ROADWORKS SUMMARY
Northumberland Crescent, FELTHAM, TW14 9SW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Northumberland Crescent, TW14 9SW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Northumberland Crescent, FELTHAM, TW14 9SW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Northumberland Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Burtons Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Burtons Road, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Colne Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Colne Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Hartington Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
21 Sep 2025
Details
View Map
Share
Follow
Winchester Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Strathmore Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Strathmore Road, Teddington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Clifden Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Lion Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Copthall Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Staten Gardens

London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.

LONG TERM
Until
28 Sep 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Ripley Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Ripley Road, Hampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
St James's Avenue

London Borough Of Richmond Upon Thames are carrying out roadworks on St James's Avenue, Hampton Hill.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.

LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Egerton Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Elmsleigh Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Elmsleigh Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
First Cross Road

London Borough Of Richmond Upon Thames are carrying out roadworks on First Cross Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:28.

LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
Amyand Park Road

London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Pump Lane

Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.

Surrey County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Elmsleigh Road

Surrey County Council are carrying out Highway improvement works on Elmsleigh Road, Staines-upon-thames.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 10:13.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
31 May and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.

Surrey County Council logo
LONG TERM
Between
1 Jun and 1 Dec 2024
Details
View Map
Share
Follow
Ashford Crescent

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Crescent, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 08:52.

Surrey County Council logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Squires Bridge Road

Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 17 Jun 2024 at 07:34.

Surrey County Council logo
LONG TERM
Between
30 Jun 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Dudley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dudley Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Apr 2024 at 06:36.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:19.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:04.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Staines Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:17.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Ashford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 13:26.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Laleham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:45.

Surrey County Council logo
LONG TERM
Between
1 Jul 2024 and 1 Jan 2025
Details
View Map
Share
Follow
South Street

Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 5 Feb 2024 at 12:09.

Transport for London (TfL) logo
LONG TERM
Between
22 Jul 2024 and 22 Jul 2027
Details
View Map
Share
Follow
Stockley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.

London Borough Of Hounslow logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are carrying out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 08:48.

London Borough Of Hounslow logo
LONG TERM
Between
29 Jul and 20 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 19 Jul 2024 at 14:48.

Thames Water logo
LONG TERM
Between
22 Aug 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 14:54.

Thames Water logo
LONG TERM
Between
27 Aug and 22 Dec 2024
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:09.

Thames Water logo
LONG TERM
Between
27 Aug and 22 Dec 2024
Details
View Map
Share
Follow
Upper Sunbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.

Transport for London (TfL) logo
LONG TERM
Between
27 Aug 2024 and 14 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.

London Borough Of Hounslow logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Wellington Road North

London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road North, Hounslow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 30 May 2024 at 13:18.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Cornwall Way

Surrey County Council are proposing to carry out Highway improvement works on Cornwall Way, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Wapshott Road

Surrey County Council are proposing to carry out Highway improvement works on Wapshott Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
Bowes Road

Surrey County Council are proposing to carry out Highway improvement works on Bowes Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.

Surrey County Council logo
LONG TERM
Between
4 Sep and 29 Nov 2024
Details
View Map
Share
Follow
St Pauls Road

Surrey County Council are proposing to carry out Highway improvement works on St Pauls Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.

Transport for London (TfL) logo
LONG TERM
Until
26 Jun 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.

Cadent Gas logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

Cadent Gas are carrying out Utility asset works on Thornbury Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 13:01 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:58.

London Borough Of Hounslow logo
LONG TERM
Between
24 Sep and 3 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 3 December 2024. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2024 at 13:24.

Surrey County Council logo
LONG TERM
Between
1 Oct 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Manygate Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Manygate Lane, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Jul 2024 at 07:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
The Causeway

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on The Causeway, Staines-upon-thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 October 2024 and run through until 16 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Aug 2024 at 11:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
The Causeway

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Causeway, Staines-upon-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Sep 2024 at 11:03.

LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Shacklegate Lane

London Borough Of Richmond Upon Thames are proposing to carry out Highway repair and maintenance works on Shacklegate Lane, Teddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 19 Sep 2024 at 10:27.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Shacklegate Lane

London Borough Of Richmond Upon Thames are carrying out Highway repair and maintenance works on Shacklegate Lane, Teddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:30 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 31 Oct 2024 at 09:25.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Great Chertsey Road, Feltham.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 22:00 and could run through until 14 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 06:46.

Transport for London (TfL) logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Great Chertsey Road, Twickenham, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 22:00 and could run through until 14 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 06:46.

Transport for London (TfL) logo
LONG TERM
Between
14 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 14:47.

Transport for London (TfL) logo
LONG TERM
Between
14 Oct and 27 Nov 2024
Details
View Map
Share
Follow
Uxbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 15:41.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 07:26.

Surrey County Council logo
LONG TERM
Between
21 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are proposing to carry out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 14:34.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Gaston Bridge Road

Surrey County Council are carrying out Highway improvement works on Gaston Bridge Road, Shepperton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 14:55.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:08.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
London Road

Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:09.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
21 Oct 2024 and 25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.

Transport for London (TfL) logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Cole Park Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 06:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 06:47.

Cadent Gas logo
LONG TERM
Between
21 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:20.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Windmill Avenue

Cadent Gas were proposing to carry out Utility asset works on Windmill Avenue, Southall.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 13:30.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 09:55.

ESP Electricity logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

ESP Electricity were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 10:06.

ESP Electricity logo
LONG TERM
Until
17 Dec 2024
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are carrying out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:30 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 22 Oct 2024 at 09:14.

City Of London Telecomms logo
LONG TERM
Between
21 Oct and 16 Dec 2024
Details
View Map
Share
Eastwood Road

City Of London Telecomms were proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:33.

Cadent Gas logo
LONG TERM
Between
21 Oct and 6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are proposing to carry out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 14:16.

Cadent Gas logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
Windmill Lane

Cadent Gas are carrying out Utility asset works on Windmill Lane, Southall.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:24 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 09:42.

London Borough Of Hounslow logo
Finishing
Saturday
Details
View Map
Share
Follow
Spinney Drive

London Borough Of Hounslow are proposing to carry out Section 50 on Spinney Drive, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 16 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 24 Oct 2024 at 10:24.

ESP Electricity logo
Finishing
Tuesday
Details
View Map
Share
Follow
Iron Bridge Road

ESP Electricity are carrying out Utility asset works on Iron Bridge Road, Yiewsley, West Drayton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 10:00 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 5 Nov 2024 at 15:30.

London Borough Of Hounslow logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Ascot Road

London Borough Of Hounslow are carrying out Highway improvement works on Ascot Road, Feltham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 09:15.

London Borough Of Hounslow logo
Finishing
Friday
Details
View Map
Share
Follow
Staines Road

London Borough Of Hounslow are carrying out Highway improvement works on Staines Road, Hounslow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 6 Nov 2024 at 09:00.

London Borough Of Hounslow logo
Finishing
Friday
Details
View Map
Share
Follow
North Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on North Street, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 8 Oct 2024 at 16:45.

Thames Water logo
Until
22 Nov 2024
Details
View Map
Share
Follow
Whitton Road

Thames Water are carrying out Utility repair and maintenance works on Whitton Road, Hounslow.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 30 October 2024 at 11:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:05.

Cadent Gas logo
LONG TERM
Until
3 Dec 2024
Details
View Map
Share
Follow
Worton Road

Cadent Gas are carrying out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 12:24 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:56.

ESP Electricity logo
Between
31 Oct and 21 Nov 2024
Details
View Map
Share
Follow
Mulberry Crescent

ESP Electricity are proposing to carry out Utility asset works on Mulberry Crescent, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Aug 2024 at 08:16.

ESP Electricity logo
Between
31 Oct and 21 Nov 2024
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 21 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Aug 2024 at 08:16.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Spelthorne Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Spelthorne Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 07:01.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Kingston Road

Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:07.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:57.

