ROADWORKS SUMMARY
Coleraine Road, LONDON, SE3 7PF
Introduction
View current and future planned roadworks and road closures for Coleraine Road, SE3 7PF and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Coleraine Road, LONDON, SE3 7PF
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Coleraine Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Mar 2025
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 12:25.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2020 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Dec 2024 at 11:40.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.
These works are categorised as Major.
The works started on 17 July 2020 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 10:23.
31 Dec 2024
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2020 at 08:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Aug 2024 at 11:18.
Monday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.
These works are categorised as Major.
The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.
25 Apr 2025
Thames Water are carrying out roadworks on Vulcan Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2021 at 10:00 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:46.
1 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.
Friday
London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.
31 Oct 2022 and 30 Jan 2025
Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.
27 Mar 2023 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.
30 Mar 2023 and 25 Mar 2025
Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.
11 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 18:14.
24 Jul 2023 and 13 Jan 2025
Thames Water are proposing to carry out New service connection on Willersley Avenue, Sidcup.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 13 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 18:23.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
20 May 2025
London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.
These works are categorised as Major.
The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.
6 Sep 2023 and 3 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.
28 Feb 2025
London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 September 2023 at 22:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 17 Dec 2024 at 12:11.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.
11 Oct 2025
Transport for London (TfL) are carrying out roadworks on Druid Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.
31 Mar 2025
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 18 Nov 2024 at 13:27.
15 Jan 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 15 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 16 Dec 2024 at 14:08.
Tomorrow
London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.
Tomorrow
London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.
Tomorrow
London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.
Monday
London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.
Tomorrow
London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.
30 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 25 Oct 2024 at 11:37.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:19.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:20.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:11.
31 Jan 2025
Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 February 2024 at 09:30 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:13.
28 Feb 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 10:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 11:24.
4 Mar 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 22:22.
15 Apr 2024 and 23 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.
28 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.
29 Apr 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.
4 Oct 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.
Today
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:16.
Today
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:15.
14 Mar 2025
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 9 Dec 2024 at 14:40.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
5 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.
12 Mar 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.
30 Apr 2026
City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.
2 Jul 2024 and 27 Jan 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.
These works are categorised as Major.
The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.
15 Jul 2024 and 13 Jul 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.
11 Feb 2025
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:24.
29 Jul 2024 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.
31 Jan 2025
London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 2 Dec 2024 at 15:03.
Friday
Thames Water are carrying out Utility asset works on Hamlets Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
Friday
Thames Water are carrying out Utility repair and maintenance works on Burdett Road, London.
These works are categorised as Major.
The works started on 12 August 2024 at 11:26 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:24.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
Saturday
Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 09:47.
Friday
Thames Tideway Tunnel are carrying out Highway improvement works on Deptford Church Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Dec 2024 at 11:41.
Friday
Thames Tideway Tunnel are carrying out roadworks on Creek Road, Deptford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2024 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Dec 2024 at 12:42.
Today
London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.
31 Aug 2024 and 31 May 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.
2 Sep 2024 and 2 Jun 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Slippers Place, London.
These works are categorised as Major.
The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 16:30.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.
9 Sep 2024 and 8 Sep 2025
Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
16 Sep 2024 and 31 Jan 2025
City Of London Corporation are proposing to carry out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 5 Sep 2024 at 14:11.
31 Jan 2025
City Of London Corporation are carrying out Highway improvement works on Monument Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 16 Sep 2024 at 08:20.
19 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.
Friday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:49.
23 Sep 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.
2 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:00 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Sep 2024 at 13:43.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Orchard Place, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 14:39.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:05.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:06.
30 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.
16 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:04.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:08.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.
28 Feb 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 20:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Dec 2024 at 16:37.
9 Feb 2025
Thames Water are carrying out Utility asset works on Mile End Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 09:15 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 13:11.
14 Apr 2025
Thames Water are carrying out Utility repair and maintenance works on Cephas Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 10:30 and could run through until 14 April 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:53.
10 Jan 2025
Thames Water are carrying out Utility repair and maintenance works on Dunvegan Road, Eltham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 October 2024 at 20:30 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:08.
Saturday
Thames Tideway Tunnel are carrying out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 14 October 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2024 at 06:39.
15 Oct and 30 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Portland Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 09:42.
21 Oct 2024 and 24 Feb 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 21 October 2024 and could run through until 24 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:03.
23 Feb 2025
Thames Water are carrying out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works started on 21 October 2024 at 08:22 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 08:22.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Ainsworth Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Well Street, Hackney, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:21 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:21.
