ROADWORKS SUMMARY
Wendover Road, LONDON, SE9 6PA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wendover Road, SE9 6PA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wendover Road, LONDON, SE9 6PA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wendover Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

LONG TERM
Until
19 Nov 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.

Thames Water logo
LONG TERM
Until
7 Apr 2026
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 1 Dec 2025
Details
View Map
Share
Faraday Avenue

Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.

Transport for London (TfL) logo
LONG TERM
Between
26 Jan 2025 and 28 Jan 2026
Details
View Map
Share
Sidcup By Pass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 08:21.

London Borough Of Southwark logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 February 2025 at 00:00 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Sep 2025 at 10:43.

LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Dock Road

London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.

Network Rail logo
LONG TERM
Between
19 May and 3 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.

Network Rail logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 08:42.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Thames Water logo
LONG TERM
Between
27 Jun and 29 Sep 2025
Details
View Map
Share
Coleman Road

Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are carrying out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 07:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.

LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Wharfside Road

London Borough Of Newham are carrying out Section 50 on Wharfside Road, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 09:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 8 Sep 2025 at 13:32.

Network Rail logo
LONG TERM
Until
29 Aug 2026
Details
View Map
Share
Follow
Springbank Road

Network Rail are carrying out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 July 2025 at 14:00 and could run through until 29 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 1 Sep 2025 at 08:08.

Thames Water logo
LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:10 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 12:54.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Charlton Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:25.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Westmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Edwards Road

Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 17:04.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Prospect Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Church Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
John Wilson Street

Transport for London (TfL) were proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 January 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:30.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 30 Jan 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 16:30.

Royal Borough Of Greenwich logo
LONG TERM
Between
21 Jul and 30 Nov 2025
Details
View Map
Share
Follow
West Parkside

Royal Borough Of Greenwich are proposing to carry out Section 50 on West Parkside, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Greenwich on 11 Aug 2025 at 16:30.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 30 Sep 2025
Details
View Map
Share
Selborne Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:07.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2025 at 00:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Aug 2025 at 17:33.

London Borough Of Southwark logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 08:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.

Thames Water logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Northumberland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 13:16.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Millbrook Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millbrook Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:45.

Southern Gas Networks logo
LONG TERM
Between
30 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 17 Jun 2025 at 16:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2025 at 13:30 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 13:48.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are carrying out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are carrying out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are carrying out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.

Transport for London (TfL) logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are carrying out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:11.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lucas Avenue

Thames Water are carrying out Utility asset works on Lucas Avenue, Upton Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 14:44 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 14:33.

Thames Water logo
LONG TERM
Between
7 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 15:58.

Thames Water logo
LONG TERM
Between
7 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 16:53.

London Borough Of Southwark logo
LONG TERM
Between
8 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 18 Jun 2025 at 13:29.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Ohio Road

Thames Water are carrying out Utility asset works on Ohio Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 August 2025 at 09:55 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:29.

Transport for London (TfL) logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Lakeside Close

Transport for London (TfL) are carrying out Highway repair and maintenance works on Lakeside Close, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 05:00 and could run through until 10 December 2025. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 08:02.

London Borough Of Bromley logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Elmstead Lane

London Borough Of Bromley are carrying out Highway improvement works on Elmstead Lane, Chislehurst.

The works started on 13 August 2025 at 10:58 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 18 Sep 2025 at 16:24.

Thames Water logo
LONG TERM
Between
15 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Braemar Road

Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:42.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jun 2025 at 11:30.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 1 Oct 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 06:04.

Southern Gas Networks logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 10:51.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Tuskar Street

Thames Water were proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Azof Street

Thames Water were proposing to carry out Utility asset works on Azof Street, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Aug 2025 at 05:53.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 15:56.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 13:06.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Okehampton Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:28.

London Borough Of Southwark logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Aug 2025 at 14:13.

London Borough Of Southwark logo
LONG TERM
Between
25 Aug and 10 Oct 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Aug 2025 at 12:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Surrey Quays Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 11:47.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.

Southern Gas Networks logo
Until
25 Sep 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 19:30 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 08:24.

Thames Water logo
LONG TERM
Until
22 Oct 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are carrying out Disconnection or alteration of supply on Coleman Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 12:30 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:51.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 14:29.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

Royal Borough Of Greenwich logo
Finishing
Monday
Details
View Map
Share
Follow
Lewisham Road

Royal Borough Of Greenwich are carrying out Highway improvement works on Lewisham Road, Lewisham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 23:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 16 Sep 2025 at 08:46.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are carrying out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 00:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 12 Sep 2025 at 11:41.

Thames Water logo
LONG TERM
Between
1 Sep 2025 and 31 Jan 2026
Details
View Map
Share
Betterton Drive

Thames Water were proposing to carry out New service connection on Betterton Drive, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:26.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Valentine Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 11:34.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 14:39.

Southern Gas Networks logo
Between
1 and 28 Sep 2025
Details
View Map
Share
Crombie Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crombie Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:20.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Halfway Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 15:24.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Halfway Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 11:53.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Ravensbourne Park Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jun 2025 at 13:55.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 29 Jul 2025 at 09:31.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Aug 2025 at 08:24.

London Borough Of Southwark logo
LONG TERM
Until
28 Oct 2025
Details
View Map
Share
Follow
Peckham Rye

London Borough Of Southwark are carrying out Highway improvement works on Peckham Rye, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Sep 2025 at 08:35.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 11:54.

Southern Gas Networks logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Buckingham Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckingham Avenue, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:06.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 10:24.

London Borough Of Southwark logo
LONG TERM
Between
1 Sep and 6 Oct 2025
Details
View Map
Share
Peckham Rye

London Borough Of Southwark were proposing to carry out Highway improvement works on Peckham Rye, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Jul 2025 at 08:11.

Thames Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 12:08.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:41.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:43.

Transport for London (TfL) logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:40.

Royal Borough Of Greenwich logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Godstow Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 23 Jul 2025 at 12:32.

Royal Borough Of Greenwich logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Godstow Road

Royal Borough Of Greenwich are carrying out Section 50 on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 2 Sep 2025 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 12:19.

Transport for London (TfL) logo
Between
1 and 25 Sep 2025
Details
View Map
Share
Limehouse Link

Transport for London (TfL) were proposing to carry out Utility asset works on Limehouse Link, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 25 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 18 Dec 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 16:30.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Croydon Road

Thames Water are proposing to carry out Utility asset works on Croydon Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 16:27.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Newham Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 15:38.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Royal Docks Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:10.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
North Circular Road

Transport for London (TfL) were proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:05.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 09:42.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Croydon Road

Thames Water were proposing to carry out Utility asset works on Croydon Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 11:17.

Southern Gas Networks logo
Between
2 and 29 Sep 2025
Details
View Map
Share
Follow
Avenue Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 15:11.