Surrey County Council logo
LONG TERM
Between
1 Nov 2024 and 1 May 2025
Details
View Map
Share
Follow
Clare Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:42.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Harlington, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:49.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:41.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:52.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fairfield Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:39.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:59.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Church Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Church Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 25 Sep 2024 at 10:21.

London Borough Of Hillingdon logo
Between
1 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Goulds Green

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Goulds Green, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:57.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Kingston Road

Cadent Gas are carrying out Utility repair and maintenance works on Kingston Road, Staines-upon-thames.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 November 2024 at 21:22 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Until
23 Feb 2025
Details
View Map
Share
Follow
Sidney Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Sidney Road, Walton-on-thames.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 08:41.

Cadent Gas logo
LONG TERM
Until
9 Dec 2024
Details
View Map
Share
Follow
Shepperton Road

Cadent Gas are carrying out Utility asset works on Shepperton Road, Shepperton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 15:24 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:00.

Cadent Gas logo
LONG TERM
Between
4 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Shepperton Road

Cadent Gas are proposing to carry out Utility asset works on Shepperton Road, Shepperton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:17.

London Borough Of Hounslow logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are carrying out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 4 Nov 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Staines Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Oct 2024 at 10:50.

National Highways logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

National Highways logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Stockley Road

National Highways are carrying out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 21:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Nov 2024 at 13:54.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.

Cadent Gas logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are proposing to carry out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:34.

Cadent Gas logo
Until
25 Nov 2024
Details
View Map
Share
Follow
Harrow View

Cadent Gas are carrying out Utility asset works on Harrow View, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 17:01 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 08:33.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
School Road

Cadent Gas are carrying out Utility repair and maintenance works on School Road, Ashford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:33 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 10:31.

London Borough Of Hillingdon logo
Between
5 Nov and 5 Dec 2024
Details
View Map
Share
Sipson Way

London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Aug 2024 at 10:27.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ashford Crescent

Surrey County Council are carrying out Highway repair and maintenance works on Ashford Crescent, Ashford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 08:47.

London Borough Of Hillingdon logo
Between
6 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Horton Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Horton Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 6 Aug 2024 at 13:48.

Boldyn Networks logo
LONG TERM
Between
7 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 11 Sep 2024 at 12:39.

London Borough Of Hillingdon logo
Between
7 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Beaconsfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 29 Oct 2024 at 14:59.

Surrey County Council logo
Between
8 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Fairfield Avenue

Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 9 Aug 2024 at 08:10.

Scottish Hydro Electric Power Dis logo
Between
9 Nov and 6 Dec 2024
Details
View Map
Share
Station Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Station Road, West Drayton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 13:55.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Fairview Drive

UK Power Networks South Eastern are proposing to carry out New service connection on Fairview Drive, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 07:50.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Fairview Drive

UK Power Networks South Eastern are carrying out New service connection on Fairview Drive, Shepperton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 15 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Nov 2024 at 10:00.

Cornerstone Telecommunications Infrastructure logo
Finishing
Friday
Details
View Map
Share
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:12.

Thames Water logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Windsor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Windsor Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:16.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dudley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Dudley Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Aug 2024 at 08:32.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:25.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 09:00.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are proposing to carry out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 16:28.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Dawes Avenue

Cadent Gas are carrying out New service connection on Dawes Avenue, Isleworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:58.

Boldyn Networks logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
Causeway

Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 3 Oct 2024 at 15:40.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
St Christophers Close

Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.

These works were categorised as Major.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Eastholme

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Eastholme, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:37.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Eastholme

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Eastholme, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 11:23.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Eastholme

Cadent Gas are carrying out Disconnection or alteration of supply on Eastholme, Hayes.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 17:25 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 17:25.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Dudley Road

Surrey County Council are carrying out Highway repair and maintenance works on Dudley Road, Ashford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 08:00 and could run through until 15 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 12 Nov 2024 at 09:24.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:30.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Worton Gardens

Cadent Gas were proposing to carry out New service connection on Worton Gardens, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:15.