18 Jan 2025
London Borough Of Hackney are carrying out Highway improvement works on Frampton Park Road, Hackney, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:22 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 21 Oct 2024 at 08:22.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.
22 Oct 2024 and 21 Apr 2026
London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Wickham Street, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 October 2024 at 17:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:44.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
Friday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 12:40.
Friday
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:34.
Friday
Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 28 Oct 2024 at 08:27.
28 Oct 2024 and 13 Jan 2025
Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Sandringham Drive, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 17:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:12.
29 Oct 2024 and 12 May 2025
City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 19 Aug 2024 at 13:56.
29 Oct 2024 and 12 May 2025
City Of London Corporation are proposing to carry out Highway improvement works on Whittington Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of London Corporation on 20 Aug 2024 at 09:25.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Ainsworth Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:17.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Well Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 15:47.
30 Oct 2024 and 24 Jan 2025
London Borough Of Hackney are proposing to carry out Highway improvement works on Frampton Park Road, Hackney, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hackney on 22 Aug 2024 at 16:31.
31 Oct 2024 and 16 Mar 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 31 October 2024 and could run through until 16 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:09.
16 Mar 2025
Thames Water are carrying out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works started on 31 October 2024 at 07:45 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 13:20.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on New Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 15:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:24.
4 Nov 2024 and 10 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
10 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Prestons Road Roundabout, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 08:08.
4 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:16.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The works started on 4 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:32.
5 Nov 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.
5 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.
10 Feb 2025
Thames Water are carrying out Utility asset works on Friern Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.
5 Nov 2024 and 15 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.
15 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.
Tuesday
Transport for London (TfL) were proposing to carry out Section 50 on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 November 2024 and run through until 24 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 12:41.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:32.
11 Nov 2024 and 4 Apr 2025
Thames Water were proposing to carry out Utility asset works on St Mildreds Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:47.
11 Nov 2024 and 4 Apr 2025
Thames Water are proposing to carry out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:11.
4 Apr 2025
Thames Water are carrying out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:30 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:54.
4 Apr 2025
Thames Water are carrying out Utility asset works on Westhorne Avenue, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:24 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:24.
4 Feb 2025
Thames Water are carrying out Utility asset works on Wickham Street, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:20 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:25.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:18.
11 Nov 2024 and 4 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 4 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:22.
Sunday
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:09.
Friday
Southern Gas Networks are carrying out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 13:09.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.
18 Nov 2024 and 24 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.
24 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.
Sunday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.
19 Nov 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:24.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works started on 19 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 06:58.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
19 Nov 2024 and 10 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:21.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 09:14.
20 Nov 2024 and 20 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 11:46.
20 Feb 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Portland Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:11.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.
22 Nov 2024 and 16 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.
Friday
UK Power Networks Eastern & London are carrying out Utility asset works on Arklow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 08:46.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:18.
25 Nov 2024 and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Dec 2023 at 14:51.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Oct 2024 at 16:56.
25 Nov 2024 and 5 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 5 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 26 Nov 2024 at 08:18.
Tomorrow
London Borough Of Newham are carrying out Highway repair and maintenance works on Connaught Bridge North Roundabout, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:04 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 6 Dec 2024 at 15:40.
Tomorrow
Thames Water are carrying out Utility asset works on Ernald Avenue, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:34 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:39.
Tomorrow
Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 11:15 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:01.
Tomorrow
Thames Water are carrying out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:34 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:39.
Tomorrow
Thames Water are carrying out Utility asset works on Navarre Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:34 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:38.
Tomorrow
Thames Water are carrying out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 13:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:01.
Tomorrow
Thames Water are carrying out Utility asset works on St Johns Road, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 13:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:39.
Monday
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 16:33.
25 Nov 2024 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.
21 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 10:00 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 11:28.
28 Nov 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.
31 Jan 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 09:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 09:14.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
29 Nov 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 07:08.
31 Mar 2025
Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 18:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Dec 2024 at 08:45.
Friday
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:09.
Friday
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:10.
2 Dec 2024 and 12 May 2025
Thames Water were proposing to carry out New service connection on Hollies Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 12 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:22.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:49.
Friday
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.
Friday
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 28 Nov 2024 at 15:32.
2 Dec 2024 and 10 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:05.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:53.
2 Dec 2024 and 13 Feb 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:49.
2 Dec 2024 and 23 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:08.
Monday
Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:04.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:15.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:52.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 11:55 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 13:51.
Tomorrow
Thames Water are carrying out Utility asset works on Grangewood Street, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 08:45 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 13:29.
