2023 at 07:00 and could run through until 1 August 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 23 Oct 2023 at 15:46.

Transport for London (TfL) logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Pembroke Road

Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.

Thames Water logo
LONG TERM
Between
9 Dec 2023 and 10 Dec 2024
Details
View Map
Share
Follow
Du Cane Road

Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Sep 2024
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 08:46 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2024 at 13:55.

HS2 logo
LONG TERM
Until
17 Aug 2024
Details
View Map
Share
Follow
Victoria Road

HS2 are carrying out Utility asset works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2024 at 00:01 and could run through until 17 August 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 23 May 2024 at 10:31.

HS2 logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Atlas Road

HS2 are carrying out Utility asset works on Atlas Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 05:00 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 23 May 2024 at 10:22.

City Of Westminster logo
LONG TERM
Until
24 Sep 2024
Details
View Map
Share
Follow
Fernhead Road

City Of Westminster are carrying out Highway repair and maintenance works on Fernhead Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 12:30 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 15 Jan 2024 at 14:17.

Affinity Water logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Preston Road

Affinity Water are carrying out Utility repair and maintenance works on Preston Road, Wembley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 10:15 and could run through until 30 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 11 Jun 2024 at 14:58.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Sep 2024
Details
View Map
Share
Follow
Victoria Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 14:00 and could run through until 20 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2024 at 13:55.

HS2 logo
LONG TERM
Until
17 Aug 2024
Details
View Map
Share
Follow
Wales Farm Road

HS2 are carrying out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2024 at 00:01 and could run through until 17 August 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 23 May 2024 at 10:57.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 15:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Willesden Lane

UK Power Networks Eastern & London are carrying out New service connection on Willesden Lane, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2024 at 09:35 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jun 2024 at 08:17.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Until
9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 Mar 2024 and 9 Feb 2025
Details
View Map
Share
Follow
Hammersmith Bridge Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
Kitson Road

London Borough Of Richmond Upon Thames are carrying out Highway repair and maintenance works on Kitson Road, Barnes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 March 2024 at 08:00 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 30 May 2024 at 08:57.

London Borough Of Hounslow logo
LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
Ealing Road

London Borough Of Hounslow are carrying out Highway improvement works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 10 May 2024 at 15:30.

HS2 logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
West Gate

HS2 are carrying out Utility asset works on West Gate, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 00:01 and could run through until 16 June 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 18 Apr 2024 at 15:03.

Thames Water logo
LONG TERM
Until
1 Jul 2024
Details
View Map
Share
Follow
Netherwood Road

Thames Water are carrying out Utility asset works on Netherwood Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:00 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 09:28.

HS2 logo
LONG TERM
Until
19 Jul 2024
Details
View Map
Share
Follow
Ruskin Gardens

HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 06:00 and could run through until 19 July 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 30 May 2024 at 13:40.

HS2 logo
LONG TERM
Until
19 Jul 2024
Details
View Map
Share
Follow
Brentham Way

HS2 are carrying out Utility asset works on Brentham Way, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 06:00 and could run through until 19 July 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 30 May 2024 at 13:28.

HS2 logo
LONG TERM
Until
19 Jul 2024
Details
View Map
Share
Follow
Brunswick Road

HS2 are carrying out Utility asset works on Brunswick Road, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 06:00 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 30 May 2024 at 13:28.

Cadent Gas logo
LONG TERM
Between
14 Apr and 12 Aug 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
15 Apr and 31 Jul 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 31 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 11:08.

London Borough Of Camden logo
LONG TERM
Until
27 Jun 2024
Details
View Map
Share
Follow
Baynes Mews

London Borough Of Camden are carrying out Highway repair and maintenance works on Baynes Mews, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 09:04 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 Apr 2024 at 09:04.

London Borough Of Brent logo
LONG TERM
Between
15 Apr and 26 Jul 2024
Details
View Map
Share
Follow
Wembley Hill Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 9 Apr 2024 at 13:34.

Transport for London (TfL) logo
LONG TERM
Until
28 Jul 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 28 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 08:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Apr and 16 Aug 2024
Details
View Map
Share
Follow
Gascony Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gascony Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2024 at 15:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 Nov 2024
Details
View Map
Share
Follow
Greencroft Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 April 2024 at 08:00 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Apr 2024 at 08:01.

Network Rail logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Acton Lane

Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 April 2024 at 22:00 and could run through until 16 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Apr 2024 at 07:42.

Thames Water logo
LONG TERM
Until
11 Aug 2024
Details
View Map
Share
Follow
Harrow Road

Thames Water are carrying out Utility asset works on Harrow Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 10:00 and could run through until 11 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Apr 2024 at 07:38.

Thames Water logo
LONG TERM
Until
3 Nov 2024
Details
View Map
Share
Follow
College Road

Thames Water are carrying out Utility asset works on College Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 08:10 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 May 2024 at 08:38.

Murphy Power Distribution logo
LONG TERM
Until
18 Aug 2024
Details
View Map
Share
Follow
South Road

Murphy Power Distribution are carrying out Utility asset works on South Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 08:01 and could run through until 18 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 29 Apr 2024 at 08:05.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
1 May and 31 Aug 2024
Details
View Map
Share
Follow
Depot Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Depot Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 15:24.

LONG TERM
Between
5 May and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 11:20.

Thames Water logo
LONG TERM
Between
9 May and 26 Jul 2024
Details
View Map
Share
Follow
Audley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Audley Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Jun 2021 at 08:37.

HS2 logo
LONG TERM
Until
2 Aug 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 2 August 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 13 Jun 2024 at 16:37.

HS2 logo
LONG TERM
Until
13 Sep 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 13 September 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 15:13.

HS2 logo
LONG TERM
Until
13 Sep 2024
Details
View Map
Share
Follow
Oxford Road

HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 13 September 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 11:46.

HS2 logo
LONG TERM
Until
2 Aug 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 10:30.

HS2 logo
LONG TERM
Until
2 Aug 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are carrying out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2024 at 19:00 and could run through until 2 August 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 15:04.

London Borough Of Camden logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Priory Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Priory Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 07:00 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 13 May 2024 at 07:23.

HS2 logo
LONG TERM
Until
13 Sep 2024
Details
View Map
Share
Follow
Greville Road

HS2 are carrying out Section 50 on Greville Road, Kilburn, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 11:00 and could run through until 13 September 2024. The works will impact the footway, carriageway and parking place.

This roadwork event was last updated by HS2 on 13 Jun 2024 at 16:52.