Southern Gas Networks logo
Between
2 and 29 Sep 2025
Details
View Map
Share
Follow
Glynde Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glynde Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 15:12.

Southern Gas Networks logo
LONG TERM
Until
15 Dec 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 17:30 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:45.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 15 Dec 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 11:54.

Southern Gas Networks logo
LONG TERM
Between
2 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 11:21.

Southern Gas Networks logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:30 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 10:39.

Southern Gas Networks logo
Between
2 and 29 Sep 2025
Details
View Map
Share
Follow
Pickford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:18.

Southern Gas Networks logo
Between
2 and 29 Sep 2025
Details
View Map
Share
Follow
Pickford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Aug 2025 at 13:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Varcoe Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 09:44.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 12:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 5 Nov 2025
Details
View Map
Share
Bramcote Grove

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:32.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Claridge Way

Thames Water are carrying out Utility repair and maintenance works on Claridge Way, Thamesmead.

The works started on 3 September 2025 at 10:29 and could run through until 22 September 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:53.

Finishing
Tomorrow
Details
View Map
Share
Silvertown Way

London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Silvertown Way, Canning Town, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Jul 2025 at 07:07.

Southern Gas Networks logo
Until
5 Oct 2025
Details
View Map
Share
Follow
Bursdon Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Bursdon Close, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 11:21.

Southern Gas Networks logo
Until
6 Oct 2025
Details
View Map
Share
Follow
Old Farm Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Old Farm Avenue, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 12:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 13:16.

Southern Gas Networks logo
Between
8 Sep and 5 Oct 2025
Details
View Map
Share
Wyncham Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyncham Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 5 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:21.

Southern Gas Networks logo
Between
8 Sep and 5 Oct 2025
Details
View Map
Share
Woodlands Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 5 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:22.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Valliers Wood Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Valliers Wood Road, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 22 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:22.

Transport for London (TfL) logo
Between
8 and 28 Sep 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 27 Oct 2025
Details
View Map
Share
Langton Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Langton Way, Blackheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 15:03.

Thames Tideway Tunnel logo
LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Hapenny Hatch Footpath

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.

Thames Tideway Tunnel logo
LONG TERM
Between
8 Sep and 8 Oct 2025
Details
View Map
Share
Hapenny Hatch Footpath

Thames Tideway Tunnel were proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 8 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Sep 2025 at 07:51.

Southern Gas Networks logo
Between
8 and 29 Sep 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:36.

London Borough Of Southwark logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are carrying out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 11:51 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Sep 2025 at 11:57.

Royal Borough Of Greenwich logo
Finishing
Monday
Details
View Map
Share
Follow
Grand Depot Road

Royal Borough Of Greenwich are proposing to carry out Section 50 on Grand Depot Road, Woolwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 09:18.

LONG TERM
Between
8 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Connaught Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Connaught Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 16 Jun 2025 at 10:51.

Thames Water logo
LONG TERM
Between
9 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 16:26.

Thames Water logo
LONG TERM
Between
9 Sep and 3 Dec 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:14.

Royal Borough Of Greenwich logo
LONG TERM
Between
9 Sep and 14 Nov 2025
Details
View Map
Share
Invermore Place

Royal Borough Of Greenwich were proposing to carry out Section 50 on Invermore Place, Plumstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 11 Sep 2025 at 10:10.

Royal Borough Of Greenwich logo
LONG TERM
Between
9 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Invermore Place

Royal Borough Of Greenwich are proposing to carry out Section 50 on Invermore Place, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Sep 2025 at 09:27.

Royal Borough Of Greenwich logo
Between
9 Sep and 8 Oct 2025
Details
View Map
Share
Tunnel Avenue

Royal Borough Of Greenwich were proposing to carry out Section 50 on Tunnel Avenue, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 8 Sep 2025 at 13:01.

Royal Borough Of Greenwich logo
Between
9 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Tunnel Avenue

Royal Borough Of Greenwich are proposing to carry out Section 50 on Tunnel Avenue, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 06:11.

Royal Borough Of Greenwich logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bentham Road

Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Bentham Road, Thamesmead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 08:45.

Thames Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Lyndon Road

Thames Water are carrying out Utility asset works on Lyndon Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:44.

Finishing
Wednesday
Details
View Map
Share
New Cross Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 10 Jun 2025 at 15:55.

Finishing
Wednesday
Details
View Map
Share
New Cross Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 24 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:33.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Eltham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Eltham Road, Eltham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 20:00 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 10:23.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are carrying out Utility repair and maintenance works on East Dulwich Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 09:00 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 19:29.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Peckham Rye

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2025 at 09:41.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Commercial Road

Cadent Gas are carrying out Utility repair and maintenance works on Commercial Road, London.

The works started on 13 September 2025 at 09:46 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 10:24.

Transport for London (TfL) logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
East Rochester Way

Transport for London (TfL) are carrying out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2025 at 22:00 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 08:57.

London Borough Of Bexley logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Royal Road

London Borough Of Bexley are carrying out Highway improvement works on Royal Road, Sidcup.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 08:20.

Thames Water logo
LONG TERM
Between
15 Sep and 19 Dec 2025
Details
View Map
Share
Bursdon Close

Thames Water were proposing to carry out New service connection on Bursdon Close, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.

Southern Gas Networks logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Hurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:00.

Southern Gas Networks logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Hurstwood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hurstwood Avenue, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:14.

Southern Gas Networks logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Braundton Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Braundton Avenue, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:22.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Halfway Street

Thames Water are carrying out Utility repair and maintenance works on Halfway Street, Sidcup.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 09:40 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:38.

Southern Gas Networks logo
LONG TERM
Until
20 Oct 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 08:10.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Bridgen Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bridgen Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:51.

Southern Gas Networks logo
Between
15 Sep and 6 Oct 2025
Details
View Map
Share
Follow
The Vista

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:18.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Nov 2025
Details
View Map
Share
Follow
Kingsground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:21.

Southern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Jun 2025 at 13:27.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 15 Dec 2025
Details
View Map
Share
Woodlands Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:32.

Thames Water logo
Between
15 Sep and 7 Oct 2025
Details
View Map
Share
Rye Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:54.

Thames Water logo
Until
13 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are carrying out Utility asset works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 11:30 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:42.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Zangwill Road

BT are proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Aug 2025 at 10:23.

BT logo
Finishing
Today
Details
View Map
Share
Follow
Zangwill Road

BT are carrying out Utility asset works on Zangwill Road, Kidbrooke.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:11 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2025 at 10:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 9 Jan 2026
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 9 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 15:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
5 Dec 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 10:11.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 11:32.

Southern Gas Networks logo
Until
12 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:00 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
15 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 15:49.

Southern Gas Networks logo
Between
15 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 16:44.

Southern Gas Networks logo
Until
12 Oct 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:00 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 13:26.