Tomorrow
Thames Water are proposing to carry out New service connection on Bell Green, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.
Tomorrow
Thames Water are carrying out New service connection on Bell Green, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 December 2024 at 10:49 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 10:50.
Friday
Thames Water are carrying out Utility repair and maintenance works on Millharbour, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 12:40.
Friday
Thames Water are carrying out Utility repair and maintenance works on Millharbour, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 December 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:58.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 15:35.
5 and 25 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 11:30.
Friday
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.
Friday
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
Friday
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:24.
Friday
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.
Friday
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:19.
Friday
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
Friday
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:32.
Saturday
Cadent Gas were proposing to carry out Utility asset works on Brushfield Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:48.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.
9 and 31 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:21.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Glenview, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 14:30 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:30.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.
9 Dec 2024 and 30 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.
9 Dec 2024 and 9 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Grove Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 9 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 09:23.
9 Dec 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.
Friday
London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Carr Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Sep 2024 at 11:13.
9 Dec 2024 and 10 Jan 2025
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:48.
9 Dec 2024 and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.
Tomorrow
London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.
22 Feb 2025
London Borough Of Newham are carrying out Highway improvement works on Rectory Road, Manor Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 08:00 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 9 Dec 2024 at 08:03.
10 Dec 2024 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:06.
17 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 13:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:18.
10 Dec 2024 and 25 Jan 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.
Tomorrow
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 2 Oct 2024 at 00:39.
Tomorrow
BT are proposing to carry out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Nov 2024 at 13:15.
Tomorrow
BT are carrying out Utility repair and maintenance works on Chamber Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 09:10 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 09:10.
10 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.
Friday
Thames Water are carrying out Utility repair and maintenance works on Red Lion Lane, Plumstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 13:01 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:53.
Friday
BT are carrying out Utility repair and maintenance works on Forty Acre Lane, Canning Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 13:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 14:53.
Friday
BT are carrying out Utility repair and maintenance works on Newham Way, Canning Town, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 13:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 14:53.
3 Jan 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Edward Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 08:00 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 08:23.
13 Dec 2024 and 31 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Omeara Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Bermondsey Wall East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
14 Dec 2024 and 7 Feb 2025
Thames Tideway Tunnel are proposing to carry out Statutory Infrastructure Works on Loftie Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 December 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 10 Sep 2024 at 15:50.
Monday
London Borough Of Bexley are carrying out Highway repair and maintenance works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:56.
Monday
London Borough Of Bexley are carrying out Highway improvement works on Westerham Drive, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:58.
Monday
London Borough Of Bexley are carrying out Highway improvement works on Ramillies Road, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:57.
Monday
London Borough Of Bexley are carrying out Highway improvement works on Overcourt Close, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 19:00 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 07:57.
Monday
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.
Monday
Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.
Monday
Southern Gas Networks are carrying out New service connection on Salehurst Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 09:25 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 09:54.
Friday
Thames Water are carrying out Utility repair and maintenance works on Lee High Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 19:37 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:22.
Today
London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.
16 Dec 2024 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Leamouth Road Roundabout, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 11:52.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Cornhill, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 21:56 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 08:40.
Friday
Thames Water are carrying out Utility repair and maintenance works on Whitechapel Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 14:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:21.
Sunday
Thames Water were proposing to carry out New service connection on Fulbourne Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:37.
Today
Thames Water are carrying out Remedial works on Burges Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 December 2024 at 13:44 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:43.
Friday
Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:17.
Tomorrow
Virgin Media were proposing to carry out Remedial works on High Street, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 17 Dec 2024 at 11:12.
Sunday
Southern Gas Networks are carrying out Utility repair and maintenance works on Rushey Green, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 09:00 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 12:33.
Tomorrow
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.
Tomorrow
UK Power Networks Eastern & London were proposing to carry out roadworks on Sondes Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:16.
Tomorrow
UK Power Networks Eastern & London are proposing to carry out New service connection on Sondes Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
Monday
Thames Water are carrying out Utility repair and maintenance works on White Hart Road, Plumstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 09:56 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:49.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Ladysmith Road, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 07:37 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 07:37.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:04.
Monday
Thames Water are carrying out Utility repair and maintenance works on Angus Road, Plaistow, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 10:03 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:36.
Tomorrow
Thames Water are proposing to carry out Utility repair and maintenance works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:25.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 December 2024 at 08:40 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 08:52.
18 Dec 2024 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cole Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 13:35.
23 and 30 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.
23 and 27 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:22.
