ROADWORKS SUMMARY
Coxwell Road, LONDON, SE18 1AN
Introduction

View current and future planned roadworks and road closures for Coxwell Road, SE18 1AN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Coxwell Road, LONDON, SE18 1AN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Coxwell Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.
31 Oct 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 3 Sep 2025 at 08:45.
7 Apr 2026
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.
12 Aug 2024 and 1 Dec 2025
Thames Water were proposing to carry out New service connection on Faraday Avenue, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 1 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:28.
15 Aug 2024 and 30 Sep 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:16.
15 Aug 2024 and 30 Sep 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:17.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 08:20.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.
12 Feb and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.
3 Oct 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
The works started on 3 March 2025 at 09:30 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 17 Sep 2025 at 08:59.
Friday
London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.
Friday
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 07:25 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 2 Jul 2025 at 15:33.
6 May and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 May 2025 at 09:05.
12 May and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:30.
12 May and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2025 at 18:50.
19 May and 3 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.
31 Oct 2025
Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Sep 2025 at 10:41.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
2 Jun and 17 Dec 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.
17 Dec 2025
London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.
These works are categorised as Major.
The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.
2 Jun and 18 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
23 Jun and 30 Sep 2025
Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.
23 Jun and 30 Sep 2025
Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.
23 Jun and 7 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:23.
Monday
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.
30 Jun and 31 Dec 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.
Tomorrow
Thames Water are carrying out Utility asset works on Bullbanks Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 July 2025 at 08:00 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 16:18.
10 Oct 2025
London Borough Of Newham are carrying out Section 50 on Wharfside Road, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 July 2025 at 09:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 8 Sep 2025 at 13:32.
29 Aug 2026
Network Rail are carrying out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 July 2025 at 14:00 and could run through until 29 August 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 1 Sep 2025 at 08:08.
31 Dec 2025
London Borough Of Bexley are carrying out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 08:00 and could run through until 31 December 2025. The works will impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 7 Jul 2025 at 16:38.
5 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Choats Road, Barking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 08:00 and could run through until 5 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:42.
4 Oct 2025
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 22:10 and could run through until 4 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 12:54.
14 Jul and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.
8 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 July 2025 at 08:00 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Jul 2025 at 12:43.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:24.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:25.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 06:49.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:25.
21 Jul and 1 Oct 2025
Thames Water were proposing to carry out Utility asset works on Bullbanks Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 May 2025 at 16:58.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:26.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 06:24.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) were proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 30 January 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 13:30.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2025 at 13:38.
21 Jul 2025 and 30 Jan 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 16:30.
21 Jul and 30 Nov 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on West Parkside, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Greenwich on 11 Aug 2025 at 16:30.
23 Jul and 30 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Selborne Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:07.
Tomorrow
Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 29 May 2025 at 15:20.
30 Jul and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 17 Jun 2025 at 16:29.
19 Oct 2025
Network Rail are carrying out Works for road purposes on Kennedy Road, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Sep 2025 at 16:32.
19 Oct 2025
Network Rail are carrying out Works for Rail Purposes on Harrow Road, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Sep 2025 at 12:48.
19 Oct 2025
Network Rail are carrying out Works for Rail Purposes on Blake Avenue, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 August 2025 at 09:00 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Sep 2025 at 12:48.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackheath Road, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:12.
24 Oct 2025
Transport for London (TfL) are carrying out Highway improvement works on Greenwich South Street, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 08:11.
Friday
Thames Water are proposing to carry out Utility asset works on Wolseley Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 11:07.
6 Aug and 3 Oct 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Winston Way, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Redbridge on 10 Sep 2025 at 10:01.
7 Aug and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 7 Jul 2025 at 15:58.
7 Aug and 6 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 24 Jul 2025 at 16:53.
10 Dec 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lakeside Close, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 August 2025 at 05:00 and could run through until 10 December 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 08:02.
15 Aug and 10 Oct 2025
Thames Water are proposing to carry out Utility asset works on Braemar Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 12:42.
18 Aug and 30 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 30 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 10 Jun 2025 at 11:30.
18 Aug and 1 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 06:04.
10 Nov 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 10:30 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 10:51.
18 Aug and 20 Oct 2025
Thames Water were proposing to carry out Utility asset works on Tuskar Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 20 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.
18 Aug and 6 Oct 2025
Thames Water were proposing to carry out Utility asset works on Azof Street, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 6 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:26.
6 Oct 2025
Thames Water are carrying out Utility asset works on Raymond Road, Upton Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 August 2025 at 15:06 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 14:04.
22 Aug and 2 Oct 2025
London Borough Of Barking And Dagenham are proposing to carry out Utility asset works on Heathway, Dagenham.
These works are categorised as Major.
The works will start on or after 22 August 2025 and could run through until 2 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Sep 2025 at 14:40.
25 Aug and 3 Oct 2025
Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 August 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 15:33.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Westmoreland Avenue, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 19:30 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 08:24.
22 Oct 2025
Thames Water are carrying out Disconnection or alteration of supply on Coleman Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 August 2025 at 12:30 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:51.
30 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Pretoria Road, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 10:30 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 15:16.
Tomorrow
Royal Borough Of Greenwich are carrying out Highway improvement works on Lewisham Road, Lewisham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 August 2025 at 23:00 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 19 Sep 2025 at 09:50.
30 Aug and 11 Oct 2025
Thames Water are proposing to carry out Utility asset works on Belton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:26.
8 Oct 2025
Thames Water are carrying out Utility asset works on Belton Road, Forest Gate, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2025 at 08:13 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 14:18.