London Borough Of Bexley logo
Finishing
Tomorrow
Details
View Map
Share
Eastern Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Eastern Way, Thamesmead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:46.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Maddams Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maddams Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Aug 2025 at 08:55.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Sep 2025 at 13:08.

Thames Water logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Garfield Road

Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 10:46.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Jul 2025 at 15:06.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 10:52.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:58.

LONG TERM
Between
15 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Devons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Devons Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Jul 2025 at 11:57.

Southern Gas Networks logo
Between
16 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Westmoreland Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 16:41.

Thames Water logo
Between
16 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Foxes Dale

Thames Water are proposing to carry out Disconnection or alteration of supply on Foxes Dale, Blackheath.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:35.

UK Power Networks Eastern & London logo
Between
16 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:16.

UK Power Networks Eastern & London logo
Between
16 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 06:55.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Azof Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Azof Street, Greenwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 14:30 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 17:08.

UK Power Networks Eastern & London logo
Finishing
Tuesday
Details
View Map
Share
Follow
Eynsford Crescent

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Eynsford Crescent, Bexley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 14:40 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 15:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Nithdale Road

Thames Water are carrying out Utility repair and maintenance works on Nithdale Road, Plumstead.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 10:54 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:34.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Godstow Road

Thames Water are carrying out New service connection on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:25 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:25.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Godstow Road

Thames Water are proposing to carry out New service connection on Godstow Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 13:47.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Selsdon Road

Thames Water are carrying out Utility repair and maintenance works on Selsdon Road, Upton Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 09:59 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:22.

Royal Borough Of Greenwich logo
Between
19 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Nathan Way

Royal Borough Of Greenwich are proposing to carry out Section 50 on Nathan Way, Thamesmead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 5 Sep 2025 at 14:36.

Southern Gas Networks logo
LONG TERM
Between
22 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Valentine Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 15:57.

Southern Gas Networks logo
Between
22 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Oakley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 16:43.

Southern Gas Networks logo
Between
22 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Oakley Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:07.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Queenscroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Blackfen Road

Thames Water are proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 13:47.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Blackfen Road

Thames Water were proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 13:14.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Upton Road

Thames Water were proposing to carry out Utility repair and maintenance works on Upton Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 14:01.

Thames Water logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Upton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Upton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 14:38.

Southern Gas Networks logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 13:19.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Abbotts Walk

London Borough Of Bexley are proposing to carry out Highway improvement works on Abbotts Walk, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:30.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Abbotts Walk

London Borough Of Bexley are proposing to carry out Highway improvement works on Abbotts Walk, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:37.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Powys Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:32.

London Borough Of Bexley logo
Finishing
Wednesday
Details
View Map
Share
Follow
Powys Close

London Borough Of Bexley are proposing to carry out Highway improvement works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:37.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:42.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 16:08.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2025 at 14:46.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Barnfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:57.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 15:48.

Southern Gas Networks logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Nuxley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.

Royal Borough Of Greenwich logo
Between
22 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Blackwall Lane

Royal Borough Of Greenwich are proposing to carry out Section 50 on Blackwall Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 16:30.

LONG TERM
Between
22 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Glenaffric Avenue

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 8 Sep 2025 at 09:48.

Royal Borough Of Greenwich logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Invermore Place

Royal Borough Of Greenwich were proposing to carry out Section 50 on Invermore Place, Plumstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 16:49.

Royal Borough Of Greenwich logo
LONG TERM
Between
22 Sep and 31 Oct 2025
Details
View Map
Share
Plumstead Road

Royal Borough Of Greenwich were proposing to carry out Section 50 on Plumstead Road, Woolwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 15:56.

Thames Water logo
LONG TERM
Between
22 Sep 2025 and 31 Oct 2026
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:01.

Royal Borough Of Greenwich logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Follow
Grovebury Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Grovebury Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 09:21.

ESP Electricity logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Manilla Street

ESP Electricity are proposing to carry out Utility asset works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Sep 2025 at 11:02.

UK Power Networks Eastern & London logo
Between
22 Sep and 15 Oct 2025
Details
View Map
Share
Follow
West India Dock Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on West India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 10:34.

Cornerstone Telecommunications Infrastructure logo
Between
22 and 27 Sep 2025
Details
View Map
Share
Strait Road

Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 27 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 10:35.

Transport for London (TfL) logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 14:45.

Thames Water logo
LONG TERM
Between
22 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 22 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 13:34.

Telefonica UK logo
Between
22 Sep and 18 Oct 2025
Details
View Map
Share
River Road

Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 18 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.

Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 10:02.

Thames Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Beaumont Road

Thames Water are proposing to carry out New service connection on Beaumont Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 12:55.

Thames Water logo
Between
22 and 27 Sep 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 14:52.

Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Tollgate Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 9 Jun 2025 at 10:04.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Jun 2025 at 09:17.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jun 2025 at 13:39.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 07:45.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Aug 2025 at 10:39.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 12:06.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Sep 2025 at 10:03.

BT logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Baring Road

BT are proposing to carry out Utility asset works on Baring Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Sep 2025 at 11:07.

Thames Water logo
Between
23 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Kidbrooke Park Road

Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Aug 2025 at 08:50.

Thames Water logo
Between
23 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Kidbrooke Park Road

Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 09:34.

Transport for London (TfL) logo
Between
23 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 15:02.

Southern Gas Networks logo
Between
24 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 15:27.

London Borough Of Bexley logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Alsike Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 May 2025 at 16:03.

London Borough Of Bexley logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Alsike Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 08:16.

Royal Borough Of Greenwich logo
Between
24 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Woolwich High Street

Royal Borough Of Greenwich are proposing to carry out Section 50 on Woolwich High Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Greenwich on 18 Sep 2025 at 10:23.

Southern Gas Networks logo
Between
25 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Harold Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 15:40.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Westmoreland Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Westmoreland Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Westmoreland Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westmoreland Road, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Masons Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Masons Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Masons Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Masons Hill, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 13:23.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 08:36.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Bromley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2025 at 08:27.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:39.

Southern Gas Networks logo
Between
29 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Cuff Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:44.

Southern Gas Networks logo
Between
29 Sep and 20 Oct 2025
Details
View Map
Share
Follow
The Vista

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:19.

Southern Gas Networks logo
Between
29 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Ravensbourne Park Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park Crescent, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Jul 2025 at 16:02.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Broadway

Thames Water are proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:17.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Blackthorn Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 13:16.

Southern Gas Networks logo
Between
29 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Blackthorn Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 12:17.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Elsa Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 10:24.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Avondale Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:15.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Ivedon Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Ivedon Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:11.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Hazeldene Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Hazeldene Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:09.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Kenmere Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Kenmere Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:03.

London Borough Of Bexley logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Teignmouth Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Teignmouth Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:07.

Royal Borough Of Greenwich logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 30 Jun 2025 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Charlton Church Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Gallions Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:34.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Gallon Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:46.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Charlton Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:08.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Penhall Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Rotherhithe New Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:14.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 11:28.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 07:03.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Jul 2025 at 12:33.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 09:04.