25 Dec 2024 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 December 2024 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 07:30.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:55.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Montrose Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:23.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:53.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.
2 and 22 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2024 at 14:58.
2 and 22 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Rutland Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:21.
2 Jan and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 15:57.
2 Jan and 13 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 16:15.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:25.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 14:55.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:22.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 13:28.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:21.
2 Jan and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:06.
3 and 5 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:07.
3 and 5 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 January 2025 and run through until 5 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:11.
3 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:01.
4 and 5 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:05.
4 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.
4 Jan and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Hockley Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:01.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:37.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:38.
6 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:47.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:56.
6 Jan and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:00.
6 and 31 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Barking.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 16:27.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:55.
6 and 8 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Dames Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 13:37.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Green Lane, Chislehurst.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:28.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Green Lane, Chislehurst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:25.
6 Jan and 6 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kirkdale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:11.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 12:31.
6 Jan and 7 Apr 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 08:57.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:09.
6 Jan and 7 Apr 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:26.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:13.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.
6 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 08:44.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 11:18.
6 and 22 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Well Hall Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 16:36.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 09:30.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:07.
6 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Boyne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 08:40.
6 Jan and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Linden Grove, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:03.
6 and 8 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Honiton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 14:39.
6 and 8 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Honiton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Dec 2024 at 13:03.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Central Avenue, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:05.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Wickham Street, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 11:57.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Awliscombe Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:08.
6 Jan and 17 Feb 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Malpas Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Dec 2024 at 10:23.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Monkton Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:14.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Glenmore Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:11.
6 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Edison Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:16.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.
6 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.
6 and 27 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 11:52.
6 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 16:08.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:33.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Redriff Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 06:41.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:36.
6 Jan and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 25 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 06:43.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:43.
6 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 18:43.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Archangel Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 11:49.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:54.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 12 Dec 2024 at 16:17.
6 Jan and 10 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 08:28.
6 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Dec 2024 at 09:59.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Lower Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 25 Oct 2024 at 10:26.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Upper Thames Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the cycleway only.
This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 08:14.
6 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:46.
6 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:49.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 15:44.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:36.
6 and 31 Jan 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 3 Nov 2024 at 18:01.
6 Jan and 14 Feb 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 17 Dec 2024 at 20:45.
6 Jan and 14 Feb 2025
Stark Infra – Electric are proposing to carry out roadworks on Vine Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Stark Infra – Electric on 13 Dec 2024 at 11:42.
6 and 26 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Gracechurch Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Dec 2024 at 10:54.
6 and 26 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Gracechurch Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 26 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 09:56.
6 and 26 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 11:34.
6 and 14 Jan 2025
Thames Water are proposing to carry out New service connection on Greenfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 10:48.
6 and 20 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:21.
6 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:11.
6 Jan and 14 Feb 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.
6 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:57.
6 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Vallance Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:14.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets were proposing to carry out roadworks on Wodeham Gardens, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 11:14.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:21.
6 Jan and 10 Feb 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Oct 2024 at 09:22.
6 and 9 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.
6 Jan and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:30.
6 Jan and 24 May 2025
Thames Water are proposing to carry out Utility asset works on Burdett Road, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 14:05.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:43.
6 and 17 Jan 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 3 Dec 2024 at 14:53.
6 and 17 Jan 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:53.
6 and 8 Jan 2025
BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.
6 Jan and 7 Feb 2025
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:53.
7 and 9 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 10:12.
7 and 16 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 16:56.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.
7 and 10 Jan 2025
Thames Water were proposing to carry out New service connection on Melon Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:13.
7 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Melon Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:55.
7 and 9 Jan 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Katherine Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 10:18.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elsenham Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 15:57.
8 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.
9 and 24 Jan 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:55.
10 and 13 Jan 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Lathom Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:02.
10 and 17 Jan 2025
Thames Water were proposing to carry out Utility asset works on High Street North, Manor Park, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:50.
10 Jan and 8 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
10 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:30.
11 Jan and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.
11 and 12 Jan 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 14:26.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 15:07.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:02.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 09:27.
11 Jan and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 14:03.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homecroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:50.
13 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:16.
13 and 20 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 08:23.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:34.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Slades Drive, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 17:22.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:19.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welbeck Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:19.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 13:00.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.
13 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:20.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:10.
13 Jan and 28 Mar 2025
Thames Water are proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 15:27.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 10:25.
13 Jan and 28 Mar 2025
Thames Water were proposing to carry out Utility asset works on Westhorne Avenue, Eltham.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:11.