London Borough Of Hillingdon logo
Between
14 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Sipson Way

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:40.

London Borough Of Hillingdon logo
Between
15 and 30 Nov 2024
Details
View Map
Share
Follow
Lavender Rise

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 5 Nov 2024 at 08:35.

Affinity Water logo
Between
17 and 20 Nov 2024
Details
View Map
Share
Follow
Trout Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Trout Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 13 Aug 2024 at 11:24.

Affinity Water logo
Between
17 and 20 Nov 2024
Details
View Map
Share
Follow
Trout Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Trout Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2024 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 10:33.

Thames Water logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Windsor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Windsor Road, Teddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 14:19.

Thames Water logo
Between
18 and 21 Nov 2024
Details
View Map
Share
Crane Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:06.

National Highways logo
LONG TERM
Between
18 Nov 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Moor Lane

National Highways are proposing to carry out Works for road purposes on Moor Lane, Staines-upon-thames.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 12 Nov 2024 at 17:03.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Syon Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Nov 2024 at 15:24.

Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Great West Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 15:12.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 14:07.

London Borough Of Hillingdon logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Sipson Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 21 Aug 2024 at 08:34.

Thames Water logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Tavistock Road, Yiewsley, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:22.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:20.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Cranford Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:49.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:19.

London Borough Of Hounslow logo
Between
19 Nov and 5 Dec 2024
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:37.

Scottish Hydro Electric Power Dis logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Mogden Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Mogden Lane, Isleworth.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 05:52.

Buckinghamshire Council logo
Between
22 and 29 Nov 2024
Details
View Map
Share
Follow
Thorney Mill Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Thorney Mill Road, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Aug 2024 at 13:05.

Southern Gas Networks logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Sidney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sidney Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 14:37.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:09.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:13.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Oct 2024 at 15:46.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 29 Nov 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Oct 2024 at 13:04.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 16:02.

Scottish Hydro Electric Power Dis logo
Between
25 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Oct 2024 at 13:09.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:44.

Thames Water logo
Between
25 and 30 Nov 2024
Details
View Map
Share
Follow
Taunton Avenue

Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:30.

Thames Water logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Epworth Road

Thames Water were proposing to carry out New service connection on Epworth Road, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:56.

London Borough Of Hillingdon logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinkwell Lane

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pinkwell Lane, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 10:00.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Crane Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:46.

Thames Water logo
Between
26 and 29 Nov 2024
Details
View Map
Share
Follow
Crane Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 15:48.

Affinity Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Aug 2024 at 13:12.

Affinity Water logo
Between
26 and 28 Nov 2024
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 09:00.

Transport for London (TfL) logo
Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:35.

Transport for London (TfL) logo
Between
28 and 30 Nov 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:38.

National Highways logo
Between
28 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Sep 2024 at 08:18.

London Borough Of Hillingdon logo
Between
28 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Station Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:41.

Buckinghamshire Council logo
Between
1 and 5 Dec 2024
Details
View Map
Share
Follow
Syke Ings

Buckinghamshire Council are proposing to carry out Highway improvement works on Syke Ings, Iver.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Apr 2024 at 13:49.

Cornerstone Telecommunications Infrastructure logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:15.

Thames Water logo
Between
2 and 17 Dec 2024
Details
View Map
Share
Follow
Hampton Road East

Thames Water are proposing to carry out Utility asset works on Hampton Road East, Feltham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:40.

London Borough Of Hounslow logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Renfrew Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Renfrew Road, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 12:52.

Affinity Water logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Service Road Fronting 155 To 171 Horton Road

Affinity Water were proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 10:55.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Hospital Bridge Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 5 Nov 2024 at 15:34.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Hospital Bridge Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Nov 2024 at 13:20.

London Borough Of Hillingdon logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Fairfield Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 2 Oct 2024 at 08:55.

