ROADWORKS SUMMARY
Deepfield Way, COULSDON, CR5 2SR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Deepfield Way, CR5 2SR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Deepfield Way, COULSDON, CR5 2SR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Deepfield Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Sydenham Road

Network Rail are carrying out Works for Rail Purposes on Sydenham Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Nov 2024 at 07:10.

Surrey County Council logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are carrying out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 07:00 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 10 Oct 2024 at 09:17.

Surrey County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Croydon Road

Surrey County Council are proposing to carry out Highway improvement works on Croydon Road, Caterham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 1 Feb 2024 at 12:05.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Mar 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
12 Aug 2024 and 23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 23 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 13:44.

Southern Gas Networks logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Hollymead Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hollymead Road, Chipstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:51.

Thames Water logo
LONG TERM
Between
26 Aug 2024 and 28 Feb 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:15.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Jun 2024 at 12:07.

Thames Water logo
LONG TERM
Between
3 Sep 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:53.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are carrying out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 08:59.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Egmont Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Egmont Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 10:31.

Surrey County Council logo
LONG TERM
Between
15 Sep 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2024 and could run through until 12 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 4 Jul 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Court Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:41.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are carrying out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 October 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 16:40.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:08.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:56.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:06.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are carrying out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:42.

Thames Water logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:19.

Thames Water logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Godson Road

Thames Water are carrying out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 14:33.

Thames Water logo
LONG TERM
Between
15 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:49.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are carrying out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 12:29 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 10:18.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 14:30.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:19.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:59.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 13:58.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 17:15.

Southern Gas Networks logo
LONG TERM
Between
28 Oct 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:16.

Southern Gas Networks logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
The Highway

Southern Gas Networks are carrying out Utility repair and maintenance works on The Highway, Sutton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 08:47.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:00.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Napier Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Napier Road, South Croydon, Croydon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 11:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Nov 2024 at 10:37.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Nutfield Marsh Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Nutfield Marsh Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:27.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:20.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Pendell Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pendell Road, Bletchingley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 15 Mar 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 15 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Oct 2024 at 14:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Oct 2024 at 09:40.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway improvement works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Aug 2024 at 15:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Bletchingley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Bletchingley Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:21.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Albury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Albury Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 6 Aug 2024 at 16:24.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Gatton Bottom

Surrey County Council were proposing to carry out Highway repair and maintenance works on Gatton Bottom, Merstham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 13:20.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Jul 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
North Acre

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Acre, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:49.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Garratts Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratts Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Mitchley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Avenue, South Croydon, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:56.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 15:02.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:02.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Kendall Avenue South

Southern Gas Networks are carrying out Utility repair and maintenance works on Kendall Avenue South, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:32.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2024 at 15:17.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Cheam Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 15:35.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:31.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:22.

UK Power Networks South Eastern logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Grosvenor Avenue

UK Power Networks South Eastern are carrying out New service connection on Grosvenor Avenue, Carshalton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Dec 2024 at 10:49.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:55.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Wellesley Road

UK Power Networks South Eastern are carrying out New service connection on Wellesley Road, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 06:07.

Thames Water logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are carrying out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Holly Lane West

Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane West, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 09:30 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 10:41.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:46.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:52.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Mitchley Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitchley Hill, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:04.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rectory Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Park, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 11:58.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 08:30.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Blakehall Road

UK Power Networks South Eastern are proposing to carry out New service connection on Blakehall Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:43.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Blakehall Road

UK Power Networks South Eastern were proposing to carry out New service connection on Blakehall Road, Carshalton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 10:14.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Carshalton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Carshalton Road, Sutton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 14:01.

Thames Water logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are carrying out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:36.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 15:50 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:44.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 08:38.

