ROADWORKS SUMMARY
Westhorne Avenue, LONDON, SE9 6DH
Introduction
View current and future planned roadworks and road closures for Westhorne Avenue, SE9 6DH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Westhorne Avenue, LONDON, SE9 6DH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Westhorne Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Mar 2025
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 12:25.
15 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2020 at 09:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:58.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.
31 Dec 2024
Thames Water are carrying out roadworks on Vulcan Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2021 at 10:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Jun 2024 at 13:32.
1 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.
31 Oct 2022 and 30 Jan 2025
Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.
24 Jul 2023 and 13 Jan 2025
Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
20 May 2025
London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.
These works are categorised as Major.
The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.
Saturday
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2023 at 08:00 and could run through until 30 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:39.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
31 Mar 2025
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 18 Nov 2024 at 13:27.
18 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 25 Nov 2024 at 09:42.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2023 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.
19 Dec 2024
London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.
23 Dec 2024
London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:47.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:46.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:50.
20 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:49.
20 Feb 2024 and 20 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lakeside Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2024 and could run through until 20 February 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2024 at 13:16.
20 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:19.
4 Mar 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.
28 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.
29 Apr 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.
6 May 2024 and 13 May 2025
Thames Water are proposing to carry out New service connection on Longmead Drive, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 13 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:16.
4 Oct 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.
13 Dec 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 12 Aug 2024 at 13:53.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
5 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.
12 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.
20 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.
18 Jun 2024 and 28 Mar 2025
UK Power Networks Eastern & London carried out Statutory Infrastructure Works on Galleywall Road, London.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 18 Jun 2024 and 28 Mar 2025 and were actually completed between 18 Jun 2024 (09:45) and 27 Nov 2024 (14:38). The works impacted the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 14:39.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Rembrandt Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:06.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Murillo Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:07.
15 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Manor Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 14:09.
6 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Weardale Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jul 2024 at 10:38.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.
15 Jul 2024 and 13 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.
29 Jul 2024 and 15 Sep 2025
Thames Water are proposing to carry out New service connection on Hatherley Crescent, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 15 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:10.
29 Jul 2024 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.
Friday
London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 10:39.
12 Aug 2024 and 1 Dec 2025
Thames Water are proposing to carry out New service connection on Faraday Avenue, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 1 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:06.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
Saturday
Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
The works started on 19 August 2024 at 08:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:17.
15 Dec 2024
Thames Tideway Tunnel are carrying out Highway improvement works on Deptford Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 10:52.
15 Dec 2024
Thames Tideway Tunnel are carrying out roadworks on Creek Road, Deptford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 13 Nov 2024 at 11:59.
Saturday
Thames Water are carrying out Utility asset works on Chaucer Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 12:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:08.
30 Aug and 18 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:13.
9 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Westwood Hill, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 September 2024 at 12:30 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:36.
9 Sep and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Vesta Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:25.
9 Sep and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ashby Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:20.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
9 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Kirkdale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 14:00 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 15:35.
Monday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 15:54.
23 Sep and 20 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:49.
23 Sep 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.
2 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.
12 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 07:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 09:02.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:00 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 13:43.
20 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Orchard Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 14:39.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Long Lane, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 12:50 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:17.
20 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 20:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:28.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Redriff Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Jul 2024 at 12:31.
20 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 20:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:29.
21 Dec 2024
Thames Tideway Tunnel are carrying out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 14 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2024 at 06:39.
15 Oct and 9 Dec 2024
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 26 Sep 2024 at 11:51.
21 Oct and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 12:59.
21 Oct and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromwell Avenue, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:32.
23 Oct and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 08:44.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Wickham Street, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2024 at 17:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 13:30.
Monday
Thames Water are carrying out Utility repair and maintenance works on Savage Gardens, Beckton, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 16:00 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:46.
28 Oct and 8 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:39.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Sandringham Drive, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 17:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:12.
Today
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandringham Drive, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:15.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 11:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 11:44.
30 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Cromwell Avenue, Bromley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 13:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 13:05.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:01.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:16.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on New Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 15:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:40.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 11:07.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 14:55.
6 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Alexander Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 08:30 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:14.