13 Jan and 14 Feb 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Heber Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:49.
13 Jan and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Heber Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:50.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:47.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 06:16.
13 and 17 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Sun Lane, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 14:14.
13 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:44.
13 Jan and 10 May 2025
Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:11.
13 Jan and 10 May 2025
Thames Water were proposing to carry out Highway improvement works on Drummond Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:39.
13 Jan and 10 May 2025
Thames Water were proposing to carry out Highway improvement works on Drummond Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 10 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:23.
13 and 22 Jan 2025
Thames Water are proposing to carry out Utility asset works on Upper North Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
13 and 22 Jan 2025
Thames Water are proposing to carry out Utility asset works on Upper North Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:38.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 13:02.
13 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, Beckton, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Dec 2024 at 15:04.
13 and 27 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 13:27.
13 Jan and 1 Feb 2025
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:29.
13 Jan and 28 Feb 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Gascoigne Road, Barking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 17 Dec 2024 at 10:01.
13 Jan and 16 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:09.
13 and 31 Jan 2025
London Borough Of Hackney are proposing to carry out New service connection on Ada Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 5 Dec 2024 at 09:16.
13 and 31 Jan 2025
London Borough Of Hackney are proposing to carry out New service connection on Ada Street, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hackney on 5 Dec 2024 at 11:50.
13 Jan and 3 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:46.
13 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 11:03.
14 and 16 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 25 Jun 2024 at 11:33.
14 and 16 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Nov 2024 at 09:18.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:42.
14 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 29 January 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:02.
14 and 17 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Merrow Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:32.
14 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Merrow Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.
14 and 16 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 11:33.
14 and 17 Jan 2025
BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Nov 2024 at 15:44.
15 and 17 Jan 2025
BT are proposing to carry out Utility asset works on Ronald Avenue, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Oct 2024 at 10:29.
15 and 17 Jan 2025
Thames Water are proposing to carry out Remedial works on Talwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:38.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:10.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:49.
16 and 18 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:33.
16 and 20 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 14:17.
17 Jan and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:20.
17 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
20 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Burnt Oak Lane, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:15.
20 Jan and 10 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Chatsworth Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:17.
20 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Brownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 16:47.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:15.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:42.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:13.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:52.
20 and 22 Jan 2025
Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:40.
20 and 23 Jan 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Oct 2024 at 16:50.
20 and 23 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on New Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:51.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 10:10.
20 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Macquarie Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:22.
20 Jan and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 11:51.
20 Jan and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Magellan Boulevard, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:02.
20 Jan and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:21.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Fenchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 16:04.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Lime Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 16:13.
20 Jan and 15 Mar 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Gainsborough Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 15 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 12:17.
20 and 23 Jan 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Keppel Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Nov 2024 at 12:03.
20 Jan and 14 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Highbridge Road, Barking.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 16:27.
20 and 25 Jan 2025
Cadent Gas are proposing to carry out Remedial works on Station Parade, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:27.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:26.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:40.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 08:14.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:36.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 07:51.
21 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:37.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:46.
21 Jan and 20 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cavell Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:53.
21 Jan and 20 Apr 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Maples Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Nov 2024 at 11:55.
22 and 27 Jan 2025
UK Power Networks Eastern & London were proposing to carry out roadworks on Burton Grove, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:33.
22 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Burton Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:57.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.
22 Jan and 10 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:50.
22 and 24 Jan 2025
Vorboss are proposing to carry out Utility repair and maintenance works on Plough Yard, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vorboss on 17 Dec 2024 at 11:03.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:51.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:21.
23 Jan and 11 Apr 2025
Thames Water are proposing to carry out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 14:15.
24 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:02.
24 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 16:03.
24 and 28 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:58.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:41.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Warwick Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:01.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Atherton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Palmerston Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.
24 Jan and 7 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Westbury Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:36.
25 and 27 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.
25 Jan and 2 Feb 2025
Thames Water are proposing to carry out New service connection on Commercial Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:32.
25 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Wheler Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:54.
26 Jan and 22 Feb 2025
Thames Water are proposing to carry out roadworks on Coopers Close, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Dec 2024 at 12:23.
27 Jan and 7 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on William Barefoot Drive, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 18:29.
27 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Collindale Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.
27 Jan and 17 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hill Crest, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:11.
27 Jan and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 13:41.
27 Jan and 10 Mar 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
27 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 18:05.
27 and 29 Jan 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:36.
27 and 29 Jan 2025
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Nov 2024 at 15:11.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:28.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:22.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Redriff Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:03.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:22.
