ROADWORKS SUMMARY
Uxbridge Road, HAYES, UB4 8HR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Uxbridge Road, UB4 8HR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Uxbridge Road, HAYES, UB4 8HR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Uxbridge Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Church Road

London Borough Of Ealing are carrying out Highway improvement works on Church Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:23.

London Borough Of Ealing logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Mandeville Road

London Borough Of Ealing are carrying out Highway improvement works on Mandeville Road, Northolt.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:30 and could run through until 1 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Ealing on 13 Jun 2024 at 16:22.

Transport for London (TfL) logo
LONG TERM
Between
22 Jul 2024 and 22 Jul 2027
Details
View Map
Share
Follow
Stockley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.

London Borough Of Hounslow logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are carrying out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 08:48.

London Borough Of Hounslow logo
LONG TERM
Between
29 Jul and 20 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 19 Jul 2024 at 14:48.

London Borough Of Hounslow logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wellington Road North

London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road North, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 30 May 2024 at 13:18.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:30.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Pinewood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Pinewood Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Wood Lane, Iver Heath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:37.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Uxbridge Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 5 Jun 2024 at 15:39.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Slough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Slough Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:36.

Buckinghamshire Council logo
LONG TERM
Between
2 Sep 2024 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Church Road, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 21 Jun 2024 at 10:32.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

Cadent Gas are carrying out Utility asset works on Thornbury Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 13:01 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:58.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Windmill Avenue

Cadent Gas were proposing to carry out Utility asset works on Windmill Avenue, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 09:55.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 10:06.

ESP Electricity logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are carrying out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:30 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 09:14.

City Of London Telecomms logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

City Of London Telecomms were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are proposing to carry out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:16.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are carrying out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:24 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:42.

Cadent Gas logo
LONG TERM
Until
24 Dec 2024
Details
View Map
Share
Follow
Sharps Lane

Cadent Gas are carrying out Utility asset works on Sharps Lane, Ruislip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:40 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 10:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are proposing to carry out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:00.

Cadent Gas logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Cheney Street

Cadent Gas are carrying out Utility asset works on Cheney Street, Eastcote.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 13:05 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:28.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 25 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 11:03.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Old Rectory Lane

Thames Water were proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 25 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:03.

ESP Electricity logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Iron Bridge Road

ESP Electricity are carrying out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 10:00 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 18 Nov 2024 at 13:06.

London Borough Of Hillingdon logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:56.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:42.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:41.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:52.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fairfield Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:21.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Goulds Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Goulds Green, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:57.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Glencoe Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Glencoe Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:57.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:55.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:50.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Owen Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Owen Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Ayles Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Ayles Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:37.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Greenway

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Greenway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:56.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Oxford Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Oxford Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:48.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:55.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Approach, South Ruislip, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 24 Oct 2024 at 10:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Field End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Field End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 15:54.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
West End Road

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on West End Road, Ruislip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 20 Aug 2024 at 15:01.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:58.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Road, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:53.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fore Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fore Street, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:59.

National Highways logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 17:01 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Bangors Road South

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bangors Road South, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Oct 2024 at 13:06.

Buckinghamshire Council logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Oct 2024 at 12:09.

London Borough Of Hillingdon logo
Finishing
Thursday
Details
View Map
Share
Follow
Kings College Road

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Kings College Road, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 4 Nov 2024 at 08:53.

London Borough Of Hillingdon logo
Between
5 Nov and 5 Dec 2024
Details
View Map
Share
Sipson Way

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Aug 2024 at 10:27.

London Borough Of Hillingdon logo
Between
6 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Horton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 6 Aug 2024 at 13:48.

Boldyn Networks logo
LONG TERM
Between
7 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 11 Sep 2024 at 12:39.

London Borough Of Hillingdon logo
Between
7 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 29 Oct 2024 at 14:59.

Scottish Hydro Electric Power Dis logo
Between
9 Nov and 6 Dec 2024
Details
View Map
Share
Station Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Station Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 13:55.

Boldyn Networks logo
Finishing
Saturday
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 3 Oct 2024 at 15:40.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
St Christophers Close

Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.

These works were categorised as Major.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bangors Road South

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Bangors Road South, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Nov 2024 at 14:28.

Buckinghamshire Council logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Uxbridge Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Iver.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 12:04.

London Borough Of Ealing logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are carrying out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:00.

London Borough Of Hillingdon logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Breakspear Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Breakspear Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 10 Sep 2024 at 10:38.

London Borough Of Hillingdon logo
Between
14 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:40.

