ROADWORKS SUMMARY
Manthorp Road, LONDON, SE18 7TA
Introduction

View current and future planned roadworks and road closures for Manthorp Road, SE18 7TA and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Manthorp Road, LONDON, SE18 7TA
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Manthorp Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
31 Mar 2024 and 26 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2024 and could run through until 26 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:03.
13 Jun 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 09:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 May 2025 at 09:23.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.
20 Jun 2025
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 26 May 2025 at 19:46.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
27 Jun 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.
27 Jun 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.
7 Apr 2026
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.
29 Jul 2024 and 15 Sep 2025
Thames Water were proposing to carry out New service connection on Hatherley Crescent, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2024 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.
12 Aug 2024 and 1 Dec 2025
Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
15 Aug 2024 and 30 Sep 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:17.
15 Aug 2024 and 30 Sep 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:16.
2 Sep 2025
Thames Water are carrying out Utility asset works on Lesney Park, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:20.
9 Sep 2024 and 18 Jul 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
31 Aug 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Apr 2025 at 15:42.
11 Jul 2025
Thames Water are carrying out Utility asset works on St Mildreds Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:30 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:45.
11 Jul 2025
Thames Water are carrying out Utility asset works on Westhorne Avenue, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 12:24 and could run through until 11 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 10:49.
18 Jul 2025
London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 14:39.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.
10 Feb and 31 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 12:12.
10 Feb and 31 Aug 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:53.
10 Feb and 27 Jun 2025
Thames Water were proposing to carry out Utility asset works on Romford Road, Manor Park, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:19.
12 Feb and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.
15 Feb and 29 Aug 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Vincent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 Jan 2025 at 16:29.
17 Feb and 4 Jul 2025
Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 8 Jan 2025 at 09:58.
4 Jul 2025
Network Rail are carrying out Works for road purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 07:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Feb 2025 at 08:11.
13 Jun 2025
Thames Water are carrying out Utility asset works on Avenue Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 14:00 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:08.
20 Feb and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.
24 Feb and 12 Jun 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.
15 Jun 2025
Riverside Energy Park are carrying out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:14.
13 Jun 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
The works started on 3 March 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Apr 2025 at 16:03.
27 Jun 2025
London Borough Of Newham are carrying out Section 50 on Leslie Road, Canning Town, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 February 2025 at 09:00 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 8 May 2025 at 09:31.
Tomorrow
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.
23 Mar and 8 Aug 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 13:45.
19 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 08:59.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:13.
Friday
Transport for London (TfL) were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 March 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:32.
30 Aug 2025
Thames Water are carrying out Utility asset works on Kingsman Street, Woolwich.
The works started on 24 March 2025 at 13:45 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 13 May 2025 at 11:40.
31 Mar and 26 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 11:42.
6 Apr and 4 Jul 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on East Rochester Way, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 April 2025 and run through until 4 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 13:57.
26 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.
8 Apr and 6 Sep 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:02.
19 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Mount Pleasant Road, Hither Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 21:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 11:02.
27 Jun 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 07:25 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2025 at 07:25.
12 Jun 2025
London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 14:39.
16 Apr and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Apr 2025 at 18:37.
13 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 08:20 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:55.
21 Apr and 16 Jun 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.
22 Apr and 30 Aug 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.
22 Apr and 11 Jul 2025
Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:17.
22 Apr and 20 Jun 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:29.
22 Apr and 23 Jun 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.
25 Apr and 19 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
28 Apr and 15 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 28 Feb 2025 at 10:08.
29 Jun 2025
Riverside Energy Park are carrying out Utility asset works on South Road, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:57.
29 Jun 2025
Riverside Energy Park are carrying out Utility asset works on Queens Road, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:15.
28 Apr and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:51.
7 Jul 2025
Thames Water are carrying out Utility asset works on Harland Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 11:30 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 12:35.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 11:59.
1 May and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.
5 Aug 2025
Thames Water are carrying out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 10:00 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 May 2025 at 11:11.
1 Jul 2025
Thames Water are carrying out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 May 2025 at 09:45 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 May 2025 at 11:12.
Sunday
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Aspen Way, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 09:12.
29 Jun 2025
Riverside Energy Park are carrying out Utility asset works on Northend Road, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 21 May 2025 at 14:50.
6 May and 4 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:41.
15 Aug 2025
Network Rail are carrying out Works for Rail Purposes on St Germans Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 6 May 2025 at 08:17.