27 Jan and 15 Apr 2025
Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:04.
27 Jan and 17 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 12:19.
27 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.
27 and 30 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 09:44.
27 and 31 Jan 2025
Thames Water were proposing to carry out roadworks on Stonewall, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:20.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:21.
27 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:03.
27 and 31 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Waghorn Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:49.
27 and 30 Jan 2025
BT were proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Nov 2024 at 08:57.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:15.
28 Jan and 1 Feb 2025
City Of London Corporation were proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 13 Aug 2024 at 11:53.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:17.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 2 Aug 2024 at 16:01.
28 Jan and 2 Feb 2025
City Of London Corporation were proposing to carry out Highway improvement works on Tower Bridge, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 12 Aug 2024 at 07:14.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:43.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:02.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 16 Aug 2024 at 12:20.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 23 Aug 2024 at 16:30.
28 Jan and 2 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 14:42.
28 Jan and 1 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Corporation on 31 Jul 2024 at 15:00.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:31.
28 and 30 Jan 2025
Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:32.
29 Jan and 17 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 11:13.
29 Jan and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
29 Jan and 1 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 3 Dec 2024 at 08:11.
30 Jan and 24 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Green, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 14:56.
31 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Sunnydene Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:09.
31 Jan and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 09:59.
31 Jan and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.
1 and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Landcroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
1 and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Landcroft Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:51.
1 Feb and 30 May 2025
London Borough Of Lewisham were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 09:39.
1 and 3 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Nov 2024 at 06:36.
1 and 9 Feb 2025
Thames Water were proposing to carry out New service connection on Prince's Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 9 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:21.
1 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on Prince's Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.
3 and 7 Feb 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.
3 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.
3 and 6 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.
3 and 6 Feb 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.
3 and 6 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.
3 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
3 and 8 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.
3 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:14.
3 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:15.
3 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 12:19.
3 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 13:10.
3 Feb and 7 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Dec 2024 at 12:33.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 08:02.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 13 Dec 2024 at 05:36.
3 Feb and 1 Aug 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 17 Dec 2024 at 16:40.
3 Feb and 25 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 29 Oct 2024 at 13:35.
3 Feb and 20 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 30 Oct 2024 at 09:23.
3 Feb and 20 Apr 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Plumstead Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 17 Dec 2024 at 16:21.
3 and 20 Feb 2025
Thames Water are proposing to carry out Highway repair and maintenance works on Drummond Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:42.
3 and 25 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:20.
3 and 6 Feb 2025
Thames Water were proposing to carry out New service connection on Horselydown Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 13:57.
3 and 6 Feb 2025
BT were proposing to carry out Utility asset works on Burslem Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Nov 2024 at 12:01.
3 and 17 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Whitechapel High Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 12:06.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whitechapel High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 13:15.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whitechapel High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 09:47.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Whitechapel High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 10:12.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 11:00.
3 and 17 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:07.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:24.
3 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:25.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:21.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:24.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:18.
3 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:40.
3 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:19.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 14:27.
3 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:23.
3 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:59.
3 and 5 Feb 2025
Thames Water were proposing to carry out roadworks on Southchurch Road, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:54.
3 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:18.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility asset works on Hockley Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 15:18.
3 and 14 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:32.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:15.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Waterloo Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:28.
3 Feb and 21 Apr 2025
Thames Water were proposing to carry out Utility asset works on Russia Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.
3 Feb and 28 Apr 2025
Thames Water are proposing to carry out Utility asset works on Russia Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:41.
3 Feb and 28 Apr 2025
Thames Water are proposing to carry out Utility asset works on Russia Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:25.
3 and 11 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:30.
3 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Winter Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 22:58.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:16.
3 and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on St Johns Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:21.
3 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:23.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Remedial works on Vyner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 14:40.
3 Feb and 21 Apr 2025
Thames Water are proposing to carry out Remedial works on Vyner Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 17:09.
3 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility asset works on Ward Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:47.
4 Feb and 6 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on John Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 12:26.
4 and 7 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Dec 2024 at 09:23.
4 and 8 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 11:17.
4 and 8 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 15:28.
4 and 8 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mile End Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 16:34.
5 and 8 Feb 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 5 Nov 2024 at 11:17.
5 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellegrove Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.
5 and 18 Feb 2025
Southern Gas Networks are proposing to carry out Utility asset works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 16:55.
6 and 11 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jennings Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 08:52.
6 Feb and 10 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 15:46.
7 and 14 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jennings Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.
10 Feb and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.
10 Feb and 10 Mar 2025
Thames Water were proposing to carry out roadworks on Barry Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.
