ROADWORKS SUMMARY
Capuchin Court, CAMBRIDGE, CB1 9GP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Capuchin Court, CB1 9GP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Capuchin Court, CAMBRIDGE, CB1 9GP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Capuchin Court are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Herbert Street

Cambridgeshire County Council are carrying out Highway improvement works on Herbert Street, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 13 Aug 2024 at 11:08.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
George Street

Cambridgeshire County Council are carrying out Highway improvement works on George Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:07.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road (A1134)

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road (A1134), Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ascham Road

Cambridgeshire County Council are carrying out Highway improvement works on Ascham Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 31 Jul 2024 at 15:06.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Hurst Park Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Hurst Park Avenue, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 14:49.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Milton Road

Cambridgeshire County Council are carrying out Highway improvement works on Milton Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 15:56.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Highworth Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Highworth Avenue, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 22:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Jan 2024 at 09:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Oak Tree Avenue

Cambridgeshire County Council are carrying out Highway improvement works on Oak Tree Avenue, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 16:29.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Union Lane

Cambridgeshire County Council are carrying out Highway improvement works on Union Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 16:27.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Arbury Road

Cambridgeshire County Council are carrying out Highway improvement works on Arbury Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 13:44.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Birch Close

Cambridgeshire County Council are carrying out Highway improvement works on Birch Close, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:28.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Downhams Lane

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Downhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:21.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Fraser Road

Cambridgeshire County Council are carrying out Highway improvement works on Fraser Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:13.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kendal Way

Cambridgeshire County Council are carrying out Highway improvement works on Kendal Way, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 15:23.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Ramsden Square

Cambridgeshire County Council are carrying out Highway improvement works on Ramsden Square, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 11:52.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Highway improvement works on Green End Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Aug 2024 at 15:24.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Kings Hedges Road

Cambridgeshire County Council are carrying out Highway improvement works on Kings Hedges Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 13:11.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Lovell Road

Cambridgeshire County Council are carrying out Highway improvement works on Lovell Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2022 at 23:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Aug 2024 at 10:58.

Cambridgeshire County Council logo
LONG TERM
Until
1 Dec 2024
Details
View Map
Share
Follow
Woodhead Drive

Cambridgeshire County Council are carrying out Highway improvement works on Woodhead Drive, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2022 at 08:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 12 Aug 2024 at 15:07.

Cambridgeshire County Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Cowley Road

Cambridgeshire County Council are carrying out Highway improvement works on Cowley Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 09:00 and could run through until 25 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 3 Oct 2024 at 14:31.

Cambridgeshire County Council logo
LONG TERM
Between
15 Jul and 29 Nov 2024
Details
View Map
Share
Barton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Barton Road, Grantchester.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 1 Aug 2024 at 09:43.

Cambridgeshire County Council logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are carrying out Highway improvement works on Newmarket Road, Little Abington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 12:44.

Cambridgeshire County Council logo
LONG TERM
Between
1 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Coleridge Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Coleridge Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 8 Aug 2024 at 16:06.

Cambridgeshire County Council logo
LONG TERM
Between
9 Sep and 13 Dec 2024
Details
View Map
Share
Follow
High Ditch Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 20 Mar 2024 at 11:29.

Cambridgeshire County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Silver Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on Silver Street, Cambridge.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 7 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 4 Oct 2024 at 14:00.

Cambridgeshire County Council logo
LONG TERM
Between
7 Oct 2024 and 7 Mar 2025
Details
View Map
Share
Follow
Silver Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on Silver Street, Cambridge.

These works are categorised as Major.

The works will start on or after 7 October 2024 and could run through until 7 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 11 Oct 2024 at 11:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Babraham Road, Sawston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 12:51.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Church Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Church Street, Stapleford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 11:29.

Cambridgeshire County Council logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Geoffrey Bishop Avenue

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Geoffrey Bishop Avenue, Fulbourn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 07:30 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 12 Nov 2024 at 12:11.