Surrey County Council logo
LONG TERM
Between
19 Nov 2024 and 19 May 2025
Details
View Map
Share
Follow
Tithepit Shaw Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tithepit Shaw Lane, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 19 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:37.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Windborough Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Windborough Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:14.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:16.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:47.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:44.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

London Borough Of Sutton logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Manor Road

London Borough Of Sutton are carrying out Highway repair and maintenance works on Manor Road, Wallington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 November 2024 at 14:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Sutton on 12 Dec 2024 at 12:17.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:01.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:54.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 08:12.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Hyde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Sep 2024 at 10:41.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Westfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westfield Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Victoria Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Victoria Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 13:10 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:31.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:54.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 16:34.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 11:41.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:13.

UK Power Networks South Eastern logo
LONG TERM
Between
25 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Hill Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hill Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 11:49.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 09:36.

Southern Gas Networks logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Haling Park Gardens

Southern Gas Networks are carrying out Utility repair and maintenance works on Haling Park Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 12:30 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 12:44.

Southern Gas Networks logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Underwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Underwood Road, Caterham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 11:30 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 16:23.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:55.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:51.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Monks Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Monks Road, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 15:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:53.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Colcokes Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Colcokes Road, Banstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 15:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 15:52.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Borrowdale Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Borrowdale Drive, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 08:24.

London Borough Of Croydon logo
Finishing
Today
Details
View Map
Share
Follow
Foxley Lane

London Borough Of Croydon are carrying out Highway repair and maintenance works on Foxley Lane, Croydon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 20:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 17 Dec 2024 at 13:25.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 14:07.

Southern Gas Networks logo
LONG TERM
Until
28 Jan 2025
Details
View Map
Share
Follow
Pine Ridge

Southern Gas Networks are carrying out Utility repair and maintenance works on Pine Ridge, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 14:30 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 14:34.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Alberta Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alberta Avenue, Cheam.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 15:27.

London Borough Of Sutton logo
Finishing
Friday
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:57.

London Borough Of Sutton logo
Finishing
Friday
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:56.

London Borough Of Sutton logo
Finishing
Friday
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are proposing to carry out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 26 Nov 2024 at 15:07.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:24.

Southern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 13:36.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:42.

Southern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 15:37.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Banstead Road

UK Power Networks South Eastern are proposing to carry out New service connection on Banstead Road, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Dec 2024 at 12:41.

Southern Gas Networks logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Penwortham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Penwortham Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 09:19.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Holly Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 11:45 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 12:38.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Glebe Hyrst

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glebe Hyrst, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 12:19.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 15:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:37.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Milton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Milton Avenue, Sutton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 13:15 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 14:06.

London Borough Of Sutton logo
Finishing
Friday
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are proposing to carry out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Dec 2024 at 12:38.

London Borough Of Sutton logo
Finishing
Friday
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are carrying out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 12:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 9 Dec 2024 at 13:31.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Coulsdon Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Coulsdon Lane, Chipstead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 12:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 08:23.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Harrow Road

UK Power Networks South Eastern are proposing to carry out New service connection on Harrow Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 11:56.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Harrow Road

UK Power Networks South Eastern are carrying out New service connection on Harrow Road, Carshalton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 09:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:51.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Farleigh Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Farleigh Road, Warlingham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 11:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:10.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Caterham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 14:45.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 10:51.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:03.

Surrey County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 14:22.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 20:57.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:07.

Southern Gas Networks logo
LONG TERM
Between
16 Dec 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 21:09.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
East Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on East Drive, Carshalton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 18:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:35.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
London Road

Vodafone are proposing to carry out Utility repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 16 Sep 2024 at 15:16.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Monday
Details
View Map
Share
Follow
Brighton Road

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out roadworks on Brighton Road, Burgh Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 14:25 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 17 Dec 2024 at 14:48.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 08:54.

Surrey County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Dec 2024 at 16:52.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:44.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Chipstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chipstead Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Dec 2024 at 13:30.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:32.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 17:26.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Woodcote Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 12:20.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:57.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Cranfield Road East

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cranfield Road East, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:14.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:57.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:26.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:27.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:11.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 10:20.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:19.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:24.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:52.