London Borough Of Hillingdon logo
Finishing
Saturday
Details
View Map
Share
Follow
Lavender Rise

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Nov 2024 at 08:35.

London Borough Of Hillingdon logo
Finishing
Saturday
Details
View Map
Share
Follow
Lavender Rise

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Nov 2024 at 11:50.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 14:07.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 Aug 2024 at 08:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Hunt Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Hunt Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:57.

Thames Water logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Tavistock Road, Yiewsley, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:22.

Buckinghamshire Council logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Wood Lane

Buckinghamshire Council are carrying out Highway repair and maintenance works on Wood Lane, Iver Heath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 00:00 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 22 Nov 2024 at 12:08.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 15:26.

Cadent Gas logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 15:52.

London Borough Of Hillingdon logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 7 Nov 2024 at 14:09.

London Borough Of Hillingdon logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are carrying out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 15 Nov 2024 at 10:51.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Central Way

Cadent Gas are carrying out Utility repair and maintenance works on Central Way, Feltham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 11:16 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:32.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:20.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:49.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:19.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:37.

Buckinghamshire Council logo
Finishing
Friday
Details
View Map
Share
Follow
Thorney Mill Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Thorney Mill Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Aug 2024 at 13:05.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Station Parade

Thames Water are proposing to carry out Utility asset works on Station Parade, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:36.

London Borough Of Ealing logo
Finishing
Thursday
Details
View Map
Share
Follow
Greenford Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 09:11.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 16:02.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Oct 2024 at 13:09.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:44.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:30.

London Borough Of Hillingdon logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinkwell Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pinkwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Swift Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 09:06.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
Copley Close

London Borough Of Ealing are proposing to carry out Highway improvement works on Copley Close, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 24 Oct 2024 at 09:49.

London Borough Of Ealing logo
Between
25 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Rowdell Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Rowdell Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 16:18.

Finishing
Wednesday
Details
View Map
Share
Eliot Drive

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Eliot Drive, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 23 Oct 2024 at 09:15.

Thames Water logo
Between
25 Nov and 25 Dec 2024
Details
View Map
Share
Follow
Old Rectory Lane

Thames Water are proposing to carry out Utility asset works on Old Rectory Lane, Denham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 25 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 16:08.

Finishing
Wednesday
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Finishing
Wednesday
Details
View Map
Share
Follow
East Towers

London Borough Of Harrow are proposing to carry out Highway improvement works on East Towers, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 6 Sep 2024 at 10:01.

Finishing
Wednesday
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 17 Jul 2024 at 11:55.

Finishing
Thursday
Details
View Map
Share
Follow
West End Lane

London Borough Of Harrow are proposing to carry out Highway improvement works on West End Lane, Pinner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 4 Sep 2024 at 14:34.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Aug 2024 at 13:12.

Affinity Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 09:00.

UK Power Networks Eastern & London logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2024 at 09:39.

UK Power Networks Eastern & London logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Wood End Avenue

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Wood End Avenue, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 16:30.

Finishing
Thursday
Details
View Map
Share
Follow
Rayners Lane

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Rayners Lane, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:49.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 13 Nov 2024 at 13:56.

London Borough Of Ealing logo
Finishing
Friday
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 20 Nov 2024 at 08:12.

Finishing
Friday
Details
View Map
Share
Follow
Sandringham Crescent

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Sandringham Crescent, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:50.

Finishing
Friday
Details
View Map
Share
Alexandra Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:27.

Finishing
Friday
Details
View Map
Share
Follow
Exeter Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Exeter Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:44.

Finishing
Friday
Details
View Map
Share
Eastcote Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Eastcote Avenue, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 24 Oct 2024 at 08:54.

Finishing
Friday
Details
View Map
Share
Coles Crescent

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Coles Crescent, South Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 21 Oct 2024 at 10:10.

Finishing
Friday
Details
View Map
Share
Follow
Capthorne Avenue

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Capthorne Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 15 Aug 2024 at 17:46.

Finishing
Friday
Details
View Map
Share
Alfriston Avenue

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Alfriston Avenue, North Harrow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 25 Oct 2024 at 08:20.

Finishing
Friday
Details
View Map
Share
Rosecroft Walk

London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Rosecroft Walk, Pinner.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 7 Oct 2024 at 08:42.

National Highways logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Sep 2024 at 08:18.

London Borough Of Hillingdon logo
Between
28 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:41.