1 Sep 2025 and 31 Jan 2026
Thames Water were proposing to carry out New service connection on Betterton Drive, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:26.
1 Sep and 6 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 6 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 11:34.
1 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 May 2025 at 14:39.
Sunday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crombie Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 28 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:20.
1 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 15:24.
1 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 11:53.
1 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 11:54.
10 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Buckingham Avenue, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:06.
Monday
Thames Water are proposing to carry out Utility asset works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Aug 2025 at 12:08.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:41.
Friday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:43.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 13:40.
Friday
Royal Borough Of Greenwich are proposing to carry out Section 50 on Godstow Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 23 Jul 2025 at 12:32.
Monday
Royal Borough Of Greenwich are carrying out Section 50 on Godstow Road, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 09:00 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 2 Sep 2025 at 11:06.
1 Sep and 7 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 29 Jul 2025 at 09:42.
1 Sep and 7 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Newham Way, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 15:38.
1 Sep and 7 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:10.
1 Sep and 7 Nov 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 16:05.
1 Sep and 31 Dec 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Maplestead Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Jul 2025 at 15:41.
1 Sep and 31 Dec 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 1 Jul 2025 at 15:43.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Avenue Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 15:11.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glynde Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 15:12.
15 Dec 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 17:30 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 11:45.
2 Sep and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 11:54.
2 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 11:21.
6 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2025 at 09:30 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 10:39.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Road, Bexleyheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:18.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Road, Bexleyheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:15.
Today
Thames Water are carrying out Utility repair and maintenance works on Claridge Way, Thamesmead.
The works started on 3 September 2025 at 10:29 and could run through until 23 September 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 16:11.
5 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Bursdon Close, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 September 2025 at 09:30 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 11:21.
6 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Old Farm Avenue, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2025 at 12:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 13:16.
8 Sep and 5 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyncham Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 5 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:21.
8 Sep and 5 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 5 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:22.
Sunday
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 10:27.
8 Sep and 27 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Langton Way, Blackheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Jun 2025 at 15:03.
8 Sep and 8 Oct 2025
Thames Tideway Tunnel are proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 8 September 2025 and could run through until 8 October 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.
8 Sep and 8 Oct 2025
Thames Tideway Tunnel were proposing to carry out Highway improvement works on Hapenny Hatch Footpath, Greenwich.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 8 September 2025 and run through until 8 October 2025. The works were due to impact the footway, carriageway and cycleway.
This roadwork event was last updated by Thames Tideway Tunnel on 12 Sep 2025 at 07:51.
Monday
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:36.
10 Nov 2025
Thames Water are carrying out Utility asset works on Beltwood Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2025 at 10:45 and could run through until 10 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:07.
8 Sep and 14 Oct 2025
INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED are proposing to carry out New service connection on Connaught Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by INDEPENDENT DISTRIBUTION CONNECTION SPECIALISTS LIMITED on 16 Jun 2025 at 10:51.
8 Sep and 28 Nov 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 28 May 2025 at 08:30.
9 Sep and 5 Nov 2025
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 16:26.
9 Sep and 3 Dec 2025
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:14.
9 Sep and 14 Nov 2025
Royal Borough Of Greenwich were proposing to carry out Section 50 on Invermore Place, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 11 Sep 2025 at 10:10.
9 Sep and 14 Nov 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Invermore Place, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Sep 2025 at 09:27.
9 Sep and 8 Oct 2025
Royal Borough Of Greenwich were proposing to carry out Section 50 on Tunnel Avenue, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 8 Sep 2025 at 13:01.
9 Sep and 8 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Tunnel Avenue, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 06:11.
19 Dec 2025
Thames Water are carrying out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 September 2025 at 10:00 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:44.
5 Dec 2025
Transport for London (TfL) are carrying out Highway improvement works on East Rochester Way, Bexley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 September 2025 at 22:00 and could run through until 5 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 08:57.
Sunday
London Borough Of Bexley are carrying out Highway improvement works on Royal Road, Sidcup.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:00 and could run through until 28 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 08:20.
15 Sep and 19 Dec 2025
Thames Water were proposing to carry out New service connection on Bursdon Close, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:27.
15 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 12:00.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hurstwood Avenue, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 11:14.
15 Sep and 12 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Braundton Avenue, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 12 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:22.
15 Sep and 3 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Jun 2025 at 13:27.
15 Sep and 15 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:32.
13 Oct 2025
Thames Water are carrying out Utility asset works on Lewisham Road, Lewisham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 11:30 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:42.
15 Sep and 24 Oct 2025
Thames Water were proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:27.
15 Sep and 27 Oct 2025
Thames Water are proposing to carry out Utility asset works on Garfield Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2025 at 10:46.
30 Sep 2025
Thames Water are carrying out Utility repair and maintenance works on Baden Road, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2025 at 08:00 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:30.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Arcadian Avenue, Bexley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 18:52 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 11:05.
16 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westmoreland Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 16:41.
16 Sep and 10 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Foxes Dale, Blackheath.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 16 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:35.
16 Sep and 9 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Aug 2025 at 09:16.
16 Sep and 9 Oct 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 06:55.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Azof Street, Greenwich.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 14:30 and could run through until 29 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 13:26.
4 Nov 2025
Thames Water are carrying out Utility asset works on Thorngrove Road, Upton Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 15:41 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:41.
Today
Thames Water are carrying out Utility repair and maintenance works on Nithdale Road, Plumstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 10:54 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:34.
Today
Thames Water are carrying out Utility repair and maintenance works on Selsdon Road, Upton Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 09:59 and could run through until 23 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:22.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Avery Hill Road, Avery Hill.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2025 at 17:01 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 12:06.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Ramillies Road, Sidcup.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2025 at 09:13 and could run through until 24 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 10:39.
