ROADWORKS SUMMARY
Westferry Road, LONDON, E14 8NH
Introduction
View current and future planned roadworks and road closures for Westferry Road, E14 8NH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Westferry Road, LONDON, E14 8NH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Westferry Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Mar 2025
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 12:25.
15 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2020 at 09:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:58.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.
23 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.
These works are categorised as Major.
The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.
22 Aug 2202
Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.
31 Dec 2024
Thames Water are carrying out roadworks on Vulcan Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2021 at 10:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:32.
1 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.
20 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.
20 Dec 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 September 2022 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 08:37.
31 Oct 2022 and 30 Jan 2025
Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.
12 Jan 2025
Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 February 2023 at 08:00 and could run through until 12 January 2025. The works will impact the footway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 19:08.
27 Mar 2023 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.
30 Mar 2023 and 25 Mar 2025
Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.
11 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 18:14.
20 May 2025
London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.
These works are categorised as Major.
The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.
Saturday
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2023 at 08:00 and could run through until 30 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:39.
6 Sep 2023 and 3 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.
20 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 September 2023 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2024 at 11:59.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.
31 Mar 2025
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 18 Nov 2024 at 13:27.
Friday
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 20 Nov 2024 at 11:00.
Thursday
London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 29 November 2023 at 06:11 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Nov 2023 at 06:14.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2023 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:26.
16 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 December 2023 at 19:28 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 16 Jul 2024 at 10:06.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.
19 Dec 2024
London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.
23 Dec 2024
London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.
30 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 25 Oct 2024 at 11:37.
17 Jan 2024 and 14 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.
5 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 00:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 15:10.
5 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 00:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 15:10.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:47.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:46.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:50.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:49.
Friday
London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 28 Oct 2024 at 10:20.
14 Feb 2024 and 12 Feb 2025
Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2024 and could run through until 12 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 15:58.
15 Feb 2024 and 12 Jul 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.
31 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.
31 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 11:20.
4 Mar 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.
15 Apr 2024 and 23 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.
28 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.
29 Apr 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.
11 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 May 2024 at 09:54.
11 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Glengarry Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:25.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:45.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:51.
4 Oct 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.
18 Dec 2024
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:16.
18 Dec 2024
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:15.
24 May 2024 and 21 Jun 2025
Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.
13 Dec 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 12 Aug 2024 at 13:53.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
10 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.
13 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.
Friday
London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 12 Nov 2024 at 09:41.
5 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.
12 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.
10 Jun 2024 and 13 Apr 2026
Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.
20 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.
Wednesday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Galleywall Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 09:45 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2024 at 08:46.
31 Jul 2025
Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Rembrandt Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:06.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Murillo Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:07.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Manor Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:09.
6 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Weardale Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jul 2024 at 10:38.
30 Apr 2026
City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.
Thursday
City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 08:00 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 18 Nov 2024 at 13:25.
1 Jul 2024 and 31 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.
2 Jul 2024 and 27 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.
These works are categorised as Major.
The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Kennington Park Road, Kennington, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 04:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 13:27.
7 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.
11 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on King James Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 July 2024 at 06:51 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 12 Jul 2024 at 05:55.
Saturday
London Borough Of Southwark are carrying out Highway repair and maintenance works on Dulwich Village, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.
Saturday
London Borough Of Southwark are carrying out Highway repair and maintenance works on Court Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.
Saturday
London Borough Of Southwark are carrying out Highway repair and maintenance works on Calton Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 08:07.
15 Jul 2024 and 13 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.
11 Feb 2025
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:46.
29 Jul 2024 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Kempsford Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Wincott Street, Kennington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.
31 Jul 2024 and 23 Dec 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.
31 Jul 2024 and 20 Aug 2026
London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.
4 Aug 2024 and 2 Mar 2025
Thames Water are proposing to carry out Utility asset works on Offord Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2024 and could run through until 2 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 16 May 2024 at 10:30.
Friday
London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 10:39.
16 Mar 2025
Thames Water are carrying out Utility asset works on Offord Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 08:00 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:16.
20 Dec 2024
Thames Water are carrying out Utility asset works on Hamlets Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
20 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Burdett Road, London.
These works are categorised as Major.
The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:24.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.
2 Dec 2024
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Highbridge Road, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 20 Aug 2024 at 13:10.
12 Aug 2024 and 22 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.
19 Aug 2024 and 12 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 12 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 29 May 2024 at 08:38.
12 Feb 2025
City Of Westminster are carrying out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 19 Aug 2024 at 08:42.
Saturday
Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
The works started on 19 August 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:17.
6 Dec 2024
London Borough Of Hackney are carrying out Highway improvement works on Marvin Street, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:03 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 19 Aug 2024 at 08:03.
15 Dec 2024
Thames Tideway Tunnel are carrying out Highway improvement works on Deptford Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:52.
15 Dec 2024
Thames Tideway Tunnel are carrying out roadworks on Creek Road, Deptford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 11:59.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Ramsay Road, Forest Gate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:06.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:17.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:16.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
30 Aug and 18 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.
1 Sep 2024 and 29 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Auriga Mews, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Islington on 25 Apr 2024 at 14:44.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:51.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:53.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:54.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:52.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:55.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:50.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:49.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:57.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:39.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:56.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:40.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:48.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:38.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:35.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:37.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:41.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:47.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:46.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:45.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:44.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:42.
2 Sep 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:43.
2 Sep 2024 and 2 Jun 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Slippers Place, London.
These works are categorised as Major.
The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 16:30.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:13.
Friday
London Borough Of Hackney are carrying out Highway improvement works on Brownlow Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 07:08 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Nov 2024 at 13:40.
Friday
London Borough Of Hackney are carrying out Highway improvement works on Shrubland Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2024 at 12:36 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Nov 2024 at 13:36.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
9 Sep and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Vesta Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:25.
9 Sep and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ashby Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:20.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:21.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:23.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.
30 Jun 2025
London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 09:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 11:09.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
6 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gilbert Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 13:50 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:37.
16 Sep 2024 and 31 Jan 2025
City Of London Corporation are proposing to carry out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 5 Sep 2024 at 14:11.