Ses Water (formerly Sutton & East Surrey Water Company) logo
LONG TERM
Between
6 Jan and 15 Jun 2025
Details
View Map
Share
Follow
Gatton Park Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Gatton Park Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 11:31.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Brook Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:01.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:23.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Ashcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ashcombe Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 14:17.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Apr 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:03.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Surrey County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 13 Feb 2024 at 08:29.

Surrey County Council logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 14:28.

Surrey County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 14:40.

Surrey County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 10:14.

Surrey County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Brighton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Kingswood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Dec 2024 at 18:18.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:28.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Elmore Road

Southern Gas Networks are proposing to carry out New service connection on Elmore Road, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:50.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 14:54.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 07:45.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Jul 2024 at 19:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 1 Nov 2024 at 15:01.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Rectory Lane, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 21 Nov 2024 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hartley Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Down, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:12.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Hartley Down

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Down, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:55.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:38.

UK Power Networks South Eastern logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 11:41.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 09:48.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Kings Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 07:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 10:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Harold Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Harold Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 07:32.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Lodge Avenue

Thames Water were proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 11:45.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Wandle Side

Thames Water were proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:46.

London Borough Of Sutton logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Brookfield Avenue

London Borough Of Sutton are proposing to carry out Highway improvement works on Brookfield Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 7 Nov 2024 at 16:39.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Dec 2024 at 13:13.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Ampere Way

UK Power Networks South Eastern are proposing to carry out New service connection on Ampere Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:56.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:54.

Thames Water logo
LONG TERM
Between
7 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:58.

Thames Water logo
LONG TERM
Between
7 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:57.

Thames Water logo
Between
7 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 06:26.

Thames Water logo
LONG TERM
Between
7 Jan and 14 Apr 2025
Details
View Map
Share
Follow
Mill Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Mill Lane, Croydon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:51.

Thames Water logo
LONG TERM
Between
7 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 06:26.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:47.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:18.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2024 at 15:28.

Southern Gas Networks logo
Between
9 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:24.

UK Power Networks South Eastern logo
Between
10 and 29 Jan 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Nov 2024 at 16:30.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
Between
13 and 18 Jan 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:08.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Rook Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rook Lane, Chaldon, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 11:34.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
The Green

Surrey County Council were proposing to carry out Highway repair and maintenance works on The Green, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 10:59.

Surrey County Council logo
LONG TERM
Between
13 Jan and 13 Jul 2025
Details
View Map
Share
Limpsfield Road

Surrey County Council were proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 13 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 4 Sep 2024 at 11:07.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 11:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 12:56.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Wellesford Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wellesford Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Pound Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pound Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:24.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Park Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility repair and maintenance works on Park Road, Banstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 11:31.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Stirling Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stirling Close, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:28.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:34.

Southern Gas Networks logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Lambert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lambert Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:35.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salisbury Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:00.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
North Down

BT were proposing to carry out Utility asset works on North Down, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Oct 2024 at 13:05.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Bramley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramley Road, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:52.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:29.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:08.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:28.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:10.

Southern Gas Networks logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:48.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 10 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 12:37.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 16:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out New service connection on Manor Lane, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 28 Nov 2024 at 12:50.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Manor Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Manor Lane, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 2 Dec 2024 at 07:43.

UK Power Networks South Eastern logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 11:52.

Thames Water logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:07.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 07:43.

UK Power Networks South Eastern logo
LONG TERM
Between
16 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hillcroome Road

UK Power Networks South Eastern are proposing to carry out New service connection on Hillcroome Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 13:43.

Surrey County Council logo
Between
17 and 25 Jan 2025
Details
View Map
Share
Follow
Limpsfield Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Limpsfield Road, Warlingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Dec 2024 at 07:31.