19 Sep and 2 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Nathan Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 5 Sep 2025 at 14:36.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Shaftesbury Road, Forest Gate, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 September 2025 at 11:44 and could run through until 25 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Sep 2025 at 13:52.
20 Sep and 22 Nov 2025
Thames Water are proposing to carry out Utility asset works on Thorngrove Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:46.
20 Sep and 22 Nov 2025
Thames Water are proposing to carry out Utility asset works on Penge Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:47.
Friday
Thames Water are carrying out Utility repair and maintenance works on Edgebury, Chislehurst.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 September 2025 at 13:59 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 16:28.
21 Sep and 7 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on London Road, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2025 at 11:03.
21 Sep and 8 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Highbridge Road, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 14:51.
22 Sep and 5 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Valentine Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 15:57.
22 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Jun 2025 at 16:43.
22 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakley Drive, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:07.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.
22 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jul 2025 at 13:47.
22 Sep and 3 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Blackfen Road, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2025 at 13:14.
22 Sep and 3 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Upton Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jul 2025 at 14:01.
22 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upton Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Jul 2025 at 14:38.
22 Sep and 6 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 13:19.
22 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stuart Mantle Way, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:53.
22 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stuart Mantle Way, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 15:45.
22 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 10:50.
22 Sep and 10 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 09:14.
Tomorrow
London Borough Of Bexley are proposing to carry out Highway improvement works on Abbotts Walk, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:30.
Tomorrow
London Borough Of Bexley are carrying out Highway improvement works on Abbotts Walk, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2025 at 12:30.
Tomorrow
London Borough Of Bexley are proposing to carry out Highway improvement works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:32.
Tomorrow
London Borough Of Bexley are carrying out Highway improvement works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 22 Sep 2025 at 12:31.
22 Sep and 20 Dec 2025
Thames Water are proposing to carry out Utility asset works on Lesney Park, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 20 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2025 at 17:54.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:42.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Jun 2025 at 16:08.
13 Oct 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Barnfield Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 08:00 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 09:03.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Barnfield Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 13:57.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 15:48.
22 Sep and 13 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuxley Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 13:24.
22 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 11:34.
22 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Riverdale Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 13:43.
11 Oct 2025
London Borough Of Tower Hamlets are carrying out Highway improvement works on Manchester Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 09:30 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 22 Sep 2025 at 09:49.
22 Sep and 5 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Blackwall Lane, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 29 Aug 2025 at 16:30.
22 Sep and 11 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 11 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 8 Sep 2025 at 09:48.
22 Sep and 31 Oct 2025
Royal Borough Of Greenwich were proposing to carry out Section 50 on Invermore Place, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 16:49.
22 Sep and 31 Oct 2025
Royal Borough Of Greenwich were proposing to carry out Section 50 on Plumstead Road, Woolwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 9 Sep 2025 at 15:56.
22 Sep 2025 and 31 Oct 2026
Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 31 October 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:01.
Thursday
Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Grovebury Road, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 08:00 and could run through until 25 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 22 Sep 2025 at 08:02.
22 Sep and 3 Oct 2025
ESP Electricity are proposing to carry out Utility asset works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Sep 2025 at 11:02.
22 Sep and 15 Oct 2025
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on West India Dock Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Sep 2025 at 11:34.
Saturday
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 27 September 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 10:35.
22 Sep and 18 Oct 2025
Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 September 2025 and run through until 18 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.
22 Sep and 17 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 9 Jun 2025 at 10:04.
22 Sep and 17 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Tollgate Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 10:02.
Friday
Thames Water are carrying out New service connection on Beaumont Road, Plaistow, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 09:10 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 10:15.
22 Sep 2025 and 9 Jan 2026
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Jun 2025 at 14:55.
Saturday
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 27 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2025 at 11:32.
19 Dec 2025
London Borough Of Redbridge are carrying out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 September 2025 at 07:57 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 22 Sep 2025 at 07:59.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Jun 2025 at 09:17.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Jun 2025 at 13:39.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Jul 2025 at 07:45.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Aug 2025 at 10:39.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 12:06.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Sep 2025 at 10:03.
Friday
BT are proposing to carry out Utility asset works on Baring Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 11 Sep 2025 at 11:07.
23 Sep and 14 Oct 2025
Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Aug 2025 at 08:50.
23 Sep and 14 Oct 2025
Thames Water are proposing to carry out New service connection on Kidbrooke Park Road, Kidbrooke.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2025 at 09:34.
23 Sep and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 06:28.
23 Sep and 17 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2025 and could run through until 17 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:42.
24 Sep and 18 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Sep 2025 at 16:40.
24 Sep and 28 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Sep 2025 at 16:38.
24 Sep and 15 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Jun 2025 at 15:27.
Friday
London Borough Of Bexley are proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 21 May 2025 at 16:03.
Friday
London Borough Of Bexley were proposing to carry out Highway improvement works on Alsike Road, Abbey Wood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 08:16.
24 Sep and 2 Oct 2025
Royal Borough Of Greenwich were proposing to carry out Section 50 on Woolwich High Street, Woolwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 September 2025 and run through until 2 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 19 Sep 2025 at 09:59.
24 Sep and 2 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Woolwich High Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 19 Sep 2025 at 12:52.
25 Sep and 17 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 15:40.
29 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 27 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2025 at 08:44.
29 Sep and 20 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:19.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Broadway, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:17.
29 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2025 at 13:16.
29 Sep and 26 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 12:17.
29 Sep and 21 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sun Court, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Jun 2025 at 16:03.