31 Jan 2025
City Of London Corporation are carrying out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 16 Sep 2024 at 08:20.
Friday
London Borough Of Hackney are carrying out Highway improvement works on Scriven Street, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Nov 2024 at 09:09.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 11:56.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 13:27.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:05.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 09:10.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:07.
9 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kirkdale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 14:00 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:35.
18 Sep and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2024 at 13:34.
19 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.
20 Sep and 6 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 07:01.
22 Sep and 6 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 15 Aug 2024 at 09:28.
23 Sep and 2 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 15:54.
23 Sep and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:49.
23 Sep 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.
2 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.
12 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 07:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:02.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:00 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 13:43.
20 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Orchard Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 14:39.
30 Sep and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Lloyd Square, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:34.
30 Sep and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Lloyd Baker Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:48.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:05.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:06.
30 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.
16 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:04.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:08.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.
4 Oct and 11 Dec 2024
Thames Water were proposing to carry out roadworks on Hillsboro Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:10.
20 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 20:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:28.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redriff Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 12:31.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 27 Jun 2024 at 08:02.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 30 November 2024. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 11 Jul 2024 at 07:57.
20 Dec 2024
Thames Water are carrying out Utility asset works on Mile End Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 09:15 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 13:25.
14 Apr 2025
Thames Water are carrying out Utility repair and maintenance works on Cephas Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 14 April 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:53.
Friday
Thames Water are carrying out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:21.
20 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 20:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:29.
12 Oct 2024 and 12 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.
21 Dec 2024
Thames Tideway Tunnel are carrying out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 14 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2024 at 06:39.
14 Oct and 5 Dec 2024
Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:35.
5 Dec 2024
Thames Water are carrying out Utility asset works on St John Street, Islington, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 11:45 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 11:45.
15 Oct and 9 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 11:51.
15 Oct and 30 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Portland Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 09:42.
Saturday
Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 11:45 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 13:20.
19 Oct 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on De Laune Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Braganza Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:50.
Wednesday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2024 at 16:04.
21 Oct and 14 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 13:01.
21 Oct 2024 and 24 Feb 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 21 October 2024 and could run through until 24 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:03.
23 Feb 2025
Thames Water are carrying out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works started on 21 October 2024 at 08:22 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 08:22.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Ainsworth Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Well Street, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:21 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:21.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Frampton Park Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.
22 Oct and 24 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Tavistock Place, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 24 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 24 Oct 2024 at 15:04.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.
22 Oct and 17 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 18 Sep 2024 at 09:31.
17 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 08:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 30 Oct 2024 at 09:11.
23 Oct and 11 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Horselydown Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 08:32.
23 Oct and 11 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 08:25.
Friday
Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity Network Company on 7 Aug 2024 at 10:35.
2 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Savage Gardens, Beckton, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 16:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:46.
28 Oct 2024 and 31 Jan 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:31.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:20.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 10:23.
28 Oct and 8 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:39.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:47.
20 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
28 Oct and 20 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 12:40.
28 Oct and 20 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:34.
20 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
Today
Transport for London (TfL) are carrying out Highway improvement works on City Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:37.
Today
Transport for London (TfL) are carrying out Highway improvement works on Islington High Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:29.
Today
Transport for London (TfL) are carrying out Highway improvement works on White Lion Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.
Today
Transport for London (TfL) are carrying out Highway improvement works on Liverpool Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:30.
Today
Transport for London (TfL) are carrying out Highway improvement works on Duncan Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:30.
Today
Transport for London (TfL) are carrying out Highway improvement works on Upper Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:26.
Today
Transport for London (TfL) are carrying out Highway improvement works on Camden Passage, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:29.
Today
Transport for London (TfL) are carrying out Highway improvement works on Charlton Place, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:28.
Today
Transport for London (TfL) are carrying out Highway improvement works on Berners Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.
Today
Transport for London (TfL) are carrying out Highway improvement works on Islington Green, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:27.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Walk, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 07:55.
Today
Transport for London (TfL) are carrying out Highway improvement works on Camden Walk, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:37.
Today
Transport for London (TfL) are carrying out Highway improvement works on St Alban's Place, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:36.
Today
Transport for London (TfL) are carrying out Highway improvement works on Collins Yard, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.
28 Oct 2024 and 13 Jan 2025
Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.
Today
Transport for London (TfL) are carrying out Highway improvement works on Theberton Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.
Today
Transport for London (TfL) are carrying out Highway improvement works on Cross Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:35.
Today
Transport for London (TfL) are carrying out Highway improvement works on Almeida Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:34.
Today
Transport for London (TfL) are carrying out Highway improvement works on Waterloo Terrace, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:34.
Today
Transport for London (TfL) are carrying out Highway improvement works on Florence Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.
Today
Transport for London (TfL) are carrying out Highway improvement works on Barnsbury Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.
Today
Transport for London (TfL) are carrying out Highway improvement works on Richmond Grove, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:33.
Today
Transport for London (TfL) are carrying out Highway improvement works on Tyndale Lane, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:32.
Today
Transport for London (TfL) are carrying out Highway improvement works on Islington Park Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:32.
Today
Transport for London (TfL) are carrying out Highway improvement works on Canonbury Lane, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:31.
Today
Transport for London (TfL) are carrying out Highway improvement works on Laycock Street, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:31.
Today
Transport for London (TfL) are carrying out Highway improvement works on Canonbury Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 19:00 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 08:27.
29 Oct 2024 and 12 May 2025
City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.
29 Oct 2024 and 12 May 2025
City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 20 Aug 2024 at 09:25.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:17.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 15:47.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:31.
31 Oct 2024 and 16 Mar 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 31 October 2024 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:09.
16 Mar 2025
Thames Water are carrying out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works started on 31 October 2024 at 07:45 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 13:39.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 08:25.
4 Nov and 6 Dec 2024
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 13 Sep 2024 at 14:22.
Friday
Cadent Gas are carrying out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 10:02 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 10:31.
9 Dec 2024
London Borough Of Tower Hamlets are carrying out roadworks on Wodeham Gardens, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Nov 2024 at 10:16.
9 Dec 2024
London Borough Of Tower Hamlets are carrying out Highway improvement works on Old Montague Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Nov 2024 at 10:16.