UK Power Networks Eastern & London logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 11:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Westmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.

UK Power Networks Eastern & London logo
Between
29 Sep and 12 Oct 2025
Details
View Map
Share
Raymouth Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Eastmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Eastmoor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:14.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Cleveley Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:17.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Cleveley Close

Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Prospect Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Pett Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Pett Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Tamar Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:23.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Tamar Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Frances Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:43.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Kingsman Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 29 March 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Kingsman Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Kingsman Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Warspite Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Ruston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Boneta Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 31 July 2027. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Boneta Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Boneta Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 14:09.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Leda Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:05.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Leda Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Church Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:04.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:11.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
John Wilson Street

Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:18.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Southwark Park Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Woolwich High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Woolwich Ferry Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Ferry Roundabout, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Glass Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 13:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Glass Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 14:07.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 31 Jul 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:49.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep 2025 and 29 Mar 2027
Details
View Map
Share
Follow
Ferry Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:19.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 16:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 09:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 16:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Poolmans Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Poolmans Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Poolmans Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 10:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 15:15.

Transport for London (TfL) logo
Between
29 Sep and 22 Oct 2025
Details
View Map
Share
Limehouse Link

Transport for London (TfL) were proposing to carry out Utility asset works on Limehouse Link, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 22 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:12.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out New service connection on Rathbone Street, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:11.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Tant Avenue

Thames Water are proposing to carry out New service connection on Tant Avenue, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 16:06.

Thames Water logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:34.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Brooks Avenue

London Borough Of Newham are proposing to carry out Highway improvement works on Brooks Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jul 2025 at 11:37.

Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Brooks Road

London Borough Of Newham were proposing to carry out Highway improvement works on Brooks Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 2 Jul 2025 at 11:29.

Cadent Gas logo
Between
29 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:45.

Cadent Gas logo
Between
29 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:46.

Transport for London (TfL) logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Alfreds Way

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 12:32.

Southern Gas Networks logo
Between
30 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Sheridan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 14:27.

Southern Gas Networks logo
Between
30 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Blackthorn Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 15:49.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct and 11 Dec 2025
Details
View Map
Share
Follow
Rushey Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Rushey Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 15:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct and 11 Dec 2025
Details
View Map
Share
Follow
Rushey Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Rushey Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2025 at 12:06.

Thames Water logo
Between
1 and 21 Oct 2025
Details
View Map
Share
Follow
Brookway

Thames Water are proposing to carry out Disconnection or alteration of supply on Brookway, Blackheath.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:52.

Royal Borough Of Greenwich logo
LONG TERM
Between
1 Oct 2025 and 31 Jul 2026
Details
View Map
Share
Tunnel Avenue

Royal Borough Of Greenwich were proposing to carry out Section 50 on Tunnel Avenue, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 31 July 2026. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Royal Borough Of Greenwich on 15 Sep 2025 at 10:15.

Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Tarling Road

London Borough Of Newham are proposing to carry out Highway improvement works on Tarling Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 10 Jul 2025 at 09:34.

Southern Gas Networks logo
LONG TERM
Between
2 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Prince Imperial Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prince Imperial Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 16:09.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Aug 2025 at 10:13.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Springbank Road

Network Rail were proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2025 and run through until 1 October 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 08:44.

Network Rail logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:18.

Network Rail logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Sep 2025 at 12:20.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 10:24.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 13:31.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:43.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:54.

Network Rail logo
LONG TERM
Between
3 Oct 2025 and 1 Oct 2026
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 5 Sep 2025 at 15:08.

Thames Water logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.

Network Rail logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
St Mildreds Road

Network Rail are proposing to carry out Works for Rail Purposes on St Mildreds Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Jun 2025 at 11:09.

Southern Gas Networks logo
Between
6 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Danson Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 12:27.

Southern Gas Networks logo
Between
6 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Donaldson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Donaldson Road, Plumstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:18.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 1 Dec 2025
Details
View Map
Share
Follow
Ankerdine Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 09:15.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Moordown

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Moordown, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:20.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Ankerdine Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 16:50.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:21.

Southern Gas Networks logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:22.

London Borough Of Lewisham logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 15 Sep 2025 at 10:46.

London Borough Of Lewisham logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 15 Sep 2025 at 11:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2025 at 14:00.

UK Power Networks Eastern & London logo
Between
6 and 27 Oct 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2025 at 12:10.

Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:50.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 8 Feb 2026
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works will start on or after 6 October 2025 and could run through until 8 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 15:19.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:34.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 19:53.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Jul 2025 at 16:12.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 12:05.

Cadent Gas logo
LONG TERM
Between
6 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Newham Way

Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:27.

Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Wharfside Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wharfside Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jul 2025 at 09:39.

Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Wharfside Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wharfside Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 09:33.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 16:30.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Wakefield Street

London Borough Of Newham are proposing to carry out Highway improvement works on Wakefield Street, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 18 Sep 2025 at 08:14.

Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Wakefield Street

London Borough Of Newham are proposing to carry out Highway improvement works on Wakefield Street, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 17 Sep 2025 at 14:14.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 11:40.

London Borough Of Lewisham logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 09:40.

London Borough Of Lewisham logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Jerningham Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:24.

London Borough Of Wandsworth logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Jerningham Road

London Borough Of Wandsworth were proposing to carry out Highway improvement works on Jerningham Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 October 2025 and run through until 11 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 11 Jun 2025 at 15:01.

BT logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Trafalgar Road

BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 29 Jul 2025 at 07:31.

BT logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Trafalgar Road

BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by BT on 4 Aug 2025 at 12:36.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 09:14.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 11:45.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 12:11.

Network Rail logo
Between
11 and 13 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 13:30.

Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Sydenham Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Sydenham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jul 2025 at 09:29.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Imperial Way

Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 08:38.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Imperial Way

Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Old Farm Road West

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Road West, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:33.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:46.

Southern Gas Networks logo
Between
13 and 27 Oct 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 12:56.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:49.

Southern Gas Networks logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:47.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Blenheim Drive

Thames Water are proposing to carry out New service connection on Blenheim Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 18:49.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:57.

Thames Water logo
Between
13 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Lausanne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 11:15.

BT logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Zangwill Road

BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 13 Aug 2025 at 10:17.

Between
13 Oct and 4 Nov 2025
Details
View Map
Share
Glenaffric Avenue

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 12:29.

LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Glenaffric Avenue

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 07:56.

BT logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
The Gardens

BT are proposing to carry out Utility asset works on The Gardens, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2025 at 09:06.

BT logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
The Gardens

BT are proposing to carry out Utility asset works on The Gardens, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2025 at 08:35.

Between
14 and 27 Oct 2025
Details
View Map
Share
Billington Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Billington Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 27 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 6 Aug 2025 at 10:32.

