ROADWORKS SUMMARY
Corfe Close, HOUNSLOW, TW4 5PX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Corfe Close, TW4 5PX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Corfe Close, HOUNSLOW, TW4 5PX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Corfe Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Burtons Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Burtons Road, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Colne Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Colne Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Hartington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Winchester Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Strathmore Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Strathmore Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Clifden Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Lion Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Copthall Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Staten Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Ripley Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Ripley Road, Hampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
St James's Avenue

London Borough Of Richmond Upon Thames are carrying out roadworks on St James's Avenue, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Egerton Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Carrington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Lower Teddington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Meadlands Drive

London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Elmsleigh Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Elmsleigh Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
First Cross Road

London Borough Of Richmond Upon Thames are carrying out roadworks on First Cross Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:28.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Amyand Park Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Manor Road

Transport for London (TfL) are carrying out Highway improvement works on Manor Road, Richmond.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 September 2023 at 08:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:23.

LONG TERM
Between
3 Feb and 7 Dec 2024
Details
View Map
Share
Follow
Parkleys Parade

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Parkleys Parade, Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 18 Jan 2024 at 07:35.

LONG TERM
Between
5 May and 1 Dec 2024
Details
View Map
Share
Follow
Station Approach

London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 10:20.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Crescent

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Crescent, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 08:52.

Surrey County Council logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Squires Bridge Road

Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 17 Jun 2024 at 07:34.

Surrey County Council logo
LONG TERM
Between
30 Jun 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Dudley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dudley Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Apr 2024 at 06:36.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:19.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:04.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 13:26.

Transport for London (TfL) logo
LONG TERM
Between
22 Jul 2024 and 22 Jul 2027
Details
View Map
Share
Follow
Stockley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.

London Borough Of Hounslow logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are carrying out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 08:48.

London Borough Of Hounslow logo
LONG TERM
Between
29 Jul and 20 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 19 Jul 2024 at 14:48.

Thames Water logo
LONG TERM
Between
22 Aug 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 14:54.

Thames Water logo
LONG TERM
Between
27 Aug and 22 Dec 2024
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:09.

Thames Water logo
LONG TERM
Between
27 Aug and 22 Dec 2024
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.

UK Power Networks South Eastern logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Beaufort Road

UK Power Networks South Eastern are carrying out Utility asset works on Beaufort Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 August 2024 at 10:30 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 15:57.

Surrey County Council logo
LONG TERM
Between
1 Sep 2024 and 1 Mar 2025
Details
View Map
Share
Follow
Walton Park

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Park, Walton-on-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Jun 2024 at 11:32.

London Borough Of Hounslow logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wellington Road North

London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road North, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 30 May 2024 at 13:18.

UK Power Networks South Eastern logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Fassett Road

UK Power Networks South Eastern are carrying out Utility asset works on Fassett Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 12:51 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Nov 2024 at 15:56.

Transport for London (TfL) logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

Cadent Gas are carrying out Utility asset works on Thornbury Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 13:01 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:58.

London Borough Of Hounslow logo
LONG TERM
Between
24 Sep and 3 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 3 December 2024. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2024 at 13:24.

London Borough Of Hounslow logo
LONG TERM
Between
27 Sep and 13 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Street, Walton-on-thames.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 September 2024 at 21:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:08.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Manygate Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Manygate Lane, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Jul 2024 at 07:40.

LONG TERM
Tomorrow
Details
View Map
Share
Shacklegate Lane

London Borough Of Richmond Upon Thames carried out Highway repair and maintenance works on Shacklegate Lane, Teddington.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 14 Oct 2024 and 22 Nov 2024 and were actually completed between 14 Oct 2024 (09:30) and 21 Nov 2024 (15:00). The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 21 Nov 2024 at 15:00.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 14:47.

Transport for London (TfL) logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 15:41.

Surrey County Council logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 14:34.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are carrying out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 14:55.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:08.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:09.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 06:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 06:47.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:20.

LONG TERM
Between
21 Oct and 11 Dec 2024
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Sep 2024 at 07:27.

