ROADWORKS SUMMARY
W10 6XL
Introduction
View current and future planned roadworks and road closures for W10 6XL and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to W10 6XL
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Colne Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:26.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:39.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:53.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:39.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:40.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:52.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:27.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:54.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:40.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on First Cross Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:28.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 12:25.
18 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 09:28.
31 Mar 2025
Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 13:00.
31 May 2024
HS2 are carrying out Works for Rail Purposes on Eastcote Lane, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 July 2023 at 07:00 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 22 Apr 2024 at 09:47.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 August 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2023 at 11:48.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
The works started on 3 August 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2023 at 11:47.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Lower Richmond Road, Richmond.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 August 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2023 at 10:33.
17 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Ealing Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2023 at 08:00 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 15:01.
31 Aug 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2023 at 23:00 and could run through until 31 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Nov 2023 at 16:30.
1 Sep 2023 and 28 Jun 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Holland Gardens, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2023 and could run through until 28 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 8 Aug 2023 at 13:27.
1 Sep 2023 and 28 Jun 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Pump House Crescent, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2023 and could run through until 28 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 8 Aug 2023 at 13:26.
26 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Kensington Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2023 at 07:00 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 24 Apr 2024 at 10:52.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Manor Road, Richmond.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2023 at 10:14.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on North Road, Kew.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 August 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 3 Aug 2023 at 07:43.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Sandycombe Road, Richmond.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 September 2023 at 07:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Sep 2023 at 14:44.
23 May 2024
HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 08:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Uneeda Drive, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 09:30 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Rockware Avenue, Greenford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 07:00 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 05:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
1 Aug 2024
London Borough Of Hounslow are carrying out Highway improvement works on High Street, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2023 at 07:00 and could run through until 1 August 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 23 Oct 2023 at 15:46.
Tomorrow
London Borough Of Ealing are carrying out Highway improvement works on Station Parade, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2023 at 11:49.
9 Dec 2023 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.
3 Jan and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Station Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Nov 2023 at 15:48.
3 Jan and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Station Yard, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Nov 2023 at 15:55.
3 Jan and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Station Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Dec 2023 at 15:04.
3 Jan and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Marys Terrace, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Nov 2023 at 16:03.
27 May 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:46 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 13:11.
17 May 2024
London Borough Of Hounslow are carrying out Highway improvement works on Parsonage Road, Hounslow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 19 Apr 2024 at 14:11.
30 Jun 2024
HS2 are carrying out Utility asset works on Victoria Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 February 2024 at 00:01 and could run through until 30 June 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 26 Apr 2024 at 13:30.
17 Aug 2024
HS2 are carrying out Utility asset works on Atlas Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 05:00 and could run through until 17 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 26 Apr 2024 at 14:17.
Tomorrow
Affinity Water are carrying out Utility repair and maintenance works on Preston Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 10:15 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Apr 2024 at 16:32.
26 May 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Victoria Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 14:00 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Feb 2024 at 15:51.
9 Aug 2024
HS2 are carrying out Utility asset works on Wales Farm Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 February 2024 at 00:01 and could run through until 9 August 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 26 Apr 2024 at 14:18.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.
30 May 2024
London Borough Of Richmond Upon Thames are carrying out Highway repair and maintenance works on Kitson Road, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 March 2024 at 08:00 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 13 Mar 2024 at 08:00.
11 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Horn Lane, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 07:31 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:02.
11 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Victoria Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 07:31 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:02.
11 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Western Avenue, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 07:31 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:03.
Friday
London Borough Of Hounslow are carrying out Highway improvement works on Grove Park Road, Chiswick, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 March 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 12 Apr 2024 at 14:16.
28 May 2024
Thames Water are carrying out Utility asset works on Station Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:00 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 16:19.
28 May 2024
Thames Water are carrying out Utility asset works on Marys Terrace, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:00 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 16:15.
28 Jun 2024
London Borough Of Ealing are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:00 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 09:42.