Thames Water logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Store Road

Thames Water were proposing to carry out roadworks on Store Road, North Woolwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:39.

London Borough Of Bexley logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Manor Way

London Borough Of Bexley are proposing to carry out Highway improvement works on Manor Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 12:32.

London Borough Of Bexley logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Hurst Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 09:45.

London Borough Of Bexley logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Denton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Denton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:16.

Thames Water logo
Between
17 and 21 Oct 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 08:28.

London Borough Of Bromley logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Oakwood Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Oakwood Avenue, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 8 Sep 2025 at 13:35.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Blakeney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 08:31.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 23 Nov 2025
Details
View Map
Share
Follow
Blakeney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2025 at 16:04.

Southern Gas Networks logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Prince Imperial Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Prince Imperial Road, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 12:48.

London Borough Of Lewisham logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 10:48.

Southern Gas Networks logo
Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Old Farm Road East

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Road East, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:09.

Southern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 15:12.

Southern Gas Networks logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Ravensbourne Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensbourne Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 15:12.

Transport for London (TfL) logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Southwold Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southwold Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 12:16.

Transport for London (TfL) logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Southwold Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Southwold Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2025 at 12:46.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Eltham Palace Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.

London Borough Of Lewisham logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 3 Sep 2025 at 12:12.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Dallin Road

Thames Water are proposing to carry out roadworks on Dallin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 11:50.

London Borough Of Southwark logo
Between
20 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Maxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Maxted Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Jul 2025 at 09:44.

Royal Borough Of Greenwich logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 5 Jun 2025 at 13:47.

Royal Borough Of Greenwich logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 10:11.

Thames Tideway Tunnel logo
Between
20 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Canberra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:10.

Southern Gas Networks logo
Between
20 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Marlborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:09.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Mascalls Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:56.

Southern Gas Networks logo
Between
20 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Charlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Varcoe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Varcoe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Oct and 19 Dec 2025
Details
View Map
Share
Follow
Bramcote Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Bramcote Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:32.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Caradoc Street

Thames Water are proposing to carry out Utility repair and maintenance works on Caradoc Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:10.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Ferry Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Ferry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:49.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Westferry Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Westferry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 31 Jul 2025 at 12:18.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Manchester Road

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Manchester Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 08:05.

Between
20 Oct and 4 Nov 2025
Details
View Map
Share
Follow
East Ferry Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on East Ferry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:51.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 16:14.

UK Power Networks Eastern & London logo
Between
20 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Limehouse Link

Transport for London (TfL) are proposing to carry out Utility asset works on Limehouse Link, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Jul 2025 at 15:11.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:47.

Between
21 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Jul 2025 at 07:10.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Follow
Bestwood Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Bestwood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:52.

London Borough Of Lewisham logo
Between
21 and 23 Oct 2025
Details
View Map
Share
Bestwood Street

London Borough Of Lewisham were proposing to carry out Highway improvement works on Bestwood Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:32.

London Borough Of Bromley logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Edgebury

London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 8 Sep 2025 at 13:51.

London Borough Of Bexley logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Carisbrooke Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Carisbrooke Avenue, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 09:31.

Thames Water logo
Between
22 and 24 Oct 2025
Details
View Map
Share
Follow
Okehampton Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 11:47.

Thames Water logo
Between
22 and 28 Oct 2025
Details
View Map
Share
Follow
Whitworth Street

Thames Water are proposing to carry out Utility repair and maintenance works on Whitworth Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:09.

Thames Water logo
LONG TERM
Between
22 Oct and 3 Dec 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:58.

London Borough Of Lewisham logo
Between
23 and 27 Oct 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 10:48.

London Borough Of Lewisham logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Chinbrook Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:42.

Southern Gas Networks logo
LONG TERM
Between
24 Oct 2025 and 23 Jan 2026
Details
View Map
Share
Cuff Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 23 January 2026. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.

Southern Gas Networks logo
LONG TERM
Between
24 Oct and 24 Nov 2025
Details
View Map
Share
Kingsground

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.

Southern Gas Networks logo
Between
24 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Salmon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 14:04.

Southern Gas Networks logo
Between
24 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Salmon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 11:56.

Network Rail logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:23.

Network Rail logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2025 at 10:01.

Network Rail logo
Between
25 and 27 Oct 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Sep 2025 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
25 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:27.

Southern Gas Networks logo
Between
25 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Harlington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harlington Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:46.

Telefonica UK logo
Between
25 Oct and 12 Nov 2025
Details
View Map
Share
River Road

Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.

London Borough Of Lewisham logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:47.

London Borough Of Lewisham logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 15:33.

Thames Water logo
LONG TERM
Between
27 Oct and 19 Dec 2025
Details
View Map
Share
Riverside Road

Thames Water were proposing to carry out New service connection on Riverside Road, Sidcup.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:25.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Brendon Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Brendon Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:50.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Ermington Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Ermington Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:51.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Agaton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Agaton Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:41.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Dulverton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Dulverton Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:36.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Bladindon Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Bladindon Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2025 at 13:38.

London Borough Of Bexley logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Bladindon Drive

London Borough Of Bexley were proposing to carry out Highway improvement works on Bladindon Drive, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Apr 2025 at 14:20.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Brockley Park

Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 12:14.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Brockley Park

Thames Water are proposing to carry out Utility repair and maintenance works on Brockley Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 14:41.

Southern Gas Networks logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
The Vista

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:19.

Thames Water logo
LONG TERM
Between
27 Oct 2025 and 2 Mar 2026
Details
View Map
Share
Follow
Rochester Drive

Thames Water are proposing to carry out Utility asset works on Rochester Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 2 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:36.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 22 Dec 2025
Details
View Map
Share
Follow
Kingsground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:04.

Southern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Queenscroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:25.

Southern Gas Networks logo
Between
27 Oct and 7 Nov 2025
Details
View Map
Share
Queenscroft Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Crook Log

Thames Water were proposing to carry out Utility repair and maintenance works on Crook Log, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 16:24.

Southern Gas Networks logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Sheridan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:45.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 15 Dec 2025
Details
View Map
Share
Welling Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 08:46.

Southern Gas Networks logo
LONG TERM
Between
27 Oct and 15 Dec 2025
Details
View Map
Share
Follow
Welling Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:59.

Southern Gas Networks logo
Between
27 Oct and 17 Nov 2025
Details
View Map
Share
Harlington Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Harlington Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 14:30.

Between
27 Oct and 11 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 4 Aug 2025 at 11:38.

Southern Gas Networks logo
Between
27 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Old Dover Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Dover Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 07:49.

Royal Borough Of Greenwich logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Timbercroft Lane

Royal Borough Of Greenwich were proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Jun 2025 at 11:43.

Royal Borough Of Greenwich logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Timbercroft Lane

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Jun 2025 at 11:46.

Between
27 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Manchester Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:47.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Manchester Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 10:51.

Thames Water logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Masons Hill

Thames Water are proposing to carry out New service connection on Masons Hill, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 17:59.