29 Sep and 10 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:39.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Elsa Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 10:24.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Avondale Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:15.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Ivedon Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:11.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hazeldene Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:09.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Kenmere Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:03.
29 Sep and 2 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Teignmouth Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 29 Apr 2025 at 14:07.
29 Sep and 3 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 30 Jun 2025 at 13:31.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallions Road, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:34.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:07.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:18.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Gallon Close, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:00.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:01.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:46.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Charlton Lane, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 13:08.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Penhall Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Westmoor Street, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:35.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:03.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastmoor Street, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:14.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:17.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Cleveley Close, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Prospect Vale, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:16.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Pett Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:44.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 07:23.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Tamar Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:42.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:37.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:43.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) were proposing to carry out Highway improvement works on Kingsman Street, Woolwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 29 March 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 12:59.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Kingsman Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:39.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) were proposing to carry out Highway improvement works on Boneta Road, Woolwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 31 July 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:02.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:04.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Boneta Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:15.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:01.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 13:16.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 14:09.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:05.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Leda Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 06:16.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Church Hill, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:41.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:04.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:11.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2025 at 08:55.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 16:30.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:35.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Ferry Roundabout, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 13:58.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Ferry Roundabout, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 22 Sep 2025 at 14:29.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 13:15.
29 Sep 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 14:07.
29 Sep 2025 and 31 Jul 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 31 July 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 15:49.
29 Sep 2025 and 29 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Ferry Approach, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 29 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2025 at 09:19.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out New service connection on Rathbone Street, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2025 at 16:11.
29 Sep and 3 Oct 2025
Thames Water are proposing to carry out New service connection on Tant Avenue, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Jun 2025 at 16:06.
29 Sep and 23 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:45.
29 Sep and 23 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 12:46.
29 Sep and 3 Nov 2025
Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 15:34.
29 Sep and 1 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Brooks Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 16 Jul 2025 at 11:37.
29 Sep and 1 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 12:32.
29 Sep and 19 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:20.
29 Sep and 19 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 16:10.
29 Sep and 19 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 08:54.
29 Sep and 1 Oct 2025
London Borough Of Newham were proposing to carry out Highway improvement works on Brooks Road, Plaistow, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 2 Jul 2025 at 11:29.
29 Sep and 13 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Gale Street, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jun 2025 at 12:01.
30 Sep and 28 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 14:27.
30 Sep and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Blackthorn Grove, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 15:49.
1 and 21 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Brookway, Blackheath.
These works are categorised as Major.
There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.
The works will start on or after 1 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2025 at 06:52.
1 Oct 2025 and 31 Jul 2026
Royal Borough Of Greenwich were proposing to carry out Section 50 on Tunnel Avenue, Greenwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 31 July 2026. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Royal Borough Of Greenwich on 15 Sep 2025 at 10:15.
1 and 3 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Tarling Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 10 Jul 2025 at 09:34.
1 and 3 Oct 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 October 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Jun 2025 at 12:31.
1 Oct 2025 and 28 Feb 2027
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alfreds Way, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 28 February 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 08:45.
1 Oct and 19 Nov 2025
Thames Water are proposing to carry out Utility asset works on Penge Road, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2025 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:25.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Aug 2025 at 10:13.
3 Oct 2025 and 1 Oct 2026
Network Rail were proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 October 2025 and run through until 1 October 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 08:44.
3 and 6 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:18.
3 and 6 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 9 Sep 2025 at 12:20.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 10:24.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 13:31.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:43.
3 Oct 2025 and 1 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 1 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 29 Aug 2025 at 14:54.
3 Oct and 7 Nov 2025
Thames Water are proposing to carry out Utility asset works on Ismailia Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Sep 2025 at 15:41.
6 and 8 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on St Mildreds Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Jun 2025 at 11:09.
6 Oct and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 12:27.
6 Oct and 2 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Donaldson Road, Plumstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:18.
6 Oct and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 09:15.
6 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Moordown, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 15:20.
6 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ankerdine Crescent, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Jun 2025 at 16:50.
6 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:21.
6 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Jun 2025 at 07:22.
6 and 10 Oct 2025
Thames Water are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2025 at 15:50.
6 and 11 Oct 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 09:50.
6 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 16:34.
6 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 May 2025 at 19:53.
6 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Jul 2025 at 16:12.
6 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 12:05.
6 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:27.
6 and 17 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wharfside Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Jul 2025 at 09:39.
6 and 17 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Wharfside Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Sep 2025 at 11:41.
6 Oct and 12 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 11:40.
6 Oct and 12 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 16:30.
6 and 8 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Wakefield Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 17 Sep 2025 at 14:14.
6 and 8 Oct 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Wakefield Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 19 Sep 2025 at 15:36.
6 Oct 2025 and 31 Mar 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Maplestead Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Sep 2025 at 14:28.
6 Oct 2025 and 31 Mar 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Goresbrook Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Sep 2025 at 14:28.
6 and 10 Oct 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Dorset Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2025 at 16:36.
6 and 10 Oct 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Dorset Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 19 Sep 2025 at 12:53.
6 Oct and 28 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.
6 and 10 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Katherine Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Jul 2025 at 10:40.
6 and 13 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Forest View Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Jul 2025 at 14:33.
6 and 13 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Forest View Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 10:11.
6 Oct 2025 and 31 Mar 2026
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Heathway, Dagenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Aug 2025 at 12:47.
8 and 10 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Slade Green Road, Slade Green, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 11:45.
9 and 20 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by BT on 29 Jul 2025 at 07:31.
9 and 20 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by BT on 4 Aug 2025 at 12:36.
9 and 24 Oct 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Halley Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 31 Jul 2025 at 10:06.
