ROADWORKS SUMMARY
FELTHAM, TW13 9AB
Introduction
View current and future planned roadworks and road closures for TW13 9AB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to FELTHAM, TW13 9AB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Burtons Road, Hampton Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Colne Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Hartington Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 07:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.
21 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Winchester Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2020 at 08:00 and could run through until 21 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:53.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Strathmore Road, Teddington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Clifden Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Lion Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:39.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Copthall Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:26.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Staten Gardens, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.
28 Sep 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Station Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 September 2020 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:52.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Ripley Road, Hampton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on St James's Avenue, Hampton Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:24.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Egerton Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:27.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Lower Teddington Road, Kingston Upon Thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:22.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Meadlands Drive, Petersham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:40.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Elmsleigh Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:23.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on First Cross Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:28.
12 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Amyand Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 October 2020 at 08:00 and could run through until 12 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:25.
31 Mar 2025
Transport for London (TfL) are carrying out roadworks on Pump Lane, Hayes.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2023 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 May 2023 at 12:00.
3 Feb and 7 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Parkleys Parade, Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 18 Jan 2024 at 07:35.
6 Dec 2024
Surrey County Council are carrying out Highway improvement works on Elmsleigh Road, Staines-upon-thames.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Mar 2024 at 10:13.
20 May 2024 and 20 May 2026
Surrey County Council are proposing to carry out Highway improvement works on Monument Hill, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:45.
20 May 2024 and 20 May 2026
Surrey County Council are proposing to carry out Highway improvement works on Monument Green, Weybridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 20 May 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 12:44.
31 May and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.
31 May and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 29 Nov 2023 at 08:51.
1 Jun and 1 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Crescent, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 08:52.
17 Jun 2025
Surrey County Council are carrying out Highway improvement works on Squires Bridge Road, Shepperton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 17 Jun 2024 at 07:34.
30 Jun 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Dudley Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 11 Apr 2024 at 06:36.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:19.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:04.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 26 Feb 2024 at 09:17.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Ashford Road, Laleham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 20 Mar 2024 at 13:26.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Laleham Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 7 Feb 2024 at 13:45.
1 Jul 2024 and 1 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on South Street, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 5 Feb 2024 at 12:09.
22 Jul 2024 and 22 Jul 2027
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stockley Road, West Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 22 July 2027. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2024 at 08:56.
20 Dec 2024
London Borough Of Hounslow are carrying out Highway improvement works on Cranford Lane, Hounslow.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 08:48.
29 Jul and 20 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 19 Jul 2024 at 14:48.
22 Aug 2024 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 August 2024 and could run through until 9 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jan 2024 at 14:54.
27 Aug and 22 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 14:09.
27 Aug and 22 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Sunbury Road, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 22 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 12:37.
27 Aug 2024 and 14 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:28.
27 Aug 2024 and 14 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 14 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 12:30.
1 Sep 2024 and 1 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Rydens Road, Walton-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Jun 2024 at 11:31.
1 Sep 2024 and 1 Mar 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Park, Walton-on-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 1 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 10 Jun 2024 at 11:32.
2 Sep 2024 and 28 Mar 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Wellington Road North, Hounslow.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 30 May 2024 at 13:18.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Cornwall Way, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Wapshott Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on Bowes Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:08.
4 Sep and 29 Nov 2024
Surrey County Council are proposing to carry out Highway improvement works on St Pauls Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 25 Jun 2024 at 13:09.
26 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 08:06.
16 Dec 2024
Cadent Gas are carrying out Utility asset works on Thornbury Road, Isleworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 13:01 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:58.
24 Sep and 3 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 3 December 2024. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 3 Sep 2024 at 13:24.
Wednesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Church Street, Walton-on-thames.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 September 2024 at 21:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:08.
1 Oct 2024 and 1 Apr 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Manygate Lane, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 1 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 9 Jul 2024 at 07:40.
London Borough Of Richmond Upon Thames carried out Highway repair and maintenance works on Shacklegate Lane, Teddington.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 14 Oct 2024 and 22 Nov 2024 and were actually completed between 14 Oct 2024 (09:30) and 21 Nov 2024 (15:00). The works impacted the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 21 Nov 2024 at 15:00.
Tomorrow
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 14:47.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, Feltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 27 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 15:41.
21 Oct and 20 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Gaston Bridge Road, Shepperton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 1 Oct 2024 at 14:34.
20 Dec 2024
Surrey County Council are carrying out Highway improvement works on Gaston Bridge Road, Shepperton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Surrey County Council on 4 Nov 2024 at 14:55.
25 Jul 2025
Transport for London (TfL) are carrying out Highway improvement works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:08.
25 Jul 2025
Transport for London (TfL) are carrying out Highway improvement works on London Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 08:09.