Affinity Water logo
Between
29 Nov and 3 Dec 2024
Details
View Map
Share
Swallow Street

Affinity Water were proposing to carry out Utility asset works on Swallow Street, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 3 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 1 Oct 2024 at 14:05.

Buckinghamshire Council logo
Between
1 and 5 Dec 2024
Details
View Map
Share
Follow
Syke Ings

Buckinghamshire Council are proposing to carry out Highway improvement works on Syke Ings, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 13:49.

London Borough Of Hounslow logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Renfrew Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Renfrew Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 12:52.

Thames Water logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

Cityfibre Metro Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Iverdale Close

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Iverdale Close, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 11:26.

Cityfibre Metro Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Iverdale Close

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Iverdale Close, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Nov 2024 at 12:01.

Affinity Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Evreham Road

Affinity Water were proposing to carry out Remedial works on Evreham Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Sep 2024 at 09:52.

Cityfibre Metro Networks logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 15:14.

Cityfibre Metro Networks logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Sep 2024 at 16:55.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 18 Sep 2024 at 13:19.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 21 Nov 2024 at 12:01.

Cityfibre Metro Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Coppins Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Coppins Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:39.

London Borough Of Hillingdon logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Kingshill Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Kingshill Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:50.

London Borough Of Hillingdon logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fairfield Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 08:55.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 15:51.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.

London Borough Of Hillingdon logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Oct 2024 at 15:31.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Downing Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Downing Drive, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

Between
6 and 15 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Oct 2024 at 10:15.

Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Ingram Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ingram Way, Greenford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Nov 2024 at 10:05.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Long Lane

Affinity Water were proposing to carry out Utility asset works on Long Lane, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:49.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Whitethorn Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Whitethorn Avenue, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 08:18.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Whitethorn Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Whitethorn Avenue, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:18.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 09:17.

London Borough Of Hillingdon logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Oct 2024 at 13:52.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 15:54.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 15:06.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 11:47.

Cityfibre Metro Networks logo
Between
12 and 18 Dec 2024
Details
View Map
Share
Follow
Love Hill Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Love Hill Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 15:46.

Between
12 and 14 Dec 2024
Details
View Map
Share
Follow
Lower Road

London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Lower Road, Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Harrow on 16 Oct 2024 at 12:38.

Cityfibre Metro Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Billet Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Billet Lane, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 2 Oct 2024 at 15:45.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Grange Way

Cadent Gas are proposing to carry out Utility asset works on Grange Way, Iver.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 11:38.

London Borough Of Hillingdon logo
LONG TERM
Between
16 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Bury Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Bury Street, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 10:11.

Thames Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Taunton Avenue

Thames Water were proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:41.

Affinity Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 14:47.

Thames Water logo
Between
19 and 22 Dec 2024
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.

London Borough Of Hillingdon logo
LONG TERM
Between
20 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Barnhill Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Barnhill Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Oct 2024 at 07:22.

Thames Water logo
Between
28 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

National Highways logo
LONG TERM
Between
2 Jan and 29 Mar 2025
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

Buckinghamshire Council logo
Between
3 and 14 Jan 2025
Details
View Map
Share
Denham Avenue

Buckinghamshire Council were proposing to carry out Highway improvement works on Denham Avenue, Denham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 14 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 1 Nov 2024 at 09:21.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.

National Highways logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:55.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Lavender Rise

Affinity Water were proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 19 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:17.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:30.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 10:22.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:16.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
West Drayton Road

Cadent Gas were proposing to carry out Utility asset works on West Drayton Road, Uxbridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 08:37.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Moorfield Road

Cadent Gas were proposing to carry out Utility asset works on Moorfield Road, Denham.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 16:09.

Affinity Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Long Lane

Affinity Water are proposing to carry out Utility asset works on Long Lane, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 08:10.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Staines Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:29.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:18.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 16:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.

Cadent Gas logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Love Lane

Cadent Gas were proposing to carry out Utility asset works on Love Lane, Iver.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:38.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 18 Sep 2024 at 08:43.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:44.

Murphy Power Distribution logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Field End Road

Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 6 Nov 2024 at 07:48.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:03.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 15:06.

Affinity Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Ealing Road

Affinity Water are proposing to carry out Utility asset works on Ealing Road, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 16:33.

Cadent Gas logo
LONG TERM
Between
14 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 14:16.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cherington Road

Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.

Affinity Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Eastcote Lane

Affinity Water were proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 12:25.

ESP Electricity logo
LONG TERM
Between
21 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 13:59.