Tomorrow
Cadent Gas are carrying out Utility asset works on Craven Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 10:40 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 16:37.
14 May 2024
Cadent Gas are carrying out Utility asset works on The Fairway, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 12:30 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 12:58.
Tomorrow
London Borough Of Hounslow are carrying out Highway improvement works on Renfrew Road, Hounslow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 18 Mar 2024 at 09:15.
5 May 2024
Cadent Gas are carrying out Utility asset works on Priory Lane, Roehampton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 12:25 and could run through until 5 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 13:18.
7 May 2024
London Borough Of Hounslow are carrying out Highway improvement works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 28 Mar 2024 at 12:27.
7 May 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 08:55.
29 May 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Lionel Road North, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 07:00 and could run through until 29 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Mar 2024 at 07:55.
10 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Gunnersbury Drive, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2024 at 10:21.
Friday
G2 Energy IDNO are carrying out Utility asset works on Alliance Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 14:44.
16 Jun 2024
HS2 are carrying out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 00:01 and could run through until 16 June 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 15:03.
Today
Thames Water are carrying out Utility repair and maintenance works on Peterborough Road, Harrow.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 19:30 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 08:55.
Wednesday
Cadent Gas are carrying out Utility asset works on Spencer Street, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 17:50 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 08:58.
1 Jul 2024
Thames Water are carrying out Utility asset works on Netherwood Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 08:00 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 09:28.
Friday
G2 Energy IDNO are carrying out Utility asset works on Westfields Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 14:44.
1 Apr and 30 May 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Mar 2024 at 11:08.
Friday
London Borough Of Ealing are carrying out Highway improvement works on The Avenue, West Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 2 Apr 2024 at 08:28.
29 May 2024
HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:27.
29 May 2024
HS2 are carrying out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:26.
29 May 2024
HS2 are carrying out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:24.
3 Jun 2024
ESP Electricity are carrying out Utility asset works on Bashley Road, Park Royal.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 09:40 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Apr 2024 at 16:30.
5 May 2024
G2 Energy IDNO are carrying out Utility asset works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 April 2024 at 09:00 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 5 Apr 2024 at 10:06.
5 Jun 2024
Cadent Gas are carrying out Utility asset works on St Margarets Grove, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 10:04 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 10:17.
9 May 2024
Cadent Gas are carrying out Utility asset works on Scotts Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 17:00 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:10.
Friday
Cadent Gas are proposing to carry out Utility asset works on Caxton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 15:00.
Friday
Cadent Gas are proposing to carry out Utility asset works on Scotts Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 16:30.
Tuesday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Wulfstan Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:10 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Apr 2024 at 14:01.
8 May 2024
G2 Energy IDNO are carrying out Utility asset works on Leamington Park, Acton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 April 2024 at 07:00 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 10 Apr 2024 at 07:11.
Tuesday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:10 and could run through until 30 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 14:42.
Friday
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2024 at 14:47.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Ealing Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 09:20.
10 May 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Mount Pleasant, Wembley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 09:20.
10 Apr and 4 Jun 2024
Thames Water are proposing to carry out Utility asset works on Marys Terrace, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Dec 2023 at 14:43.
14 Apr and 15 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 10:27.
Friday
Thames Water are carrying out Utility asset works on Sulgrave Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:15 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:11.
12 May 2024
Cadent Gas are carrying out Utility asset works on Caxton Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:43 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:00.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Footpath From Avenue Road And Church Road Junction To 118 Boll, Acton.
The works should not impact the carriageway.
The works started on 14 April 2024 at 13:14 and could run through until 30 April 2024. The works will impact the verge only.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 15:30.
25 May 2024
Thames Water are carrying out Utility asset works on Woodfield Crescent, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:30 and could run through until 25 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:14.
11 May 2024
Thames Water are carrying out Utility repair and maintenance works on Woodfield Avenue, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:30 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:14.