LONG TERM
Until
11 Dec 2024
Details
View Map
Share
Follow
London Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on London Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 09:15.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Windmill Avenue

Cadent Gas were proposing to carry out Utility asset works on Windmill Avenue, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 09:55.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 10:06.

ESP Electricity logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are carrying out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:30 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 09:14.

City Of London Telecomms logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

City Of London Telecomms were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are proposing to carry out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:16.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are carrying out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:24 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:42.

London Borough Of Hounslow logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Ascot Road

London Borough Of Hounslow are carrying out Highway improvement works on Ascot Road, Feltham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 09:15.

London Borough Of Hounslow logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Staines Road

London Borough Of Hounslow are carrying out Highway improvement works on Staines Road, Hounslow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 13 Nov 2024 at 15:04.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 2 Oct 2024 at 10:52.

UK Power Networks South Eastern logo
Finishing
Monday
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are carrying out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Oct 2024 at 08:37.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Whitton Road

Thames Water are carrying out Utility repair and maintenance works on Whitton Road, Hounslow.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 30 October 2024 at 11:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:05.

Cadent Gas logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are carrying out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 12:24 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:56.

ESP Electricity logo
Finishing
Today
Details
View Map
Share
Follow
Mulberry Crescent

ESP Electricity are proposing to carry out Utility asset works on Mulberry Crescent, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Aug 2024 at 08:16.

ESP Electricity logo
Finishing
Today
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Aug 2024 at 08:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Spelthorne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Spelthorne Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 07:01.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kingston Road

Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:07.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:57.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:42.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:41.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:21.

Southern Gas Networks logo
LONG TERM
Between
4 Nov 2024 and 23 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:48.

Southern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:12.

Southern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Sidney Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sidney Road, Walton-on-thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 08:41.

London Borough Of Hounslow logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are carrying out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Nov 2024 at 10:00.

National Highways logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:34.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 17:01 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

London Borough Of Hillingdon logo
Between
5 Nov and 5 Dec 2024
Details
View Map
Share
Sipson Way

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Aug 2024 at 10:27.

Boldyn Networks logo
LONG TERM
Between
7 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 11 Sep 2024 at 12:39.

London Borough Of Hillingdon logo
Between
7 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 29 Oct 2024 at 14:59.

Southern Gas Networks logo
Until
2 Dec 2024
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Walton-on-thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:49.

Thames Water logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Windsor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Windsor Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:16.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Friars Lane

Virgin Media are proposing to carry out Utility asset works on Friars Lane, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 6 Aug 2024 at 09:37.

Boldyn Networks logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 3 Oct 2024 at 15:40.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
St Christophers Close

Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.

These works were categorised as Major.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Footpath From London Road To Brent Lea

Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:11.

Finishing
Wednesday
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Nov 2024 at 16:11.

Cadent Gas logo
LONG TERM
Between
11 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:43.

Cadent Gas logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:57.

Cadent Gas logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Ealing Road

Cadent Gas are carrying out Utility asset works on Ealing Road, Brentford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 15:07 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:17.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Berwyn Road

Cadent Gas are carrying out Utility repair and maintenance works on Berwyn Road, Richmond.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 11:59.

London Borough Of Hillingdon logo
Between
14 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:40.

Cadent Gas logo
Monday
Details
View Map
Share
Green Street

Cadent Gas carried out Utility repair and maintenance works on Green Street, Sunbury On Thames.

Two-way signals were in place for some or all of the period.

The works were originally planned between 15 Nov 2024 and 25 Nov 2024 and were actually completed between 15 Nov 2024 (12:22) and 21 Nov 2024 (10:45). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 21:24.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Harlington Road East

Cadent Gas are carrying out Utility repair and maintenance works on Harlington Road East, Feltham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 10:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:32.

London Borough Of Hillingdon logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Follow
Lavender Rise

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Nov 2024 at 08:35.

