ROADWORKS SUMMARY
Dehavilland Close, NORTHOLT, UB5 6RU
Introduction
View current and future planned roadworks and road closures for Dehavilland Close, UB5 6RU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Dehavilland Close, NORTHOLT, UB5 6RU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Dehavilland Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 13:00.
31 May 2024
HS2 are carrying out Works for Rail Purposes on Eastcote Lane, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 July 2023 at 07:00 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 22 Apr 2024 at 09:47.
17 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Ealing Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2023 at 08:00 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 15:01.
26 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Kensington Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2023 at 07:00 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 24 Apr 2024 at 10:52.
23 May 2024
HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 08:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Uneeda Drive, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 09:30 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Rockware Avenue, Greenford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 07:00 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
23 May 2024
HS2 are carrying out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 05:00 and could run through until 23 May 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 14:12.
1 Aug 2024
London Borough Of Hounslow are carrying out Highway improvement works on High Street, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 October 2023 at 07:00 and could run through until 1 August 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 23 Oct 2023 at 15:46.
Tomorrow
London Borough Of Ealing are carrying out Highway improvement works on Station Parade, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2023 at 11:49.
17 May 2024
London Borough Of Hounslow are carrying out Highway improvement works on Parsonage Road, Hounslow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:00 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 19 Apr 2024 at 14:11.
Tomorrow
Affinity Water are carrying out Utility repair and maintenance works on Preston Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 10:15 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Apr 2024 at 16:32.
30 May 2024
London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Mulberry Parade, West Drayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 16 Apr 2024 at 06:55.
28 Jun 2024
London Borough Of Ealing are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:00 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 09:42.
Tomorrow
London Borough Of Hounslow are carrying out Highway improvement works on Renfrew Road, Hounslow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 18 Mar 2024 at 09:15.
7 May 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 08:55.
20 May 2024
Cadent Gas are carrying out Utility asset works on Parkside Way, North Harrow.
These works are categorised as Major.
The works started on 22 March 2024 at 08:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:43.
10 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Gunnersbury Drive, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 9 Apr 2024 at 10:21.
Friday
G2 Energy IDNO are carrying out Utility asset works on Alliance Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 14:44.
16 Jun 2024
HS2 are carrying out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 00:01 and could run through until 16 June 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 18 Apr 2024 at 15:03.
Today
Thames Water are carrying out Utility repair and maintenance works on Peterborough Road, Harrow.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 19:30 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 08:55.
Wednesday
Cadent Gas are carrying out Utility asset works on Spencer Street, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 17:50 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 08:58.
1 Apr and 30 May 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Mar 2024 at 11:08.
Friday
London Borough Of Ealing are carrying out Highway improvement works on The Avenue, West Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 2 Apr 2024 at 08:28.
29 May 2024
HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:27.
29 May 2024
HS2 are carrying out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:26.
29 May 2024
HS2 are carrying out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 17:24.
9 May 2024
Cadent Gas are carrying out Utility asset works on Scotts Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 17:00 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:10.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Hatton Road North, London Heathrow Airport, Heathrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:35.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Bath Road, Heathrow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:36.
18 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on High Street, Harlington, Hayes.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 19:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 07:36.
Friday
Cadent Gas are proposing to carry out Utility asset works on Caxton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 15:00.
Friday
Cadent Gas are proposing to carry out Utility asset works on Scotts Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Feb 2024 at 16:30.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Ealing Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 09:20.
10 May 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Mount Pleasant, Wembley.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 09:20.
12 May 2024
Cadent Gas are carrying out Utility asset works on Caxton Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 09:43 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:00.
25 May 2024
Thames Water are carrying out Utility asset works on Woodfield Crescent, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:30 and could run through until 25 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:14.
11 May 2024
Thames Water are carrying out Utility repair and maintenance works on Woodfield Avenue, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:30 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:14.
14 Apr and 12 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 16:30.
9 Jun 2024
Cadent Gas are carrying out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:13 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:21.
Tomorrow
London Borough Of Hounslow are carrying out Highway improvement works on Bell Road, Hounslow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:00 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 26 Apr 2024 at 14:43.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2023 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:30.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:24.
7 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Wharncliffe Drive, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 18:00 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 07:24.
15 Apr and 26 Jul 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Wembley Hill Road, Wembley.
These works are categorised as Major.
The works will start on or after 15 April 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 9 Apr 2024 at 13:34.