UK Power Networks South Eastern logo
Between
17 and 29 Jan 2025
Details
View Map
Share
Queensway

UK Power Networks South Eastern were proposing to carry out New service connection on Queensway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 08:35.

Southern Gas Networks logo
Between
18 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:55.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Clareville Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clareville Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Surrey County Council logo
Between
20 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Godstone Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Godstone Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Oct 2024 at 06:58.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Birch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Avenue, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:20.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 08:25.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 07:27.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Gale Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Crescent, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:18.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:15.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Thornfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornfield Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 14:03.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Chalk Pit Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalk Pit Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Oct 2024 at 12:06.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:48.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:04.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Nonsuch Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nonsuch Walk, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:16.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Oct 2024 at 15:16.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 13:43.

UK Power Networks South Eastern logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Sandy Lane South

UK Power Networks South Eastern were proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 10:16.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Briar Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:13.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:17.

Southern Gas Networks logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:05.

UK Power Networks South Eastern logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Waverley Way

UK Power Networks South Eastern are proposing to carry out New service connection on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 12:35.

UK Power Networks South Eastern logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Downside Road

UK Power Networks South Eastern are proposing to carry out New service connection on Downside Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 17 Dec 2024 at 11:28.

Southern Gas Networks logo
Between
20 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:06.

Southern Gas Networks logo
Between
21 Jan and 3 Feb 2025
Details
View Map
Share
Follow
How Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on How Lane, Chipstead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 13:03.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Holly Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 26 Nov 2024 at 14:04.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Holly Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Holly Lane, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Dec 2024 at 14:22.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:51.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:23.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:06.

Southern Gas Networks logo
Between
21 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Wonersh Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wonersh Way, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:07.

Surrey County Council logo
Between
22 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Oct 2024 at 15:38.

Thames Water logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Follow
Lodge Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:21.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 31 May 2025
Details
View Map
Share
Follow
Rockshaw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rockshaw Road, Chaldon, Merstham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 07:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:34.

Southern Gas Networks logo
Between
27 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Briar Banks

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Briar Banks, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:12.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:01.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:32.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:45.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:35.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Chalgrove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalgrove Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 11:29.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:35.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:59.

Southern Gas Networks logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Waverley Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waverley Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:58.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 4 Mar 2025
Details
View Map
Share
Follow
Cedar Road

UK Power Networks South Eastern are proposing to carry out New service connection on Cedar Road, Sutton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 11:02.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 2 Mar 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 13:49.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bensham Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 15:56.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bensham Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Dec 2024 at 11:09.

UK Power Networks South Eastern logo
Between
28 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:55.

UK Power Networks South Eastern logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Plough Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Plough Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 08:55.

Thames Water logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Sutherland Road

Thames Water are proposing to carry out Utility asset works on Sutherland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:49.

UK Power Networks South Eastern logo
Between
30 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 13:52.

Southern Gas Networks logo
Between
31 Jan and 28 Feb 2025
Details
View Map
Share
Fairview Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fairview Road, Sutton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Brook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Road, Merstham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:16.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 5 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 08:47.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Court Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 13:20.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:23.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 11:15.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:26.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Sylverdale Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sylverdale Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:23.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Kenley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:17.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
St James Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on St James Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:20.

Transport for London (TfL) logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Godstone Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Godstone Road, Purley, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:14.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Cheam Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cheam Road, Cheam.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 11:17.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Boundary Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Boundary Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:04.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:04.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:18.

Southern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Farmdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farmdale Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:19.

Southern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Farm Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 18:11.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 31 Mar 2025
Details
View Map
Share
Farm Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Farm Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 31 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Central Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:57.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:05.

Southern Gas Networks logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:01.

Southern Gas Networks logo
Between
3 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Erskine Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erskine Road, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 07:50.

Transport for London (TfL) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Edridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 08:49.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 09:36.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Nork Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Nork Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 5 Dec 2024 at 08:14.