Virgin Media logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Woodland Terrace

Virgin Media are proposing to carry out Utility asset works on Woodland Terrace, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Aug 2025 at 05:48.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Glenaffric Avenue

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:45.

London Borough Of Southwark logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Cope Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Cope Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Jul 2025 at 16:42.

Thames Water logo
Between
27 and 30 Oct 2025
Details
View Map
Share
Follow
Factory Road

Thames Water are proposing to carry out Utility repair and maintenance works on Factory Road, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 09:19.

Transport for London (TfL) logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Albert Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Albert Road, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:20.

Transport for London (TfL) logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Manor Way, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 10:44.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:47.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.

Cadent Gas logo
Between
27 Oct and 9 Nov 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Tree Road

Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 15:32.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Tree Road

Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:12.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Stokes Road

Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:22.

Thames Water logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Howards Road

Thames Water are proposing to carry out New service connection on Howards Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:45.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:42.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Pepys Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:45.

Between
28 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Pepys Road

INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 5 Aug 2025 at 14:52.

London Borough Of Lewisham logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Chinbrook Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:23.

BT logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bournville Road

BT are proposing to carry out Utility asset works on Bournville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jul 2025 at 14:51.

BT logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Bournville Road

BT are proposing to carry out Utility asset works on Bournville Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2025 at 10:21.

Thames Water logo
Between
29 Oct and 2 Nov 2025
Details
View Map
Share
Church Road

Thames Water were proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 11:15.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Jun 2025 at 19:24.

London Borough Of Southwark logo
LONG TERM
Between
29 Oct 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 26 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Jun 2025 at 08:24.

Thames Water logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Reynard Close

Thames Water are proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 12:41.

London Borough Of Lewisham logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 15:32.

London Borough Of Lewisham logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Whitefoot Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Whitefoot Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 16 Jun 2025 at 14:50.

London Borough Of Bexley logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Porthkerry Avenue

London Borough Of Bexley were proposing to carry out Highway improvement works on Porthkerry Avenue, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 14 Jul 2025 at 07:49.

London Borough Of Bexley logo
Between
30 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Porthkerry Avenue

London Borough Of Bexley are proposing to carry out Highway improvement works on Porthkerry Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 11 Aug 2025 at 09:44.

Thames Water logo
LONG TERM
Between
31 Oct and 18 Dec 2025
Details
View Map
Share
Follow
Churston Avenue

Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:26.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Columbia Road

Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:35.

Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Glen Road

London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 16 Jun 2025 at 10:52.

Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Glen Road

London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Jul 2025 at 13:29.

Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Glen Road

London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 17 Sep 2025 at 12:22.

Between
3 and 27 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Aug 2025 at 11:58.

Between
3 and 27 Nov 2025
Details
View Map
Share
Follow
Bell Green

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Aug 2025 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Halfway Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:11.

Thames Water logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 14:44.

Thames Water logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:35.

Southern Gas Networks logo
Between
3 Nov and 1 Dec 2025
Details
View Map
Share
Cuff Crescent

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:34.

Thames Water logo
LONG TERM
Between
3 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
South View Close

Thames Water are proposing to carry out Utility asset works on South View Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:07.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Queenscroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:08.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Stratton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratton Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:46.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Glengall Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glengall Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:47.

Southern Gas Networks logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Chestnut Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 15:29.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Falconwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 15:30.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Blenheim Drive

Thames Water were proposing to carry out New service connection on Blenheim Drive, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:45.

UK Power Networks Eastern & London logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 13:08.

UK Power Networks Eastern & London logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Follow
Lindsell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 14:24.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:08.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:38.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:09.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.

Southern Gas Networks logo
LONG TERM
Between
3 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Osborne Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:23.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Ha Ha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:57.

London Borough Of Lewisham logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
Grinstead Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grinstead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 17 Sep 2025 at 10:37.

Southern Gas Networks logo
Between
3 and 17 Nov 2025
Details
View Map
Share
Follow
Charlton Church Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Church Lane, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 07:49.

Virgin Media logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Maryon Road

Virgin Media were proposing to carry out Utility asset works on Maryon Road, Charlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 5 Aug 2025 at 10:49.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Old Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

London Borough Of Southwark logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Rotherhithe Old Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Rotherhithe Old Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2025 at 07:59.

London Borough Of Southwark logo
Between
3 and 26 Nov 2025
Details
View Map
Share
Cope Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Cope Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 26 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Sep 2025 at 09:34.

London Borough Of Lewisham logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Grove Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:40.

London Borough Of Lewisham logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Grove Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Grove Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:10.

Transport for London (TfL) logo
LONG TERM
Between
3 Nov 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Powis Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
3 Nov 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Glass Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 10:18.

ESP Electricity logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
Manilla Street

ESP Electricity are proposing to carry out Utility asset works on Manilla Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 16 Sep 2025 at 12:45.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:09.

Southern Gas Networks logo
LONG TERM
Between
4 Nov 2025 and 5 Feb 2026
Details
View Map
Share
Halfway Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 5 February 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:20.

London Borough Of Bexley logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Follow
Crescent Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Crescent Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:59.

London Borough Of Bexley logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Station Road, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:30.

Thames Water logo
Between
6 and 14 Nov 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:57.

Southern Gas Networks logo
LONG TERM
Between
7 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:36.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Boxley Street

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Boxley Street, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Victoria Dock Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:59.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Radland Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Forty Acre Lane

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 22 Aug 2025 at 11:41.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Brooks Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Brooks Avenue, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:28.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Barking Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Barking Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:29.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Kimberley Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Kimberley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:19.

Between
7 and 28 Nov 2025
Details
View Map
Share
Follow
Lonsdale Avenue

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Lonsdale Avenue, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:27.

Thames Water logo
Between
8 and 11 Nov 2025
Details
View Map
Share
Follow
Sandy Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Sandy Lane, St Pauls Cray.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 08:46.

Thames Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Reynard Close

Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 11:32.

Thames Water logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 12:31.

Southern Gas Networks logo
LONG TERM
Between
10 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Blakeney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blakeney Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 08:41.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Cuff Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:09.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
The Vista

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:10.

BT logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Chudleigh Road

BT are proposing to carry out Utility asset works on Chudleigh Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2025 at 10:20.

BT logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Gordonbrock Road

BT are proposing to carry out Utility asset works on Gordonbrock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 15:13.

Southern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Sandford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandford Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 15:37.

Southern Gas Networks logo
Between
10 and 24 Nov 2025
Details
View Map
Share
Follow
Stratton Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratton Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 14:33.

Southern Gas Networks logo
Between
10 Nov and 8 Dec 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:41.

Royal Borough Of Greenwich logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Greenwich High Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 20 Aug 2025 at 10:41.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Grenada Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grenada Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:32.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Shooters Hill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:04.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Indus Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Indus Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:31.

Southern Gas Networks logo
Between
10 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Marlborough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 06:38.