Wednesday
ESP Electricity are carrying out Utility asset works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 April 2024 at 07:00 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by ESP Electricity on 18 Apr 2024 at 12:55.
17 Apr and 17 May 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Hewens Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 25 Jan 2024 at 15:02.
7 May 2024
City Of London Telecomms are carrying out Utility asset works on The Greenway, Uxbridge.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 07:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 24 Apr 2024 at 08:57.
12 May 2024
Cadent Gas are carrying out Utility asset works on Northolt Lane, Greenford.
These works are categorised as Major.
The works started on 22 April 2024 at 16:41 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 06:57.
22 Apr and 13 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Moorfield Road, Uxbridge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2024 at 14:15.
22 Apr and 13 May 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Peter's Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2024 at 14:12.
22 Apr and 8 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sweetcroft Lane, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 09:47.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Spring Grove Road, Hounslow.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 08:31 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 08:56.
25 Apr and 12 May 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lankers Drive, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 16 Apr 2024 at 09:03.
Tomorrow
Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Newtown Road, Denham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Buckinghamshire Council on 16 Apr 2024 at 14:04.
Tomorrow
Murphy Power Distribution are proposing to carry out Utility asset works on Somerset Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
27 Apr and 19 May 2024
BT are proposing to carry out Utility asset works on Pinner Hill Road, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Mar 2024 at 15:01.
28 Apr and 27 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Staines Road, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 27 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2024 at 17:47.
Tuesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jan 2024 at 13:20.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Cranford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Dec 2023 at 10:34.
29 Apr and 12 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.
29 Apr and 18 Aug 2024
Murphy Power Distribution are proposing to carry out Utility asset works on South Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 18 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 17 Apr 2024 at 10:18.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2023 at 15:43.
1 and 23 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Waterloo Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 24 Apr 2024 at 13:10.
4 and 6 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Denbigh Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
4 and 7 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Boleyn Drive, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Feb 2024 at 09:36.
6 and 9 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Blossom Way, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Apr 2024 at 08:34.
6 and 19 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:15.
6 and 31 May 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 5 Apr 2024 at 15:38.
6 May and 1 Nov 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 1 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 3 Apr 2024 at 14:06.
6 and 12 May 2024
London Borough Of Hillingdon are proposing to carry out Utility repair and maintenance works on Villier Street, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 11 Mar 2024 at 10:57.
6 May and 26 Jul 2024
Thames Water are proposing to carry out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:34.
6 and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Vine Grove, Uxbridge.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 15:30.
7 and 15 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 15 May 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 15:29.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Boston Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Maunder Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 11:16.
11 and 13 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Chepstow Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
12 May and 29 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Botwell Common Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 10:36.
12 and 30 May 2024
Cadent Gas are proposing to carry out Utility asset works on Kingsway Footpath To 2-44, Hayes.
These works are categorised as Major.
The works will start on or after 12 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
12 May and 9 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Barrow Point Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:10.
12 and 27 May 2024
Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Pinner.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.
13 and 31 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Faggs Road, Feltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Jan 2024 at 16:30.
13 and 31 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Steam Farm Lane, Feltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jan 2024 at 15:49.
13 and 15 May 2024
BT are proposing to carry out Utility asset works on Great South West Road, Heathrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Apr 2024 at 11:50.
13 and 15 May 2024
BT are proposing to carry out Utility asset works on Hatton Road South, London Heathrow Airport, Heathrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Apr 2024 at 11:41.
13 and 15 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on St Johns Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Apr 2024 at 09:31.
15 and 26 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bilton Way, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 12:23.
20 and 22 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Brickfield Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Feb 2024 at 12:52.
20 May and 22 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on North Hyde Road, Hayes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 10:55.
20 May and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Woodfield Road, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
20 and 22 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 07:53.
21 May and 25 Jun 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Cowley Mill Road, Uxbridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 25 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by G2 Energy IDNO on 25 Apr 2024 at 08:21.
25 and 27 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Carlyle Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
27 and 31 May 2024
Affinity Water are proposing to carry out Permanent reinstatement on Station Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Feb 2024 at 15:11.
27 and 29 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on College Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 16 Apr 2024 at 08:57.
27 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenhill Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 08:19.
28 May and 2 Jun 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Pinkwell Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Feb 2024 at 16:00.
28 and 30 May 2024
Virgin Media are proposing to carry out Utility asset works on Mount Park Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 1 Mar 2024 at 14:50.
28 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hemmen Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Jan 2024 at 08:24.