London Borough Of Hillingdon logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Follow
Lavender Rise

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 15 Nov 2024 at 08:20.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hawks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hawks Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:41.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hawks Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Hawks Road, Kingston Upon Thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:08.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cambridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:42.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cambridge Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Cambridge Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:30 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 09:49.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Tudor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Tudor Road, Hampton.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:02 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:35.

Thames Water logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Windsor Road

Thames Water are carrying out Utility repair and maintenance works on Windsor Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:48 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:54.

Thames Water logo
Finishing
Today
Details
View Map
Share
Crane Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:06.

London Borough Of Hounslow logo
Finishing
Tuesday
Details
View Map
Share
Follow
Spinney Drive

London Borough Of Hounslow are proposing to carry out Section 50 on Spinney Drive, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 18 Nov 2024 at 12:52.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dynevor Road

UK Power Networks South Eastern are proposing to carry out New service connection on Dynevor Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Aug 2024 at 14:26.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:34.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Great West Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:05.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 14:07.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 Aug 2024 at 08:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Hunt Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Hunt Road, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:57.

Affinity Water logo
Monday
Details
View Map
Share
Gordon Road

Affinity Water carried out Utility repair and maintenance works on Gordon Road, Shepperton.

The road was closed for some or all of the period.

The works were originally planned between 19 Nov 2024 and 25 Nov 2024 and were actually completed between 19 Nov 2024 (09:54) and 21 Nov 2024 (11:15). The works impacted the footway and carriageway.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 11:34.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Hanworth Road

Cadent Gas are carrying out Utility repair and maintenance works on Hanworth Road, Whitton.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 11:07 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:48.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Red Lion Street

Thames Water are proposing to carry out Remedial works on Red Lion Street, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:28.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Central Way

Cadent Gas are carrying out Utility repair and maintenance works on Central Way, Feltham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 11:16 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:32.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Vicarage Farm Road

Thames Water are carrying out Utility repair and maintenance works on Vicarage Farm Road, Hounslow.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 09:37 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:17.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:20.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:49.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:19.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:37.

Thames Water logo
Between
20 Nov and 10 Dec 2024
Details
View Map
Share
Sandy Lane

Thames Water carried out Utility repair and maintenance works on Sandy Lane, Teddington.

Two-way signals were in place for some or all of the period.

The works were originally planned between 20 Nov 2024 and 10 Dec 2024 and were actually completed between 20 Nov 2024 (10:30) and 21 Nov 2024 (04:56). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:44.

Cadent Gas logo
Between
21 and 29 Nov 2024
Details
View Map
Share
Service Road Fronting 95 To 111 Staines Road East

Cadent Gas carried out Utility repair and maintenance works on Service Road Fronting 95 To 111 Staines Road East, Sunbury On Thames.

The road was closed for some or all of the period.

The works were originally planned between 21 Nov 2024 and 29 Nov 2024 and were actually completed on 21 Nov 2024 between 09:05 and 15:29. The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:34.

Thames Water logo
Today
Details
View Map
Share
Eastbank Road

Thames Water carried out Utility asset works on Eastbank Road, Hampton Hill.

The road was closed for some or all of the period.

The works were completed on 21 November 2024 The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:00.

Scottish Hydro Electric Power Dis logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Mogden Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Mogden Lane, Isleworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 05:52.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:39.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:09.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:13.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Oct 2024 at 15:46.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Oct 2024 at 13:04.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 16:02.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Oct 2024 at 13:09.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:44.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:30.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Epworth Road

Thames Water were proposing to carry out New service connection on Epworth Road, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:56.

Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 09:13.

Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 09:42.

London Borough Of Hillingdon logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinkwell Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pinkwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Swift Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 09:06.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 12:58.

Thames Water logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Hatfield Road

Thames Water are proposing to carry out New service connection on Hatfield Road, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:18.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Crane Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:46.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Crane Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 15:48.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Kingsdown Avenue

Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:55.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 09:07.

Thames Water logo
Between
26 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Kingsdown Avenue

Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:39.

Transport for London (TfL) logo
Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:35.

Transport for London (TfL) logo
Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:38.

National Highways logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Sep 2024 at 08:18.

London Borough Of Hillingdon logo
Between
28 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:41.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:15.