9 Dec 2024
London Borough Of Tower Hamlets are carrying out Highway improvement works on Vallance Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:30 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Nov 2024 at 10:16.
15 Dec 2024
London Borough Of Camden are carrying out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Nov 2024 at 10:03.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:54.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:52.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 12:01.
4 Nov and 8 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 13:12.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 30 Oct 2024 at 08:53.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.
13 Dec 2024
Thames Water are carrying out Utility asset works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:08.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:06.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2024 at 05:57.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.
Friday
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.
Friday
Thames Water were proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:16.
Friday
Thames Water were proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:41.
Friday
Thames Water are proposing to carry out Utility asset works on Navarre Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:05.
Friday
Thames Water are proposing to carry out Utility asset works on Streatfeild Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:38.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:46.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.
Friday
Thames Water are carrying out Utility repair and maintenance works on Mandeville Street, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 14:18.
4 Nov 2024 and 10 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 10:31.
Today
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Albany Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:13.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Albany Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 09:31.
Tomorrow
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 13:16.
Tomorrow
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Nov 2024 at 08:41.
Saturday
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
10 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Prestons Road Roundabout, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 08:08.
4 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:16.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The works started on 4 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:32.
4 Nov and 10 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 8 Aug 2024 at 12:30.
4 Nov and 10 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 5 Sep 2024 at 14:10.
4 Nov and 10 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Abchurch Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 15 Oct 2024 at 14:28.
10 Dec 2024
Electricity Network Company are carrying out Utility asset works on Abchurch Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 09:20.
5 Nov and 2 Dec 2024
Thames Water are proposing to carry out roadworks on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2024 at 11:56.
5 Nov 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.
10 Feb 2025
Thames Water are carrying out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.
5 Nov 2024 and 15 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.
Saturday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.
Saturday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 08:07.
Friday
London Borough Of Hackney are carrying out New service connection on Clissold Road, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 15:13 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 14 Nov 2024 at 13:17.
15 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.
8 Nov and 24 Dec 2024
Transport for London (TfL) were proposing to carry out Section 50 on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 12:41.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.
11 Nov 2024 and 4 Apr 2025
Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.
4 Apr 2025
Thames Water are carrying out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:30 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:54.
4 Apr 2025
Thames Water are carrying out Utility asset works on Westhorne Avenue, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:24.
12 Dec 2024
Thames Water are carrying out roadworks on Hillsboro Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 14:00 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:02.
11 Nov and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:26.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:31.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:36.
14 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works started on 11 November 2024 at 21:00 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 06:50.
20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:18.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:22.
13 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Archangel Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:43.
Friday
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are carrying out New service connection on Factory Road, North Woolwich, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 21 Nov 2024 at 16:17.
11 Nov 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.
Thursday
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 23 Sep 2024 at 12:49.
Thursday
London Borough Of Southwark are carrying out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 06:47 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 06:55.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:00.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:43.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:46.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:00.
11 Nov and 21 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:39.
Saturday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 07:13.
Saturday
UK Power Networks Eastern & London are carrying out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 07:12.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Holborn Viaduct, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 17:06 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:09.
Friday
Cadent Gas are proposing to carry out Utility asset works on Basinghall Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:10.
13 Dec 2024
Thames Water are carrying out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:11 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:24.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Kingsland Road, Hackney, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:18.
24 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on London Fields West Side, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.
24 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Richmond Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.
24 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Greenwood Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:07 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 11 Nov 2024 at 08:07.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:14.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on St Jude Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:17.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:15.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:18.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:13.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Crossway, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:12.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Wolsey Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:20.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 22 Aug 2024 at 13:28.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:19.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Mildmay Park, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:50.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:11.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:49.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:47.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:48.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:53.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:00.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Boleyn Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:58.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:57.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:56.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:54.
11 Nov 2024 and 30 Apr 2025
London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:55.
Friday
Thames Water are carrying out Utility repair and maintenance works on Albion Road, Hackney, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:38.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Nelson Terrace, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 08:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:57.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2024 at 14:19.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:44.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 07:55.
5 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 22:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 07:13.
12 Nov and 9 Dec 2024
Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 06:48.
23 Dec 2024
Cadent Gas are carrying out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 16:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 18:27.
12 Nov and 23 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 17:10.
12 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:02.
21 Dec 2024
Cadent Gas are carrying out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 07:39 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:03.
2 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Little Newport Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 19 Nov 2024 at 08:50.
13 Nov and 22 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on East India Dock Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 09:03 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 16:30.
6 Dec 2024
Thames Water are carrying out Utility asset works on Carpenters Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 17:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:04.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.
15 Nov and 9 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thorne Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 14:57.
Tomorrow
G. Network Communications were proposing to carry out Utility asset works on Berwick Street, West End, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 16 Nov 2024 at 16:58.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Law Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 20:04.
17 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Law Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 08:54.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 12:19.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:04.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.
2 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:08.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.
Tomorrow
Thames Water were proposing to carry out New service connection on Jonathan Street, Vauxhall, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:04.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Law Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 11:30 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:41.
Friday
London Borough Of Southwark are proposing to carry out Highway improvement works on Tanner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Sep 2024 at 12:21.
Friday
London Borough Of Southwark are carrying out Highway improvement works on Tanner Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:13 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 09:18.
7 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Bridgeland Road, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 18 Nov 2024 at 08:01.
Tomorrow
Thames Water are proposing to carry out New service connection on New Row, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 14:33.
Tomorrow
Thames Water are carrying out New service connection on New Row, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:45 and could run through until 26 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:46.
18 Nov 2024 and 30 Mar 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Little Trinity Lane, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 23 Oct 2024 at 10:23.
30 Mar 2025
City Of London Corporation are carrying out Highway repair and maintenance works on Little Trinity Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 18 Nov 2024 at 08:03.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:42.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:08.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:12.
18 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:15.
18 Nov and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Queen Victoria Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:34.
Friday
Cadent Gas are proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 18:31.
6 Dec 2024
Cadent Gas are carrying out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 11:17 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:06.
18 Nov and 8 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 8 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 12:34.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Upper Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 07:59.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:47.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:02.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:59.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Euston Road, King's Cross, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:00.