29 and 31 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on St Stephens Road, Yiewsley, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 31 Jan 2024 at 12:36.
30 May and 20 Jun 2024
HS2 are proposing to carry out Utility asset works on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 20 June 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:47.
1 and 3 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Ascot Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
2 Jun and 11 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
2 and 6 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Swakeleys Road, Ickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 11 Apr 2024 at 09:41.
2 and 8 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Love Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Apr 2024 at 13:53.
3 and 17 Jun 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Parkside Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 22 Apr 2024 at 09:42.
3 and 7 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Church Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 15:27.
3 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Avenue Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
3 and 29 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Fermoy Road, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 09:28.
3 and 21 Jun 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 21 June 2024. The works will impact the footway, carriageway, cycleway and parking place.
This roadwork event was last updated by HS2 on 5 Apr 2024 at 15:51.
3 and 6 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Rushout Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Mar 2024 at 07:01.
8 and 10 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on North Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
9 Jun and 14 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Love Lane, Pinner.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 09:09.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Access Road To Barratt Industrial Park, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 15:30.
10 and 29 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Mansell Road, Greenford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 09:46.
10 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Pitshanger Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Star Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Mar 2024 at 15:09.
16 and 20 Jun 2024
BT are proposing to carry out Utility asset works on Princess Lane, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Apr 2024 at 09:07.
17 and 19 Jun 2024
Vodafone are proposing to carry out Utility asset works on Golden Crescent, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 21 Mar 2024 at 11:37.
17 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
17 Jun and 12 Jul 2024
Affinity Water are proposing to carry out Utility asset works on Boyd Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Apr 2024 at 08:12.
17 and 21 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Remedial works on Vine Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Mar 2024 at 21:52.
17 and 20 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2024 at 08:37.
17 Jun and 26 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Holyrood Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 26 Apr 2024 at 08:44.
17 Jun 2024 and 13 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 12:40.
19 Jun and 5 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Popes Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Apr 2024 at 10:56.
22 and 24 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Shackleton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
24 and 26 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Minet Drive, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 09:06.
24 Jun and 14 Aug 2024
Cadent Gas are proposing to carry out Highway repair and maintenance works on Catlins Lane, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 14 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 13:16.
25 Jun and 16 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Bevin Road Footpath To Morrison Road, Hayes.
These works are categorised as Major.
The works will start on or after 25 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 14:16.
29 Jun and 3 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:27.
30 Jun and 2 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Elm Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 12 Apr 2024 at 17:32.
1 and 5 Jul 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Eton Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2024 at 13:46.
6 and 10 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Parkfield Crescent, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2024 at 09:25.
8 Jul and 5 Aug 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 5 August 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Apr 2024 at 08:52.
8 and 12 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Windmill Road, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Apr 2024 at 09:18.
8 and 11 Jul 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 22 Feb 2024 at 15:49.
8 and 14 Jul 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Park Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 14 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.
14 and 17 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Bell Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:56.
14 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Wesley Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 10:14.
17 and 21 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on West Common Road, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 13:38.
17 and 19 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Southill Lane, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 19 July 2024. The works will impact the verge only.
This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 14:38.
21 and 28 Jul 2024
BT are proposing to carry out Utility asset works on Whitton Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Apr 2024 at 13:35.
21 and 27 Jul 2024
Thames Water are proposing to carry out New service connection on Somerset Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 27 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Apr 2024 at 12:41.
21 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Sweetcroft Lane, Uxbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 15:00.
22 and 26 Jul 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Drayton Green Road, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Apr 2024 at 13:30.
22 Jul and 16 Aug 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Oldfield Lane North, Greenford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Apr 2024 at 08:43.
22 and 24 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Salisbury Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Apr 2024 at 08:21.
22 and 24 Jul 2024
Virgin Media are proposing to carry out Utility asset works on Blawith Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 16 Apr 2024 at 09:04.
23 and 25 Jul 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Featherstone Terrace, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Apr 2024 at 13:24.
Roadworks Map near to Dehavilland Close, NORTHOLT, UB5 6RU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Dehavilland Close, NORTHOLT, UB5 6RU (27 Events)
(Scheduled Dates)
(miles)
(Scheduled: 4 Apr 2024 - 4 May 2024)
(Scheduled: 4 Apr 2024 - 4 May 2024)
(Scheduled: 24 Apr 2024 - 25 May 2024)
(Scheduled: 16 Apr 2024 - 21 Jun 2024)
(Scheduled: 7 Nov 2022 - 1 Jul 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data