Southern Gas Networks logo
LONG TERM
Between
5 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Harrow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrow Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:37.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Nov 2024 at 10:19.

UK Power Networks South Eastern logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Downland Way

UK Power Networks South Eastern are proposing to carry out New service connection on Downland Way, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 13:35.

Thames Water logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out New service connection on Selsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 12:56.

Southern Gas Networks logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:16.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Nelson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nelson Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:29.

Surrey County Council logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Outwood Lane

Surrey County Council are proposing to carry out Highway improvement works on Outwood Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 28 Nov 2024 at 14:18.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Horsecroft

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsecroft, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:32.

Southern Gas Networks logo
Between
10 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 14:03.

Southern Gas Networks logo
Between
10 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 11:08.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:40.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 13:57.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Little Woodcote Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 17:32.

Southern Gas Networks logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Little Woodcote Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Woodcote Lane, Carshalton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 16:17.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 13:47.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:18.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Albury Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albury Avenue, Cheam.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 08:46.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Sanderstead Road

Thames Water were proposing to carry out Utility repair and maintenance works on Sanderstead Road, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:02.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:02.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:28.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Radcliffe Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radcliffe Gardens, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:34.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Staplehurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Staplehurst Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:30.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:22.

Southern Gas Networks logo
Between
10 and 24 Feb 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:36.

Southern Gas Networks logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Mayfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 06:52.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:50.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 07:40.

UK Power Networks South Eastern logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sumner Road South

UK Power Networks South Eastern are proposing to carry out New service connection on Sumner Road South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 09:02.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:17.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:27.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thornton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:17.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:19.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.

UK Power Networks South Eastern logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Montpelier Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Montpelier Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Nov 2024 at 14:26.

Thames Water logo
LONG TERM
Between
11 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Lodge Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:01.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Pump Pail South

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:08.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Utility asset works on Wellesley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 07:58.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Utility asset works on Wellesley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 16:04.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
George Street

Transport for London (TfL) are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 07:58.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
George Street

Transport for London (TfL) are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 16:04.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Stanley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanley Street, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:49.

Southern Gas Networks logo
Between
15 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:48.

London Borough Of Sutton logo
Between
15 and 19 Feb 2025
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 4 Dec 2024 at 13:11.

London Borough Of Sutton logo
Between
15 and 19 Feb 2025
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Dec 2024 at 17:14.

London Borough Of Sutton logo
Between
15 and 19 Feb 2025
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 16 Dec 2024 at 11:34.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Ormside Way

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ormside Way, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 11:38.

Surrey County Council logo
Between
17 and 22 Feb 2025
Details
View Map
Share
Follow
Frenches Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frenches Road, Redhill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Dec 2024 at 11:37.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Monkswell Lane

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Monkswell Lane, Chipstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Dec 2024 at 16:25.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:26.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out New service connection on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 07:41.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Merrymeet

Surrey County Council are proposing to carry out Highway repair and maintenance works on Merrymeet, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Dec 2024 at 21:34.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Merrymeet

Surrey County Council are proposing to carry out Highway repair and maintenance works on Merrymeet, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2024 at 14:30.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Tonbridge Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tonbridge Close, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 1 Dec 2024 at 21:36.

Surrey County Council logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Tonbridge Close

Surrey County Council are proposing to carry out Highway repair and maintenance works on Tonbridge Close, Woodmansterne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 13:15.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Downlands Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Downlands Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 09:24.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:41.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Hall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hall Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:02.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Harbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:25.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Harbury Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harbury Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:32.

Southern Gas Networks logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:05.

Southern Gas Networks logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 16:39.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Woodcote Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcote Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 16:41.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Featherbed Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Featherbed Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 07:01.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sanderstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Sanderstead Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 06:22.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Brambledown Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brambledown Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Barrow Hedges Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 15:28.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Charlotte Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out roadworks on Charlotte Road, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 08:09.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Charlotte Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Charlotte Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 13:31.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Clyde Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out roadworks on Clyde Road, Wallington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 08:07.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Clyde Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Clyde Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 29 Oct 2024 at 14:02.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Selsdon Road

Southern Gas Networks are proposing to carry out New service connection on Selsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 12:55.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:01.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:33.