Tomorrow
London Borough Of Hounslow are carrying out Highway improvement works on Bell Road, Hounslow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:00 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 26 Apr 2024 at 14:43.
Tuesday
London Borough Of Hounslow are proposing to carry out Highway improvement works on Station Approach Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 9 Feb 2024 at 15:32.
3 Jun 2024
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Wood Lane, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:40 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 11:13.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2023 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:30.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:24.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Wharncliffe Drive, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:24.
15 Apr and 31 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 31 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 11:08.
25 May 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Leamington Park, Acton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 06:30 and could run through until 25 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Apr 2024 at 07:19.
15 Apr and 26 Jul 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The works will start on or after 15 April 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 9 Apr 2024 at 13:34.
28 Jul 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 22:00 and could run through until 28 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 08:19.
20 May 2024
Cadent Gas are carrying out Utility asset works on Craven Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 07:42 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 08:14.
16 Jun 2024
Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 April 2024 at 22:00 and could run through until 16 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Apr 2024 at 07:42.
9 May 2024
Cadent Gas are carrying out Utility asset works on Bollo Bridge Road, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 08:19 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 14:33.
12 May 2024
Cadent Gas are carrying out Utility asset works on Northolt Lane, Greenford.
These works are categorised as Major.
The works started on 22 April 2024 at 16:41 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 06:57.
Thursday
London Borough Of Hounslow are carrying out Highway improvement works on Spencer Road, Chiswick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 07:00 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 23 Apr 2024 at 10:18.
Friday
Scottish Hydro Electric Power Dis are proposing to carry out Remedial works on Pump Alley, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Mar 2024 at 11:07.
22 Apr and 7 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Dolman Road, Chiswick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2024 at 12:44.
9 May 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Arnott Close, Chiswick, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 13:00 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2024 at 13:56.
22 Apr and 22 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fishers Lane, Chiswick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2024 at 09:02.
6 May 2024
Thames Water are carrying out Utility repair and maintenance works on Lower Addison Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 10:30 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2024 at 11:20.
22 Apr and 13 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chase Road, Park Royal.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Mar 2024 at 14:47.
22 Apr and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Droop Street, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:37.
22 Apr and 2 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fifth Avenue, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:36.
17 May 2024
Thames Water are carrying out Utility asset works on Trenmar Gardens, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 09:00 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 06:38.
11 Aug 2024
Thames Water are carrying out Utility asset works on Harrow Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 10:00 and could run through until 11 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 07:38.
22 Apr and 24 May 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.
These works are categorised as Major.
The works will start on or after 22 April 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 17 Apr 2024 at 06:34.
Cadent Gas carried out Utility repair and maintenance works on First Avenue, Mortlake.
The road was closed for some or all of the period.
The works were originally planned between 23 Apr 2024 and 2 May 2024 and were actually completed between 23 Apr 2024 (10:00) and 28 Apr 2024 (09:17). The works impacted the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Apr 2024 at 09:34.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Ormond Road, Richmond.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 12:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 11:59.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Spring Grove Road, Hounslow.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 08:31 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 08:56.
15 May 2024
Thames Water are carrying out Utility repair and maintenance works on Milson Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 16:00 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 06:28.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Dudden Hill Lane, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 12:02 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 16:40.
9 May 2024
London Borough Of Hounslow are carrying out Highway improvement works on Town Meadow, Brentford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 07:00 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 25 Apr 2024 at 14:09.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Burns Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 10:08 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 16:43.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Gunnersbury Avenue (North Circular Road), London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 21:00 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Apr 2024 at 07:56.
Tomorrow
Murphy Power Distribution are proposing to carry out Utility asset works on Somerset Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
28 Apr and 10 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Hamilton Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2024 at 12:12.
28 Apr and 15 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Hounslow Road, Twickenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 11:16.
28 Apr and 27 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Staines Road, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 27 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2024 at 17:47.