25 Jul 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 10:09.
21 Oct 2024 and 25 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 16:21.
25 Jul 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Cole Park Road, Twickenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 06:00 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 06:47.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:20.
21 Oct and 11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Sep 2024 at 07:27.
11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Oct 2024 at 09:15.
19 Dec 2024
London Borough Of Hounslow are carrying out Highway improvement works on Ascot Road, Feltham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 09:15.
Tomorrow
London Borough Of Hounslow are carrying out Highway improvement works on Staines Road, Hounslow.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 13 Nov 2024 at 15:04.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Whitton Road, Hounslow.
There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works started on 30 October 2024 at 11:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:05.
3 Dec 2024
Cadent Gas are carrying out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 31 October 2024 at 12:24 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 12:56.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Spelthorne Lane, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Jul 2024 at 07:01.
1 Nov 2024 and 31 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Kingston Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:07.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:57.
1 Nov 2024 and 1 May 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Clare Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 5 Aug 2024 at 08:59.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:42.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on High Street, Harlington, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 22 Oct 2024 at 08:49.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 2 Aug 2024 at 07:41.
1 Nov and 1 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 1 Aug 2024 at 11:38.
4 Nov 2024 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Walton-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 08:48.
23 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Winchester Road, Walton-on-thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:12.
23 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Sidney Road, Walton-on-thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 08:41.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Shepperton Road, Shepperton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 15:24 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:13.
4 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Shepperton Road, Shepperton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:17.
6 Dec 2024
London Borough Of Hounslow are carrying out Highway improvement works on High Street, Feltham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 4 Nov 2024 at 10:00.
4 Nov and 20 Dec 2024
National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.
5 Nov and 5 Dec 2024
London Borough Of Hillingdon were proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 5 Aug 2024 at 10:27.
7 Nov and 24 Dec 2024
Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Boldyn Networks on 11 Sep 2024 at 12:39.
7 Nov and 6 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Beaconsfield Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 29 Oct 2024 at 14:59.
8 Nov and 6 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 9 Aug 2024 at 08:10.
6 Dec 2024
Surrey County Council are carrying out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 07:00 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 18 Nov 2024 at 09:21.
2 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Walton-on-thames.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 08:49.
11 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Windsor Road, Teddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:16.
Tomorrow
Virgin Media are proposing to carry out Utility asset works on Friars Lane, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Virgin Media on 6 Aug 2024 at 09:37.
11 and 30 Nov 2024
Boldyn Networks are proposing to carry out Utility asset works on Causeway, Feltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Boldyn Networks on 3 Oct 2024 at 15:40.
11 Nov and 6 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on St Christophers Close, Isleworth.
These works were categorised as Major.
The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 08:51.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:11.
Wednesday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Nov 2024 at 16:11.
14 Nov and 13 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Way, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:40.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Green Street, Sunbury On Thames.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 12:22 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:18.
Tomorrow
Cadent Gas are carrying out Utility repair and maintenance works on Harlington Road East, Feltham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 10:00 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:32.
15 and 30 Nov 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 5 Nov 2024 at 08:35.
15 and 30 Nov 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 15 Nov 2024 at 08:20.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Tudor Road, Hampton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:02 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:35.
13 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Windsor Road, Teddington.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:48 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:54.
Today
Thames Water were proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 21 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:06.
Tuesday
London Borough Of Hounslow are proposing to carry out Section 50 on Spinney Drive, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 18 Nov 2024 at 12:52.
Tomorrow
UK Power Networks South Eastern are proposing to carry out New service connection on Dynevor Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 9 Aug 2024 at 14:26.
18 Nov and 2 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:34.
18 Nov and 2 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:05.
18 Nov and 18 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 8 Aug 2024 at 14:07.
18 Nov and 18 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Sipson Road, Sipson, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 21 Aug 2024 at 08:34.
20 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Hunt Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Nov 2024 at 09:57.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hersham Road, Walton-on-thames.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 10:45 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:40.
Affinity Water carried out Utility repair and maintenance works on Gordon Road, Shepperton.
The road was closed for some or all of the period.
The works were originally planned between 19 Nov 2024 and 25 Nov 2024 and were actually completed between 19 Nov 2024 (09:54) and 21 Nov 2024 (11:15). The works impacted the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 11:34.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Hanworth Road, Whitton.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 11:07 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:48.
Today
Thames Water are proposing to carry out Remedial works on Red Lion Street, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 21 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:28.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Central Way, Feltham.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 11:16 and could run through until 27 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 15:32.
Monday
Thames Water are carrying out Utility repair and maintenance works on Vicarage Farm Road, Hounslow.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:37 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:17.
19 Nov and 5 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:20.
19 Nov and 5 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Cranford Lane, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:49.