9 and 24 Oct 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Gainsborough Avenue, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 09:46.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 09:14.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 11:45.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 12:11.
11 and 13 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 24 Jul 2025 at 13:30.
11 Oct and 22 Nov 2025
Thames Water are proposing to carry out Utility asset works on Ismailia Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 October 2025 and could run through until 22 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.
13 and 17 Oct 2025
Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Jul 2025 at 08:38.
13 and 17 Oct 2025
Thames Water are proposing to carry out New service connection on Imperial Way, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Aug 2025 at 13:39.
13 and 27 Oct 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Road West, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 27 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 09:33.
13 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 11:46.
13 and 27 Oct 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Sep 2025 at 12:56.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:49.
13 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:47.
13 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:58.
13 Oct and 3 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ely Close, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:39.
13 and 17 Oct 2025
Thames Water are proposing to carry out New service connection on Blenheim Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 18:49.
13 and 16 Oct 2025
BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 13 Aug 2025 at 10:17.
13 Oct and 4 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Jul 2025 at 12:29.
13 Oct and 14 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 07:56.
13 and 16 Oct 2025
London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Lens Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:47.
13 and 31 Oct 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Green Street, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 09:13.
14 and 17 Oct 2025
Thames Water were proposing to carry out roadworks on Store Road, North Woolwich, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:39.
14 and 16 Oct 2025
London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Charles Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:46.
15 and 18 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Manor Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 12:32.
15 and 18 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Hurst Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 09:45.
15 and 17 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Denton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:16.
15 and 17 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Thorngrove Road, Upton Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Jul 2025 at 16:39.
16 Oct and 18 Dec 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2025 and could run through until 18 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:41.
17 and 21 Oct 2025
Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 October 2025 and run through until 21 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2025 at 08:28.
17 Oct and 14 Nov 2025
London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Fourth Avenue, Manor Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 10:29.
18 Oct and 6 Dec 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 October 2025 and run through until 6 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
20 Oct and 4 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Farm Road East, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 10:09.
20 Oct and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southwold Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 12:16.
20 Oct and 2 Nov 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Southwold Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 19 Aug 2025 at 12:46.
20 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2025 at 10:20.
20 and 24 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Fernbrook Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lewisham on 3 Sep 2025 at 12:12.
20 and 24 Oct 2025
Thames Water are proposing to carry out roadworks on Dallin Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jun 2025 at 11:50.
20 Oct and 2 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Barnehurst Avenue, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 11:57.
20 and 31 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Jul 2025 at 10:49.
20 and 24 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 5 Jun 2025 at 13:47.
20 and 24 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 6 Jun 2025 at 10:11.
20 Oct and 2 Nov 2025
Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Norman Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 3 Sep 2025 at 13:15.
20 and 28 Oct 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 4 Sep 2025 at 10:51.
20 Oct and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:10.
20 Oct and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 12:09.
20 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:56.
20 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Aug 2025 at 13:57.
20 and 24 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Caradoc Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:10.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Ferry Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:49.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Westferry Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 31 Jul 2025 at 12:18.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Manchester Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 4 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 23 Jul 2025 at 08:05.
20 Oct and 4 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on East Ferry Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:51.
20 and 23 Oct 2025
Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Jul 2025 at 09:47.
20 and 31 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:09.
20 and 24 Oct 2025
London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Whyteville Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 15 Sep 2025 at 09:46.
22 and 24 Oct 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 8 Sep 2025 at 13:51.
22 and 24 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Carisbrooke Avenue, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Jul 2025 at 09:31.
22 and 24 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Okehampton Crescent, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Sep 2025 at 11:47.
22 and 28 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Whitworth Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2025 at 14:09.
22 Oct and 3 Dec 2025
Thames Water are proposing to carry out Utility asset works on Mayfield Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:58.
23 and 25 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:42.
24 Oct 2025 and 23 Jan 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2025 and run through until 23 January 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
24 Oct and 24 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 October 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
24 Oct and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 14:04.
24 Oct and 3 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Salmon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 11:56.
25 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 11 Jun 2025 at 10:23.
25 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Sep 2025 at 10:01.
25 and 27 Oct 2025
Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Sep 2025 at 10:51.
25 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:27.
25 Oct and 16 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harlington Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 16 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:46.
25 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beechcroft Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:13.
25 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beechcroft Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 08:59.
25 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 12:53.
25 Oct and 7 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heath Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:30.
25 Oct and 12 Nov 2025
Telefonica UK were proposing to carry out Utility asset works on River Road, Barking.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 October 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 5 Sep 2025 at 15:59.
27 Oct and 19 Dec 2025
Thames Water were proposing to carry out New service connection on Riverside Road, Sidcup.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 19 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 11:25.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brendon Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:50.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Ermington Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:51.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Agaton Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:41.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Dulverton Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 12:36.
27 and 29 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bladindon Drive, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 14 May 2025 at 13:38.
27 and 29 Oct 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Bladindon Drive, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Apr 2025 at 14:20.
27 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:19.
27 Oct 2025 and 2 Mar 2026
Thames Water are proposing to carry out Utility asset works on Rochester Drive, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 March 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:36.
27 Oct and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 22 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:04.
27 Oct and 7 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:25.
27 Oct and 7 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:33.
27 and 30 Oct 2025
Thames Water were proposing to carry out New service connection on Chieveley Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 30 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 19 Sep 2025 at 09:13.
27 and 31 Oct 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Crook Log, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Jul 2025 at 16:24.
27 Oct and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:45.
27 Oct and 15 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 15 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 08:46.
27 Oct and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 10:59.
27 Oct and 17 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Harlington Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Jul 2025 at 14:30.