Cadent Gas logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Winnings Walk

Cadent Gas are carrying out Utility asset works on Winnings Walk, Northolt.

These works are categorised as Major.

The works started on 16 May 2024 at 13:35 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2024 at 08:50.

Thames Water logo
LONG TERM
Until
11 Jul 2024
Details
View Map
Share
Follow
Woodfield Road

Thames Water are carrying out Utility asset works on Woodfield Road, Ealing.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 May 2024 at 08:00 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2024 at 08:36.

London Borough Of Barnet logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Wildwood Road

London Borough Of Barnet are carrying out Highway improvement works on Wildwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 08:30 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 09:34.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 07:31.

London Borough Of Barnet logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are carrying out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2024 at 23:00 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2024 at 11:16.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
North End Road

Thames Water are carrying out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 10:00 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 May 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
20 May and 5 Jul 2024
Details
View Map
Share
Follow
Old Oak Common Lane

Cadent Gas are proposing to carry out Utility asset works on Old Oak Common Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 14:00.

ESP Electricity logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Chandos Road

ESP Electricity are carrying out Utility asset works on Chandos Road, Park Royal.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 09:00 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 13 Jun 2024 at 08:48.

London Borough Of Brent logo
LONG TERM
Until
11 Jul 2024
Details
View Map
Share
Follow
Walm Lane

London Borough Of Brent are carrying out Highway repair and maintenance works on Walm Lane, London.

These works are categorised as Major.

The works started on 20 May 2024 at 11:35 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Brent on 20 May 2024 at 11:35.

City Of Westminster logo
LONG TERM
Until
9 Jul 2024
Details
View Map
Share
Follow
Jerome Crescent

City Of Westminster are carrying out Highway improvement works on Jerome Crescent, Church Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2024 at 13:00 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 May 2024 at 13:23.

London Borough Of Hounslow logo
Finishing
Tuesday
Details
View Map
Share
Follow
Ferry Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Ferry Lane, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Oct 2023 at 08:48.

London Borough Of Ealing logo
LONG TERM
Until
22 Jun 2024
Details
View Map
Share
Follow
Haven Place

London Borough Of Ealing are carrying out Highway improvement works on Haven Place, Ealing.

The works started on 22 May 2024 at 23:00 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 24 May 2024 at 08:20.

Cadent Gas logo
LONG TERM
Until
25 Jun 2024
Details
View Map
Share
Follow
Craven Park

Cadent Gas are carrying out Utility asset works on Craven Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 May 2024 at 09:54 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Jun 2024 at 17:28.

Thames Water logo
LONG TERM
Until
6 Jul 2024
Details
View Map
Share
Follow
Wood Lane

Thames Water are carrying out Utility asset works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 May 2024 at 07:45 and could run through until 6 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2024 at 08:54.

Cadent Gas logo
LONG TERM
Until
28 Jul 2024
Details
View Map
Share
Follow
Rocks Lane

Cadent Gas are carrying out Utility asset works on Rocks Lane, Barnes.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 May 2024 at 07:06 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2024 at 08:05.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brook Mews North

Cadent Gas are carrying out Utility asset works on Brook Mews North, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 05:43 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2024 at 07:39.

UK Power Networks Eastern & London logo
Until
22 Jun 2024
Details
View Map
Share
Follow
Porchester Gardens

UK Power Networks Eastern & London are carrying out Utility asset works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 07:00 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2024 at 10:35.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Courtnell Street

Thames Water are carrying out Utility repair and maintenance works on Courtnell Street, Bayswater, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 09:50 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2024 at 09:52.

HS2 logo
Finishing
Friday
Details
View Map
Share
Follow
Western Avenue

HS2 are carrying out Section 50 on Western Avenue, Perivale.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 21:00 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 29 May 2024 at 12:29.

London Borough Of Barnet logo
Until
25 Jun 2024
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are carrying out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

The works started on 28 May 2024 at 08:30 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 May 2024 at 09:16.

London Borough Of Barnet logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
Wessex Gardens

London Borough Of Barnet are carrying out Highway improvement works on Wessex Gardens, Golders Green, London.

These works are categorised as Major.

The works started on 29 May 2024 at 08:00 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 May 2024 at 09:56.

City Of Westminster logo
Finishing
Tuesday
Details
View Map
Share
Follow
Aquila Street

City Of Westminster are carrying out Highway repair and maintenance works on Aquila Street, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 May 2024 at 09:00.

UK Power Networks Eastern & London logo
Until
22 Jun 2024
Details
View Map
Share
Follow
Lincoln Mews

UK Power Networks Eastern & London are carrying out Utility asset works on Lincoln Mews, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2024 at 08:30 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 May 2024 at 08:49.

London Borough Of Hounslow logo
Finishing
Monday
Details
View Map
Share
Follow
Jersey Road

London Borough Of Hounslow are carrying out Highway improvement works on Jersey Road, Isleworth.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 June 2024 at 08:00 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Jun 2024 at 14:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
4 Jul 2024
Details
View Map
Share
Follow
Portland Crescent

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Portland Crescent, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 June 2024 at 09:19 and could run through until 4 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Jun 2024 at 09:22.

Scottish Hydro Electric Power Dis logo
Until
29 Jun 2024
Details
View Map
Share
Follow
Mansell Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Mansell Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:30 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jun 2024 at 08:44.

Scottish Hydro Electric Power Dis logo
Until
29 Jun 2024
Details
View Map
Share
Follow
Fermoy Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Fermoy Road, Greenford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:30 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jun 2024 at 08:44.

G2 Energy IDNO logo
Between
3 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Station Road

G2 Energy IDNO are proposing to carry out Utility asset works on Station Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 3 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 29 Feb 2024 at 10:10.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

Scottish Hydro Electric Power Dis logo
Between
5 and 26 Jun 2024
Details
View Map
Share
Follow
Fishers Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fishers Lane, Chiswick, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Mar 2024 at 14:59.

Thames Water logo
Until
25 Jun 2024
Details
View Map
Share
Follow
Nibthwaite Road

Thames Water are carrying out Utility repair and maintenance works on Nibthwaite Road, Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 June 2024 at 09:00 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jun 2024 at 11:59.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Cannon Lane

Cadent Gas are carrying out Utility repair and maintenance works on Cannon Lane, Pinner.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 June 2024 at 08:45 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Jun 2024 at 16:09.

Telefonica UK logo
Finishing
Monday
Details
View Map
Share
Follow
Greenock Road

Telefonica UK are carrying out Utility asset works on Greenock Road, Acton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 June 2024 at 15:00 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 9 Jun 2024 at 07:27.