Friday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:47.
6 May and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 09:05.
6 May and 10 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:53.
6 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nelson Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:20.
20 Jun 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Nelson Road, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.
6 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Creek Road, Deptford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:19.
20 Jun 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Creek Road, Deptford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.
6 May and 20 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Greenwich Church Street, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:18.
20 Jun 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Greenwich Church Street, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:08.
Monday
UK Power Networks Eastern & London are carrying out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 09:03.
13 Jun 2025
Thames Water are carrying out Utility asset works on Norman Road, Greenwich.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 May 2025 at 12:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 May 2025 at 06:43.
7 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.
7 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
8 May and 18 Jul 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:06.
12 May and 15 Sep 2025
Thames Water were proposing to carry out New service connection on Old Farm Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.
12 May and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:30.
12 May and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 18:50.
12 May and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:06.
30 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Exmouth Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2025 at 11:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:12.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2025 at 07:00 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 07:47.
13 May and 27 Jun 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 05:54.
14 May and 28 Jul 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Battle Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 13:37.
Sunday
Thames Water were proposing to carry out Utility repair and maintenance works on Parkhill Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Apr 2025 at 08:41.
19 May and 3 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.
6 Oct 2025
Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Olyffe Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:39.
13 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Olyffe Avenue, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 May 2025 at 10:30 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 13:35.
Today
Thames Water were proposing to carry out roadworks on Olyffe Avenue, Welling.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 May 2025 at 08:04.
Today
Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 14:44.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:09.
19 May and 16 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Heath, Charlton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:54.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:48.
Sunday
Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:15.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:09.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:52.
23 May and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ightham Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:52.
23 May and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hythe Avenue, Bexleyheath.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.
23 May and 27 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 09:53.
23 May and 15 Jun 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 11:39.
23 May and 15 Jun 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:42.
Monday
Harlaxton Energy Networks are carrying out Utility asset works on Brampton Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 27 May 2025 at 10:32.
Monday
Harlaxton Energy Networks are carrying out Utility asset works on Crook Log, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 May 2025 at 08:00 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 27 May 2025 at 10:32.
Friday
Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:37.
Friday
Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:17.
Friday
Royal Borough Of Greenwich are proposing to carry out Section 50 on St Nicholas Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Royal Borough Of Greenwich on 28 Apr 2025 at 13:33.
26 May and 27 Jun 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED were proposing to carry out New service connection on Albert Road, North Woolwich, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 06:11.
26 May and 27 Jun 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 9 May 2025 at 14:47.
26 May and 28 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.
26 May and 15 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:37.
27 May and 24 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:06.
27 May and 24 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:09.
27 May and 24 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 15:10.
27 May and 23 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 08:54.
27 May and 24 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:43.
20 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Heath Way, Erith.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 11:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 14:14.
4 Aug 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2025 at 08:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 08:29.
27 May and 2 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:29.
28 May and 10 Jun 2025
Thames Water were proposing to carry out roadworks on Thanet Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 10 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 07:45.
28 May and 20 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 12:14.
Today
Thames Water are carrying out Utility repair and maintenance works on Bardsley Lane, Greenwich.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 08:55 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 May 2025 at 11:10.
17 Jun 2025
Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 May 2025 at 21:00 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 08:17.
Today
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:25.
29 May and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bradenham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:14.
30 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Bradenham Avenue, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:09.
29 May and 26 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clinton Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 16:27.
26 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Clinton Avenue, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 08:00 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 08:14.
29 May and 13 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Lovel Avenue, Welling.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 May 2025 at 07:23.
29 May and 1 Jul 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 29 May 2025 at 13:29.
11 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Julia Gardens, Barking.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 09:20 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 15:44.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Longbridge Road, Barking.
The works started on 29 May 2025 at 11:12 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 12:05.
Sunday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:44.
Monday
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 May 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 08:43.
2 and 13 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 09:03.
2 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:47.
2 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:14.
2 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Grove, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:01.
2 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Grove, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 09:33.
Friday
Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 12:14.
Friday
Southern Gas Networks are proposing to carry out New service connection on Chieveley Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 09:21.
Friday
Southern Gas Networks were proposing to carry out New service connection on Chieveley Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 09:58.
Friday
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 11 Mar 2025 at 08:32.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Grangehill Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:05.
Monday
Thames Water are carrying out Utility repair and maintenance works on Grangehill Road, Eltham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 07:26 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:58.