27 Oct and 10 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Dover Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 07:49.
27 and 31 Oct 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 2 Jul 2025 at 16:06.
27 and 31 Oct 2025
T-Mobile (UK) are proposing to carry out Utility asset works on Parsonage Manorway, Belvedere.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 19 Sep 2025 at 14:58.
27 Oct and 4 Nov 2025
Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 4 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Sep 2025 at 11:49.
27 and 31 Oct 2025
Royal Borough Of Greenwich were proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Jun 2025 at 11:43.
27 and 31 Oct 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Timbercroft Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Jun 2025 at 11:46.
27 Oct and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Harold Avenue, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Sep 2025 at 14:08.
27 Oct and 12 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:47.
27 Oct and 14 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Manchester Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jul 2025 at 10:51.
27 Oct and 9 Nov 2025
Thames Water are proposing to carry out New service connection on Masons Hill, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Jul 2025 at 17:59.
27 and 31 Oct 2025
Virgin Media are proposing to carry out Utility asset works on Woodland Terrace, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 4 Aug 2025 at 05:48.
27 Oct and 14 Nov 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 28 Jul 2025 at 12:45.
27 Oct 2025 and 2 Jan 2026
Thames Water were proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 2 January 2026. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 12:15.
27 and 30 Oct 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Factory Road, North Woolwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 30 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jul 2025 at 09:19.
27 Oct and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Albert Road, North Woolwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:20.
27 Oct and 1 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Manor Way, North Woolwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 10:44.
27 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:47.
27 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.
27 Oct and 9 Nov 2025
Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Sep 2025 at 13:57.
27 and 29 Oct 2025
Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Jul 2025 at 15:32.
27 and 29 Oct 2025
Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:12.
27 and 31 Oct 2025
Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2025 at 18:22.
27 Oct and 3 Nov 2025
Thames Water are proposing to carry out New service connection on Howards Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:45.
27 Oct and 1 Nov 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Renwick Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 16 Sep 2025 at 09:02.
27 and 31 Oct 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Greatfields Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Sep 2025 at 10:01.
27 and 31 Oct 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Blake Avenue, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 15 Sep 2025 at 09:42.
27 Oct 2025 and 28 Feb 2026
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Romford Road, Forest Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 28 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 11 Aug 2025 at 10:18.
28 Oct and 14 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Frances Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Sep 2025 at 09:53.
29 and 31 Oct 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Chinbrook Road, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 18 Aug 2025 at 11:23.
29 Oct and 2 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 October 2025 and run through until 2 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jul 2025 at 11:15.
30 Oct 2025 and 30 Oct 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 30 October 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Sep 2025 at 11:20.
30 Oct and 1 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Porthkerry Avenue, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 14 Jul 2025 at 07:49.
30 Oct and 1 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Porthkerry Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 11 Aug 2025 at 09:44.
30 Oct and 13 Nov 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Chequers Lane, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:01.
30 Oct and 13 Nov 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 8 Aug 2025 at 09:14.
31 Oct and 18 Dec 2025
Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:26.
1 Nov and 6 Dec 2025
Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 May 2025 at 15:35.
3 Nov and 19 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:11.
3 Nov and 1 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 1 December 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:34.
3 Nov 2025 and 19 Jan 2026
Thames Water are proposing to carry out Utility asset works on South View Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:07.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Queenscroft Road, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:08.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratton Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:46.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glengall Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Aug 2025 at 11:47.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 14:20.
3 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 15:29.
3 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 15:30.
3 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lincoln Close, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:58.
3 and 7 Nov 2025
Thames Water were proposing to carry out New service connection on Blenheim Drive, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:45.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Northumberland Close, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 May 2025 at 11:18.
3 and 26 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 13:08.
3 and 26 Nov 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lindsell Street, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 14:24.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Mill Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:43.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Northumberland Park, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:36.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Limewood Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:36.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Horsa Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:44.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Avenue Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:35.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Hengist Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:34.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Ling Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 16:34.
3 and 15 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 15 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 May 2025 at 15:41.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:08.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:38.
3 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Jul 2025 at 16:09.
3 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.
3 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Osborne Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:23.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2025 at 14:57.
3 and 17 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jun 2025 at 07:49.
3 and 5 Nov 2025
Virgin Media were proposing to carry out Utility asset works on Maryon Road, Charlton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 November 2025 and run through until 5 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 5 Aug 2025 at 10:49.
3 Nov 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Powis Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 10:15.
3 Nov 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 10:18.
3 and 28 Nov 2025
ESP Electricity are proposing to carry out Utility asset works on Manilla Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 16 Sep 2025 at 12:45.
3 and 7 Nov 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:09.
3 and 14 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Thames Gateway, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 08:42.
3 and 7 Nov 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 16 Jun 2025 at 10:52.
3 and 7 Nov 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Jul 2025 at 13:29.
3 and 7 Nov 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Glen Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 17 Sep 2025 at 12:22.
3 Nov and 8 Dec 2025
Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:10.
4 Nov 2025 and 5 Feb 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Halfway Street, Sidcup.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 5 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Sep 2025 at 10:20.
4 Nov and 2 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Wyatt Road, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 2 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.
4 and 18 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Walker Close, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Aug 2025 at 15:28.
4 and 18 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Walker Close, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2025 and run through until 18 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:35.
5 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:26.
5 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Jul 2025 at 11:22.
5 and 7 Nov 2025
London Borough Of Havering are proposing to carry out Highway improvement works on New Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 2 Sep 2025 at 09:31.
6 and 8 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Crescent Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:59.
6 and 8 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Station Road, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 7 Aug 2025 at 10:30.
6 and 14 Nov 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2025 at 08:57.