Cambridgeshire County Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Porson Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Porson Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cambridgeshire County Council on 5 Sep 2024 at 16:25.

Cambridgeshire County Council logo
LONG TERM
Between
21 Oct and 28 Nov 2024
Details
View Map
Share
Follow
Barrow Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Barrow Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 4 Jul 2024 at 14:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Oct and 2 Dec 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
Cherry Hinton Road

UK Power Networks Eastern & London are carrying out New service connection on Cherry Hinton Road, Great Shelford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 October 2024 at 09:10 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Oct 2024 at 09:17.

Cambridgeshire County Council logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Babraham Road

Cambridgeshire County Council are carrying out Works for road purposes on Babraham Road, Cambridge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 07:50 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 19 Aug 2024 at 11:02.

Cambridgeshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Mowbray Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mowbray Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:28.

Cambridgeshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Perne Road (A1134)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Perne Road (A1134), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:14.

Cambridgeshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Cherry Hinton Road (C235)

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cherry Hinton Road (C235), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 28 Mar 2024 at 10:23.

UK Power Networks Eastern & London logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are carrying out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:15 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 10:39.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are carrying out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 15:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 15:11.

UK Power Networks Eastern & London logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Paddock Way

UK Power Networks Eastern & London are carrying out Utility asset works on Paddock Way, Sawston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 15:50 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:23.

Cambridgeshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Queen Ediths Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Queen Ediths Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 08:42.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Argyle Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on Argyle Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:07.

Cambridgeshire County Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Argyle Street

Cambridgeshire County Council are carrying out Highway improvement works on Argyle Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:26.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Access Road To Mill Road Depot

Cambridgeshire County Council are proposing to carry out Highway improvement works on Access Road To Mill Road Depot, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:08.

Cambridgeshire County Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Access Road To Mill Road Depot

Cambridgeshire County Council are carrying out Highway improvement works on Access Road To Mill Road Depot, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:26.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Kingston Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on Kingston Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:10.

Cambridgeshire County Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Kingston Street

Cambridgeshire County Council are carrying out Highway improvement works on Kingston Street, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:26.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Devonshire Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Devonshire Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:09.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Devonshire Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Devonshire Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 4 Nov 2024 at 16:02.

Cambridgeshire County Council logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Mill Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Mill Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 24 Oct 2024 at 11:02.

Cambridgeshire County Council logo
Until
30 Nov 2024
Details
View Map
Share
Follow
Mill Road

Cambridgeshire County Council are carrying out Highway improvement works on Mill Road, Cambridge.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 14 Nov 2024 at 11:26.

UK Power Networks Eastern & London logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:13.

Cambridgeshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are proposing to carry out Section 50 on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:32.

Cambridgeshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Green End Road

Cambridgeshire County Council are carrying out Section 50 on Green End Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:13 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 18 Nov 2024 at 14:30.

Cambridgeshire County Council logo
Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
Enniskillen Road

Cambridgeshire County Council are proposing to carry out Section 50 on Enniskillen Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:46.

Cambridgeshire County Council logo
Until
29 Nov 2024
Details
View Map
Share
Follow
Enniskillen Road

Cambridgeshire County Council are carrying out Section 50 on Enniskillen Road, Cambridge.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:40 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 11:26.

Cambridgeshire County Council logo
Between
14 and 28 Nov 2024
Details
View Map
Share
Gwydir Street

Cambridgeshire County Council were proposing to carry out Section 50 on Gwydir Street, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 November 2024 and run through until 28 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 23 Sep 2024 at 11:26.

Cambridge Water Company logo
Between
16 and 30 Nov 2024
Details
View Map
Share
Follow
Hills Road

Cambridge Water Company are proposing to carry out New service connection on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 27 Sep 2024 at 10:05.