Cityfibre Metro Networks logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Bangors Road South

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Bangors Road South, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 29 Oct 2024 at 10:47.

London Borough Of Ealing logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Wharncliffe Drive

London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:07.

London Borough Of Ealing logo
LONG TERM
Between
28 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Ruislip Road

London Borough Of Ealing are proposing to carry out Highway improvement works on Ruislip Road, Northolt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 April 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Ealing on 31 Oct 2024 at 16:15.

Buckinghamshire Council logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Southlands Road

Buckinghamshire Council were proposing to carry out Highway repair and maintenance works on Southlands Road, Iver.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 1 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Nov 2024 at 10:19.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 15:25.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 14:54.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:44.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Neal Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Neal Avenue, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:14.

Scottish Hydro Electric Power Dis logo
Between
6 and 27 Feb 2025
Details
View Map
Share
Follow
Lady Margaret Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lady Margaret Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 13:48.

Network Rail logo
Between
7 and 10 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Network Rail are proposing to carry out Works for Rail Purposes on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 16:55.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 11:16.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 07:52.

Affinity Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Kingsway

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Nov 2024 at 11:07.

Cadent Gas logo
LONG TERM
Between
10 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Uxbridge Road

Cadent Gas are proposing to carry out Utility asset works on Uxbridge Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:25.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Fine Bush Lane

BT are proposing to carry out Utility asset works on Fine Bush Lane, Harefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 10:24.

Affinity Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Alexandra Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Alexandra Avenue, Rayners Lane.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 08:40.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 12:30.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 10:03.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 7 Oct 2024 at 09:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 11:00.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:23.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Royal Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Royal Lane, Yiewsley, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 11:14.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Moorfield Road

Cadent Gas are proposing to carry out Utility asset works on Moorfield Road, Denham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:53.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Chase

Cadent Gas are proposing to carry out Utility asset works on The Chase, Eastcote.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:39.

Affinity Water logo
Between
18 and 21 Feb 2025
Details
View Map
Share
Follow
Eastcote Lane

Affinity Water are proposing to carry out Utility asset works on Eastcote Lane, Northolt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 07:47.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Northolt Road

Affinity Water are proposing to carry out Highway repair and maintenance works on Northolt Road, South Harrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 12:28.


Roadworks Map near to Uxbridge Road, HAYES, UB4 8HR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 02:24
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Uxbridge Road, HAYES, UB4 8HR (47 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Affinity Water logo
UXBRIDGE ROAD 
(0.0 miles)
Affinity Water
Utility repair and maintenance works - Footway, Cycleway - Lane closure
Planned
Scheduled: 25 Nov 2024 - 1 Dec 2024
0.0
Details
Share
Follow
2
Affinity Water logo
UXBRIDGE ROAD 
(0.0 miles)
Affinity Water
Utility repair and maintenance works - Footway, Cycleway - Lane closure
Planned
Scheduled: 25 Nov 2024 - 1 Dec 2024
0.0
Details
Share
Follow
3
Affinity Water logo
UXBRIDGE ROAD 
(0.0 miles)
Affinity Water
Utility repair and maintenance works - Footway, Cycleway - Lane closure
Planned
Scheduled: 25 Nov 2024 - 1 Dec 2024
0.0
Details
Share
Follow
4
Affinity Water logo
TUDOR ROAD 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
21 Nov 2024 13:42 - 17:14
0.2
Details
Share
5
Affinity Water logo
MORGANS LANE 
(0.2 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.2
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
KINGSWAY 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Verge - Some carriageway incursion
Cancelled
(Scheduled: 14 Oct 2024 - 3 Mar 2025)
0.3
Details
Share
7
Cadent Gas logo
MAJOR
  
KINGSWAY 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Verge - Some carriageway incursion
Planned
Scheduled: 14 Oct 2024 - 3 Mar 2025
0.3
Details
Share
Follow
8
London Borough Of Hillingdon logo
MAJOR
  
BALMORAL DRIVE 
(0.3 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 7 Oct 2024 - 29 Nov 2024)
0.3
Details
Share
9
London Borough Of Hillingdon logo
BOTWELL CRESCENT 
(0.4 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 22 Nov 2024 08:00
(Scheduled: 22 Nov 2024 - 29 Nov 2024)
0.4
Details
Share
Follow
10
London Borough Of Hillingdon logo
MAJOR
  
BALMORAL DRIVE 
(0.5 miles)
London Borough Of Hillingdon
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 1 Nov 2024 - 1 Dec 2024
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data