Transport for London (TfL) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Pump Pail North

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail North, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 07:32.

BT logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Sydenham Road

BT are proposing to carry out Utility repair and maintenance works on Sydenham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 13:28.

UK Power Networks South Eastern logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
The Drive

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on The Drive, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:56.

UK Power Networks South Eastern logo
Between
19 and 25 Feb 2025
Details
View Map
Share
Follow
Sandy Lane South

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Sandy Lane South, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 11:53.

London Borough Of Sutton logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 4 Dec 2024 at 13:09.

London Borough Of Sutton logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Dec 2024 at 11:54.

Southern Gas Networks logo
Between
20 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Harestone Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestone Valley Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 07:54.

UK Power Networks South Eastern logo
Between
20 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 10:00.

UK Power Networks South Eastern logo
Between
20 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Queensway

UK Power Networks South Eastern are proposing to carry out New service connection on Queensway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Dec 2024 at 06:12.

BT logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Sylverdale Road

BT are proposing to carry out Utility asset works on Sylverdale Road, Purley, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 16:53.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 23 May 2025
Details
View Map
Share
Follow
Tupwood Scrubbs Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Scrubbs Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:09.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 11 Apr 2025
Details
View Map
Share
Follow
Tupwood Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tupwood Lane, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:12.

Southern Gas Networks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:39.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Chaldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 11:55.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
Chaldon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaldon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:10.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway improvement works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:30.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

Surrey County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Ballards Green

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ballards Green, Burgh Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the verge only.

This roadwork event was last updated by Surrey County Council on 17 Dec 2024 at 12:52.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Lyme Regis Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyme Regis Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Dec 2024 at 20:27.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Shrubland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shrubland Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:02.

Surrey County Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Epsom Downs.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2024 at 15:15.

London Borough Of Croydon logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 31 Oct 2024 at 09:29.

Southern Gas Networks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Carshalton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carshalton Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:41.

Southern Gas Networks logo
Between
24 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Carshalton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carshalton Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:36.

Southern Gas Networks logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 13:25.

Southern Gas Networks logo
Between
24 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Croydon Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Lane, Banstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:21.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:23.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Ingleton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:31.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Fullerton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fullerton Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:23.

BT logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Brabazon Avenue

BT are proposing to carry out Utility asset works on Brabazon Avenue, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Nov 2024 at 14:52.

Southern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Dalmeny Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalmeny Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 16:13.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 14:14.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:04.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Heathdene Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathdene Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 13:18.

Southern Gas Networks logo
Between
24 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:33.

Southern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 13:56.

Southern Gas Networks logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Hawthorn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawthorn Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:03.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 10:56.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Barrow Hedges Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barrow Hedges Close, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 11:24.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 7 Apr 2025
Details
View Map
Share
Follow
The Ridgway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridgway, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 12:53.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Upland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upland Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 09:48.

UK Power Networks South Eastern logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 13 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 13:41.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Hayes Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Disconnection or alteration of supply on Hayes Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 10:19.

London Borough Of Croydon logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Follow
High Street

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 4 Nov 2024 at 07:07.

BT logo
Between
28 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Whitefield Avenue

BT are proposing to carry out Utility asset works on Whitefield Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 16:49.

Southern Gas Networks logo
Between
28 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Harestone Valley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harestone Valley Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 10:45.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Crescent Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Crescent Road, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Jul 2024 at 12:24.

Surrey County Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Caterham By-pass

Surrey County Council are proposing to carry out Highway repair and maintenance works on Caterham By-pass, Caterham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Nov 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Brighton Road Service Road Between Burgh Wood And Tattenham Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brighton Road Service Road Between Burgh Wood And Tattenham Way, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Wallington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Woodmansterne Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodmansterne Lane, Wallington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 13:20.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
West Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Way, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:34.