28 Apr and 6 May 2024
Thames Water are proposing to carry out Utility asset works on South Street, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2024 at 14:16.
Thursday
Thames Water are proposing to carry out New service connection on Niton Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 06:47.
28 Apr and 13 Jul 2024
Thames Water are proposing to carry out Utility asset works on College Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 07:26.
Tuesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jan 2024 at 13:20.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Cranford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Dec 2023 at 10:34.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Jan 2024 at 09:01.
29 Apr and 12 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.
29 Apr and 18 Aug 2024
Murphy Power Distribution are proposing to carry out Utility asset works on South Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 18 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 17 Apr 2024 at 10:18.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2023 at 15:43.
29 Apr and 16 May 2024
ESP Electricity are proposing to carry out Utility asset works on St Leonards Road, Park Royal.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 25 Apr 2024 at 13:39.
1 May and 11 Jun 2024
Thames Water are proposing to carry out Utility asset works on Station Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 18:04.
1 May and 10 Jun 2024
Thames Water are proposing to carry out Utility asset works on Station Road, Twickenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Dec 2023 at 15:47.
1 May and 31 Aug 2024
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Depot Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 15:24.
3 May and 14 Jun 2024
Thames Water are proposing to carry out Utility asset works on Brewery Lane, Twickenham.
These works are categorised as Major.
The works will start on or after 3 May 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Jan 2024 at 16:30.
3 and 5 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Winslow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 May 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Apr 2024 at 15:20.
4 and 6 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Denbigh Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
4 and 7 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Boleyn Drive, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Feb 2024 at 09:36.
5 May and 1 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 11:20.
6 and 19 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:15.
6 and 31 May 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 5 Apr 2024 at 15:38.
6 May and 1 Nov 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 1 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 14:06.
6 May and 26 Jul 2024
Thames Water are proposing to carry out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:34.
7 and 15 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 15 May 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:29.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Boston Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Maunder Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 and 11 May 2024
Thames Water are proposing to carry out New service connection on Rosebank Way, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Apr 2024 at 15:25.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.
8 and 10 May 2024
Affinity Water are proposing to carry out Remedial works on The Drive, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Feb 2024 at 10:04.
11 and 13 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Chepstow Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
11 May and 6 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Craven Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 16:43.
12 May and 29 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:36.
12 and 30 May 2024
Cadent Gas are proposing to carry out Utility asset works on Kingsway Footpath To 2-44, Hayes.
These works are categorised as Major.
The works will start on or after 12 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
13 and 15 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Fielding Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Feb 2024 at 10:51.
13 and 15 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Apr 2024 at 09:31.
14 and 17 May 2024
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Dowdeswell Close, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 21 Feb 2024 at 07:44.
15 and 17 May 2024
Abovenet Communications UK are proposing to carry out Utility asset works on Vernon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 18 Apr 2024 at 11:47.
15 and 26 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bilton Way, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 12:23.
16 and 18 May 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Vernon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 11:30.
18 and 20 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Manor Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Apr 2024 at 12:59.
18 and 20 May 2024
Network Rail are proposing to carry out Works for Rail Purposes on Sheen Lane, Mortlake, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Apr 2024 at 13:05.
19 and 21 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Apr 2024 at 07:22.
20 and 23 May 2024
Thames Water are proposing to carry out New service connection on King Street, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Apr 2024 at 08:37.
20 May and 10 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Applegarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Feb 2024 at 10:37.
20 May and 22 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on North Hyde Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 10:55.
20 May and 5 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Old Oak Common Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 14:00.
20 May and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Woodfield Road, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
20 May and 7 Jun 2024
ESP Electricity are proposing to carry out Utility asset works on Chandos Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 25 Apr 2024 at 14:44.
20 and 22 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 07:53.
22 May and 7 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Pump Alley, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 14:28.
22 May and 18 Jun 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Ferry Lane, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 12 Oct 2023 at 08:48.
25 May and 2 Jun 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Weltje Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2024 at 07:36.