Electricity Network Company logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Sedley Taylor Road

Electricity Network Company are proposing to carry out Utility repair and maintenance works on Sedley Taylor Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 28 Oct 2024 at 14:27.

Electricity Network Company logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Sedley Taylor Road

Electricity Network Company are proposing to carry out Utility repair and maintenance works on Sedley Taylor Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 11 Nov 2024 at 14:50.

Cambridgeshire County Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Devonshire Road

Cambridgeshire County Council are proposing to carry out Section 50 on Devonshire Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Nov 2024 at 11:07.

Cambridgeshire County Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Devonshire Road

Cambridgeshire County Council are proposing to carry out Section 50 on Devonshire Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 13 Nov 2024 at 10:51.

Cambridgeshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on High Street, Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 13 Nov 2024 at 15:41.

Cambridgeshire County Council logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
High Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on High Street, Horningsea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 10:41.

Electricity Network Company logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Cherry Hinton Road (C233)

Electricity Network Company are proposing to carry out Permanent reinstatement on Cherry Hinton Road (C233), Teversham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Electricity Network Company on 7 Nov 2024 at 13:36.

Cityfibre Metro Networks logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 9 Sep 2024 at 10:53.

Cityfibre Metro Networks logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hinton Way

Cityfibre Metro Networks are proposing to carry out Utility asset works on Hinton Way, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 10 Sep 2024 at 10:57.

Cambridge Water Company logo
Between
7 and 15 Dec 2024
Details
View Map
Share
High Street

Cambridge Water Company were proposing to carry out New service connection on High Street, East Chesterton, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 13 Aug 2024 at 14:41.

Cityfibre Metro Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Whittlesford Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Whittlesford Road, Little Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 1 Oct 2024 at 09:50.

Cityfibre Metro Networks logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Whittlesford Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Whittlesford Road, Little Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Oct 2024 at 09:01.

UK Power Networks Eastern & London logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Lower Park Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lower Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 14:27.

UK Power Networks Eastern & London logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Lower Park Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lower Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 11:07.

Cambridgeshire County Council logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Bottisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Jul 2024 at 15:08.

Cambridge Water Company logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Aug 2024 at 10:38.

Cambridge Water Company logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Suez Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 2 Oct 2024 at 15:54.

Cambridge Water Company logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Suez Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 25 Oct 2024 at 09:30.

UK Power Networks Eastern & London logo
Between
13 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Babraham Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Babraham Road, Sawston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 14:16.

Cambridge Water Company logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Thornton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 2 Oct 2024 at 16:07.

Cambridge Water Company logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Thornton Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Thornton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 10 Oct 2024 at 14:03.

Cambridge Water Company logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Woodlark Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 17 Oct 2024 at 12:22.

Cambridge Water Company logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Woodlark Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Woodlark Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 12:40.

Cambridgeshire County Council logo
Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Granhams Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granhams Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 17 Sep 2024 at 15:56.

Cambridgeshire County Council logo
Between
19 and 23 Dec 2024
Details
View Map
Share
Follow
Granhams Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Granhams Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 13:51.

Cambridgeshire County Council logo
Between
2 and 13 Jan 2025
Details
View Map
Share
Follow
Worts Causeway

Cambridgeshire County Council are proposing to carry out New service connection on Worts Causeway, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 21 Nov 2024 at 09:34.

Cambridge Water Company logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Devonshire Road

Cambridge Water Company were proposing to carry out Utility asset works on Devonshire Road, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 7 Oct 2024 at 13:50.

Cambridge Water Company logo
Between
2 and 25 Jan 2025
Details
View Map
Share
Follow
Devonshire Road

Cambridge Water Company are proposing to carry out Utility asset works on Devonshire Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 14 Oct 2024 at 10:15.

Cambridge Water Company logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Mill Road

Cambridge Water Company are proposing to carry out Utility asset works on Mill Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 11 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
3 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:17.

Cadent Gas logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Hills Road

Cadent Gas were proposing to carry out Utility asset works on Hills Road, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 12:53.