Sunday
Thames Water are proposing to carry out New service connection on Crestfield Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:21.
Sunday
Thames Water are carrying out New service connection on Crestfield Street, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:42.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Pelly Road, Plaistow, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:20 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:28.
20 Dec 2024
London Borough Of Islington are carrying out Highway improvement works on Mildmay Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 18 Nov 2024 at 09:13.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Morris Road, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:31 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 10:52.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
Tomorrow
Thames Water are proposing to carry out New service connection on High Street North, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:36.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:39.
Thursday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 14:26.
7 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 11:56 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:02.
7 Dec 2024
London Borough Of Southwark are carrying out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 11:56 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:02.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.
19 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:24.
19 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:26.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Floral Street, St James's, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:57 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:23.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Brixton Water Lane, Brixton Rush Common, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 10:50 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:23.
Thursday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Bellenden Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 11:02 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 14:26.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:21.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 09:14.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 11:46.
20 Feb 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:11.
Today
BT are carrying out Utility repair and maintenance works on Gillingham Row, Warwick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 12:26 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 13:05.
Thursday
Cadent Gas are carrying out Utility repair and maintenance works on Old Compton Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 14:35 and could run through until 28 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:47.
20 Nov and 3 Dec 2024
London Borough Of Newham were proposing to carry out Highway improvement works on Dyson Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 11:54.
20 Nov and 3 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 12 Nov 2024 at 15:42.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:06.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:07.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:08.
Today
Hyperoptic are carrying out Utility asset works on Glebe Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 13:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 22 Nov 2024 at 14:03.
Wednesday
London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Martello Terrace, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 29 Aug 2024 at 13:42.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on St Paul's Road, Islington, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 08:54 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:44.
Wednesday
Thames Water are carrying out roadworks on Osborne Road, Forest Gate, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 10:53 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:26.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Vestry Road, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 14:30 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 17:35.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Oct 2024 at 12:08.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:32.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 08:39.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 18 Oct 2024 at 08:11.
4 Dec 2024
Electricity Network Company are carrying out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 13:30 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Nov 2024 at 15:27.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 10:38.
21 Nov and 4 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 16 Oct 2024 at 13:23.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Lupus Street, Warwick, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 02:46 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:56.
Thursday
Thames Water are carrying out roadworks on Bryant Street, Stratford, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 14:15 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:46.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 08:30.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:18.
Thursday
Cadent Gas were proposing to carry out Utility asset works on Dean Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:55.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Sheraton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:30.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Sheraton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 15:23.
Thursday
Cadent Gas were proposing to carry out Utility asset works on Sheraton Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:14.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:37.
Thursday
Cadent Gas are proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:57.
Today
Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:38.
Today
Thames Water are carrying out New service connection on Farringdon Road, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 08:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Nov 2024 at 09:04.
Today
Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:29.
Today
Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 November 2024 and run through until 25 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:23.
Today
Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:39.
Today
Thames Water are carrying out New service connection on Baker's Row, Islington, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 08:30 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Nov 2024 at 09:04.
Today
Thames Water are carrying out Utility repair and maintenance works on Calthorpe Street, King's Cross, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 15:12 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Nov 2024 at 15:12.
23 Nov 2024 and 5 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 09:21.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on New Bridge Street, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 November 2024 at 10:08 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Nov 2024 at 10:08.
3 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Brackley Avenue, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 November 2024 at 17:58 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Nov 2024 at 17:59.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:01.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:41.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:29.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:08.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 10:44.
25 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:46.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 05:44.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 08:12.
25 Nov and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Section 50 on Crane Mead, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 13:59.
25 Nov and 13 Dec 2024
Hertfordshire County Council were proposing to carry out Section 50 on Crane Mead, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 14:04.
25 Nov and 14 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Nov 2024 at 13:52.
25 Nov and 6 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Reedworth Street, Kennington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 4 Jul 2024 at 07:36.
Saturday
Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 11:13.
25 Nov and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:18.
25 Nov 2024 and 8 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 8 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 15 Nov 2024 at 15:54.
25 Nov 2024 and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Dec 2023 at 14:51.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Oct 2024 at 16:56.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 14 Nov 2024 at 11:50.
Sunday
Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:29.
Thursday
Thames Water were proposing to carry out New service connection on Park Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:43.
Thursday
Thames Water were proposing to carry out New service connection on Park Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:40.
25 Nov and 15 Dec 2024
Transport for London (TfL) were proposing to carry out Section 50 on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 12:42.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Section 50 on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 13:44.
Wednesday
Abovenet Communications UK are proposing to carry out Utility asset works on Cockspur Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Abovenet Communications UK on 18 Sep 2024 at 07:54.
Wednesday
Abovenet Communications UK are proposing to carry out Utility asset works on Cockspur Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Abovenet Communications UK on 4 Oct 2024 at 09:42.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 12:44.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:38.
25 Nov and 15 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Section 50 on Blackwall Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Nov 2024 at 10:30.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 09:43.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:23.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Section 50 on Leamouth Road Roundabout, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 14:00.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Section 50 on Leamouth Road Roundabout, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 12:39.
Thursday
Thames Water are proposing to carry out New service connection on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:57.
Thursday
Thames Water are proposing to carry out New service connection on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:22.
Thursday
G. Network Communications are proposing to carry out Utility asset works on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 22 Nov 2024 at 12:37.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 12:42.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:37.
25 Nov and 2 Dec 2024
Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:09.
25 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Remedial works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 10:07.
25 Nov and 2 Dec 2024
Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:11.
25 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Remedial works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:58.
Friday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:18.
Friday
Thames Water were proposing to carry out New service connection on D'arblay Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:31.
25 Nov and 2 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:09.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:49.
25 Nov and 13 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Section 50 on Harford Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 21 Nov 2024 at 11:04.
Wednesday
City Of London Telecomms were proposing to carry out Utility repair and maintenance works on Lever Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 15 Nov 2024 at 09:06.
Thursday
Thames Water are proposing to carry out New service connection on Cumberland Gardens, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 07:50.
Thursday
Thames Water were proposing to carry out New service connection on Regan Way, Hackney, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 11:35.