4 Nov 2024 and 10 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
10 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Prestons Road Roundabout, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 08:08.
4 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:16.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The works started on 4 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:32.
Friday
Cadent Gas are carrying out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 10:02 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 10:31.
Monday
Thames Water are proposing to carry out roadworks on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2024 at 11:56.
5 Nov 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.
10 Feb 2025
Thames Water are carrying out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.
Saturday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.
Saturday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 08:07.
6 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:36.
19 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:44.
6 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Franklin Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:36.
19 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Franklin Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:40.
8 Nov and 24 Dec 2024
Transport for London (TfL) were proposing to carry out Section 50 on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 12:41.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.
11 Nov 2024 and 4 Apr 2025
Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.
4 Apr 2025
Thames Water are carrying out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:30 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:54.
4 Apr 2025
Thames Water are carrying out Utility asset works on Westhorne Avenue, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:24.
11 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 12:45.
4 Feb 2025
Thames Water are carrying out Utility asset works on Wickham Street, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:20 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:25.
20 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:18.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:22.
13 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Archangel Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:43.
Friday
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are carrying out New service connection on Factory Road, North Woolwich, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 21 Nov 2024 at 16:17.
Saturday
UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 07:13.
Saturday
UK Power Networks Eastern & London are carrying out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 19:00 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 07:12.
12 Nov and 9 Dec 2024
Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.
13 Nov and 22 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.
18 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hayes Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.
17 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Sandford Road, Bromley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 15:45 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 16:02.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Summer Hill, Chislehurst.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 09:30 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:22.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 12:19.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:04.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:12.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 09:38.
18 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:14.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 09:29.
18 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 13:33.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:21.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.
7 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Bridgeland Road, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 18 Nov 2024 at 08:01.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:39.
4 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Glenton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 18:30 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 08:58.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.
19 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:24.
19 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:26.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
Cadent Gas carried out Utility repair and maintenance works on Morris Road, London.
Two-way signals were in place for some or all of the period.
The works were originally planned between 19 Nov 2024 and 27 Nov 2024 and were actually completed between 19 Nov 2024 (10:31) and 27 Nov 2024 (10:51). The works impacted the carriageway only.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:43.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
UK Power Networks Eastern & London carried out Utility repair and maintenance works on Bellenden Road, London.
The road was closed for some or all of the period.
The works were originally planned between 20 Nov 2024 and 28 Nov 2024 and were actually completed between 20 Nov 2024 (11:02) and 27 Nov 2024 (02:10). The works impacted the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 09:01.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Hill Street, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 19:45 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:28.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:06.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:07.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:08.
Thames Water carried out Utility repair and maintenance works on Edward Road, Bromley.
The road was closed for some or all of the period.
The works were originally planned between 22 Nov 2024 and 2 Dec 2024 and were actually completed between 22 Nov 2024 (15:01) and 27 Nov 2024 (01:28). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 08:43.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.
Tuesday
Thames Water were proposing to carry out Utility repair and maintenance works on Linden Grove, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:18.
Friday
Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 November 2024 at 17:58 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:29.
Tuesday
Thames Water were proposing to carry out Utility repair and maintenance works on Brackley Avenue, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:42.
25 Nov and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.
25 Nov and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2024 at 13:34.
25 Nov and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 08:41.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:00.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:43.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:06.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:33.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:14.
17 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Clifton Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 18:30 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 08:42.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:01.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:41.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:29.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:08.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:24.
25 Nov and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:04.
25 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 14:46.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 05:44.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Calvert Road, Greenwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 11:11 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:47.
25 Nov and 13 Dec 2024
Hertfordshire County Council are proposing to carry out Section 50 on Crane Mead, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 13:59.
25 Nov and 13 Dec 2024
Hertfordshire County Council were proposing to carry out Section 50 on Crane Mead, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 14:04.
14 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Rotherhithe New Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 09:38.
25 Nov 2024 and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Dec 2023 at 14:51.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Oct 2024 at 16:56.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 26 Nov 2024 at 08:18.
Sunday
Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:29.
25 Nov and 15 Dec 2024
Transport for London (TfL) were proposing to carry out Section 50 on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 12:42.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Section 50 on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 13:44.