2 and 23 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 16:13.
2 Jun and 28 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 15:46.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
2 and 12 Jun 2025
Thames Water are proposing to carry out Utility asset works on Colomb Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 10:31.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:37.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:23.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:32.
Thursday
London Borough Of Bexley are carrying out Highway improvement works on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 08:25.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.
Thursday
London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 28 May 2025 at 12:22.
2 Jun and 8 Aug 2025
Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 May 2025 at 09:12.
14 Jul 2025
Electricity Network Company are carrying out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 09:11.
2 and 27 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 21:31.
2 and 13 Jun 2025
London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:27.
2 and 13 Jun 2025
London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 20 May 2025 at 14:08.
20 Jun 2025
Thames Water are carrying out Utility repair and maintenance works on Glaucus Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 10:00 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.
2 Jun and 18 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
2 Jun and 13 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:43.
2 Jun and 13 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.
2 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.
2 and 22 Jun 2025
Cadent Gas were proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.
Monday
Thames Water are carrying out Utility repair and maintenance works on Yester Road, Chislehurst.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 10:24 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:02.
3 Jun and 1 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.
10 Jun 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Picardy Manorway, Belvedere.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2025 at 09:45 and could run through until 10 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:53.
Friday
Thames Water are proposing to carry out Utility repair and maintenance works on Flanders Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.
Sunday
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:08.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.
5 and 10 Jun 2025
Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:54.
5 and 10 Jun 2025
Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:55.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:47.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:17.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:15.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Cecil Avenue, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:23.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Cecil Avenue, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 19 May 2025 at 08:56.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Wilmington Gardens, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 May 2025 at 07:30.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Wilmington Gardens, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:22.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 May 2025 at 10:25.
Sunday
London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on Hurstbourne Gardens, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 19 May 2025 at 08:56.
9 and 16 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 12:40.
9 and 16 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 13:11.
9 and 16 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 10:42.
9 and 16 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Ash Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 10:02.
9 and 23 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Crossway, Mottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:07.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 08:43.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Park Road, Mottingham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 13:04.
9 Jun and 28 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 May 2025 at 10:52.
9 Jun and 28 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:29.
9 and 13 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 10:40.
9 and 13 Jun 2025
Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 13:54.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 11:30.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.
9 and 20 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 May 2025 at 16:36.
9 and 20 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:26.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:20.
9 and 11 Jun 2025
BT are proposing to carry out Utility asset works on Albury Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Apr 2025 at 11:02.
9 and 11 Jun 2025
BT are proposing to carry out Utility asset works on Albury Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Apr 2025 at 06:13.
9 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:58.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:17.
9 and 13 Jun 2025
Thames Water are proposing to carry out Utility asset works on Tyler Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jan 2025 at 13:28.
9 Jun and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 16:30.
9 and 12 Jun 2025
London Borough Of Bexley are proposing to carry out Section 50 on Picardy Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2025 at 11:36.
9 Jun and 7 Aug 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:57.
9 and 27 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Millharbour, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 08:59.
9 and 27 Jun 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Marsh Wall, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 09:00.
9 and 20 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:15.
9 and 13 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 16:16.
9 and 14 Jun 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 8 Apr 2025 at 12:11.
9 and 14 Jun 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 2 May 2025 at 10:31.
9 and 27 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Mar 2025 at 08:30.
9 and 27 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 09:38.
9 Jun and 1 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 14:01.
9 and 11 Jun 2025
Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:49.
9 and 11 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dore Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:19.
9 and 11 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:38.
10 and 12 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Woolwich Road, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 20 Mar 2025 at 10:41.
10 Jun and 4 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:38.
10 and 13 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:12.
12 Jun and 2 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:24.
12 Jun and 21 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:25.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:42.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Mar 2025 at 20:42.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 14:44.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:45.
13 and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:09.
13 and 16 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:30.
13 and 15 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 15:11.
16 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Court Farm Road, Mottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Jun 2025 at 17:23.
16 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Esher Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 08:51.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gwillim Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:14.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:55.
16 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bynon Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:47.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 16:12.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Gipsy Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:55.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Palmeira Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:56.
16 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 15:56.
16 Jun and 28 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Park, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:25.
16 Jun and 4 Jul 2025
London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.
16 Jun and 4 Jul 2025
London Borough Of Bexley are proposing to carry out Section 50 on Holly Hill Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 29 May 2025 at 16:39.
16 Jun and 4 Jul 2025
London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 22 May 2025 at 16:52.