Thursday
Thames Water are proposing to carry out New service connection on Regan Way, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 12:28.
Thursday
Thames Water are proposing to carry out New service connection on Regan Way, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:01.
25 Nov and 7 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coombs Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Oct 2024 at 11:35.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:27.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:26.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:27.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on Navarre Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:20.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:25.
25 Nov and 16 Dec 2024
Thames Water are proposing to carry out Utility asset works on St Johns Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:26.
25 Nov and 23 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 16:33.
25 Nov 2024 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.
25 Nov and 6 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Nov 2024 at 12:30.
Friday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Winchester Place, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:48.
Friday
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Winchester Place, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:47.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 09:05.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:26.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 10:10.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 09:45.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 10:14.
Thursday
Thames Water are proposing to carry out Permanent reinstatement on Vivian Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 15:53.
Friday
Thames Water are proposing to carry out New service connection on Charlton Place, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:08.
26 Nov 2024 and 30 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Brownlow Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:29.
26 Nov 2024 and 30 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Scriven Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:31.
26 Nov 2024 and 30 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Shrubland Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 3 Sep 2024 at 10:28.
Friday
Thames Water are proposing to carry out Utility asset works on Bryant Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:19.
26 Nov and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Park Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 14:56.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Turney Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Calton Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Court Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:41.
Saturday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 10:34.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Stepney Way, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 27 November 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 16:01.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Norman Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:58.
Friday
Thames Water are proposing to carry out Permanent reinstatement on Keystone Crescent, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 10:14.
28 Nov and 2 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:59.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
28 Nov and 6 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 5 Sep 2024 at 12:59.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:09.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:10.
Friday
NWP Street (formerly New World Payphones) were proposing to carry out Utility asset works on Portia Way, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were scheduled for 29 November 2024 The works were due to impact the footway and carriageway.
This roadwork event was last updated by NWP Street (formerly New World Payphones) on 11 Oct 2024 at 15:27.
Sunday
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:39.
29 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Aug 2024 at 10:41.
29 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Farringdon Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:39.
29 Nov and 2 Dec 2024
Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 09:22.
29 Nov and 2 Dec 2024
Thames Water were proposing to carry out New service connection on Baker's Row, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:26.
29 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:39.
29 Nov and 2 Dec 2024
Thames Water are proposing to carry out New service connection on Baker's Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 07:45.
30 Nov and 6 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:46.
30 Nov and 8 Dec 2024
Abovenet Communications UK were proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 1 Oct 2024 at 10:05.
1 and 3 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:26.
2 and 4 Dec 2024
Vodafone are proposing to carry out Remedial works on Birchin Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 24 Nov 2024 at 14:41.
2 and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 09:56.
2 and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:31.
2 and 15 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:54.
2 and 4 Dec 2024
Vorboss are proposing to carry out Utility repair and maintenance works on Goodmans Stile, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vorboss on 4 Oct 2024 at 10:24.
2 and 5 Dec 2024
Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:46.
2 and 5 Dec 2024
Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:29.
2 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Fulbourne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:54.
2 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Fulbourne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 14:09.
2 and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Glasshouse Yard, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 07:44.
2 and 23 Dec 2024
Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:04.
2 and 19 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:15.
2 and 19 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:52.
2 and 19 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:53.
2 and 20 Dec 2024
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.
2 Dec 2024 and 10 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
2 and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:48.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.
2 and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:03.
2 Dec 2024 and 23 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:08.
2 and 4 Dec 2024
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 1 Nov 2024 at 10:54.
2 and 13 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:42.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 13:01.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 07:50.
3 and 17 Dec 2024
Thames Water are proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:24.
3 and 23 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Kingsland Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:23.
4 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.
4 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:19.
4 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:00.
4 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:39.
4 and 6 Dec 2024
Thames Water are proposing to carry out Remedial works on Overhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:19.
4 and 9 Dec 2024
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:45.
4 and 6 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:54.
4 and 7 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:19.
4 and 7 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:23.
4 and 6 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:18.
4 and 6 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Notley Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Oct 2024 at 14:25.
5 and 10 Dec 2024
Thames Water were proposing to carry out Utility asset works on Tulse Hill, St Martin's, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 December 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:02.
5 and 18 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 12:49.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 15:35.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 11:30.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:24.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:19.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:32.
6 Dec 2024 and 7 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:57.
6 Dec 2024 and 7 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:58.
6 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:03.
6 and 11 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 10:17.
6 and 8 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:03.
6 and 8 Dec 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 December 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:18.
6 and 13 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 13 Sep 2024 at 11:36.
7 and 15 Dec 2024
Thames Water were proposing to carry out New service connection on Prince's Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:23.
7 and 15 Dec 2024
Thames Water are proposing to carry out New service connection on Prince's Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 17:19.
7 and 21 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Brushfield Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:48.
9 and 20 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Carr Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Sep 2024 at 11:13.
9 and 11 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Settles Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Sep 2024 at 11:32.
9 and 12 Dec 2024
Thames Water are proposing to carry out New service connection on Great Winchester Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:59.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:31.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Cock Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:42.
9 and 17 Dec 2024
Thames Water were proposing to carry out New service connection on Fulbourne Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 14:58.
9 and 11 Dec 2024
Cadent Gas are proposing to carry out New service connection on Bale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 10:12.
9 and 11 Dec 2024
Cadent Gas are proposing to carry out New service connection on Bale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:58.
9 and 13 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Clerkenwell Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:14.
9 and 18 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 08:10.
9 Dec 2024 and 13 Jan 2025
Thames Water are proposing to carry out roadworks on Coopers Close, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:32.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Cheshire Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:22.
9 and 13 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Golden Lane, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:25.
9 and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Sep 2024 at 15:36.
9 and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Oct 2024 at 14:37.
9 and 13 Dec 2024
London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:03.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Bancroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Aug 2024 at 14:16.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Bancroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:12.
9 Dec 2024 and 10 Jan 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:48.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 13:59.
9 and 17 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:49.
9 and 13 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Cloudesley Place, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:18.
9 Dec 2024 and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:52.
9 and 19 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.
9 Dec 2024 and 22 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Rectory Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 22 Nov 2024 at 09:09.