19 Nov and 5 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 15:19.
19 Nov and 5 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Cranford, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 5 Nov 2024 at 10:37.
20 Nov and 10 Dec 2024
Thames Water carried out Utility repair and maintenance works on Sandy Lane, Teddington.
Two-way signals were in place for some or all of the period.
The works were originally planned between 20 Nov 2024 and 10 Dec 2024 and were actually completed between 20 Nov 2024 (10:30) and 21 Nov 2024 (04:56). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:44.
21 and 29 Nov 2024
Cadent Gas carried out Utility repair and maintenance works on Service Road Fronting 95 To 111 Staines Road East, Sunbury On Thames.
The road was closed for some or all of the period.
The works were originally planned between 21 Nov 2024 and 29 Nov 2024 and were actually completed on 21 Nov 2024 between 09:05 and 15:29. The works impacted the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 15:34.
Thames Water carried out Utility asset works on Eastbank Road, Hampton Hill.
The road was closed for some or all of the period.
The works were completed on 21 November 2024 The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 16:00.
22 Nov and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Mogden Lane, Isleworth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 05:52.
25 and 29 Nov 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:09.
25 and 29 Nov 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:13.
25 and 29 Nov 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 8 Oct 2024 at 15:46.
25 and 29 Nov 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 16 Oct 2024 at 13:04.
25 Nov and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Oct 2024 at 16:02.
25 Nov and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Oct 2024 at 13:09.
25 and 30 Nov 2024
Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:44.
25 and 30 Nov 2024
Thames Water are proposing to carry out New service connection on Taunton Avenue, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:30.
25 and 28 Nov 2024
Thames Water were proposing to carry out New service connection on Epworth Road, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:56.
25 Nov and 13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 09:13.
25 Nov and 13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 09:42.
25 Nov and 20 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Pinkwell Lane, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 10:00.
25 Nov and 20 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Swift Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 09:06.
26 and 29 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 09:46.
26 and 29 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Crane Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 15:48.
28 and 30 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:35.
28 and 30 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:38.
28 Nov and 11 Dec 2024
National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Sep 2024 at 08:18.
28 Nov and 16 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Station Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:41.
2 and 6 Dec 2024
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 30 Aug 2024 at 16:15.
2 and 4 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Richmond Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 13:16.
2 and 17 Dec 2024
Thames Water are proposing to carry out Utility asset works on Hampton Road East, Feltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:40.
2 and 6 Dec 2024
Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:23.
2 and 13 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Renfrew Road, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 12:52.
3 and 5 Dec 2024
Affinity Water were proposing to carry out Remedial works on Service Road Fronting 155 To 171 Horton Road, Stanwell Moor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Affinity Water on 10 Oct 2024 at 10:55.
4 and 6 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 5 Nov 2024 at 15:34.
4 and 6 Dec 2024
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hospital Bridge Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 6 Nov 2024 at 13:20.
6 and 20 Dec 2024
London Borough Of Hillingdon are proposing to carry out Highway repair and maintenance works on Central Avenue, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hillingdon on 9 Aug 2024 at 09:58.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chertsey Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:50.
9 and 14 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Browells Lane, Feltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 12 Nov 2024 at 10:14.
9 and 14 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on Browells Lane, Feltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hounslow on 13 Nov 2024 at 14:34.
9 and 12 Dec 2024
Affinity Water were proposing to carry out Utility asset works on Long Lane, Stanwell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 09:49.
9 and 15 Dec 2024
Thames Water were proposing to carry out Utility asset works on London Road, Twickenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 15:19.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:14.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Avenue, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:45.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:21.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:39.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:48.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 24 Sep 2024 at 15:54.
10 and 12 Dec 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenland Crescent, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Nov 2024 at 15:06.
11 Dec 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:46.
11 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Worton Road, Isleworth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:47.
16 and 20 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 3 Sep 2024 at 11:08.
16 and 20 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 13 Sep 2024 at 08:14.
16 and 20 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 11 Oct 2024 at 15:16.
16 and 20 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 23 Oct 2024 at 10:40.
16 and 20 Dec 2024
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Upper Halliford By-pass, Shepperton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Oct 2024 at 07:42.
16 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Nov 2024 at 07:17.
16 and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Commercial Road, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 08:06.
17 and 22 Dec 2024
Thames Water were proposing to carry out New service connection on Taunton Avenue, Hounslow.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:41.
19 and 22 Dec 2024
Thames Water were proposing to carry out New service connection on Wood Lane, Isleworth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:55.
2 Jan and 29 Mar 2025
National Highways are proposing to carry out Highway improvement works on Stockley Road, West Drayton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 21 Aug 2024 at 07:22.
6 and 26 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Churchfield Road, Walton-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 08:26.