25 Nov and 15 Dec 2024
London Borough Of Tower Hamlets are proposing to carry out Section 50 on Blackwall Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Nov 2024 at 10:30.
15 Dec 2024
London Borough Of Tower Hamlets are carrying out Section 50 on Blackwall Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Nov 2024 at 16:06.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Utility repair and maintenance works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 09:43.
15 Dec 2024
Transport for London (TfL) are carrying out Utility repair and maintenance works on Aspen Way, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 09:56.
25 Nov and 15 Dec 2024
Transport for London (TfL) are proposing to carry out Section 50 on Leamouth Road Roundabout, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 14:00.
15 Dec 2024
Transport for London (TfL) are carrying out Section 50 on Leamouth Road Roundabout, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 11:59.
Friday
London Borough Of Bromley are carrying out Highway improvement works on Station Square, Petts Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 26 Nov 2024 at 08:15.
16 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Kirkdale, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 11:58 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:40.
4 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Ermine Road, Ladywell, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 20:00 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 08:17.
21 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 10:00 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 11:28.
16 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Lewisham Road, Lewisham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 10:50 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:19.
Monday
Thames Water were proposing to carry out Utility repair and maintenance works on Albert Road, North Woolwich, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:18.
Monday
Thames Water are carrying out Utility repair and maintenance works on Albert Road, North Woolwich, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 14:14 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:42.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Norman Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:58.
28 Nov 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.
28 Nov 2024 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:05.
28 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 14:08.
28 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:39.
28 Nov and 6 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 5 Sep 2024 at 12:59.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:41.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:09.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:10.
30 Nov and 6 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 15:46.
30 Nov and 8 Dec 2024
Abovenet Communications UK were proposing to carry out Utility asset works on Greenwich Church Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 November 2024 and run through until 8 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Abovenet Communications UK on 1 Oct 2024 at 10:05.
Tuesday
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:26.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stone Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 10:43.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cameron Road, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 10:43.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2024 at 13:15.
2 and 4 Dec 2024
London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 25 Nov 2024 at 10:59.
2 and 5 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Avondale Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:33.
2 Dec 2024 and 12 May 2025
Thames Water are proposing to carry out New service connection on Hollies Avenue, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:27.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:22.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:49.
2 and 20 Dec 2024
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.
2 and 20 Dec 2024
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 26 Nov 2024 at 14:39.
2 and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 10:01.
2 and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Rippolson Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 11:46.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.
2 Dec 2024 and 23 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:08.
2 and 13 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:42.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 13:01.
2 and 16 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 07:50.
2 and 5 Dec 2024
Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:46.
2 and 5 Dec 2024
Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:29.
4 and 19 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.
4 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.
4 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:19.
4 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:00.
4 and 10 Dec 2024
Thames Water are proposing to carry out New service connection on Wellmeadow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 10:39.
4 and 6 Dec 2024
Thames Water are proposing to carry out Remedial works on Overhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:19.
4 and 6 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:54.
4 and 7 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 16:19.
4 and 7 Dec 2024
Thames Water are proposing to carry out Utility asset works on Albyn Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:23.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:24.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:19.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:32.
6 and 13 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 13 Sep 2024 at 11:36.
9 and 20 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Sep 2024 at 14:14.
9 and 20 Dec 2024
National Highways are proposing to carry out Works for road purposes on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Oct 2024 at 13:02.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility asset works on Torridon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:35.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility asset works on Dowanhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:03.
9 and 15 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lee High Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:31.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.
9 and 13 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:04.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Nov 2024 at 15:20.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:21.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 13:08.
9 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenview, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:58.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.
9 Dec 2024 and 9 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2024 at 10:38.
9 Dec 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.
10 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 10:16.
10 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Framlingham Crescent, Mottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.
10 and 12 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 14:55.
10 and 12 Dec 2024
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 11:45.
10 Dec 2024 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:06.
10 Dec 2024 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 13:28.
10 Dec 2024 and 25 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.
10 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.
14 and 16 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:14.
14 and 16 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Nov 2024 at 15:58.
16 and 23 Dec 2024
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 13:37.