9 and 13 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Grange Grove, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:23.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility asset works on Torridon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:35.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility asset works on Dowanhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:03.
9 and 15 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:31.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:04.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 15:20.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 10:48.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.
9 Dec 2024 and 6 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:39.
9 and 16 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:40.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.
9 Dec 2024 and 9 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:38.
9 Dec 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.
9 and 20 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Copperfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 11 Oct 2024 at 11:32.
9 and 20 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Copperfield Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 24 Nov 2024 at 20:30.
10 and 12 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 14:55.
10 and 12 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 11:45.
10 Dec 2024 and 25 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.
10 Dec 2024 and 28 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:13.
10 and 12 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Hill, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 09:59.
10 and 12 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Way, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 09:59.
10 and 19 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Oct 2024 at 00:39.
10 and 19 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Nov 2024 at 13:15.
10 and 19 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Nov 2024 at 11:09.
10 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.
11 and 13 Dec 2024
Vorboss are proposing to carry out Utility repair and maintenance works on Goodmans Stile, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vorboss on 26 Sep 2024 at 11:25.
11 Dec 2024 and 28 Feb 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on London Fields West Side, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 7 Oct 2024 at 09:53.
11 Dec 2024 and 10 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Eleanor Road (North), Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:36.
11 Dec 2024 and 28 Feb 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Greenwood Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 16 Oct 2024 at 09:02.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.
13 Dec 2024 and 14 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Richmond Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 18 Sep 2024 at 13:24.
13 and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:06.
13 and 15 Dec 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.
13 and 16 Dec 2024
Virgin Media were proposing to carry out Utility asset works on Borough High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Aug 2024 at 15:14.
13 Dec 2024 and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 16:28.
14 and 16 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:14.
14 and 16 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Nov 2024 at 15:58.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
15 Dec 2024 and 12 Jan 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
15 Dec 2024 and 12 Jan 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.
16 and 22 Dec 2024
Thames Water were proposing to carry out New service connection on Fulbourne Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:37.
16 and 20 Dec 2024
London Borough Of Islington were proposing to carry out Highway improvement works on Central Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 13 Sep 2024 at 14:12.
16 and 20 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Central Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 07:46.
16 and 20 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on New North Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:46.
16 and 20 Dec 2024
London Borough Of Islington are proposing to carry out Highway improvement works on Baring Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Islington on 16 Sep 2024 at 10:44.
16 and 20 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:17.
16 and 20 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Ferndale Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Oct 2024 at 13:27.
16 and 20 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Ferndale Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Nov 2024 at 15:37.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.
16 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:31.
16 and 19 Dec 2024
Thames Water were proposing to carry out New service connection on Lambeth Walk, Kennington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 13:47.
16 and 18 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.
16 and 19 Dec 2024
Thames Water were proposing to carry out New service connection on Denman Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 15:56.
17 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.
17 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:39.
17 and 19 Dec 2024
UK Power Networks Eastern & London were proposing to carry out roadworks on Sondes Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:16.
17 and 19 Dec 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Sondes Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
17 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:04.
17 and 19 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:25.
17 and 19 Dec 2024
Virgin Media are proposing to carry out Remedial works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 15:27.
18 Dec 2024 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cole Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 13:35.
23 and 30 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.
23 and 27 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:22.
23 and 30 Dec 2024
Thames Water are proposing to carry out New service connection on Dunlace Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:33.
27 and 31 Dec 2024
BT are proposing to carry out Utility asset works on Grosvenor Avenue, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 26 Sep 2024 at 07:52.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.
30 Dec 2024 and 1 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Grosvenor Avenue, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Oct 2024 at 10:12.
2 and 22 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bewdley Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 07:31.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:11.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:01.
3 Jan and 28 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.
These works are categorised as Major.
The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.
3 and 5 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:07.
3 and 5 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 5 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.
4 and 5 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:05.
5 Jan and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:16.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:31.
6 Jan and 7 Apr 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:57.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:09.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:26.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.
6 and 22 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Well Hall Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 16:36.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 09:30.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 08:40.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 08:15.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:29.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 10:56.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 11:52.
6 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 16:08.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:33.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:34.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:36.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:37.
6 Jan and 15 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Great College Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 13:01.
6 Jan and 15 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:43.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 13:51.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:54.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 08:28.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:14.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 11 Sep 2024 at 09:49.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:34.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 07:22.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Lower Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 25 Oct 2024 at 10:26.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Upper Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:14.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:50.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:52.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:18.
6 and 10 Jan 2025
Thames Water are proposing to carry out Permanent reinstatement on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 06:10.
6 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:15.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:44.
6 and 31 Jan 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 3 Nov 2024 at 18:01.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on New Bridge Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 13:14.
6 Jan and 22 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 13:53.
6 and 8 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Nov 2024 at 08:33.
6 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 13:52.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:13.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:54.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:10.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 14:26.
6 Jan and 6 Mar 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 09:12.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:21.
6 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:11.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets were proposing to carry out roadworks on Wodeham Gardens, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 11:14.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:21.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:22.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:50.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:10.
6 and 9 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.
6 Jan and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:30.
6 Jan and 24 May 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 14:05.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 18:12.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 13:57.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:43.
6 Jan and 7 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:36.
6 Jan and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.
6 Jan and 15 Mar 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Gainsborough Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 Nov 2024 at 08:44.
6 Jan and 17 May 2025
Cadent Gas are proposing to carry out Utility asset works on Compton Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:34.
6 and 8 Jan 2025
BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.
6 Jan and 17 May 2025
Cadent Gas are proposing to carry out Utility asset works on Ashby Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:30.
6 Jan and 16 Feb 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.
6 Jan and 16 Feb 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.
6 Jan and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.
6 Jan and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:06.
6 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:53.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 21:52.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 16:06.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 16:05.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:37.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:38.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:47.
6 Jan and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:00.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on London Road, Barking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:40.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:55.
6 Jan and 1 Feb 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Dove Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 25 Sep 2024 at 09:36.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dames Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 13:37.
6 Jan and 7 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Lea Bridge Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Nov 2024 at 10:07.