10 Feb and 9 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.
10 Feb and 20 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elderslie Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:45.
10 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Micheldever Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:14.
10 Feb and 6 Mar 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.
10 and 28 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 3 Dec 2024 at 19:59.
10 and 28 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 06:13.
10 Feb and 24 Apr 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 26 Nov 2024 at 15:41.
10 and 15 Feb 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 4 Dec 2024 at 15:29.
10 and 18 Feb 2025
Thames Water are proposing to carry out New service connection on Greenfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:56.
10 and 18 Feb 2025
Thames Water were proposing to carry out New service connection on Plumbers Row, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 18 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:17.
10 and 14 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:38.
10 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:49.
10 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Edwin Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:31.
10 and 22 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Elm Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Road Service Road Westbound, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:33.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:36.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:17.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:15.
12 and 15 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:15.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:14.
12 and 18 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Humber Road, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 07:00.
12 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Dec 2024 at 10:04.
12 and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Commercial Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:25.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shirley Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:31.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:00.
13 and 15 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 15:48.
13 and 15 Feb 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Nov 2024 at 07:29.
13 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lewisham Road, Lewisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:29.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out roadworks on Wellington Gardens, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:16.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 09:16.
13 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Charlton Church Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:16.
13 and 28 Feb 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:40.
14 Feb and 12 Apr 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Green Dale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 08:51.
14 Feb and 11 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Robinson Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:31.
15 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hook Lane, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 11:01.
15 Feb and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 16:02.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:03.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.
15 and 17 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:15.
15 and 23 Feb 2025
Thames Water are proposing to carry out New service connection on Westferry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:13.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.
16 Feb and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.
16 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Stonewall, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:46.
17 Feb and 9 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.
17 and 19 Feb 2025
Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:30.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:50.
17 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:14.
17 and 19 Feb 2025
Thames Water were proposing to carry out Utility asset works on Danson Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:31.
17 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Berwick Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:25.
17 Feb and 31 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.
17 and 21 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bostall Lane, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:10.
17 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.
17 and 20 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:38.
17 and 23 Feb 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:52.
17 and 21 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 10:29.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:02.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:36.
18 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 16:44.
18 and 20 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Elsenham Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 13:24.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gillender Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 14:04.
18 and 22 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Twelvetrees Crescent, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 10:04.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Central Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Awliscombe Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Monkton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Glenmore Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:36.
19 and 21 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Edison Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Oct 2024 at 11:37.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 11:38.
19 and 25 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:39.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on St Mary Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 07:54.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:38.
20 and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Limehouse Link, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 10:39.
21 Feb and 21 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:00.
21 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 14:52.
21 Feb and 21 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill, Plumstead.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:22.
21 Feb and 12 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 13:29.
21 and 23 Feb 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:48.
24 Feb and 4 Mar 2025
Thames Water are proposing to carry out New service connection on Barry Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:27.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:37.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Village Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on East Dulwich Grove, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 Feb and 2 May 2025
London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Red Post Hill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:23.
24 Feb and 1 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:33.
24 Feb and 1 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 11:35.
24 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hyde Vale, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:49.
24 and 28 Feb 2025
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Hyde Vale, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 13:40.
24 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Ancaster Street, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:41.
24 Feb and 4 Mar 2025
Southern Gas Networks are proposing to carry out New service connection on Ancaster Street, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:49.
24 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bostall Lane, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 10:28.
24 and 26 Feb 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Overton Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Oct 2024 at 16:05.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 08:56.
24 Feb and 9 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 11:35.
24 and 26 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:24.
24 and 26 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Priory Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 27 Nov 2024 at 09:24.
24 Feb and 12 Apr 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Valetta Grove, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 19 Nov 2024 at 12:11.
24 Feb and 8 Mar 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Maitland Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:03.
24 Feb and 9 Mar 2025
Thames Water are proposing to carry out New service connection on Olympic Park Avenue, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:12.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carpenters Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:18.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:44.
25 and 27 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:39.
26 Feb and 10 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 07:42.
26 Feb and 10 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 10 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 09:38.
26 and 28 Feb 2025
London Borough Of Newham are proposing to carry out Highway improvement works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 26 Nov 2024 at 09:30.
27 Feb and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thornham Grove, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:19.
27 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyton Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:18.
28 Feb and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:08.
28 Feb and 6 Mar 2025
Thames Water are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jul 2024 at 08:36.
28 Feb and 6 Mar 2025
Thames Water are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 08:24.