London Borough Of Ealing logo
Until
30 Jun 2024
Details
View Map
Share
Follow
Weymouth Avenue

London Borough Of Ealing are carrying out Highway improvement works on Weymouth Avenue, Ealing.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2024 at 00:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 11 Jun 2024 at 16:30.

London Borough Of Hounslow logo
Finishing
Wednesday
Details
View Map
Share
Follow
Strand-on-the-green

London Borough Of Hounslow are proposing to carry out Section 50 on Strand-on-the-green, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 14 Jun 2024 at 11:02.

Thames Water logo
LONG TERM
Until
10 Nov 2024
Details
View Map
Share
Follow
Acton Lane

Thames Water are carrying out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 08:35.

Thames Water logo
LONG TERM
Until
21 Jul 2024
Details
View Map
Share
Follow
Baker Road

Thames Water are carrying out Utility asset works on Baker Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2024 at 08:35.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 17:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 17:22.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are carrying out Highway repair and maintenance works on Hendon Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 22:00 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 15:03.

Cadent Gas logo
LONG TERM
Until
23 Jul 2024
Details
View Map
Share
Follow
Belmont Lane

Cadent Gas are carrying out Utility asset works on Belmont Lane, Stanmore.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 June 2024 at 13:00 and could run through until 23 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 13:06.

London Borough Of Barnet logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 09:05.

Thames Water logo
Until
1 Jul 2024
Details
View Map
Share
Follow
Finchley Road

Thames Water are carrying out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 June 2024 at 15:00 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Jun 2024 at 08:19.

London Borough Of Barnet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Finchley Lane

London Borough Of Barnet are carrying out Highway improvement works on Finchley Lane, Hendon, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 June 2024 at 09:30 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 11 Jun 2024 at 10:45.

Thames Water logo
Until
2 Jul 2024
Details
View Map
Share
Follow
Hillgate Place

Thames Water are carrying out Utility repair and maintenance works on Hillgate Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 June 2024 at 11:00 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jun 2024 at 14:49.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Westbourne Park Road

Thames Water are carrying out Utility repair and maintenance works on Westbourne Park Road, Bayswater, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 June 2024 at 10:14 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:21.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brondesbury Villas

Thames Water are carrying out roadworks on Brondesbury Villas, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 June 2024 at 07:54 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Jun 2024 at 08:48.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Edgware Road Flyover

London Borough Of Barnet are carrying out Highway improvement works on Edgware Road Flyover, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 June 2024 at 22:00 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Jun 2024 at 08:41.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Spalding Road

Thames Water were proposing to carry out Utility repair and maintenance works on Spalding Road, Hendon, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 June 2024 and run through until 18 June 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 11:27.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wellgarth Road

Thames Water are carrying out Utility repair and maintenance works on Wellgarth Road, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 June 2024 at 08:17 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 10:10.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Fortune Green Road

Thames Water are carrying out Utility repair and maintenance works on Fortune Green Road, Fortune Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 June 2024 at 08:35 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jun 2024 at 10:02.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Tithe Farm Avenue

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Tithe Farm Avenue, South Harrow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 June 2024 at 14:21 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jun 2024 at 14:24.

London Borough Of Barnet logo
Between
16 and 23 Jun 2024
Details
View Map
Share
Follow
Goldsmith Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Goldsmith Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 May 2024 at 14:29.

Transport for London (TfL) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Clifford Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2024 at 14:56.

London Borough Of Hounslow logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Wilkes Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Wilkes Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Jun 2024 at 16:23.

Virgin Media logo
Finishing
Wednesday
Details
View Map
Share
Follow
Pembridge Road

Virgin Media are proposing to carry out Utility asset works on Pembridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Mar 2024 at 12:11.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Ealing are proposing to carry out Highway improvement works on Station Approach, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Jun 2024 at 16:16.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
York Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on York Avenue, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Jun 2024 at 16:21.

Thames Water logo
Between
17 Jun and 15 Jul 2024
Details
View Map
Share
Follow
Pitshanger Lane

Thames Water are proposing to carry out Utility asset works on Pitshanger Lane, Ealing.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jun 2024 at 14:35.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Harp Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Harp Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 15:45.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Aspen Lane

London Borough Of Ealing are proposing to carry out Highway improvement works on Aspen Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Jun 2024 at 16:00.

UK Power Networks Eastern & London logo
Between
17 and 24 Jun 2024
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Eton Avenue, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2024 at 15:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Jun and 25 Jul 2024
Details
View Map
Share
Follow
College Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2024 at 09:50.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Oakwood Crescent

London Borough Of Ealing are proposing to carry out Highway improvement works on Oakwood Crescent, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Jun 2024 at 14:33.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Woodland Rise

London Borough Of Ealing are proposing to carry out Highway improvement works on Woodland Rise, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Jun 2024 at 15:47.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Sussex Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 29 May 2024 at 08:13.

London Borough Of Ealing logo
Between
17 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Cambridge Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Cambridge Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 15:54.

Murphy Power Distribution logo
LONG TERM
Between
17 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Holyrood Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 May 2024 at 08:59.

Cadent Gas logo
LONG TERM
Between
17 Jun 2024 and 13 Mar 2025
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:40.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Jun 2024 at 14:26.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Hoop Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Hoop Lane, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2024 at 15:00.

Transport for London (TfL) logo
Between
20 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Lionel Road South

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lionel Road South, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2024 at 16:49.

Thames Water logo
LONG TERM
Between
20 Jun and 6 Oct 2024
Details
View Map
Share
Follow
Minford Gardens

Thames Water are proposing to carry out Utility asset works on Minford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2024 at 13:36.

Thames Water logo
Between
20 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Richmond Way

Thames Water are proposing to carry out Utility asset works on Richmond Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2024 at 14:18.

HS2 logo
LONG TERM
Between
21 Jun and 21 Sep 2024
Details
View Map
Share
Follow
Western Avenue

HS2 are proposing to carry out Section 50 on Western Avenue, Ealing.

These works are categorised as Major.

The works will start on or after 21 June 2024 and could run through until 21 September 2024. The works will impact the footway, carriageway, cycleway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 28 May 2024 at 14:32.

Thames Water logo
Between
22 and 24 Jun 2024
Details
View Map
Share
Follow
Winslow Road

Thames Water are proposing to carry out roadworks on Winslow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 14:36.

Murphy Power Distribution logo
Between
22 and 24 Jun 2024
Details
View Map
Share
Follow
Shackleton Road

Murphy Power Distribution are proposing to carry out Utility asset works on Shackleton Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.