7 and 9 Jan 2025
City Of London Telecomms were proposing to carry out Utility asset works on Pickard Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 25 Sep 2024 at 11:47.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:01.
8 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.
8 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 07:59.
8 and 11 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 06:16.
9 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 10:06.
9 and 29 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:23.
9 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:51.
10 Jan and 8 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:52.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Foster Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 11:34.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gresham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:06.
10 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on St Martin's-le-grand, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Oct 2024 at 12:09.
10 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 18:02.
10 and 13 Jan 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Lathom Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:02.
11 Jan and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
11 and 12 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:26.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 15:07.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:10.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:27.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 10:25.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:11.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 06:16.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:14.
13 Jan and 10 May 2025
Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 08:24.
13 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Margaret Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:39.
13 and 27 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:24.
13 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 08:19.
13 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:47.
13 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 08:00.
13 and 26 Jan 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:25.
13 and 26 Jan 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Addle Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Oct 2024 at 13:49.
13 and 17 Jan 2025
Vorboss are proposing to carry out Utility repair and maintenance works on Long Acre, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vorboss on 17 Oct 2024 at 08:13.
13 and 18 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Shoe Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:22.
13 and 22 Jan 2025
Thames Water are proposing to carry out Utility asset works on Upper North Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 16:00.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:27.
13 and 26 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hayne Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 14:06.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Cowcross Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:00.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Cowcross Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:04.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Remedial works on Cowcross Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 07:24.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:44.
13 and 15 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 11:02.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Turnmill Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Oct 2024 at 15:10.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 2 Oct 2024 at 14:06.
13 and 15 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Benjamin Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 10:46.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Charles Square, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 12:45.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Charles Square, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 11:19.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rawstorne Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:01.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rawstorne Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 07:52.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Paget Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 11:01.
13 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Paget Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 07:52.
13 and 15 Jan 2025
City Of London Telecomms were proposing to carry out Utility asset works on Hall Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 25 Sep 2024 at 08:08.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:29.
13 and 18 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Remington Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:10.
13 and 21 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Nelson Place, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:09.
13 and 19 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Elia Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:07.
13 and 25 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coombs Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:06.
13 and 18 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Colebrooke Row, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 07:04.
13 Jan and 16 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:09.
13 and 16 Jan 2025
Thames Water were proposing to carry out New service connection on Charlton Place, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 16 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:14.
13 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:46.
13 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Caledonian Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 07:58.
13 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Caledonian Road, Islington, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:42.
13 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 11:03.
14 Jan and 28 Feb 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 15:35.
14 and 17 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Nov 2024 at 15:44.
14 and 16 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Gaskin Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Oct 2024 at 08:17.
14 and 16 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Jun 2024 at 11:33.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:42.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:02.
14 and 17 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Merrow Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:32.
14 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Merrow Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
14 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 09:12.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 11:33.
15 and 17 Jan 2025
BT are proposing to carry out Utility asset works on Ronald Avenue, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Oct 2024 at 10:29.
15 and 17 Jan 2025
Thames Water are proposing to carry out Remedial works on Talwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:38.
17 and 25 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:26.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:20.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
17 Jan and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.
18 Jan 2025
Telefonica UK are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 18 January 2025 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 15 Nov 2024 at 18:12.
20 and 24 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Poppins Court, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 09:44.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on D'arblay Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:52.
20 and 27 Jan 2025
Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 16:57.
20 and 23 Jan 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Keppel Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:03.
20 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:39.
20 Jan and 20 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:26.
20 Jan and 20 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:25.
20 Jan and 20 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 11:06.
20 Jan and 20 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 17 Oct 2024 at 08:03.
20 Jan and 20 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Canonbury Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 16 Oct 2024 at 09:23.
20 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Road, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:13.
20 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hitcham Road, Walthamstow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:14.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:52.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:40.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 10:10.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:22.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Wilfred Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Catherine Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 22 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 13:22.
20 Jan and 3 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:35.
20 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 06:43.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:51.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:37.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:46.
21 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 08:19.
21 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Park Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 16:05.
21 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:38.
21 Jan and 5 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:51.
21 Jan and 20 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cavell Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:53.
21 Jan and 20 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maples Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:55.
22 and 27 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Burton Grove, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:33.
22 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burton Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:57.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:50.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:51.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:21.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:15.
24 and 28 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.
24 and 26 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 10:49.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:58.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:41.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Warwick Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:01.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Atherton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Palmerston Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Westbury Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.
25 Jan and 2 Feb 2025
Thames Water are proposing to carry out New service connection on Commercial Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:32.
25 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Wheler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:54.
25 and 27 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.
26 Jan and 28 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 January 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:01.
27 Jan and 7 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 18 Nov 2024 at 14:12.
27 Jan and 7 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Nov 2024 at 09:32.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:41.
27 Jan and 10 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
27 and 29 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:36.
27 and 29 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.
27 and 29 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Oct 2024 at 07:25.
27 Jan and 17 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.
27 Jan and 4 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 06:23.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:32.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:31.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
27 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 08:12.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:57.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:04.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 and 30 Jan 2025
City Of London Telecomms were proposing to carry out Utility asset works on Brewer Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 16 Oct 2024 at 09:32.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 Jan and 1 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:16.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 14:53.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 5 Nov 2024 at 10:51.
27 and 31 Jan 2025
Thames Water were proposing to carry out roadworks on Stonewall, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:20.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:21.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:03.
27 Jan and 7 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Silk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:54.
27 Jan and 7 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Silk Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 12:00.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 18:14.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 08:13.
27 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Waghorn Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:49.
27 and 30 Jan 2025
BT were proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Nov 2024 at 08:57.
27 and 29 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 06:40.
27 and 29 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Canonbury Grove, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 06:39.
28 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Finsbury Pavement, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:56.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:31.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:32.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:15.
28 Jan and 1 Feb 2025
City Of London Corporation were proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 13 Aug 2024 at 11:53.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:17.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 2 Aug 2024 at 16:01.
28 Jan and 2 Feb 2025
City Of London Corporation were proposing to carry out Highway improvement works on Tower Bridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 12 Aug 2024 at 07:14.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:43.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:02.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 16 Aug 2024 at 12:20.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 23 Aug 2024 at 16:30.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:42.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:00.