6 Jan and 13 Jun 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 20 Aug 2024 at 07:36.
6 Jan and 13 Jun 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Sunbury On Thames.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:17.
6 Jan and 13 Jun 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Staines Road West, Ashford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 8 Nov 2024 at 08:15.
6 Jan and 30 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 11:14.
6 Jan and 30 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on London Road, Staines-upon-thames.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:49.
6 and 29 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Stanwell New Road, Staines-upon-thames.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:50.
6 and 23 Jan 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 25 Oct 2024 at 15:07.
6 and 23 Jan 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Feltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Hounslow on 8 Nov 2024 at 14:37.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on Richmond Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:45.
6 Jan and 6 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Kneller Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 09:04.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:53.
6 and 8 Jan 2025
Cadent Gas are proposing to carry out New service connection on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:27.
6 and 18 Jan 2025
National Highways are proposing to carry out Works for road purposes on Southall Lane, Heston, Hounslow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 25 Oct 2024 at 12:55.
6 and 19 Jan 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 19 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:17.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 10:30.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 10:22.
6 and 19 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lavender Rise, West Drayton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Nov 2024 at 14:16.
7 and 20 Jan 2025
Thames Water are proposing to carry out New service connection on Percy Road, Hampton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:20.
10 and 24 Jan 2025
London Borough Of Hounslow are proposing to carry out Highway improvement works on Ascot Road, Feltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hounslow on 29 Oct 2024 at 10:24.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out Remedial works on Eden Street, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:10.
13 and 17 Jan 2025
UK Power Networks South Eastern are proposing to carry out Remedial works on Lady Booth Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Sep 2024 at 09:18.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath From 89 Latchmere Lane To 206 Tudor Drive, Kingston Upon Thames.
These works are categorised as Major.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:31.
13 and 16 Jan 2025
Affinity Water are proposing to carry out Utility asset works on Long Lane, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 08:10.
13 Jan and 2 Feb 2025
Affinity Water are proposing to carry out Utility asset works on Stanwell Moor Road, Stanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Oct 2024 at 07:22.
13 and 24 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 11:29.
13 and 24 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Staines Road, Hounslow.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 15:18.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Oct 2024 at 10:51.
13 and 15 Jan 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 16:24.
14 and 16 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 14:03.
14 and 16 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on King Street, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 15:06.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 08:42.
15 and 17 Jan 2025
Surrey County Council are proposing to carry out Works for road purposes on Staines By-pass, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Oct 2024 at 13:26.
18 Jan and 22 Feb 2025
Royal Borough Of Kingston Upon Thames are proposing to carry out roadworks on Eden Street, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kingston Upon Thames on 16 Aug 2024 at 15:36.
18 and 26 Jan 2025
Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 07:26.
18 and 26 Jan 2025
Thames Water are proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:19.
18 and 26 Jan 2025
Thames Water were proposing to carry out Utility asset works on Brooklands Close, Sunbury On Thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 12:51.
27 Jan and 17 Mar 2025
Surrey County Council are proposing to carry out Highway improvement works on Fairfield Avenue, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Surrey County Council on 5 Nov 2024 at 07:58.
3 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jul 2024 at 08:24.
3 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Winchester Road, Walton-on-thames.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 14:14.
3 and 5 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 8 Nov 2024 at 16:30.
3 and 5 Feb 2025
London Borough Of Richmond Upon Thames are proposing to carry out Highway improvement works on Hampton Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 11 Nov 2024 at 15:36.
10 Feb and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:35.
10 Feb and 23 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portmore Park Road, Weybridge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:45.
10 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gibbon Road, Kingston Upon Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Nov 2024 at 11:56.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:16.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Hythe, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:30.
10 and 14 Feb 2025
Thames Water are proposing to carry out New service connection on Pembroke Place, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:20.
12 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Walpole Place, Teddington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 13 Nov 2024 at 10:14.
15 and 22 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:41.
17 and 27 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Hampton Court Way, East Molesey.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 30 Oct 2024 at 15:07.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 16 Oct 2024 at 09:57.
17 and 21 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Park Road, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 25 Oct 2024 at 08:26.
17 and 19 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Worton Gardens, Isleworth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 12:30.
18 and 20 Feb 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Muncaster Close, Ashford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 5 Nov 2024 at 07:57.
18 Feb and 17 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on High Street, Staines-upon-thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 13:53.
Roadworks Map near to FELTHAM, TW13 9AB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to FELTHAM, TW13 9AB (19 Events)
(Scheduled Dates)
(miles)
(Scheduled: 18 Nov 2024 - 6 Dec 2024)
(Scheduled: 4 Nov 2024 - 6 Dec 2024)
(Scheduled: 15 Nov 2024 - 22 Nov 2024)
(Scheduled: 14 Nov 2024 - 22 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data