London Borough Of Hounslow logo
LONG TERM
Between
23 Jun and 22 Aug 2024
Details
View Map
Share
Follow
Goat Wharf

London Borough Of Hounslow are proposing to carry out Highway improvement works on Goat Wharf, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 22 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Oct 2023 at 08:49.

Virgin Media logo
Between
23 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Fitzjames Avenue

Virgin Media are proposing to carry out Utility asset works on Fitzjames Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 May 2024 at 11:02.

Thames Water logo
Between
24 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Colville Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Colville Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Apr 2024 at 15:12.

London Borough Of Camden logo
LONG TERM
Between
24 Jun and 2 Aug 2024
Details
View Map
Share
Follow
Priory Terrace

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Priory Terrace, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 13 Jun 2024 at 16:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Jun and 17 Sep 2024
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 17 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2024 at 12:15.

London Borough Of Barnet logo
Between
24 Jun and 22 Jul 2024
Details
View Map
Share
Follow
West Heath Road

London Borough Of Barnet are proposing to carry out Highway improvement works on West Heath Road, Hampstead, London.

These works are categorised as Major.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2024 at 12:31.

Virgin Media logo
Between
25 and 27 Jun 2024
Details
View Map
Share
Follow
Heath Street

Virgin Media are proposing to carry out Utility asset works on Heath Street, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 Mar 2024 at 11:17.

Affinity Water logo
Between
25 and 28 Jun 2024
Details
View Map
Share
Follow
Sedgecombe Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Sedgecombe Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 18:44.

Thames Water logo
Between
26 and 28 Jun 2024
Details
View Map
Share
Follow
Ladbroke Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 15:11.

Thames Water logo
Between
26 and 28 Jun 2024
Details
View Map
Share
Follow
Ladbroke Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 10:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Jun and 11 Oct 2024
Details
View Map
Share
Follow
Gascony Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Gascony Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 11 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2024 at 13:02.

Affinity Water logo
Between
26 and 28 Jun 2024
Details
View Map
Share
Follow
Wentworth Hill

Affinity Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 2 Apr 2024 at 17:45.

London Borough Of Barnet logo
Between
26 and 30 Jun 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 May 2024 at 09:22.

London Borough Of Barnet logo
LONG TERM
Between
27 Jun and 1 Aug 2024
Details
View Map
Share
Follow
Silkstream Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Silkstream Road, Edgware.

These works are categorised as Major.

The works will start on or after 27 June 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 08:52.

Scottish Hydro Electric Power Dis logo
Between
28 and 30 Jun 2024
Details
View Map
Share
Follow
Costons Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Costons Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Jun 2024 at 11:58.

UK Power Networks Eastern & London logo
Between
28 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Queen's Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Queen's Grove, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2024 at 07:45.

Murphy Power Distribution logo
Between
29 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 13 May 2024 at 12:24.

London Borough Of Barnet logo
LONG TERM
Between
29 Jun and 12 Aug 2024
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2024 and could run through until 12 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 12:52.

Thames Water logo
Between
30 Jun and 9 Jul 2024
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out New service connection on Twyford Avenue, Acton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2024 at 07:40.

Affinity Water logo
Between
30 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Elm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Apr 2024 at 17:32.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 25 Oct 2024
Details
View Map
Share
Follow
Hampstead Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works will start on or after 30 June 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 May 2024 at 07:31.

London Borough Of Hounslow logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 6 Jun 2024 at 14:06.

Thames Water logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Stratford Road

Thames Water are proposing to carry out Utility asset works on Stratford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2024 at 16:30.

Thames Water logo
Between
1 and 5 Jul 2024
Details
View Map
Share
Follow
Hamilton Terrace

Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2024 at 08:04.

Thames Water logo
LONG TERM
Between
1 Jul and 30 Sep 2024
Details
View Map
Share
Follow
Holly Bush Hill

Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jun 2024 at 07:05.

Scottish Hydro Electric Power Dis logo
Between
5 and 7 Jul 2024
Details
View Map
Share
Follow
Shelley Avenue

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Shelley Avenue, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Jun 2024 at 11:56.

Scottish Hydro Electric Power Dis logo
Between
6 and 9 Jul 2024
Details
View Map
Share
Follow
Capital Interchange Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Capital Interchange Way, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 May 2024 at 11:30.

Murphy Power Distribution logo
Between
6 and 10 Jul 2024
Details
View Map
Share
Follow
Parkfield Crescent

Murphy Power Distribution are proposing to carry out Utility asset works on Parkfield Crescent, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 13 May 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2024 at 10:20.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
South Africa Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on South Africa Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2024 at 10:20.

Thames Water logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 13:21.

Between
8 and 13 Jul 2024
Details
View Map
Share
Follow
Lichfield Road

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Lichfield Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 11:20.

Between
8 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 5 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Jun 2024 at 14:09.

London Borough Of Hounslow logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 6 Jun 2024 at 14:09.

Its Technology Group logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Barrowgate Road

Its Technology Group are proposing to carry out Utility repair and maintenance works on Barrowgate Road, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 14 Jun 2024 at 10:10.

Scottish Hydro Electric Power Dis logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Windmill Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Windmill Road, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jun 2024 at 10:07.

London Borough Of Ealing logo
Between
8 and 11 Jul 2024
Details
View Map
Share
Follow
York Road

London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 22 Feb 2024 at 15:49.

Murphy Power Distribution logo
Between
8 and 14 Jul 2024
Details
View Map
Share
Follow
Park Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Park Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.

Thames Water logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Ormiston Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Ormiston Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Feb 2024 at 10:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Willesden Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Willesden Lane, Kilburn, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 16:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Kilburn High Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 09:03.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Kilburn High Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kilburn High Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 16:32.

Affinity Water logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Brook Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Brook Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 09:31.

Cadent Gas logo
Between
8 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are proposing to carry out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

The works will start on or after 8 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 14:47.

London Borough Of Hounslow logo
Between
10 and 13 Jul 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 6 Jun 2024 at 14:10.

Royal Borough Of Kensington And Chelsea logo
Between
10 and 12 Jul 2024
Details
View Map
Share
Follow
Portobello Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Portobello Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 May 2024 at 08:55.

Royal Borough Of Kensington And Chelsea logo
Between
10 and 12 Jul 2024
Details
View Map
Share
Follow
Wornington Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Wornington Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 7 May 2024 at 15:30.

Affinity Water logo
Between
14 and 16 Jul 2024
Details
View Map
Share
Follow
Brook Avenue

Affinity Water are proposing to carry out Remedial works on Brook Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 9 Apr 2024 at 16:46.