28 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 16:01.
28 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 16:09.
29 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:27.
29 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
29 Jan and 1 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:46.
29 Jan and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Median Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Oct 2024 at 11:45.
1 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on Prince's Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:41.
1 Feb and 30 May 2025
London Borough Of Lewisham were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 09:39.
1 and 3 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 06:36.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 12:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 09:45.
1 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 08:31.
3 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.
3 and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.
3 and 6 Feb 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.
3 and 6 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 13:19.
3 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
3 and 8 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.
3 Feb and 25 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 29 Oct 2024 at 13:35.
3 Feb and 20 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:23.
3 and 25 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:20.
3 and 6 Feb 2025
Thames Water were proposing to carry out New service connection on Horselydown Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 13:57.
3 Feb and 23 May 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:37.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:36.
3 and 5 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 14:37.
3 and 6 Feb 2025
BT were proposing to carry out Utility asset works on Burslem Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Nov 2024 at 12:01.
3 and 17 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Whitechapel High Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:06.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:42.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:24.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
3 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chenies Mews, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 15:16.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Doughty Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:20.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:25.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:21.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:24.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:18.
3 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:40.
3 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:19.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:27.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:23.
3 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:59.
3 and 5 Feb 2025
Thames Water were proposing to carry out roadworks on Southchurch Road, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:54.
3 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:18.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility asset works on Hockley Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:18.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:32.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:15.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:28.
3 Feb and 21 Apr 2025
Thames Water were proposing to carry out Utility asset works on Russia Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.
3 Feb and 28 Apr 2025
Thames Water are proposing to carry out Utility asset works on Russia Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.
3 Feb and 28 Apr 2025
Thames Water are proposing to carry out Utility asset works on Russia Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:25.
3 and 11 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:30.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:16.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on St Johns Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:21.
3 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:23.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Remedial works on Vyner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:40.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Remedial works on Vyner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:09.
3 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility asset works on Ward Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:47.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on King Henry's Walk, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:18.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Grove North, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:29.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on St Jude Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:15.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Queen Margaret's Grove, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:13.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:55.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:53.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Crossway, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:13.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Wolsey Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:15.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:07.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Mildmay Park, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:19.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Shellgrove Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:12.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:27.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:08.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Ferntower Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:49.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:09.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Pellerin Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 09:00.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:25.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:52.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Barretts Grove, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:56.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:12.
3 Feb and 30 Apr 2025
London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:50.
4 and 8 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:11.
4 Feb and 6 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on John Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:26.
4 and 6 Feb 2025
BT were proposing to carry out Utility asset works on Theberton Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Nov 2024 at 10:48.
4 and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Nov 2024 at 15:54.
5 and 11 Feb 2025
Thames Water are proposing to carry out New service connection on Exeter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:26.
5 and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Coptic Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:14.
6 and 11 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 08:28.
10 Feb and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.
10 Feb and 10 Mar 2025
Thames Water were proposing to carry out roadworks on Barry Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.
10 Feb and 9 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.
10 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Micheldever Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:14.
10 and 22 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 15 Nov 2024 at 15:05.
10 and 22 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 13:19.
10 Feb and 6 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
10 and 14 Feb 2025
Hyperoptic are proposing to carry out Utility asset works on Chadwick Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 21 Nov 2024 at 14:19.
10 and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 15:02.
10 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 12 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 15:10.
10 and 14 Feb 2025
Cadent Gas were proposing to carry out Remedial works on Mercer Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 08:48.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Mercer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:33.
10 and 18 Feb 2025
Thames Water are proposing to carry out New service connection on Greenfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:56.
10 and 18 Feb 2025
Thames Water were proposing to carry out New service connection on Plumbers Row, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:17.
10 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Noble Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:53.
10 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Noble Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 12:00.
10 and 14 Feb 2025
Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:49.
10 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:49.
10 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:31.
10 and 22 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Elm Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Road Service Road Westbound, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:33.
12 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:36.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:20.
12 and 18 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Humber Road, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 07:00.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cambridge Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.
12 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Old Paradise Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:04.
12 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:25.
13 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lewisham Road, Lewisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 09:17.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out roadworks on Wellington Gardens, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:21.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:15.
13 and 28 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:40.
14 and 19 Feb 2025
Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:38.
14 Feb and 12 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Green Dale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 08:51.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:31.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 12:08.
15 and 23 Feb 2025
Thames Water are proposing to carry out New service connection on Westferry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:13.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.
16 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stonewall, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:46.
16 Feb and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
16 Feb and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:54.
17 Feb and 2 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Staining Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 11:58.
17 Feb and 2 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Staining Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 22 Nov 2024 at 12:02.
17 Feb and 17 May 2025
Cadent Gas are proposing to carry out Utility asset works on Seward Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 09:25.
17 and 19 Feb 2025
City Of London Telecomms were proposing to carry out Utility asset works on Hall Street, Islington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 25 Sep 2024 at 11:31.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:02.
17 and 22 Feb 2025
Thames Water are proposing to carry out New service connection on Glebe Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 16:08.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Edward's Cottages, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 07:39.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Edward's Cottages, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 11:50.
17 and 19 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Barretts Grove, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 12 Nov 2024 at 18:39.
17 Feb and 8 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stoke Newington Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:21.
17 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 11:48.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:50.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:14.
17 Feb and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.
17 and 25 Feb 2025
Thames Water are proposing to carry out New service connection on Jonathan Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:16.
17 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Tothill Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 and 20 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 12:49.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hopkins Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:15.
18 Feb and 4 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Queen Square, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 18:09.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gillender Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 14:04.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Twelvetrees Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:37.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:34.
18 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:44.
19 and 21 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Penton Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 10:16.
19 and 21 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:20.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:03.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:06.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:25.
20 Feb and 12 May 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 12 May 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:42.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 14:12.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Mary Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 07:54.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 15:28.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Limehouse Link, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 15:21.
21 Feb and 12 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 13:29.
21 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:48.
Roadworks Map near to Westferry Road, LONDON, E14 8NH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Westferry Road, LONDON, E14 8NH (71 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
(Scheduled: 21 Nov 2024 - 26 Nov 2024)
(Scheduled: 30 Sep 2020 - 5 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data