16 and 23 Dec 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Westerham Drive, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 13:38.
16 and 23 Dec 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Ramillies Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 13:38.
16 and 23 Dec 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Overcourt Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Oct 2024 at 13:38.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.
16 and 23 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.
16 and 18 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.
17 and 19 Dec 2024
London Borough Of Bromley are proposing to carry out Highway improvement works on Midfield Way, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 20 Nov 2024 at 09:08.
17 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.
17 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:04.
18 and 20 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Pickhurst Lane, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 11:17.
23 and 30 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.
2 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:52.
2 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 08:23.
2 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Way, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.
2 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Southborough Lane, Bromley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.
2 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crown Lane, Bromley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:46.
2 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 08:52.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:23.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.
2 Jan and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:57.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:25.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:31.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 09:58.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:28.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:17.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:22.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 13:28.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:21.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:06.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:11.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:01.
4 and 5 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:05.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:55.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 10:12.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.
6 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.
6 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 13:37.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:31.
6 Jan and 7 Apr 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:57.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:09.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:26.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 14:51.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.
6 and 14 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Hansol Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 12:00.
6 and 14 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Hansol Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:15.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.
6 and 29 Jan 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.
6 and 22 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Well Hall Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 16:36.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 09:30.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 08:40.
6 Jan and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Linden Grove, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:33.
6 and 8 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Honiton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 14:39.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Central Avenue, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:05.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Wickham Street, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 11:57.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Awliscombe Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:08.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Monkton Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:14.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Glenmore Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:11.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Edison Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:16.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 11:52.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:33.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:34.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:36.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:37.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:43.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:44.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:21.
6 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:11.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.
6 and 9 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:43.
6 and 8 Jan 2025
BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.
7 Jan and 19 Jun 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.
7 Jan and 19 Jun 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Main Road, St Pauls Cray.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 27 May 2024 at 08:36.
7 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 10:12.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:01.
8 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.
9 and 11 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:30.
9 and 11 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Selborne Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:35.
10 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:19.
10 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:11.
11 Jan and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
11 and 12 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:26.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 15:07.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:02.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
13 and 15 Jan 2025
Thames Water are proposing to carry out New service connection on Thorndon Close, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 10:56.
13 and 15 Jan 2025
Thames Water were proposing to carry out New service connection on Thorndon Close, St Pauls Cray.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:40.
13 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:52.
13 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:29.
13 Jan and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.
13 Jan and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homecroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:50.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:16.
13 and 16 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 14:34.
13 and 16 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:14.
13 and 16 Jan 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydney Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:34.
13 and 20 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:34.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:19.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:10.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:27.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 10:25.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:11.
13 and 15 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Horsham Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 12:05.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 06:16.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:14.
13 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:44.
13 and 22 Jan 2025
Thames Water are proposing to carry out Utility asset works on Upper North Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 13:02.
14 Jan and 3 Mar 2025
UK Power Networks South Eastern were proposing to carry out Statutory Infrastructure Works on Sandy Lane, St Pauls Cray.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:22.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:42.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:02.
14 and 17 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Nov 2024 at 15:44.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:10.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:49.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:33.
17 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.
17 Jan and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:20.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
20 and 24 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Station Square, Petts Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 11:44.
20 and 29 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Cray Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 14:40.
20 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:15.
20 Jan and 10 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:17.
20 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 16:47.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:15.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:42.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:13.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:52.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:40.
20 and 23 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Oct 2024 at 16:50.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:51.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 10:10.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:22.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:40.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:14.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:36.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:51.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:37.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:50.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:51.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:21.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:15.
23 Jan and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 13:30.
24 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:02.
24 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:03.
24 and 28 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.
25 and 27 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.
26 Jan 2025 and 28 Jan 2026
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 January 2025 and could run through until 28 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 16:13.
27 and 30 Jan 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Midfield Way, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 4 Nov 2024 at 12:00.
27 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:19.
27 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass Road, St Pauls Cray.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:34.
27 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:24.
27 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:39.
27 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on William Barefoot Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 08:32.
27 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.
27 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:41.
27 Jan and 10 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
27 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 18:05.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.
27 Jan and 17 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.
27 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.