Cambridge Water Company logo
Between
4 and 19 Jan 2025
Details
View Map
Share
Follow
Hills Road

Cambridge Water Company are proposing to carry out New service connection on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cambridge Water Company on 11 Nov 2024 at 12:01.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan 2025 and 24 Dec 2027
Details
View Map
Share
Follow
Cambridge Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cambridge Road, Hauxton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 December 2027. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 21 Feb 2024 at 10:11.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan 2025 and 24 Dec 2027
Details
View Map
Share
Follow
Trumpington Park And Ride Access Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Trumpington Park And Ride Access Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 December 2027. The works will impact the carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 21 Feb 2024 at 10:10.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Cow Lane

Cambridgeshire County Council are proposing to carry out Highway improvement works on Cow Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 15:55.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Hills Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jun 2024 at 13:10.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Hills Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Oct 2024 at 16:11.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Suez Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 14:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 15:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 12:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
High Ditch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on High Ditch Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 09:52.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Huntingdon Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Huntingdon Road, Girton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 25 Sep 2024 at 10:19.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 08:46.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Girton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:36.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Girton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Girton Road, Girton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 1 Nov 2024 at 09:02.

Cambridgeshire County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Girton Road

Cambridgeshire County Council were proposing to carry out Highway improvement works on Girton Road, Girton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 31 Oct 2024 at 17:38.

Between
7 and 20 Jan 2025
Details
View Map
Share
Follow
Hills Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Nov 2024 at 09:43.

Between
7 and 20 Jan 2025
Details
View Map
Share
Follow
Hills Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Nov 2024 at 11:49.

Cambridgeshire County Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brookfields (C280)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brookfields (C280), Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Oct 2024 at 15:54.

Cambridgeshire County Council logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brookfields (C280)

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Brookfields (C280), Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 16:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Mowbray Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Mowbray Road, Cambridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Aug 2024 at 11:32.

Cambridgeshire County Council logo
Between
8 and 29 Jan 2025
Details
View Map
Share
Follow
St Barnabas Road

Cambridgeshire County Council are proposing to carry out Section 50 on St Barnabas Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:58.

UK Power Networks Eastern & London logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Thompsons Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thompsons Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 15:32.

UK Power Networks Eastern & London logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Thompsons Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thompsons Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 11:18.

UK Power Networks Eastern & London logo
Between
9 and 22 Jan 2025
Details
View Map
Share
Follow
Thompsons Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thompsons Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:07.

Cambridge Water Company logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
High Street

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on High Street, East Chesterton, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 16 Oct 2024 at 14:58.

Electricity Network Company logo
Between
13 and 29 Jan 2025
Details
View Map
Share
Follow
Derby Road

Electricity Network Company are proposing to carry out Utility asset works on Derby Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 29 January 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Electricity Network Company on 19 Nov 2024 at 15:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Queens Meadow

UK Power Networks Eastern & London were proposing to carry out New service connection on Queens Meadow, Cambridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 23 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 10:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Queens Meadow

UK Power Networks Eastern & London are proposing to carry out New service connection on Queens Meadow, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Queens Meadow

UK Power Networks Eastern & London are proposing to carry out New service connection on Queens Meadow, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 12:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Jan and 23 Feb 2025
Details
View Map
Share
Follow
Coldhams Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Coldhams Lane, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:18.

Anglian Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Holland Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Holland Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 23 Oct 2024 at 16:24.

Electricity Network Company logo
Between
15 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Rock Road

Electricity Network Company are proposing to carry out Utility asset works on Rock Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 Nov 2024 at 15:17.

Cambridge Water Company logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Hobart Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Hobart Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 24 Oct 2024 at 11:28.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 15:44.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 7 Nov 2024 at 15:12.