Thames Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Trundleys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:41.

Telefonica UK logo
Between
10 and 15 Nov 2025
Details
View Map
Share
Follow
St Augustines Road

Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 1 Sep 2025 at 11:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 6 Mar 2026
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 14:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 13:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 09:23.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Needleman Street

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 18 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 13:36.

Royal Borough Of Greenwich logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Ordnance Crescent

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 4 Aug 2025 at 12:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Nov 2025 and 18 Jan 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 18 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 16:50.

London Borough Of Lewisham logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Marvels Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:39.

London Borough Of Lewisham logo
Between
11 and 13 Nov 2025
Details
View Map
Share
Follow
Marvels Lane

London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:12.

London Borough Of Bexley logo
Between
13 and 15 Nov 2025
Details
View Map
Share
Erith Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Jul 2025 at 15:17.

London Borough Of Bexley logo
Between
14 and 19 Nov 2025
Details
View Map
Share
Follow
Welling High Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Welling High Street, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 19:12.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 10:05.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 12:30.

Transport for London (TfL) logo
Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 11:39.

London Borough Of Bexley logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Danson Underpass

London Borough Of Bexley were proposing to carry out Highway improvement works on Danson Underpass, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:32.

London Borough Of Bexley logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Danson Underpass

London Borough Of Bexley are proposing to carry out Highway improvement works on Danson Underpass, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 13:27.

Thames Water logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Rye Close

Thames Water are proposing to carry out Utility asset works on Rye Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:20.

Southern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Veroan Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Veroan Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 15:32.

Southern Gas Networks logo
Between
17 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Basilon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Basilon Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 15:31.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Morden College Footpath

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:41.

Southern Gas Networks logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Kidbrooke Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:44.

Thames Water logo
Between
17 and 24 Nov 2025
Details
View Map
Share
Springwater Close

Thames Water were proposing to carry out Utility repair and maintenance works on Springwater Close, Plumstead.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 16:54.

London Borough Of Southwark logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Hanover Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Hanover Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Sep 2025 at 11:39.

Southern Gas Networks logo
Between
17 Nov and 1 Dec 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.

Virgin Media logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Maryon Road

Virgin Media are proposing to carry out Utility asset works on Maryon Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Aug 2025 at 07:43.

Transport for London (TfL) logo
LONG TERM
Between
17 Nov 2025 and 28 Mar 2027
Details
View Map
Share
Follow
Glass Yard

Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 10:37.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Beaumont Road

Thames Water are proposing to carry out New service connection on Beaumont Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:44.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 14:24.

Cadent Gas logo
Between
17 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Tollgate Road

Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:44.

BT logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Cresswell Park

BT are proposing to carry out Utility asset works on Cresswell Park, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Aug 2025 at 06:27.

BT logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Bennett Park

BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Aug 2025 at 06:24.

London Borough Of Bexley logo
Between
18 and 20 Nov 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 14:58.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 09:20.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2025 and run through until 20 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Jun 2025 at 10:06.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Jun 2025 at 12:30.

Between
18 Nov and 9 Dec 2025
Details
View Map
Share
Follow
Glenaffric Avenue

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 9 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Sep 2025 at 10:39.

Thames Water logo
Between
19 and 21 Nov 2025
Details
View Map
Share
Reynard Close

Thames Water were proposing to carry out Utility repair and maintenance works on Reynard Close, Bickley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 13:28.

Cellnex OT UK logo
Between
21 and 23 Nov 2025
Details
View Map
Share
Blackbrook Lane

Cellnex OT UK were proposing to carry out Utility asset works on Blackbrook Lane, Bickley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 November 2025 and run through until 23 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by Cellnex OT UK on 31 Jul 2025 at 08:38.

Cellnex OT UK logo
Between
21 and 23 Nov 2025
Details
View Map
Share
Follow
Blackbrook Lane

Cellnex OT UK are proposing to carry out Utility asset works on Blackbrook Lane, Bickley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 23 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cellnex OT UK on 12 Aug 2025 at 08:46.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:18.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 14:23.

Southern Gas Networks logo
Between
21 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Upper Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.

Transport for London (TfL) logo
Between
21 and 24 Nov 2025
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 12:19.

Thames Water logo
LONG TERM
Between
22 Nov 2025 and 21 Feb 2026
Details
View Map
Share
Follow
Churston Avenue

Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2025 and could run through until 21 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 11:48.

Cadent Gas logo
Between
24 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Devons Road

Cadent Gas are proposing to carry out Utility asset works on Devons Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 15:27.

Southern Gas Networks logo
Between
24 Nov and 15 Dec 2025
Details
View Map
Share
Follow
Glasbrook Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glasbrook Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:56.

Southern Gas Networks logo
LONG TERM
Between
24 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Eltham Palace Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:28.

Southern Gas Networks logo
LONG TERM
Between
24 Nov 2025 and 26 Jan 2026
Details
View Map
Share
Eltham Palace Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:36.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Coton Road

Thames Water are proposing to carry out New service connection on Coton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 16:45.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Coton Road

Thames Water were proposing to carry out New service connection on Coton Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 November 2025 and run through until 27 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:58.

Thames Water logo
Between
24 and 27 Nov 2025
Details
View Map
Share
Follow
Costa Street

Thames Water are proposing to carry out New service connection on Costa Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:08.

London Borough Of Lewisham logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 08:10.

London Borough Of Lewisham logo
Between
24 and 29 Nov 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 14:42.

Telefonica UK logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
St Augustines Road

Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Telefonica UK on 3 Sep 2025 at 15:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Nov 2025 and 13 Mar 2026
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 13 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 14:28.

London Borough Of Southwark logo
LONG TERM
Between
24 Nov 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Elephant Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Elephant Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 20 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Sep 2025 at 13:23.

Cornerstone Telecommunications Infrastructure logo
Between
25 and 28 Nov 2025
Details
View Map
Share
Follow
Strait Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:08.

London Borough Of Bexley logo
Between
26 and 29 Nov 2025
Details
View Map
Share
Follow
East Rochester Way

London Borough Of Bexley are proposing to carry out Highway improvement works on East Rochester Way, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Jul 2025 at 14:43.

London Borough Of Southwark logo
Between
26 and 28 Nov 2025
Details
View Map
Share
Follow
Rotherhithe Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rotherhithe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Sep 2025 at 16:27.

Thames Water logo
Between
28 Nov and 18 Dec 2025
Details
View Map
Share
Follow
Columbia Road

Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:28.

Network Rail logo
Between
30 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Mantle Road

Network Rail are proposing to carry out Works for Rail Purposes on Mantle Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:43.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Spekehill

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Spekehill, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Woodcroft

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Woodcroft, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Larchwood Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Larchwood Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:47.

Southern Gas Networks logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Kingsground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.

Southern Gas Networks logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
The Vista

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Perpins Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Perpins Road, Avery Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:51.