16 Jun and 4 Jul 2025
London Borough Of Bexley are proposing to carry out Section 50 on Rutland Gate, Belvedere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 27 May 2025 at 16:35.
16 Jun and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.
16 and 18 Jun 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.
16 Jun and 6 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 6 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 May 2025 at 16:16.
16 Jun and 6 Jul 2025
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:38.
16 Jun and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:04.
16 and 19 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:35.
17 Jun and 7 Jul 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 4 Mar 2025 at 09:23.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:13.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:12.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:47.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:46.
19 Jun and 11 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:21.
19 and 21 Jun 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:36.
19 and 22 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 08:38.
20 and 23 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:12.
20 and 23 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 15:07.
20 and 23 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 16:07.
20 Jun and 16 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
23 Jun and 4 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.
23 Jun and 4 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longmead Drive, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.
23 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stansted Crescent, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 11:22.
23 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shoreham Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 12:24.
23 Jun and 1 Jul 2025
Thames Water are proposing to carry out New service connection on Burnt Oak Lane, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:52.
23 Jun and 30 Sep 2025
Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.
23 Jun and 30 Sep 2025
Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.
23 Jun and 30 Sep 2025
Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:32.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:43.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:08.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:26.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:10.
23 Jun and 28 Jul 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 1 May 2025 at 15:57.
23 Jun and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 06:21.
23 and 25 Jun 2025
Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:36.
23 Jun and 22 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:18.
23 and 26 Jun 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 26 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 May 2025 at 12:06.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Burgess Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Mar 2025 at 13:26.
23 Jun and 7 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.
23 and 25 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:48.
23 and 25 Jun 2025
Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 11:43.
23 and 25 Jun 2025
London Borough Of Newham were proposing to carry out roadworks on Ferns Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 19:35.
24 Jun and 28 Aug 2025
Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 14:38.
24 Jun and 28 Aug 2025
Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:59.
24 Jun and 1 Sep 2025
Thames Water were proposing to carry out Utility asset works on Monarch Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 June 2025 and run through until 1 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:12.
24 Jun and 2 Jul 2025
Thames Water are proposing to carry out New service connection on Colchester Avenue, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.
25 and 28 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:56.
26 Jun and 8 Sep 2025
Thames Water are proposing to carry out Utility asset works on Bullbanks Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 17:01.
26 Jun and 26 Jul 2025
London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 26 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:42.
26 Jun and 26 Jul 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 4 Apr 2025 at 17:16.
26 Jun and 18 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:21.
26 Jun and 18 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:47.
26 Jun and 18 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 18 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:50.
27 and 30 Jun 2025
Thames Water are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:24.
27 Jun and 29 Sep 2025
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.
28 Jun and 1 Sep 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.
30 Jun and 3 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:01.
30 Jun and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:02.
30 Jun and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 08:58.
30 Jun and 25 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:45.
30 Jun and 25 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:48.
30 Jun and 25 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:47.
30 Jun and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 16:06.
30 Jun and 8 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:53.
30 Jun and 8 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:33.
30 Jun and 31 Dec 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.
30 Jun and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.
30 Jun and 5 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.
30 Jun and 19 Sep 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.
1 and 21 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 15:52.
1 and 3 Jul 2025
Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:28.
1 and 7 Jul 2025
Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Apr 2025 at 09:30.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:05.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:40.
3 and 7 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:06.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:08.
3 and 7 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:13.
3 and 7 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:41.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:07.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:16.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 09:04.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 10:38.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:11.
3 and 5 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 15:42.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:44.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 09:09.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:19.
3 and 17 Jul 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 Apr 2025 at 21:51.
7 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 19:10.
7 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:11.
7 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 16:09.
7 and 9 Jul 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2025 at 14:45.
7 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.
7 Jul and 15 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 7 July 2025 and could run through until 15 October 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 15:24.
7 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:18.
7 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 07:19.
7 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Germans Place, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 06:27.
7 Jul and 31 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 31 October 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 15:48.
7 and 18 Jul 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Little Ilford Lane, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 09:27.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:20.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:35.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 12:09.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:17.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 16:34.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 11:20.
8 and 11 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:07.
9 and 11 Jul 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Apr 2025 at 11:21.
9 and 11 Jul 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 10:56.
9 and 23 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 24 Apr 2025 at 13:27.
9 and 23 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 28 Apr 2025 at 07:19.