Cambridgeshire County Council logo
LONG TERM
Between
20 Jan and 18 Jul 2025
Details
View Map
Share
Follow
Barton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Barton Road, Grantchester.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cambridgeshire County Council on 15 Oct 2024 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Brooks Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Brooks Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Jun 2024 at 14:57.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Church Street

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Church Street, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Nov 2024 at 12:27.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Lanes

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on The Lanes, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 12:06.

Cambridgeshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
The Lanes

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on The Lanes, Great Wilbraham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 14:02.

Cadent Gas logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Tennis Court Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tennis Court Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 11:55.

Cadent Gas logo
LONG TERM
Between
20 Jan and 20 Jun 2025
Details
View Map
Share
Follow
Hills Road

Cadent Gas are proposing to carry out Utility asset works on Hills Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 15:09.

Cambridgeshire County Council logo
Between
20 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Gwydir Street

Cambridgeshire County Council are proposing to carry out Section 50 on Gwydir Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 30 Oct 2024 at 16:03.

Cambridge Water Company logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Arbury Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Arbury Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 23 Oct 2024 at 15:39.

Cambridge Water Company logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Butt Lane (C206)

Cambridge Water Company are proposing to carry out New service connection on Butt Lane (C206), Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 27 Sep 2024 at 13:52.

Cambridge Water Company logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Hobart Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Hobart Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 20 Nov 2024 at 12:36.

Cambridgeshire County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Station Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 15:37.

Cambridgeshire County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Works for road purposes on Station Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 16 Aug 2024 at 16:11.

Cambridgeshire County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Section 50 on Station Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 09:36.

Cambridgeshire County Council logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Section 50 on Station Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 6 Sep 2024 at 09:49.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cityfibre Metro Networks are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:45.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 14:11.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 5 Nov 2024 at 10:59.

Cambridgeshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 11 Nov 2024 at 11:28.

UK Power Networks Eastern & London logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
New Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 15:40.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
New Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 14:11.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
New Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on New Park Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 09:24.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cycleway From Church Road To Newmarket Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cycleway From Church Road To Newmarket Road, Stow Cum Quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and cycleway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:35.

Cityfibre Metro Networks logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Cycleway From Church Road To Newmarket Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Cycleway From Church Road To Newmarket Road, Stow Cum Quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway, verge and cycleway.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Nov 2024 at 09:43.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 15:17.

Cityfibre Metro Networks logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Nov 2024 at 15:30.

Cambridge Water Company logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Butt Lane (C206)

Cambridge Water Company are proposing to carry out New service connection on Butt Lane (C206), Milton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 18 Oct 2024 at 14:41.

Electricity Network Company logo
Between
28 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blinco Grove

Electricity Network Company are proposing to carry out Utility asset works on Blinco Grove, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 Nov 2024 at 15:20.

Cambridgeshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Hooper Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on Hooper Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:53.

Cambridgeshire County Council logo
Between
28 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Hooper Street

Cambridgeshire County Council are proposing to carry out Works for road purposes on Hooper Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:58.

Cityfibre Metro Networks logo
Between
31 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Station Road

Cityfibre Metro Networks are proposing to carry out Utility asset works on Station Road, Great Shelford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 11 Nov 2024 at 09:58.

Cambridgeshire County Council logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ainsworth Street

Cambridgeshire County Council are proposing to carry out Section 50 on Ainsworth Street, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 25 Oct 2024 at 11:11.

Cambridge Water Company logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Langham Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Langham Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 24 Oct 2024 at 11:35.

Cambridge Water Company logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Langham Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Langham Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 20 Nov 2024 at 12:23.

Cityfibre Metro Networks logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Main Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 10:16.

Cityfibre Metro Networks logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Main Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Main Street, Stow-cum-quy.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 10:51.

Cambridge Water Company logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
St Philips Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on St Philips Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 25 Oct 2024 at 16:13.

Cambridge Water Company logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
St Philips Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on St Philips Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 20 Nov 2024 at 12:24.

Cityfibre Metro Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Stonebridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Stonebridge Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 12 Nov 2024 at 12:09.