Thames Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Newick Close

Thames Water are proposing to carry out Utility asset works on Newick Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:55.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Well Hall Parade

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Well Hall Parade, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:46.

Southern Gas Networks logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Morden Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 15:00.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Bassant Road

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bassant Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 17:04.

Southern Gas Networks logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 12:19.

Southern Gas Networks logo
Between
1 and 22 Dec 2025
Details
View Map
Share
Follow
Dryhill Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:50.

Southern Gas Networks logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:36.

London Borough Of Southwark logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Peckham Park Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Peckham Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Aug 2025 at 09:46.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Welland Street

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Welland Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 10:41.

Southern Gas Networks logo
Between
1 and 15 Dec 2025
Details
View Map
Share
Follow
Vanbrugh Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 07:07.

Thames Water logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Pelton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pelton Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:10.

Royal Borough Of Greenwich logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Bostall Manorway

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bostall Manorway, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 17:04.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 08:31.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 08:47.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:39.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
St Leonards Road

Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 15:06.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:40.

Cadent Gas logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Brunswick Road

Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 15:05.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Gascoigne Road

Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 16:00.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:42.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:09.

Cadent Gas logo
Between
1 and 21 Dec 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Royal Docks Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:47.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Woolwich Manor Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Newham Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 13:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2025 and 6 Feb 2026
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:48.

London Borough Of Bexley logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Rochester Drive

London Borough Of Bexley were proposing to carry out Highway improvement works on Rochester Drive, Bexley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 10:44.

London Borough Of Bexley logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Rochester Drive

London Borough Of Bexley are proposing to carry out Highway improvement works on Rochester Drive, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 10:46.

London Borough Of Bexley logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Midhurst Hill

London Borough Of Bexley are proposing to carry out Highway improvement works on Midhurst Hill, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Sep 2025 at 11:20.

London Borough Of Bexley logo
Between
2 and 4 Dec 2025
Details
View Map
Share
Follow
Erith Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 15:14.

London Borough Of Bexley logo
Between
3 and 6 Dec 2025
Details
View Map
Share
Follow
Foots Cray High Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Foots Cray High Street, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 21 Aug 2025 at 13:41.

BT logo
Between
4 and 8 Dec 2025
Details
View Map
Share
Follow
Burnt Ash Lane

BT are proposing to carry out Utility asset works on Burnt Ash Lane, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Sep 2025 at 17:57.

London Borough Of Bromley logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Oakwood Avenue

London Borough Of Bromley are proposing to carry out Highway improvement works on Oakwood Avenue, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2025 at 11:59.

London Borough Of Bromley logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Edgebury

London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2025 at 11:59.

Thames Water logo
Between
8 and 13 Dec 2025
Details
View Map
Share
Follow
Bridgen Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bridgen Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 11:48.

Thames Water logo
Between
8 and 10 Dec 2025
Details
View Map
Share
Follow
Vanbrugh Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 06:43.

Southern Gas Networks logo
Between
8 and 22 Dec 2025
Details
View Map
Share
Follow
The View

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The View, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Dec 2025 and 13 Mar 2026
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 13 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jul 2025 at 13:25.

Thames Water logo
Between
8 and 14 Dec 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 14 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 09:28.

London Borough Of Bexley logo
Between
9 and 16 Dec 2025
Details
View Map
Share
Follow
Hatherley Crescent

London Borough Of Bexley are proposing to carry out Highway improvement works on Hatherley Crescent, Sidcup.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 2 Sep 2025 at 13:15.

Hutchinson 3G logo
Between
9 and 12 Dec 2025
Details
View Map
Share
Follow
Mottingham Lane

Hutchinson 3G are proposing to carry out Utility asset works on Mottingham Lane, Mottingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Hutchinson 3G on 16 Sep 2025 at 08:55.

London Borough Of Bexley logo
Between
11 and 13 Dec 2025
Details
View Map
Share
Follow
Danson Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Danson Road, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 15:21.

Network Rail logo
Between
14 and 19 Dec 2025
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Aug 2025 at 14:42.

BT logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Shroffold Road

BT are proposing to carry out Utility asset works on Shroffold Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Sep 2025 at 14:38.

BT logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Shroffold Road

BT are proposing to carry out Utility asset works on Shroffold Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Sep 2025 at 09:47.

Thames Water logo
LONG TERM
Between
15 Dec 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Oakway Close

Thames Water are proposing to carry out Utility asset works on Oakway Close, Bexley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:35.

BT logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Bennett Park

BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Sep 2025 at 12:43.

Thames Water logo
Between
15 and 19 Dec 2025
Details
View Map
Share
Follow
Manor Grove

Thames Water are proposing to carry out New service connection on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 10:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Dec 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 20 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jul 2025 at 06:40.

Cadent Gas logo
Between
15 Dec 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:10.

Cadent Gas logo
Between
15 Dec 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:42.


Roadworks Map near to Wendover Road, LONDON, SE9 6PA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wendover Road, LONDON, SE9 6PA (43 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Royal Borough Of Greenwich logo
SHIREBROOK ROAD 
(0.1 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.1
Details
Share
Follow
2
Royal Borough Of Greenwich logo
SEDGEBROOK ROAD 
(0.1 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.1
Details
Share
Follow
3
Royal Borough Of Greenwich logo
WINCHCOMB GARDENS 
(0.1 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 8 Sep 2025 08:00
(Scheduled: 8 Sep 2025 - 19 Sep 2025)
0.1
Details
Share
Follow
4
Royal Borough Of Greenwich logo
SCARSBROOK ROAD 
(0.2 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 8 Sep 2025 08:00
(Scheduled: 8 Sep 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
5
Royal Borough Of Greenwich logo
ROSS WAY 
(0.2 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 18 Sep 2025 08:30
(Scheduled: 18 Sep 2025)
0.2
Details
Share
Follow
6
Virgin Media logo
MAYDAY GARDENS 
(0.2 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
18 Sep 2025 14:14 - 15:00
0.2
Details
Share
7
Royal Borough Of Greenwich logo
RIDGEBROOK ROAD 
(0.3 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 19 Sep 2025 - 23 Sep 2025
0.3
Details
Share
Follow
8
Royal Borough Of Greenwich logo
CONGREVE ROAD 
(0.4 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Carriageway - Stop/go boards
In Progress
Since: 18 Sep 2025 08:30
(Scheduled: 18 Sep 2025)
0.4
Details
Share
Follow
9
Royal Borough Of Greenwich logo
PRINCE RUPERT ROAD 
(0.4 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
16 Sep 2025 10:10 - 11:56
0.4
Details
Share
10
Royal Borough Of Greenwich logo
PRINCE RUPERT ROAD 
(0.4 miles)
Royal Borough Of Greenwich
Highway repair and maintenance works - Footway - No carriageway incursion
Complete
16 Sep 2025 10:59 - 11:49
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data