Thames Water logo
On
14 Jul 2024
Details
View Map
Share
Follow
Gould Way

Thames Water are proposing to carry out Utility repair and maintenance works on Gould Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 14 July 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2024 at 15:30.

London Borough Of Hounslow logo
Between
15 and 19 Jul 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 6 Jun 2024 at 14:11.

Thames Water logo
Between
15 and 22 Jul 2024
Details
View Map
Share
Follow
Rootes Drive

Thames Water are proposing to carry out New service connection on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:07.

Thames Water logo
Between
15 and 23 Jul 2024
Details
View Map
Share
Follow
Cheviot Gardens

Thames Water are proposing to carry out New service connection on Cheviot Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 23 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2024 at 10:40.

BT logo
Between
15 and 20 Jul 2024
Details
View Map
Share
Follow
Highview Gardens

BT are proposing to carry out Utility asset works on Highview Gardens, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 20 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Jun 2024 at 08:56.

Thames Water logo
Between
17 and 19 Jul 2024
Details
View Map
Share
Follow
Porten Road

Thames Water are proposing to carry out Utility repair and maintenance works on Porten Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jun 2024 at 15:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Jul and 24 Sep 2024
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 24 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 May 2024 at 16:38.

HS2 logo
Between
20 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Lynwood Road

HS2 are proposing to carry out Utility asset works on Lynwood Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2024 and could run through until 16 August 2024. The works will impact the carriageway and parking place.

This roadwork event was last updated by HS2 on 30 May 2024 at 13:28.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 28 Aug 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:11.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 28 Aug 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:12.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 28 Aug 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:11.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 28 Aug 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:11.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul and 28 Aug 2024
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 28 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 May 2024 at 13:36.

Thames Water logo
Between
21 Jul and 17 Aug 2024
Details
View Map
Share
Follow
Greenhill Park

Thames Water are proposing to carry out Utility asset works on Greenhill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 17 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2024 at 14:08.

Thames Water logo
Between
21 Jul and 3 Aug 2024
Details
View Map
Share
Follow
Vale Of Health

Thames Water are proposing to carry out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 3 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 16:10.

Virgin Media logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Pembridge Gardens

Virgin Media are proposing to carry out Utility asset works on Pembridge Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 May 2024 at 09:19.

London Borough Of Ealing logo
Between
22 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Emanuel Avenue

London Borough Of Ealing are proposing to carry out Utility asset works on Emanuel Avenue, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 31 May 2024 at 14:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jul and 29 Oct 2024
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jun 2024 at 09:57.

Thames Water logo
Between
22 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Andover Place

Thames Water are proposing to carry out New service connection on Andover Place, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jun 2024 at 09:17.

Between
22 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Oldfield Lane North

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 May 2024 at 12:30.

Thames Water logo
Between
22 Jul and 9 Aug 2024
Details
View Map
Share
Follow
College Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Jun 2024 at 10:25.

UK Power Networks Eastern & London logo
Between
22 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Borthwick Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Borthwick Road, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 May 2024 at 09:00.

Between
22 and 26 Jul 2024
Details
View Map
Share
Follow
Chester Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Chester Drive, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Jun 2024 at 10:52.

Affinity Water logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Salisbury Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Salisbury Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 May 2024 at 15:50.

UK Power Networks Eastern & London logo
Between
22 and 29 Jul 2024
Details
View Map
Share
Follow
Kenton Gardens

UK Power Networks Eastern & London are proposing to carry out Remedial works on Kenton Gardens, Kenton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2024 at 09:02.

Virgin Media logo
Between
22 and 24 Jul 2024
Details
View Map
Share
Follow
Blawith Road

Virgin Media are proposing to carry out Utility asset works on Blawith Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Apr 2024 at 09:04.

HS2 logo
Between
23 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Oldfield Lane North

HS2 are proposing to carry out Works for Rail Purposes on Oldfield Lane North, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 20 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 15:29.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
24 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Noel Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Noel Road, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 29 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2024 at 13:28.

Scottish Hydro Electric Power Dis logo
Between
24 Jul and 14 Aug 2024
Details
View Map
Share
Follow
Tudor Gardens

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Tudor Gardens, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 14 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 May 2024 at 14:35.

Scottish Hydro Electric Power Dis logo
Between
24 Jul and 12 Aug 2024
Details
View Map
Share
Follow
Howard Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Howard Close, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 12 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 May 2024 at 14:33.

UK Power Networks Eastern & London logo
Between
24 Jul and 17 Aug 2024
Details
View Map
Share
Follow
Goldhurst Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2024 and could run through until 17 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Apr 2024 at 15:47.

London Borough Of Barnet logo
Between
24 Jul and 14 Aug 2024
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The works will start on or after 24 July 2024 and could run through until 14 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2024 at 09:36.

London Borough Of Barnet logo
Between
25 and 29 Jul 2024
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 09:21.

Thames Water logo
On
26 Jul 2024
Details
View Map
Share
Follow
Turnham Green Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Turnham Green Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 26 July 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2024 at 15:09.

Murphy Power Distribution logo
Between
26 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Holyrood Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 13 May 2024 at 10:44.

Murphy Power Distribution logo
Between
26 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Holyrood Avenue

Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 20 May 2024 at 15:07.

Network Rail logo
Between
27 and 29 Jul 2024
Details
View Map
Share
Follow
Grove Park Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Grove Park Terrace, Chiswick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 7 May 2024 at 10:03.

Thames Water logo
Between
28 and 30 Jul 2024
Details
View Map
Share
Follow
Addison Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Addison Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2024 at 14:29.

Thames Water logo
Between
28 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Ordnance Hill

Thames Water are proposing to carry out Disconnection or alteration of supply on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 May 2024 at 15:30.

Cadent Gas logo
Between
28 Jul and 24 Aug 2024
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are proposing to carry out Utility asset works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2024 and could run through until 24 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 11:02.

Cadent Gas logo
LONG TERM
Between
28 Jul and 3 Oct 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 May 2024 at 07:47.

Affinity Water logo
Between
28 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Kenton Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Kenton Lane, Harrow Weald.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2024 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 May 2024 at 15:14.

Between
29 and 31 Jul 2024
Details
View Map
Share
Follow
Acacia Avenue

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Acacia Avenue, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 May 2024 at 15:13.

Affinity Water logo
Between
29 Jul and 9 Aug 2024
Details
View Map
Share
Follow
North Road

Affinity Water are proposing to carry out Utility repair and maintenance works on North Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Apr 2024 at 09:39.