Thames Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Richmond Road

Thames Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 13:16.

Thames Water logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Hampton Road East

Thames Water are proposing to carry out Utility asset works on Hampton Road East, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:40.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Pembroke Place

Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:23.

London Borough Of Hounslow logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Renfrew Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Renfrew Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 12:52.

Thames Water logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

Affinity Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Service Road Fronting 155 To 171 Horton Road

Affinity Water were proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 10:55.

BT logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
York Road

BT are proposing to carry out Utility asset works on York Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Nov 2024 at 12:09.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Hospital Bridge Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 5 Nov 2024 at 15:34.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Hospital Bridge Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Nov 2024 at 13:20.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 15:51.

Thames Water logo
Between
5 and 12 Dec 2024
Details
View Map
Share
Follow
Boston Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Boston Road, Hanwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.

London Borough Of Hillingdon logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:50.

London Borough Of Hounslow logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Browells Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Browells Lane, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Nov 2024 at 10:14.

London Borough Of Hounslow logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Browells Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Browells Lane, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 13 Nov 2024 at 14:34.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Long Lane

Affinity Water were proposing to carry out Utility asset works on Long Lane, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:49.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
London Road

Thames Water were proposing to carry out Utility asset works on London Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 15:19.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:14.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:45.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:21.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:39.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Kew Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:48.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:19.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Mortlake Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:40.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:15.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lower Richmond Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:46.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 15:54.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 15:06.

Cadent Gas logo
LONG TERM
Between
11 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.

Cadent Gas logo
Between
11 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:08.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:14.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Oct 2024 at 15:16.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Oct 2024 at 10:40.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Oct 2024 at 07:42.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
York Road

BT are proposing to carry out Utility asset works on York Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 12:00.

Thames Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Taunton Avenue

Thames Water were proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:41.

Thames Water logo
Between
19 and 22 Dec 2024
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.

Thames Water logo
Between
28 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Rosebank Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rosebank Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 14:14.

National Highways logo
LONG TERM
Between
2 Jan and 29 Mar 2025
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

Southern Gas Networks logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Churchfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchfield Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 08:26.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 07:36.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:17.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Ashford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:15.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
London Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 11:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
London Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:49.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Stanwell New Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:50.

London Borough Of Hounslow logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 15:07.

London Borough Of Hounslow logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 14:37.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Richmond Road

Thames Water are proposing to carry out Utility asset works on Richmond Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:45.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Kneller Road

Cadent Gas are proposing to carry out Utility asset works on Kneller Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 09:04.

UK Power Networks South Eastern logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Pagoda Avenue

UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 13:11.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.

National Highways logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:55.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Lavender Rise

Affinity Water were proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 19 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:17.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:30.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 10:22.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:16.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.

Thames Water logo
Between
7 and 20 Jan 2025
Details
View Map
Share
Follow
Percy Road

Thames Water are proposing to carry out New service connection on Percy Road, Hampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:20.

London Borough Of Hounslow logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Ascot Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Ascot Road, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 29 Oct 2024 at 10:24.

Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lingfield Avenue

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway improvement works on Lingfield Avenue, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 20 Nov 2024 at 11:08.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Eden Street

UK Power Networks South Eastern are proposing to carry out Remedial works on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:10.

UK Power Networks South Eastern logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Lady Booth Road

UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:18.

Cadent Gas logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Follow
Footpath From 89 Latchmere Lane To 206 Tudor Drive

Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:31.

Affinity Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Long Lane

Affinity Water are proposing to carry out Utility asset works on Long Lane, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 08:10.

Affinity Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 07:22.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Staines Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:29.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:18.

Network Rail logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
North Road

Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Nov 2024 at 09:41.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 16:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:03.

Scottish Hydro Electric Power Dis logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
King Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 15:06.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 08:42.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 13:26.

LONG TERM
Between
18 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Eden Street

Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Eden Street, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Aug 2024 at 15:36.

Thames Water logo
Between
18 and 26 Jan 2025
Details
View Map
Share
Follow
Brooklands Close

Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 07:26.