9 Jul and 7 Aug 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 14 Jul 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:28.
11 Jul and 11 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bursdon Close, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 13:42.
14 and 16 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Nov 2024 at 16:18.
14 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup By Pass, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:57.
14 Jul and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.
14 and 24 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 16:36.
14 and 17 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 17 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 May 2025 at 11:52.
14 and 18 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:00.
14 and 18 Jul 2025
Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:30.
14 and 24 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:18.
14 and 23 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:09.
14 Jul and 8 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.
14 Jul and 8 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.
14 and 16 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 28 Apr 2025 at 16:00.
14 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.
14 Jul and 19 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.
15 Jul and 26 Aug 2025
Electricity Network Company are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 23 Apr 2025 at 07:15.
16 and 18 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Forty Acre Lane, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 14:00.
17 Jul and 7 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
19 Jul and 23 Aug 2025
Thames Water are proposing to carry out Utility asset works on Ohio Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 May 2025 at 13:35.
19 Jul and 20 Sep 2025
Thames Water are proposing to carry out Utility asset works on Lucas Avenue, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:44.
19 Jul and 20 Sep 2025
Thames Water are proposing to carry out Utility asset works on Raymond Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.
19 Jul and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Wolseley Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.
21 and 25 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 14:06.
21 and 25 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 May 2025 at 15:20.
21 and 26 Jul 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out roadworks on Avery Hill Road, Avery Hill.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 09:12.
21 and 26 Jul 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Avery Hill Road, Avery Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 9 May 2025 at 12:53.
21 and 25 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Leyland Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 May 2025 at 11:36.
21 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 13:36.
21 and 27 Jul 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:38.
21 Jul and 27 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 16:19.
21 Jul and 27 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:42.
21 Jul and 27 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:55.
21 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:43.
21 and 29 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 14:49.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.
21 Jul and 17 Sep 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 10:54.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.
21 Jul and 1 Oct 2025
Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 16:58.
21 Jul and 19 Sep 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 May 2025 at 17:04.
21 Jul and 1 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:28.
21 and 27 Jul 2025
Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:46.
21 Jul and 19 Sep 2025
Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.
22 Jul and 11 Aug 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 12:23.
22 Jul and 11 Aug 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Baring Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 11 Mar 2025 at 09:44.
23 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:27.
23 Jul and 30 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 11:09.
23 Jul and 1 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newstead Road, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 15:27.
23 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 13:33.
23 and 29 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on Dallin Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 15:10.
23 Jul and 25 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelham Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 14:49.
23 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Lane, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:10.
23 Jul and 8 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dorcis Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 08:57.
23 Jul and 8 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:25.
23 Jul and 8 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 13:43.
23 Jul and 11 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:25.
23 Jul and 8 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shakespeare Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.
23 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Mar 2025 at 07:06.
23 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 15:35.
23 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 13:56.
24 Jul and 25 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Overmead, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 16:39.
24 Jul and 25 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Overmead, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 10:07.
24 Jul and 11 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Holmesdale Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:42.
24 Jul and 11 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gipsy Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.
25 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Elsa Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 15:44.
25 Jul and 29 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheldon Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:25.
25 Jul and 31 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnehurst Avenue, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 11:28.
26 and 28 Jul 2025
Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:17.
26 and 28 Jul 2025
Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2025 at 09:27.
27 Jul and 30 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gravel Hill, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 July 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2023 at 11:16.
28 Jul and 24 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Onslow Drive, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 24 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 12:01.
28 Jul and 26 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Onslow Drive, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Mar 2025 at 13:17.
28 and 30 Jul 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:33.
28 and 30 Jul 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:25.
28 and 30 Jul 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Rochester Way, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 10:54.
28 and 30 Jul 2025
BT are proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 30 Apr 2025 at 11:21.
28 and 30 Jul 2025
BT were proposing to carry out Utility asset works on Penshurst Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 7 May 2025 at 10:35.
28 Jul and 8 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 May 2025 at 11:13.
28 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brantwood Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 15:03.
28 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowness Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:54.
28 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Erith Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:57.
28 Jul and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Court, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 15:20.
28 Jul and 13 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:50.
28 Jul and 13 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Budleigh Crescent, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 13 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 May 2025 at 09:37.
28 Jul and 4 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Brook Street, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:12.
28 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:44.
28 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Highcombe, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 21:07.