Southern Gas Networks logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Park Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill Road, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 13:06.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
The Downsway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Downsway, Sutton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 11:03.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:41.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 14 Apr 2025
Details
View Map
Share
Follow
Kayemoor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kayemoor Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:27.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:27.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 13:50.

London Borough Of Sutton logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
Throwley Way

London Borough Of Sutton are proposing to carry out Highway repair and maintenance works on Throwley Way, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 28 Nov 2024 at 11:12.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
Oakfield Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Oakfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:41.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
Montague Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Montague Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:42.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
London Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
St James's Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on St James's Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
London Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Garrard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garrard Road, Banstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:43.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Burgh Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burgh Heath Road, Epsom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 15:14.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Kenley Lane

BT are proposing to carry out Utility asset works on Kenley Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 11 Dec 2024 at 09:55.

Southern Gas Networks logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Follow
Hartley Old Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hartley Old Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 14:29.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 13:13.

Southern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Beeches Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Walk, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:43.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Willis Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willis Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:55.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Tavistock Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tavistock Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 16:01.

Network Rail logo
Between
15 and 17 Mar 2025
Details
View Map
Share
Beeches Avenue

Network Rail were proposing to carry out Works for Rail Purposes on Beeches Avenue, Carshalton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Dec 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 5 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 11:54.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 5 May 2025
Details
View Map
Share
Follow
Coulsdon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coulsdon Road, Caterham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 14:14.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 19 May 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 17:42.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 19 May 2025
Details
View Map
Share
Follow
Prior Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prior Avenue, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:50.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 11 May 2025
Details
View Map
Share
Follow
Harrow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harrow Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 17:16.

Southern Gas Networks logo
LONG TERM
Between
17 Mar and 20 Apr 2025
Details
View Map
Share
Follow
Banstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Banstead Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 17:15.

Southern Gas Networks logo
Between
17 Mar and 13 Apr 2025
Details
View Map
Share
Follow
Park Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Hill, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 17:17.

Thames Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 12:51.

Thames Water logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 13:10.


Roadworks Map near to Deepfield Way, COULSDON, CR5 2SR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Deepfield Way, COULSDON, CR5 2SR (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks South Eastern logo
REDLANDS 
(0.1 miles)
UK Power Networks South Eastern
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 13:40
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.1
Details
Share
Follow
2
UK Power Networks South Eastern logo
URGENT
  
COULSDON COURT ROAD 
(0.4 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 09:08
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.4
Details
Share
Follow
3
BT logo
STOATS NEST ROAD 
(0.4 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.4
Details
Share
Follow
4
BT logo
PETERSFIELD CRESCENT 
(0.4 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.4
Details
Share
Follow
5
London Borough Of Croydon logo
STOATS NEST ROAD 
(0.5 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.5
Details
Share
Follow
6
London Borough Of Croydon logo
STOATS NEST ROAD 
(0.5 miles)
London Borough Of Croydon
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 17 Dec 2024 09:40
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.5
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
ST DAVIDS, COULSDON 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 31 Jul 2024 09:00
(Scheduled: 30 Jul 2024 - 20 Dec 2024)
0.5
Details
Share
Follow
8
Virgin Media logo
HARTLEY DOWN 
(0.7 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
17 Dec 2024 12:54 - 13:24
0.7
Details
Share
9
Southern Gas Networks logo
SMITHAM DOWNS ROAD 
(0.7 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 9 Dec 2024 - 20 Dec 2024
0.7
Details
Share
Follow
10
Ses Water (formerly Sutton & East Surrey Water Company) logo
URGENT
  
SMITHAM DOWNS ROAD 
(0.7 miles)
Ses Water (formerly Sutton & East Surrey Water Company)
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 16 Dec 2024 10:00
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data