28 Feb and 6 Mar 2025
Thames Water were proposing to carry out Utility asset works on Baring Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:03.
28 Feb and 6 Mar 2025
Thames Water are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 13:03.
28 Feb and 2 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Peckham High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 13:32.
28 Feb and 7 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:56.
28 Feb and 7 Mar 2025
Thames Water were proposing to carry out Utility asset works on Teredo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:34.
1 and 30 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:16.
1 and 30 Mar 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 16:16.
3 and 14 Mar 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Westwood Lane, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by G2 Energy IDNO on 13 Dec 2024 at 14:53.
3 and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Manor Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:33.
3 and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:21.
3 and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 11:47.
3 and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:20.
3 and 6 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 18:13.
3 and 6 Mar 2025
Thames Water were proposing to carry out Highway repair and maintenance works on Lassell Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:56.
3 and 28 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 08:27.
3 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Odessa Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 13:44.
3 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Nicholas Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 10:47.
3 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Nicholas Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Aug 2024 at 18:30.
3 and 5 Mar 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Katherine Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 27 Nov 2024 at 09:25.
3 and 5 Mar 2025
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:17.
3 and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 14:18.
3 and 5 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Monega Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:20.
4 and 6 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 16:49.
4 and 6 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Boyson Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 16 Dec 2024 at 16:49.
4 and 7 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 12:13.
5 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Magellan Boulevard, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:54.
5 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:59.
7 and 20 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:58.
7 and 9 Mar 2025
City Of London Corporation are proposing to carry out Highway improvement works on Finsbury Circus, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 9 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Corporation on 4 Jul 2024 at 13:50.
10 Mar and 10 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 12:50.
10 and 14 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cornhill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:52.
10 Mar and 15 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 15 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 15:50.
10 Mar and 25 Apr 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Gascoigne Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Dec 2024 at 15:04.
10 and 18 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:25.
10 Mar and 5 Apr 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Cross Route, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 5 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 10:10.
10 Mar and 5 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on East Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 5 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 07:29.
10 and 22 Mar 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Tavistock Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:05.
10 and 17 Mar 2025
Thames Water were proposing to carry out Utility asset works on High Street North, Manor Park, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 17 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:55.
11 and 13 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Dec 2024 at 14:05.
11 Mar and 24 Apr 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 March 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.
12 and 26 Mar 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 12 Dec 2024 at 15:47.
13 and 18 Mar 2025
Thames Water were proposing to carry out New service connection on Inverton Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 March 2025 and run through until 18 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 08:11.
13 and 15 Mar 2025
UK Power Networks Eastern & London are proposing to carry out roadworks on Manor Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 15:29.
13 and 20 Mar 2025
Thames Water are proposing to carry out Utility asset works on High Street North, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 12:57.
14 and 18 Mar 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 18 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Sep 2024 at 11:13.
14 and 18 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:14.
14 and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 25 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:42.
14 and 25 Mar 2025
Thames Water were proposing to carry out Utility asset works on Teredo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 March 2025 and run through until 25 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:39.
17 Mar and 14 Apr 2025
Thames Water are proposing to carry out Utility asset works on Overhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Albion Way, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 13 Nov 2024 at 12:25.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Albion Way, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 13 Nov 2024 at 12:53.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Mercia Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 13 Nov 2024 at 12:25.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Mercia Grove, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 13 Nov 2024 at 12:52.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 16:31.
17 and 28 Mar 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 13 Nov 2024 at 10:23.
17 and 19 Mar 2025
BT are proposing to carry out Utility asset works on Bethwin Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 07:31.
17 and 19 Mar 2025
BT were proposing to carry out Utility repair and maintenance works on Bethwin Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 15:28.
17 and 20 Mar 2025
Thames Water are proposing to carry out New service connection on Lassell Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 18:49.
17 Mar and 4 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kinglake Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:48.
17 and 21 Mar 2025
BT are proposing to carry out Utility asset works on Huntsman Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Dec 2024 at 10:59.
17 and 19 Mar 2025
Virgin Media were proposing to carry out Utility asset works on Wentworth Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Dec 2024 at 15:58.
17 and 19 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Wentworth Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Dec 2024 at 15:59.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Rosedale Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 14:21.
17 Mar and 30 May 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 15:22.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sebert Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 17:33.
Roadworks Map near to Coleraine Road, LONDON, SE3 7PF
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Coleraine Road, LONDON, SE3 7PF (47 Events)
(Scheduled Dates)
(miles)
(Scheduled: 5 Dec 2024 - 18 Dec 2024)
(Scheduled: 15 Dec 2024 - 18 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data