28 Jul and 1 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 May 2025 at 17:48.
28 Jul and 1 Sep 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 12:01.
28 Jul and 5 Aug 2025
Southern Gas Networks are proposing to carry out New service connection on Masons Hill, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 09:29.
28 Jul and 2 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 21:44.
28 Jul and 24 Sep 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.
28 Jul and 18 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 Feb 2025 at 14:39.
28 Jul and 4 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Eastern Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:35.
28 Jul and 2 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 13:42.
28 Jul and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Oval Road South, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:41.
29 and 31 Jul 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Dulverton Road, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 2 Jun 2025 at 13:43.
29 Jul and 29 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:41.
29 Jul and 21 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ellison Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:49.
29 Jul and 4 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brightfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 May 2025 at 15:26.
29 Jul and 19 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 13:16.
29 Jul and 19 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Millbrook Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 11:45.
30 Jul and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 15:18.
30 Jul and 2 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.
30 Jul and 2 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:31.
30 Jul and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Palmeira Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 16:14.
30 Jul and 2 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Bazalgette Way, Thamesmead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 July 2025 and run through until 2 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 12:40.
2 and 4 Aug 2025
Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.
2 and 4 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 August 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2025 at 11:01.
4 and 9 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 9 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:09.
4 and 8 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Church Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 16:31.
4 and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.
4 and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bowford Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.
4 and 13 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Shakespeare Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:54.
4 and 13 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Kingsgate Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:59.
4 and 13 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:50.
4 Aug and 24 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.
4 Aug and 24 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.
4 and 13 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:46.
4 Aug and 24 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.
4 Aug and 24 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Greenwich South Street, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:54.
4 and 13 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 May 2025 at 08:07.
4 and 13 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brampton Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 12:21.
4 and 11 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Bexley Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:17.
4 Aug and 8 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 06:18.
4 and 8 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Chancelot Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 May 2025 at 09:17.
4 Aug and 5 Sep 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Albert Road, North Woolwich, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 12 May 2025 at 09:46.
4 and 24 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:02.
4 and 24 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:19.
4 and 29 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on London Road, Barking.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 May 2025 at 15:17.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:52.
4 and 18 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:43.
4 and 18 Aug 2025
Cadent Gas were proposing to carry out Utility asset works on Gale Street, Dagenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:27.
4 and 8 Aug 2025
Cadent Gas are proposing to carry out roadworks on Washington Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 16:00.
4 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Henderson Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 08:48.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 May 2025 at 12:30.
5 and 7 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Court Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:24.
5 and 31 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:40.
6 and 25 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avery Hill Road, Avery Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 13:14.
6 and 8 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Woodland Terrace, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Apr 2025 at 07:23.
7 and 10 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 May 2025 at 13:29.
7 and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Darwin Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:35.
7 and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northumberland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:33.
7 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westwood Lane, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:38.
8 and 18 Aug 2025
Thames Water are proposing to carry out New service connection on Broadfield Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 May 2025 at 14:16.
8 and 29 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cornwall Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 09:34.
8 and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 May 2025 at 11:27.
9 and 11 Aug 2025
Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.
9 and 11 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 August 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2025 at 11:09.
10 Aug and 7 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 13:47.
11 and 27 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sidcup Hill, Sidcup.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 13:26.
11 and 14 Aug 2025
Thames Water are proposing to carry out New service connection on Chieveley Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway, verge and cycleway.
This roadwork event was last updated by Thames Water on 14 May 2025 at 12:03.
11 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Wickham Lane, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:37.
11 and 18 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 24 Feb 2025 at 10:21.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Mill Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:48.
11 and 26 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bideford Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Northumberland Park, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:44.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Limewood Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:46.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Horsa Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:39.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Avenue Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:42.
11 and 26 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Totnes Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:37.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hengist Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:35.
11 Aug and 8 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Hill, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 16:36.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Ling Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:32.
11 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Bexley Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 11 Apr 2025 at 12:17.
11 and 14 Aug 2025
Thames Water were proposing to carry out New service connection on Aperfield Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 14 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 09:54.
11 and 14 Aug 2025
Thames Water are proposing to carry out New service connection on Aperfield Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 May 2025 at 09:56.
11 and 15 Aug 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Grovebury Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 9 May 2025 at 05:46.
11 and 22 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Pintail Close, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 May 2025 at 09:01.
11 and 28 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Glaucus Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 May 2025 at 14:56.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 May 2025 at 09:30.
11 Aug and 1 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Balfour Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 11:00.
12 and 31 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Manchester Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 11:12.
12 and 15 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 May 2025 at 09:35.