London Borough Of Hillingdon logo
Between
6 and 20 Dec 2024
Details
View Map
Share
Follow
Central Avenue

London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Chertsey Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:50.

London Borough Of Hounslow logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Browells Lane

London Borough Of Hounslow are proposing to carry out Highway improvement works on Browells Lane, Feltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hounslow on 12 Nov 2024 at 10:14.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Long Lane

Affinity Water were proposing to carry out Utility asset works on Long Lane, Stanwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:49.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
London Road

Thames Water were proposing to carry out Utility asset works on London Road, Twickenham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 15:19.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:14.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
The Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:45.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:21.

Transport for London (TfL) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Twickenham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:39.

Affinity Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Whitethorn Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Whitethorn Avenue, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Sep 2024 at 08:18.

Affinity Water logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Follow
Greenland Crescent

Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 15:54.

Cadent Gas logo
LONG TERM
Between
11 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.

Cadent Gas logo
Between
11 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Worton Road

Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:08.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:14.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Oct 2024 at 15:16.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Oct 2024 at 10:40.

Cornerstone Telecommunications Infrastructure logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Upper Halliford By-pass

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Oct 2024 at 07:42.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 08:06.

Surrey County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Commercial Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2024 at 13:06.

Thames Water logo
Between
17 and 22 Dec 2024
Details
View Map
Share
Taunton Avenue

Thames Water were proposing to carry out New service connection on Taunton Avenue, Hounslow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:41.

Thames Water logo
Between
19 and 22 Dec 2024
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.

National Highways logo
LONG TERM
Between
2 Jan and 29 Mar 2025
Details
View Map
Share
Follow
Stockley Road

National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.

Southern Gas Networks logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Churchfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchfield Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 08:26.

Southern Gas Networks logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Churchfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchfield Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2024 at 14:49.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 07:36.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:17.

Surrey County Council logo
LONG TERM
Between
6 Jan and 13 Jun 2025
Details
View Map
Share
Follow
Staines Road West

Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Ashford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:15.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
Follow
London Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 11:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 30 Mar 2025
Details
View Map
Share
London Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:49.

Scottish Hydro Electric Power Dis logo
Between
6 and 29 Jan 2025
Details
View Map
Share
Stanwell New Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:50.

London Borough Of Hounslow logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 15:07.

London Borough Of Hounslow logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
High Street

London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 14:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Mar 2025
Details
View Map
Share
Follow
Kneller Road

Cadent Gas are proposing to carry out Utility asset works on Kneller Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 09:04.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.

Cadent Gas logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Worton Gardens

Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.

National Highways logo
Between
6 and 18 Jan 2025
Details
View Map
Share
Follow
Southall Lane

National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:55.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hunt Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hunt Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 12:48.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Lavender Rise

Affinity Water were proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 19 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:17.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:30.

Affinity Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Lavender Rise

Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 7 Nov 2024 at 11:39.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Drenon Square

Cadent Gas are proposing to carry out Utility asset works on Drenon Square, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 10:10.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 10:50.

Cadent Gas logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
Follow
West Drayton Road

Cadent Gas are proposing to carry out Utility asset works on West Drayton Road, Uxbridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
New Road

Cadent Gas are proposing to carry out Utility asset works on New Road, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 08:38.

Thames Water logo
Between
7 and 20 Jan 2025
Details
View Map
Share
Follow
Percy Road

Thames Water are proposing to carry out New service connection on Percy Road, Hampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:33.

London Borough Of Hounslow logo
Between
10 and 24 Jan 2025
Details
View Map
Share
Follow
Ascot Road

London Borough Of Hounslow are proposing to carry out Highway improvement works on Ascot Road, Feltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hounslow on 29 Oct 2024 at 10:24.

Affinity Water logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Long Lane

Affinity Water are proposing to carry out Utility asset works on Long Lane, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 08:10.

Affinity Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Stanwell Moor Road

Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 07:22.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Staines Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:29.