25 and 27 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Carlyle Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
27 and 29 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Grand Avenue East, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 22 Feb 2024 at 09:59.
27 and 29 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on College Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2024 at 08:57.
27 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenhill Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 08:19.
28 and 30 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Rosedew Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 08:59.
28 and 30 May 2024
Virgin Media are proposing to carry out Utility asset works on Titmuss Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 12:41.
28 and 30 May 2024
Virgin Media are proposing to carry out Utility asset works on Mount Park Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 1 Mar 2024 at 14:50.
28 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hemmen Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jan 2024 at 08:24.
30 May and 20 Jun 2024
HS2 are proposing to carry out Utility asset works on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 20 June 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:47.
31 May and 2 Jun 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Rosebank Way, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 15 Apr 2024 at 12:59.
1 and 3 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Ascot Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
2 Jun and 11 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
2 Jun and 13 Jul 2024
Thames Water are proposing to carry out Utility asset works on Baker Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2024 at 16:37.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2024 at 13:53.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:20.
3 and 17 Jun 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Parkside Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 22 Apr 2024 at 09:42.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:10.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:09.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:09.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:07.
3 and 6 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 12:07.
3 and 7 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Church Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 15:27.
3 and 7 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Avenue Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 13:22.
3 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Avenue Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
3 and 29 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fermoy Road, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 09:28.
3 and 21 Jun 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 21 June 2024. The works will impact the footway, carriageway, cycleway and parking place.
This roadwork event was last updated by HS2 on 5 Apr 2024 at 15:51.
3 Jun and 3 Jul 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Station Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 3 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 29 Feb 2024 at 10:10.
3 Jun and 3 Nov 2024
Thames Water are proposing to carry out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2024 at 16:37.
3 and 6 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Rushout Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Mar 2024 at 07:01.
5 and 26 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fishers Lane, Chiswick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Mar 2024 at 14:59.
8 and 17 Jun 2024
Telefonica UK are proposing to carry out Utility asset works on Greenock Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 22 Apr 2024 at 15:30.
8 and 10 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on North Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
9 Jun and 7 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Riverside Drive, Ham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 7 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 12:52.
10 and 12 Jun 2024
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Nelson Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 24 Apr 2024 at 15:14.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Access Road To Barratt Industrial Park, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 15:30.
10 and 29 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Mansell Road, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 09:46.
10 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Pitshanger Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:49.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:49.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:48.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:48.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:48.
14 and 19 Jun 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Feb 2024 at 15:44.
17 and 24 Jun 2024
Thames Water are proposing to carry out New service connection on Petersham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 09:12.
17 and 19 Jun 2024
Vodafone are proposing to carry out Utility asset works on Golden Crescent, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 21 Mar 2024 at 11:37.
17 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
17 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Boyd Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
17 and 23 Jun 2024
Thames Water are proposing to carry out New service connection on Shrewsbury Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2024 at 09:00.
17 and 20 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 08:37.
17 Jun and 26 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 26 Apr 2024 at 08:44.
17 Jun 2024 and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:40.
19 Jun and 5 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Popes Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 10:56.
20 Jun and 1 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lionel Road South, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 14:42.
22 and 24 Jun 2024
Thames Water are proposing to carry out roadworks on Winslow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 14:36.
22 and 24 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Shackleton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
23 Jun and 22 Aug 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Goat Wharf, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 22 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 12 Oct 2023 at 08:49.
24 and 27 Jun 2024
Thames Water are proposing to carry out New service connection on The Green, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 11:18.
24 and 26 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Minet Drive, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 09:06.
25 Jun and 16 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Bevin Road Footpath To Morrison Road, Hayes.
These works are categorised as Major.
The works will start on or after 25 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 14:16.
25 and 28 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Sedgecombe Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 18:44.
26 and 28 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 15:11.
26 and 28 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ladbroke Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 10:22.
26 and 28 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 2 Apr 2024 at 17:45.