6 and 28 Nov 2025
London Borough Of Newham were proposing to carry out Highway repair and maintenance works on Morris Avenue, Manor Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2025 and run through until 28 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Sep 2025 at 08:37.
7 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 15:36.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Boxley Street, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Victoria Dock Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:59.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:50.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Radland Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 20 Aug 2025 at 14:51.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Forty Acre Lane, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 22 Aug 2025 at 11:41.
7 Nov and 20 Dec 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 November 2025 and run through until 20 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 May 2025 at 10:50.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Brooks Avenue, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:28.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Lonsdale Avenue, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:27.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Kimberley Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:19.
7 and 28 Nov 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Barking Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 6 Aug 2025 at 09:29.
10 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cuff Crescent, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:09.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2025 at 08:10.
10 and 24 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandford Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Sep 2025 at 15:37.
10 and 24 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stratton Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 14:33.
10 and 24 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Darlton Close, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.
10 Nov and 8 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gascoyne Drive, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:37.
10 and 24 Nov 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Buckley Close, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:36.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ely Close, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:59.
10 Nov and 8 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:41.
10 and 21 Nov 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Greenwich High Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 Aug 2025 at 10:41.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grenada Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:32.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shooters Hill Road, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2025 at 09:04.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Indus Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 10:31.
10 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marlborough Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Jul 2025 at 06:38.
10 and 15 Nov 2025
Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 1 Sep 2025 at 11:10.
10 and 14 Nov 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Ordnance Crescent, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 4 Aug 2025 at 12:22.
11 and 13 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 12 Jun 2025 at 14:39.
11 and 13 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway improvement works on Marvels Lane, Grove Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 20 Aug 2025 at 12:12.
12 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Jul 2025 at 07:49.
12 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 08:14.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Erith Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 21 Jul 2025 at 15:17.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Mill Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:57.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Northumberland Park, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:56.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Limewood Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:56.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Horsa Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:55.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Avenue Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:55.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hengist Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:54.
13 and 15 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Ling Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 November 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 23 Apr 2025 at 12:54.
14 and 19 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Welling High Street, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 19:12.
14 Nov and 15 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.
14 Nov and 15 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 16:24.
14 Nov and 15 Dec 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 10:05.
14 Nov and 15 Dec 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 12:30.
14 and 17 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 11:39.
17 and 22 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Danson Underpass, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:32.
17 and 22 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Danson Underpass, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 9 Sep 2025 at 13:27.
17 and 28 Nov 2025
Thames Water are proposing to carry out Utility asset works on Rye Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:20.
17 Nov and 8 Dec 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Norris Way, Crayford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:37.
17 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Veroan Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 15:32.
17 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Basilon Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 15:31.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden College Footpath, Kidbrooke.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 16:41.
17 Nov and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kidbrooke Gardens, Kidbrooke.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 15:44.
17 and 24 Nov 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Springwater Close, Plumstead.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 24 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jul 2025 at 16:54.
17 and 30 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Terrace, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:52.
17 and 30 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on York Terrace, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:52.
17 and 30 Nov 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brook Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 4 Sep 2025 at 16:50.
17 and 22 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Hind Crescent, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:23.
17 and 22 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 11:15.
17 and 22 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Hind Crescent, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:14.
17 Nov and 1 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 11:23.
17 and 21 Nov 2025
Virgin Media are proposing to carry out Utility asset works on Maryon Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 15 Aug 2025 at 07:43.
17 Nov 2025 and 28 Mar 2027
Transport for London (TfL) are proposing to carry out Highway improvement works on Glass Yard, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 28 March 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 10:37.
17 Nov and 7 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 14:24.
17 Nov and 7 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Tollgate Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Aug 2025 at 11:44.
17 and 21 Nov 2025
Thames Water are proposing to carry out New service connection on Beaumont Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2025 at 13:44.
17 Nov and 7 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.
17 Nov and 7 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.
18 and 20 Nov 2025
BT are proposing to carry out Utility asset works on Cresswell Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Aug 2025 at 06:27.
18 and 20 Nov 2025
BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 21 Aug 2025 at 06:24.
18 and 20 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 14:58.
18 Nov and 9 Dec 2025
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Glenaffric Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 9 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Tower Hamlets on 17 Sep 2025 at 10:39.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:15.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on James Watt Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:40.
19 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on James Watt Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:03.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 10:12.
19 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Queens Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 24 Jul 2025 at 09:53.
19 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Queens Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Sep 2025 at 16:04.
21 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 15:18.
21 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 14:23.
21 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 15 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2025 at 09:39.
21 and 24 Nov 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2025 and could run through until 24 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 12:19.
22 Nov 2025 and 21 Feb 2026
Thames Water are proposing to carry out Utility asset works on Churston Avenue, Upton Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2025 and could run through until 21 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 May 2025 at 11:48.
22 Nov 2025 and 17 Jan 2026
Thames Water are proposing to carry out Utility asset works on Beauchamp Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2025 and could run through until 17 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Apr 2025 at 08:27.
24 Nov and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glasbrook Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Aug 2025 at 09:56.
24 Nov 2025 and 26 Jan 2026
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:28.
24 Nov 2025 and 26 Jan 2026
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eltham Palace Road, Eltham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 26 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Jul 2025 at 17:36.
24 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Old Barn Way, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.
24 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Manor Way, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.
24 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Oakwood Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.
24 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Mayplace Road East, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 10:18.
24 and 28 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Midfield Avenue Parade, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Aug 2025 at 12:08.
24 and 27 Nov 2025
Thames Water are proposing to carry out New service connection on Coton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 16:45.
24 and 27 Nov 2025
Thames Water were proposing to carry out New service connection on Coton Road, Welling.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 November 2025 and run through until 27 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:58.