Scottish Hydro Electric Power Dis logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Staines Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:32.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Sussex Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 14:15.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 18 Feb 2025
Details
View Map
Share
Church Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Church Road, Hayes.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Oct 2024 at 14:10.

Scottish Hydro Electric Power Dis logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Swift Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Oct 2024 at 11:43.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 08:42.

Surrey County Council logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Staines By-pass

Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 13:26.

Thames Water logo
Between
18 and 26 Jan 2025
Details
View Map
Share
Follow
Brooklands Close

Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:19.

Thames Water logo
Between
18 and 26 Jan 2025
Details
View Map
Share
Follow
Brooklands Close

Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:08.

Southern Gas Networks logo
Between
20 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Esher Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Esher Avenue, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 08:30.

ESP Electricity logo
LONG TERM
Between
21 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Eastwood Road

ESP Electricity are proposing to carry out Utility asset works on Eastwood Road, West Drayton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 10 Oct 2024 at 13:59.

Surrey County Council logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Fairfield Avenue

Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 07:58.

Southern Gas Networks logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jul 2024 at 08:24.

Southern Gas Networks logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Winchester Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 14:14.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hampton Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Nov 2024 at 16:30.

Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Hampton Road

London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Nov 2024 at 15:36.

Cadent Gas logo
LONG TERM
Between
3 Feb and 30 May 2025
Details
View Map
Share
Follow
Central Avenue

Cadent Gas are proposing to carry out Utility asset works on Central Avenue, Hayes.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 14:07.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Green Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Green Lane, Uxbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 30 Oct 2024 at 12:10.

Cadent Gas logo
Between
10 Feb and 3 Mar 2025
Details
View Map
Share
Follow
The Hythe

Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:00.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Pembroke Place

Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:20.

Cadent Gas logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Albert Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Yiewsley, West Drayton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 14:30.

Affinity Water logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Kingsway

Affinity Water are proposing to carry out Utility repair and maintenance works on Kingsway, Hayes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Oct 2024 at 10:17.


Roadworks Map near to Northumberland Crescent, FELTHAM, TW14 9SW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Nov 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Northumberland Crescent, FELTHAM, TW14 9SW (18 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
BETHANY WAYE 
(0.1 miles)
BT
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 14 Nov 2024 - 15 Nov 2024
0.1
Details
Share
Follow
2
Virgin Media logo
BETHANY WAYE 
(0.2 miles)
Virgin Media
Permanent reinstatement - Footway, Verge - No carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 14 Nov 2024
0.2
Details
Share
Follow
3
Affinity Water logo
FAIRHOLME 
(0.3 miles)
Affinity Water
Utility repair and maintenance works - Carriageway - Give and take
Complete
11 Nov 2024 15:19 - 12 Nov 2024 12:10
0.3
Details
Share
4
BT logo
STAINES ROAD 
(0.3 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 12 Nov 2024 - 14 Nov 2024
0.3
Details
Share
Follow
5
BT logo
STAINES ROAD 
(0.4 miles)
BT
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 13 Nov 2024 - 15 Nov 2024)
0.4
Details
Share
6
Virgin Media logo
BEDFONT LANE 
(0.4 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 12 Nov 2024 - 13 Nov 2024
0.4
Details
Share
Follow
7
Affinity Water logo
GREAT SOUTH WEST ROAD 
(0.5 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.5
Details
Share
Follow
8
Affinity Water logo
GREAT SOUTH WEST ROAD 
(0.5 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 13 Nov 2024 - 15 Nov 2024
0.5
Details
Share
Follow
9
London Borough Of Hounslow logo
MAJOR
  
BEDFONT LANE 
(0.7 miles)
London Borough Of Hounslow
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 13 Nov 2024 - 14 Nov 2024
0.7
Details
Share
Follow
10
London Borough Of Hounslow logo
MAJOR
  
SPINNEY DRIVE 
(0.8 miles)
London Borough Of Hounslow
Section 50 - Carriageway - Multi-way signals
Planned
Scheduled: 24 Oct 2024 - 16 Nov 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data