Thames Water logo
Between
29 Jul and 2 Aug 2024
Details
View Map
Share
Follow
East Acton Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on East Acton Lane, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jun 2024 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Hanger Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Hanger Lane, Ealing.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2024 at 11:17.

Thames Water logo
Between
29 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Beaufort Road

Thames Water are proposing to carry out roadworks on Beaufort Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2024 at 11:41.

Affinity Water logo
Between
29 and 31 Jul 2024
Details
View Map
Share
Follow
Buckingham Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Perivale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 May 2024 at 13:55.

T-Mobile (UK) logo
LONG TERM
Between
29 Jul and 3 Sep 2024
Details
View Map
Share
Follow
Birse Crescent

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Birse Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 3 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 7 May 2024 at 09:17.

Cadent Gas logo
LONG TERM
Between
29 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Herbert Road

Cadent Gas are proposing to carry out Utility asset works on Herbert Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 11:04.

Affinity Water logo
Between
29 and 31 Jul 2024
Details
View Map
Share
Follow
Pinner Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 May 2024 at 08:47.

Cadent Gas logo
LONG TERM
Between
29 Jul and 10 Sep 2024
Details
View Map
Share
Follow
Cotman Gardens

Cadent Gas are proposing to carry out Utility asset works on Cotman Gardens, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 10 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2024 at 10:35.

Virgin Media logo
Between
30 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Ruislip Road Service Road To Numbers 1-13

Virgin Media are proposing to carry out Utility asset works on Ruislip Road Service Road To Numbers 1-13, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2024 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 May 2024 at 11:19.

Affinity Water logo
Between
30 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Castleton Gardens

Affinity Water are proposing to carry out Utility repair and maintenance works on Castleton Gardens, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 17:25.

Affinity Water logo
Between
30 Jul and 5 Aug 2024
Details
View Map
Share
Follow
Kingsfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsfield Avenue, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2024 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 May 2024 at 09:55.

Affinity Water logo
Between
31 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Manor Farm Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Manor Farm Road, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 May 2024 at 06:34.

Network Rail logo
LONG TERM
Between
3 Aug and 13 Oct 2024
Details
View Map
Share
Follow
Acton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Apr 2024 at 07:19.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
4 Aug and 13 Sep 2024
Details
View Map
Share
Follow
Brook Green

London Borough Of Hammersmith & Fulham are proposing to carry out Utility asset works on Brook Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 31 May 2024 at 16:51.

Virgin Media logo
Between
4 and 6 Aug 2024
Details
View Map
Share
Follow
Rabbit Row

Virgin Media are proposing to carry out Utility asset works on Rabbit Row, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2024 and could run through until 6 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Apr 2024 at 09:56.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
5 Aug and 13 Sep 2024
Details
View Map
Share
Follow
Hammersmith Road

London Borough Of Hammersmith & Fulham are proposing to carry out Utility asset works on Hammersmith Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Jun 2024 at 19:12.

Murphy Power Distribution logo
Between
5 and 18 Aug 2024
Details
View Map
Share
Follow
Merrick Road

Murphy Power Distribution are proposing to carry out Utility asset works on Merrick Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 18 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:15.

Thames Water logo
Between
5 and 9 Aug 2024
Details
View Map
Share
Follow
Bloemfontein Road

Thames Water are proposing to carry out New service connection on Bloemfontein Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 May 2024 at 10:29.

Thames Water logo
Between
5 and 7 Aug 2024
Details
View Map
Share
Follow
Kensington Park Road

Thames Water are proposing to carry out New service connection on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 7 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2024 at 12:36.

Thames Water logo
Between
5 and 9 Aug 2024
Details
View Map
Share
Follow
Oakworth Road

Thames Water are proposing to carry out New service connection on Oakworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2024 at 16:07.

Thames Water logo
LONG TERM
Between
5 Aug and 11 Oct 2024
Details
View Map
Share
Follow
Greenford Road

Thames Water are proposing to carry out Utility asset works on Greenford Road, Greenford.

These works are categorised as Major.

The works will start on or after 5 August 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2024 at 13:06.

BT logo
Between
5 and 9 Aug 2024
Details
View Map
Share
Follow
Northumberland Road

BT are proposing to carry out Utility asset works on Northumberland Road, North Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 9 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 6 Jun 2024 at 10:34.

Between
5 and 9 Aug 2024
Details
View Map
Share
Follow
Chestnut Drive

London Borough Of Harrow are proposing to carry out Highway improvement works on Chestnut Drive, Harrow Weald.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Jun 2024 at 09:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Aug and 27 Sep 2024
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2024 at 17:44.

G2 Energy IDNO logo
LONG TERM
Between
7 Aug and 8 Sep 2024
Details
View Map
Share
Follow
Old Oak Lane

G2 Energy IDNO are proposing to carry out Utility asset works on Old Oak Lane, Park Royal.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2024 and could run through until 8 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 23 Apr 2024 at 13:53.

London Borough Of Ealing logo
Between
9 and 13 Aug 2024
Details
View Map
Share
Follow
Park Royal Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 August 2024 and could run through until 13 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 10:01.

London Borough Of Ealing logo
LONG TERM
Between
10 Aug and 10 Oct 2024
Details
View Map
Share
Follow
Broadmead Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Broadmead Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2024 and could run through until 10 October 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 May 2024 at 08:22.

London Borough Of Ealing logo
LONG TERM
Between
10 Aug and 10 Oct 2024
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2024 and could run through until 10 October 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 May 2024 at 08:22.

Thames Water logo
Between
11 and 15 Aug 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 15 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2024 at 07:33.

London Borough Of Camden logo
Between
11 and 22 Aug 2024
Details
View Map
Share
Follow
East Heath Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on East Heath Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2024 and could run through until 22 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 May 2024 at 15:27.

Affinity Water logo
LONG TERM
Between
12 Aug and 20 Sep 2024
Details
View Map
Share
Follow
Avenue Road

Affinity Water are proposing to carry out Utility asset works on Avenue Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Jun 2024 at 13:49.

Affinity Water logo
LONG TERM
Between
12 Aug and 20 Sep 2024
Details
View Map
Share
Follow
Hamilton Road

Affinity Water are proposing to carry out Utility asset works on Hamilton Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Jun 2024 at 14:00.

Cadent Gas logo
Between
12 and 16 Aug 2024
Details
View Map
Share
Follow
Northumberland Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Northumberland Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2024 at 15:33.