29 Jun and 3 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:27.
30 Jun and 29 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Kneller Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 13:50.
30 Jun and 2 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Apr 2024 at 17:32.
1 and 22 Jul 2024
Thames Water are proposing to carry out Utility asset works on Richmond Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 10:23.
1 and 5 Jul 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 13:46.
6 and 10 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Parkfield Crescent, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:25.
8 and 11 Jul 2024
Thames Water are proposing to carry out Utility asset works on Shaftesbury Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2024 at 09:39.
8 and 13 Jul 2024
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Lichfield Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 11:20.
8 Jul and 5 Aug 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 5 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Apr 2024 at 08:52.
8 and 12 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Windmill Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2024 at 09:18.
8 and 11 Jul 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 22 Feb 2024 at 15:49.
8 and 14 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Park Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.
8 and 21 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Ormiston Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Feb 2024 at 10:56.
8 and 10 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Collingbourne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 11:48.
8 and 12 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Brook Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 09:31.
11 and 15 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wendell Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 16:50.
14 and 17 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Bell Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:56.
14 and 22 Jul 2024
Thames Water are proposing to carry out New service connection on Roslin Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:45.
14 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Wesley Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 10:14.
14 and 25 Jul 2024
Thames Water are proposing to carry out New service connection on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Apr 2024 at 09:32.
14 Jul and 10 Aug 2024
Thames Water are proposing to carry out Utility asset works on Greenhill Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 10 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2024 at 16:37.
14 and 16 Jul 2024
Affinity Water are proposing to carry out Remedial works on Brook Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Apr 2024 at 16:46.
16 and 18 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on St James's Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2024 at 14:15.
19 and 30 Jul 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Wilkes Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2024 and could run through until 30 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 20 Feb 2024 at 16:30.
21 and 28 Jul 2024
BT are proposing to carry out Utility asset works on Whitton Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Apr 2024 at 13:35.
21 and 27 Jul 2024
Thames Water are proposing to carry out New service connection on Somerset Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 27 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 12:41.
22 Jul and 8 Aug 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:01.
22 and 26 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Leconfield Avenue, Barnes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 10:16.
22 and 26 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hertford Avenue, East Sheen.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:24.
22 and 26 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sutherland Gardens, East Sheen.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:27.
22 and 26 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Priests Bridge, East Sheen.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:26.
22 Jul and 8 Aug 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Richmond Road, Putney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:05.
22 Jul and 22 Sep 2024
Thames Water are proposing to carry out Utility asset works on Westwick Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 10:33.
22 and 26 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Drayton Green Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 13:30.
22 Jul and 16 Aug 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Apr 2024 at 08:43.
23 and 25 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Featherstone Terrace, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 13:24.
26 and 30 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Roehampton Lane, Roehampton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:39.
26 and 30 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Priory Lane, Roehampton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 09:58.
26 and 30 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Daylesford Avenue, Putney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Apr 2024 at 08:17.
26 Jul and 1 Aug 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Dungarvan Avenue, Putney, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 10:02.
26 Jul and 1 Aug 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Queens Ride, Barnes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 10:16.
26 and 30 Jul 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Vine Road, Barnes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 10:16.
26 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Turnham Green Terrace, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 26 July 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2024 at 13:20.
Roadworks Map near to W10 6XL
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to W10 6XL (86 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Aug 2022 - 31 Oct 2025)
(Scheduled: 23 Apr 2024 - 29 Apr 2024)
(Scheduled: 5 Apr 2024 - 5 May 2024)
(Scheduled: 15 Mar 2024 - 15 May 2024)
(Scheduled: 5 Apr 2024 - 5 May 2024)
(Scheduled: 25 Apr 2024 - 3 May 2024)
(Scheduled: 5 Apr 2024 - 5 May 2024)
(Scheduled: 14 Apr 2022 - 20 Jan 2025)
(Scheduled: 2 Apr 2024 - 3 May 2024)
(Scheduled: 25 Apr 2024 - 3 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data