13 and 15 Aug 2025
Thames Water are proposing to carry out New service connection on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 May 2025 at 15:54.
14 Aug and 5 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 09:37.
15 and 28 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ingleton Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:54.
15 and 28 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wendover Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 12:40.
16 and 18 Aug 2025
Network Rail are proposing to carry out Works for road purposes on Kennedy Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 May 2025 at 11:16.
16 and 18 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Harrow Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 May 2025 at 11:13.
18 and 20 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on The Park, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:27.
18 and 21 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Rochester Way, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:06.
18 and 27 Aug 2025
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:34.
18 and 21 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 10:32.
18 and 31 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 08:20.
18 and 31 Aug 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Ealdham Square, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 07:24.
18 Aug and 30 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:10.
18 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lyndhurst Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 15:16.
18 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Silverdale Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jan 2024 at 14:51.
18 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hamilton Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.
18 Aug and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jenton Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:12.
18 and 22 Aug 2025
Network Rail are proposing to carry out Works for Rail Purposes on Deptford High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Apr 2025 at 13:10.
18 and 22 Aug 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.
18 Aug and 8 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Dec 2024 at 07:18.
18 Aug and 20 Oct 2025
Thames Water are proposing to carry out Utility asset works on Tuskar Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 May 2025 at 06:58.
18 Aug and 6 Oct 2025
Thames Water are proposing to carry out Utility asset works on Azof Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 21 May 2025 at 06:54.
18 and 29 Aug 2025
Thames Water are proposing to carry out New service connection on Mauritius Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 May 2025 at 07:17.
18 Aug and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:12.
18 Aug and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:53.
18 Aug and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:01.
18 Aug and 7 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:34.
18 and 25 Aug 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street South, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:20.
18 and 25 Aug 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Pilgrims Way, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Newham on 19 May 2025 at 15:16.
18 and 21 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 May 2025 at 08:19.
19 Aug and 5 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cumberland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:35.
19 Aug and 8 Sep 2025
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 10:19.
20 and 23 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Canterbury Avenue, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 16:11.
20 and 23 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Apr 2025 at 09:06.
20 and 23 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Foots Cray Lane, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 15:58.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Ivedon Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:53.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hazeldene Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Kenmere Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:51.
25 and 29 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Teignmouth Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 10:52.
25 and 31 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:47.
25 Aug and 22 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:28.
25 and 31 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Brook Street, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 26 Feb 2025 at 13:04.
25 Aug and 15 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:35.
25 Aug and 15 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Avenue, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 15:30.
25 and 29 Aug 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bentham Road, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 May 2025 at 08:52.
25 Aug and 3 Oct 2025
Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.
26 and 30 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Manor Way, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 May 2025 at 11:40.
26 and 30 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hurst Road, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 10:21.
26 Aug and 6 Sep 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 6 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 14:25.
26 Aug and 1 Sep 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 4 Apr 2025 at 07:40.
26 and 31 Aug 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2025 and run through until 31 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 07:57.
26 Aug and 6 Sep 2025
London Borough Of Newham are proposing to carry out Section 50 on Ruscoe Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:34.
27 and 30 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Groombridge Close, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:17.
27 and 30 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Sutherland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:20.
27 and 30 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Ingleton Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:15.
27 and 30 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Wendover Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:12.
27 and 30 Aug 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Westwood Lane, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jun 2025 at 10:09.
27 Aug and 6 Sep 2025
London Borough Of Newham are proposing to carry out Section 50 on Rathbone Street, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 6 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 13 May 2025 at 11:36.
27 and 31 Aug 2025
London Borough Of Newham are proposing to carry out Section 50 on Welfare Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 May 2025 at 16:35.
30 Aug and 11 Oct 2025
Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.
Roadworks Map near to Manthorp Road, LONDON, SE18 7TA (68 Events)



























































































































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Manthorp Road, LONDON, SE18 7TA (68 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 May 2025 - 5 Jun 2025)
(Scheduled: 17 Mar 2025 - 23 Jun 2025)
(Scheduled: 3 Jun 2025 - 9 Jun 2025)
(Scheduled: 2 Jun 2025 - 13 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data