27 and 31 Jan 2025
Thames Water were proposing to carry out roadworks on Stonewall, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:20.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:21.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:03.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:31.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:32.
29 Jan and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:13.
29 Jan and 14 Feb 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 6 Nov 2024 at 11:09.
30 Jan and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:14.
30 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:56.
31 Jan and 2 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Baugh Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 13:32.
31 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Sunnydene Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:09.
1 Feb and 30 May 2025
London Borough Of Lewisham were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 09:39.
1 and 3 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 06:36.
3 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkfield Way, Bromley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 11:00.
3 and 5 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Hillside Road, Shortlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:37.
3 and 5 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 18 Nov 2024 at 13:55.
3 and 6 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Lennard Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 and 7 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.
3 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:25.
3 and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.
3 and 6 Feb 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.
3 and 12 Feb 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:22.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Penhill Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:42.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.
3 and 12 Feb 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:34.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 21 Oct 2024 at 18:15.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.
3 and 12 Feb 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Blendon Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:28.
3 and 12 Feb 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:33.
3 and 12 Feb 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Danson Underpass, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Nov 2024 at 10:32.
3 and 6 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 13:19.
3 Feb and 25 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 29 Oct 2024 at 13:35.
3 Feb and 20 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:23.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:24.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
5 and 8 Feb 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 5 Nov 2024 at 11:17.
5 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellegrove Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.
5 and 18 Feb 2025
Southern Gas Networks are proposing to carry out Utility asset works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.
6 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:46.
10 Feb and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, West Wickham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 12:00.
10 and 18 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.
10 Feb and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.
10 Feb and 10 Mar 2025
Thames Water were proposing to carry out roadworks on Barry Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.
10 Feb and 9 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.
10 Feb and 20 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elderslie Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:45.
10 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Micheldever Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:14.
10 and 19 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 15:12.
10 and 19 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:40.
10 and 19 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Lavernock Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 08:16.
11 and 13 Feb 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Westbury Road, Penge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 08:13.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Road Service Road Westbound, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:33.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:36.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:17.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:15.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:15.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 15:20.
12 and 18 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Humber Road, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 07:00.
13 and 15 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 15:48.
13 and 15 Feb 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:29.
13 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Haslemere Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:38.
13 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lewisham Road, Lewisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:29.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out roadworks on Wellington Gardens, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:16.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:16.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:16.
13 and 28 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:40.
14 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elmwood Drive, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:58.
15 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Lane, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 12:10.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:03.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:15.
15 and 23 Feb 2025
Thames Water are proposing to carry out New service connection on Westferry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:13.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.
16 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stonewall, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:46.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Scotts Avenue, Shortlands.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:03.
17 Feb and 3 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:39.
17 Feb and 3 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:08.
17 Feb and 11 Sep 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.
17 and 21 Feb 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on North Cray Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 12:00.
17 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:30.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:50.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:14.
17 and 19 Feb 2025
Thames Water were proposing to carry out Utility asset works on Danson Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:31.
17 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2024 at 13:27.
17 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 15:24.
17 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 16:37.
17 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 13:27.
17 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Berwick Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:52.
17 Feb and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.
17 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.
17 and 20 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 12:49.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Central Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Awliscombe Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Monkton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Glenmore Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Edison Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:03.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 13:06.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Mary Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 07:54.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 15:28.
21 Feb and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:00.
21 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:52.
21 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:32.
23 Feb and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hyde Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:08.
24 Feb and 3 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Southborough Road, Bickley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:44.
24 Feb and 11 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 16:31.
24 Feb and 11 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East Rochester Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.
24 Feb and 1 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:33.
24 Feb and 1 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 11:35.
24 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Ancaster Street, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:41.
24 and 26 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Overton Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 16:05.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 08:56.
Roadworks Map near to Westhorne Avenue, LONDON, SE9 6DH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Westhorne Avenue, LONDON, SE9 6DH (34 Events)
(Scheduled Dates)
(miles)
(Scheduled: 26 Nov 2024 - 27 Nov 2024)
(Scheduled: 26 Nov 2024 - 3 Dec 2024)
(Scheduled: 27 Nov 2024 - 29 Nov 2024)