Cityfibre Metro Networks logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Stonebridge Lane

Cityfibre Metro Networks are proposing to carry out Utility asset works on Stonebridge Lane, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 14 Nov 2024 at 11:53.

Cambridge Water Company logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Fulbourn Old Drift

Cambridge Water Company are proposing to carry out Utility asset works on Fulbourn Old Drift, Fulbourn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridge Water Company on 21 Nov 2024 at 09:48.

Cambridgeshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Station Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Fulbourn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 20 Nov 2024 at 15:25.

Cambridgeshire County Council logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Carlton Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Carlton Way, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 23 Apr 2024 at 12:04.

Cambridge Water Company logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Suez Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Suez Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 8 Nov 2024 at 14:02.

Cambridge Water Company logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Victoria Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 3 Sep 2024 at 16:30.

Cambridge Water Company logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Victoria Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 26 Sep 2024 at 16:33.

Cambridge Water Company logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Victoria Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 11 Oct 2024 at 12:13.

Cambridgeshire County Council logo
Between
16 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Newmarket Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Newmarket Road, Stow-cum-quy.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 19 Sep 2024 at 12:29.

Cambridgeshire County Council logo
Between
17 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Hills Road

Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 14:02.

Cambridgeshire County Council logo
Between
17 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Hills Road

Cambridgeshire County Council are proposing to carry out Section 50 on Hills Road, Cambridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Oct 2024 at 16:04.

Cambridge Water Company logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Sidgwick Avenue

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Sidgwick Avenue, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 25 Sep 2024 at 15:47.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Stourbridge Grove

Cadent Gas are proposing to carry out New service connection on Stourbridge Grove, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:15.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Park Parade

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Park Parade, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:17.

Cambridge Water Company logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Victoria Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 10 Jul 2024 at 14:23.

Cambridge Water Company logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Victoria Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Victoria Road, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridge Water Company on 3 Jul 2024 at 14:44.

Cambridgeshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Kendal Way

Cambridgeshire County Council are proposing to carry out Section 50 on Kendal Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 10:17.

Cambridgeshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Kendal Way

Cambridgeshire County Council are proposing to carry out Section 50 on Kendal Way, Cambridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 8 Nov 2024 at 10:51.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 30 Aug 2024 at 15:17.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 23 Oct 2024 at 12:37.

Cambridge Water Company logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Horningsea Road

Cambridge Water Company are proposing to carry out Utility repair and maintenance works on Horningsea Road, Fen Ditton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cambridge Water Company on 30 Oct 2024 at 08:24.


Roadworks Map near to Capuchin Court, CAMBRIDGE, CB1 9GP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Capuchin Court, CAMBRIDGE, CB1 9GP (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
COLVILLE ROAD 
(0.5 miles)
Virgin Media
Utility asset works - Footway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 20 Nov 2024 - 22 Nov 2024)
0.5
Details
Share
2
Gigaclear logo
MARSHALLS CLOSE 
(0.7 miles)
Gigaclear
Utility asset works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.7
Details
Share
3
Cambridgeshire County Council logo
YARROW ROAD 
(0.7 miles)
Cambridgeshire County Council
Works for road purposes - Carriageway - Multi-way signals
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
0.7
Details
Share
Follow
4
Gigaclear logo
CHERRY HINTON ROAD 
(0.7 miles)
Gigaclear
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.7
Details
Share
5
Cambridgeshire County Council logo
FULBOURN ROAD 
(0.7 miles)
Cambridgeshire County Council
Core Sampling - Carriageway - Multi-way signals
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
0.7
Details
Share
Follow
6
Cambridgeshire County Council logo
CAMBRIDGE ROAD 
(0.7 miles)
Cambridgeshire County Council
Core Sampling - Carriageway - Multi-way signals
Planned
Scheduled: 20 Nov 2024 - 21 Nov 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.