London Borough Of Ealing logo
LONG TERM
Between
12 Aug and 12 Sep 2024
Details
View Map
Share
Follow
Rowdell Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Rowdell Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 12 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 11 Jun 2024 at 09:05.

Affinity Water logo
Between
12 and 15 Aug 2024
Details
View Map
Share
Follow
Hillfield Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Hillfield Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 15 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 May 2024 at 08:19.

Between
12 and 16 Aug 2024
Details
View Map
Share
Follow
Ronart Street

London Borough Of Harrow are proposing to carry out Highway improvement works on Ronart Street, Wealdstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 16 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 14 Jun 2024 at 09:46.

Transport for London (TfL) logo
Between
14 and 20 Aug 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Section 58 on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 20 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jun 2024 at 11:00.

G2 Energy IDNO logo
LONG TERM
Between
14 Aug and 15 Sep 2024
Details
View Map
Share
Follow
Victoria Road

G2 Energy IDNO are proposing to carry out Utility asset works on Victoria Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 22 Apr 2024 at 12:55.

London Borough Of Ealing logo
Between
15 and 20 Aug 2024
Details
View Map
Share
Follow
Minterne Avenue

London Borough Of Ealing are proposing to carry out Highway improvement works on Minterne Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 20 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 10:55.

London Borough Of Barnet logo
Between
15 and 20 Aug 2024
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 20 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Jun 2024 at 14:14.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 09:12.

G2 Energy IDNO logo
LONG TERM
Between
18 Aug and 19 Sep 2024
Details
View Map
Share
Follow
Wales Farm Road

G2 Energy IDNO are proposing to carry out Utility asset works on Wales Farm Road, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2024 and could run through until 19 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 30 Apr 2024 at 10:02.

Thames Water logo
LONG TERM
Between
18 Aug and 28 Sep 2024
Details
View Map
Share
Follow
Fairlight Avenue

Thames Water are proposing to carry out Utility asset works on Fairlight Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2024 and could run through until 28 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2024 at 07:12.

Thames Water logo
LONG TERM
Between
19 Aug and 5 Oct 2024
Details
View Map
Share
Follow
Westwick Gardens

Thames Water are proposing to carry out Utility asset works on Westwick Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 5 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2024 at 07:47.

Thames Water logo
Between
19 and 24 Aug 2024
Details
View Map
Share
Follow
Park Place

Thames Water are proposing to carry out New service connection on Park Place, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 24 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2024 at 14:33.

Thames Water logo
Between
19 and 23 Aug 2024
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out Utility repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 23 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2024 at 08:52.

UK Power Networks Eastern & London logo
Between
19 and 30 Aug 2024
Details
View Map
Share
Follow
Bridstow Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2024 at 12:07.

Affinity Water logo
Between
19 and 23 Aug 2024
Details
View Map
Share
Follow
Somerset Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Somerset Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 23 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 4 Jun 2024 at 08:34.

HS2 logo
Between
19 Aug and 13 Sep 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, Maida Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 13 September 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 14:46.

HS2 logo
Between
19 Aug and 13 Sep 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 13 September 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 15:44.

HS2 logo
Between
19 Aug and 13 Sep 2024
Details
View Map
Share
Follow
Kilburn High Road

HS2 are proposing to carry out Section 50 on Kilburn High Road, Kilburn, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 13 September 2024. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 14 Jun 2024 at 10:02.

Scottish Hydro Electric Power Dis logo
Between
20 and 31 Aug 2024
Details
View Map
Share
Follow
Lionel Road North

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lionel Road North, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2024 and could run through until 31 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Jun 2024 at 12:34.

London Borough Of Ealing logo
LONG TERM
Between
21 Aug and 31 Oct 2024
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 22 May 2024 at 09:02.

UK Power Networks Eastern & London logo
Between
21 Aug and 5 Sep 2024
Details
View Map
Share
Follow
West End Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on West End Lane, West Hampstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2024 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 09:52.

Affinity Water logo
Between
25 Aug and 20 Sep 2024
Details
View Map
Share
Follow
Cambridge Road

Affinity Water are proposing to carry out Utility asset works on Cambridge Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Jun 2024 at 14:00.

Affinity Water logo
Between
25 Aug and 20 Sep 2024
Details
View Map
Share
Follow
Boyd Avenue

Affinity Water are proposing to carry out Utility asset works on Boyd Avenue, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 4 Jun 2024 at 14:00.

G2 Energy IDNO logo
Between
25 Aug and 19 Sep 2024
Details
View Map
Share
Follow
Leamington Park

G2 Energy IDNO are proposing to carry out Utility asset works on Leamington Park, Acton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 19 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 08:44.

Cadent Gas logo
LONG TERM
Between
25 Aug and 3 Oct 2024
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out Utility asset works on Station Road, Hendon, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2024 at 13:27.

Thames Water logo
Between
26 and 29 Aug 2024
Details
View Map
Share
Follow
Dunster Gardens

Thames Water are proposing to carry out Remedial works on Dunster Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 29 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2024 at 07:15.

Thames Water logo
Between
26 Aug and 1 Sep 2024
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2024 at 07:16.

Cadent Gas logo
Between
27 Aug and 1 Sep 2024
Details
View Map
Share
Follow
Perth Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Perth Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jun 2024 at 11:04.

Virgin Media logo
Between
27 and 29 Aug 2024
Details
View Map
Share
Follow
Iverson Road

Virgin Media are proposing to carry out Utility asset works on Iverson Road, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 29 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 23 May 2024 at 20:57.

Virgin Media logo
Between
28 and 30 Aug 2024
Details
View Map
Share
Follow
Bridgeview

Virgin Media are proposing to carry out Utility asset works on Bridgeview, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 May 2024 at 14:40.

UK Power Networks Eastern & London logo
Between
30 Aug and 5 Sep 2024
Details
View Map
Share
Follow
Woodchurch Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Woodchurch Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2024 at 06:51.

Cadent Gas logo
Between
1 and 19 Sep 2024
Details
View Map
Share
Follow
Deborah Close

Cadent Gas are proposing to carry out Utility asset works on Deborah Close, Isleworth.

These works are categorised as Major.

The works will start on or after 1 September 2024 and could run through until 19 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 May 2024 at 15:07.

London Borough Of Camden logo
LONG TERM
Between
1 Sep and 25 Oct 2024
Details
View Map
Share
Follow
Hermit Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Hermit Place, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Apr 2024 at 17:15.

Virgin Media logo
Between
1 and 3 Sep 2024
Details
View Map
Share
Follow
Holly Hill

Virgin Media are proposing to carry out Utility asset works on Holly Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 3 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 May 2024 at 15:37.