Thames Water logo
Between
18 and 26 Jan 2025
Details
View Map
Share
Follow
Brooklands Close

Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:19.

Thames Water logo
Between
18 and 26 Jan 2025
Details
View Map
Share
Brooklands Close

Thames Water were proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 12:51.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Cherington Road

Thames Water are proposing to carry out New service connection on Cherington Road, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:29.

ESP Electricity logo
LONG TERM
Between
21 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 13:59.

London Borough Of Ealing logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Wharncliffe Drive

London Borough Of Ealing are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 8 Nov 2024 at 13:57.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Bloomfield Road

Thames Water are proposing to carry out New service connection on Bloomfield Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:27.

Cadent Gas logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:21.

Southern Gas Networks logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2024 at 08:24.

Southern Gas Networks logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 14:14.

Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Orchard Road

Royal Borough Of Kingston Upon Thames are proposing to carry out Highway repair and maintenance works on Orchard Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 24 Oct 2024 at 11:04.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hampton Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Nov 2024 at 16:30.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hampton Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Nov 2024 at 15:36.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

Thames Water logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Gibbon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gibbon Road, Kingston Upon Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 13:59.

Southern Gas Networks logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Kingston Upon Thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2024 at 14:50.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pembroke Place

Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:20.

BT logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Walpole Place

BT are proposing to carry out Utility asset works on Walpole Place, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Nov 2024 at 10:14.

Thames Water logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:41.

London Borough Of Ealing logo
Between
15 and 25 Feb 2025
Details
View Map
Share
Follow
York Road

London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 14 Oct 2024 at 11:31.

Surrey County Council logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Portsmouth Road

Surrey County Council were proposing to carry out Highway improvement works on Portsmouth Road, Long Ditton, Surbiton.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 14:51.

Surrey County Council logo
Between
17 and 27 Feb 2025
Details
View Map
Share
Follow
Hampton Court Way

Surrey County Council are proposing to carry out Highway improvement works on Hampton Court Way, East Molesey.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:07.

Surrey County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 09:57.

Surrey County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Park Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Oct 2024 at 08:26.

Cadent Gas logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 12:30.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Carville Crescent

Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:37.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Muncaster Close

Affinity Water are proposing to carry out Utility repair and maintenance works on Muncaster Close, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 07:57.


Roadworks Map near to Corfe Close, HOUNSLOW, TW4 5PX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 21 Nov 2024 21:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Corfe Close, HOUNSLOW, TW4 5PX (32 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
CONWAY ROAD 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.5
Details
Share
Follow
2
Cadent Gas logo
EMERGENCY
  
HANWORTH ROAD 
(0.5 miles)
Cadent Gas
Utility repair and maintenance works - Carriageway - Two-way signals
In Progress
Since: 19 Nov 2024 11:07
(Scheduled: 19 Nov 2024 - 27 Nov 2024)
0.5
Details
Share
Follow
3
BT logo
HANWORTH ROAD 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
0.6
Details
Share
4
BT logo
HANWORTH ROAD 
(0.6 miles)
BT
Utility asset works - Carriageway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 25 Nov 2024
0.6
Details
Share
Follow
5
BT logo
HANWORTH ROAD 
(0.6 miles)
BT
Utility asset works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.6
Details
Share
6
Transport for London (TfL) logo
UXBRIDGE ROAD 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 18 Nov 2024 08:00
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
0.6
Details
Share
Follow
7
Transport for London (TfL) logo
MAJOR
  
UXBRIDGE ROAD 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 14 Oct 2024 - 22 Nov 2024
0.6
Details
Share
Follow
8
Transport for London (TfL) logo
MAJOR
  
UXBRIDGE ROAD 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Oct 2024 - 27 Nov 2024
0.6
Details
Share
Follow
9
Transport for London (TfL) logo
MAJOR
  
UXBRIDGE ROAD 
(0.6 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 14 Oct 2024 - 27 Nov 2024
0.6
Details
Share
Follow
10
BT logo
MEADOW CLOSE 
(0.6 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.6
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data