24 and 29 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 08:10.
24 and 29 Nov 2025
London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Deptford Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lewisham on 27 Aug 2025 at 14:42.
24 and 30 Nov 2025
Telefonica UK are proposing to carry out Utility asset works on St Augustines Road, Belvedere.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 3 Sep 2025 at 15:39.
24 Nov and 2 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on West Ham Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 9 Jun 2025 at 10:08.
24 Nov and 2 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on West Ham Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 2 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 29 Jul 2025 at 10:04.
24 Nov and 1 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 10:12.
24 Nov and 1 Dec 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 10:34.
25 and 28 Nov 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2025 and could run through until 28 November 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 29 Jul 2025 at 12:08.
26 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on East Rochester Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Jul 2025 at 14:43.
26 and 29 Nov 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Gravel Hill, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Jul 2025 at 07:53.
26 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on East Rochester Way, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Jul 2025 at 14:43.
26 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bourne Road, Crayford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Jul 2025 at 11:11.
26 and 29 Nov 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Gravel Hill, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2025 and could run through until 29 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 16 Jul 2025 at 11:11.
28 Nov and 18 Dec 2025
Thames Water are proposing to carry out Utility asset works on Columbia Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2025 and could run through until 18 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:28.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Spekehill, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Woodcroft, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:48.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Larchwood Road, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:47.
1 and 21 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsground, Eltham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.
1 and 21 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Vista, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2025 at 09:34.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Perpins Road, Avery Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:51.
1 and 12 Dec 2025
Thames Water are proposing to carry out Utility asset works on Newick Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:55.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Well Hall Parade, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 27 Aug 2025 at 09:46.
1 and 19 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dale View, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 14:57.
1 and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Morden Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Sep 2025 at 15:00.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bassant Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 17:04.
1 and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Aug 2025 at 12:19.
1 and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dryhill Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 12:50.
1 and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Aug 2025 at 14:36.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Welland Street, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 10:41.
1 and 15 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 15 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2025 at 07:07.
1 and 12 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Pelton Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 12:10.
1 and 5 Dec 2025
Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bostall Manorway, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 26 Aug 2025 at 17:04.
1 and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Sep 2025 at 08:31.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 08:47.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:39.
1 and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on St Leonards Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 15:06.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Aug 2025 at 15:40.
1 and 19 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Brunswick Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 15:05.
1 Dec 2025 and 6 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2025 at 09:44.
1 Dec 2025 and 6 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Newham Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 13:30.
1 Dec 2025 and 6 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:47.
1 Dec 2025 and 6 Feb 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 13:48.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:41.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:09.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:42.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:08.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 12:52.
1 and 21 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Sep 2025 at 13:30.
1 and 5 Dec 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Eliot Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 14:10.
2 and 4 Dec 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Rochester Drive, Bexley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 10:44.
2 and 4 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Rochester Drive, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 15 Sep 2025 at 10:46.
2 and 4 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Midhurst Hill, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 8 Sep 2025 at 11:20.
2 and 4 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Erith Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 4 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Aug 2025 at 15:14.
2 and 5 Dec 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Choats Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Sep 2025 at 09:45.
3 and 6 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Foots Cray High Street, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 21 Aug 2025 at 13:41.
8 and 10 Dec 2025
London Borough Of Bromley are proposing to carry out Highway improvement works on Edgebury, Chislehurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 28 Aug 2025 at 11:59.
8 and 13 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bridgen Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jul 2025 at 11:48.
8 and 10 Dec 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Vanbrugh Hill, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 06:43.
8 and 22 Dec 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The View, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 09:34.
8 and 14 Dec 2025
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 14 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2025 at 09:28.
8 and 17 Dec 2025
Cadent Gas are proposing to carry out Utility asset works on Highgrove Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 14:30.
9 and 16 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Hatherley Crescent, Sidcup.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2025 and could run through until 16 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 2 Sep 2025 at 13:15.
9 and 12 Dec 2025
Hutchinson 3G are proposing to carry out Utility asset works on Mottingham Lane, Mottingham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Hutchinson 3G on 16 Sep 2025 at 08:55.
11 and 13 Dec 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Danson Road, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jun 2025 at 15:21.
15 Dec 2025 and 16 Feb 2026
Thames Water are proposing to carry out Utility asset works on Oakway Close, Bexley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 16 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:35.
15 and 17 Dec 2025
BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Sep 2025 at 08:49.
15 and 17 Dec 2025
BT are proposing to carry out Utility asset works on Bennett Park, Blackheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Sep 2025 at 13:50.
15 Dec 2025 and 5 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 09:42.
15 Dec 2025 and 5 Jan 2026
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2025 at 10:10.
15 and 17 Dec 2025
Thames Water are proposing to carry out roadworks on Wall End Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Sep 2025 at 11:31.
Roadworks Map near to Coxwell Road, LONDON, SE18 1AN (132 Events)



























































































































































































































































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Coxwell Road, LONDON, SE18 1AN (132 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Jul 2025 - 10 Oct 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data