London Borough Of Barnet logo
Between
1 and 3 Sep 2024
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 3 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Apr 2024 at 11:16.

Thames Water logo
Between
2 and 13 Sep 2024
Details
View Map
Share
Follow
Fletcher Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Dec 2023 at 13:50.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 May 2024 at 13:36.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:16.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:12.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
West Cross Route (A3220)

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2024 at 14:13.

Transport for London (TfL) logo
LONG TERM
Between
2 Sep and 12 Oct 2024
Details
View Map
Share
Follow
Holland Park Roundabout

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Holland Park Roundabout, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 16:27.

Thames Water logo
Between
2 and 6 Sep 2024
Details
View Map
Share
Follow
Adpar Street

Thames Water are proposing to carry out New service connection on Adpar Street, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jun 2024 at 12:49.

Transport for London (TfL) logo
Between
2 and 27 Sep 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2024 at 09:58.

UK Power Networks Eastern & London logo
Between
2 and 6 Sep 2024
Details
View Map
Share
Follow
Kingsmere Park

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kingsmere Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 6 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jun 2024 at 11:01.

Between
2 and 11 Sep 2024
Details
View Map
Share
Follow
Burnt Oak Broadway Access Road To Nos 53 To 115

NWP Street (formerly New World Payphones) are proposing to carry out roadworks on Burnt Oak Broadway Access Road To Nos 53 To 115, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 11 September 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by NWP Street (formerly New World Payphones) on 7 Jun 2024 at 15:41.

UK Power Networks Eastern & London logo
Between
3 and 8 Sep 2024
Details
View Map
Share
Follow
Kingsgate Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Kingsgate Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 8 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Jun 2024 at 08:51.

Thames Water logo
Between
6 and 9 Sep 2024
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2024 and could run through until 9 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Jun 2024 at 10:29.

Thames Water logo
Between
8 and 17 Sep 2024
Details
View Map
Share
Follow
Rockley Road

Thames Water are proposing to carry out Utility asset works on Rockley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2024 and could run through until 17 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2024 at 07:48.

Virgin Media logo
Between
8 and 10 Sep 2024
Details
View Map
Share
Follow
West End Lane

Virgin Media are proposing to carry out Utility asset works on West End Lane, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2024 and could run through until 10 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 May 2024 at 15:01.

Network Rail logo
Between
9 and 13 Sep 2024
Details
View Map
Share
Follow
Wood Lane

Network Rail are proposing to carry out Works for Rail Purposes on Wood Lane, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Jun 2024 at 15:51.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Shepherd's Bush Green

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 12:21.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 12:09.

UK Power Networks Eastern & London logo
Between
9 and 13 Sep 2024
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jun 2024 at 17:27.

UK Power Networks Eastern & London logo
Between
9 and 18 Sep 2024
Details
View Map
Share
Follow
Monmouth Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monmouth Road, Bayswater, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jun 2024 at 13:17.

Transport for London (TfL) logo
Between
9 Sep and 4 Oct 2024
Details
View Map
Share
Follow
Craven Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Craven Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jun 2024 at 18:09.

Transport for London (TfL) logo
Between
9 Sep and 4 Oct 2024
Details
View Map
Share
Follow
St Marys Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St Marys Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jun 2024 at 18:22.

Virgin Media logo
Between
10 and 12 Sep 2024
Details
View Map
Share
Follow
Pembridge Gardens

Virgin Media are proposing to carry out roadworks on Pembridge Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 12 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Jun 2024 at 15:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Sep and 25 Nov 2024
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2024 at 17:26.

Transport for London (TfL) logo
LONG TERM
Between
11 Sep and 16 Oct 2024
Details
View Map
Share
Follow
West Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2024 and could run through until 16 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 15:02.

Cadent Gas logo
LONG TERM
Between
11 Sep and 19 Nov 2024
Details
View Map
Share
Follow
West Hendon Broadway

Cadent Gas are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 September 2024 and could run through until 19 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2024 at 13:27.


Roadworks Map near to Belgrave Road, HA0 1AG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 15 Jun 2024 13:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Belgrave Road, HA0 1AG (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
URGENT
  
BERESFORD AVENUE 
(0.1 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 12 Jun 2024 09:00
(Scheduled: 12 Jun 2024 - 19 Jun 2024)
0.1
Details
Share
Follow
2
London Borough Of Brent logo
MAJOR
  
CRAIGMUIR PARK 
(0.1 miles)
London Borough Of Brent
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 27 May 2024 08:00
(Scheduled: 27 May 2024 - 17 Jun 2024)
0.1
Details
Share
Follow
3
London Borough Of Brent logo
MAJOR
  
OLD NORTH CIRCULAR ROAD, STONEBRIDGE 
(0.3 miles)
London Borough Of Brent
Remedial works - Footway - No carriageway incursion
In Progress
Since: 7 May 2024 07:00
(Scheduled: 7 May 2024 - 21 Jun 2024)
0.3
Details
Share
Follow
4
BT logo
EMERGENCY
  
ELVEDEN ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 13 Jun 2024 06:36
(Scheduled: 13 Jun 2024 - 17 Jun 2024)
0.4
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
STANLEY AVENUE 
(0.4 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 23 May 2024 - 13 Aug 2024
0.4
Details
Share
Follow
6
HS2 logo
MAJOR
  
WEST GATE 
(0.8 miles)
HS2
Utility asset works - Footway, Carriageway, Parking place - Multi-way signals
In Progress
Since: 25 Mar 2024 00:01
(Scheduled: 25 Mar 2024 - 16 Jun 2024)
0.8
Details
Share
Follow
7
BT logo
CENTRAL WAY 
(0.8 miles)
BT
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 15 Jun 2024
0.8
Details
Share
Follow
8
Transport for London (TfL) logo
MAJOR
  
HANGER LANE ROUNDABOUT 
(0.8 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 7 Dec 2020 - 26 Jul 2024
0.8
Details
Share
Follow
9
HS2 logo
WEST GATE 
(0.8 miles)
HS2
Utility asset works - Footway, Carriageway - Lane closure
Planned
Scheduled: 10 Jun 2024 - 21 Jun 2024
0.8
Details
Share
Follow
10
HS2 logo
MAJOR
  
WEST GATE 
(0.9 miles)
HS2
Utility asset works - Cycleway - Some carriageway incursion
In Progress
Since: 6 Nov 2023 08:00
(Scheduled: 6 Nov 2023 - 12 Jul 2024)
0.9
Details