ROADWORKS SUMMARY
Southwark, LONDON, SE11 9BB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for SE11 9BB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southwark, LONDON, SE11 9BB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 08:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 3 Jan 2025 at 12:00.

Thames Tideway Tunnel logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 2 Jun 2025 at 15:17.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Thames Water logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 15:26.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Jan 2025 at 13:24.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

London Borough Of Southwark logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2023 at 00:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Jan 2025 at 11:47.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

Thames Water logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 09:11.

Transport for London (TfL) logo
LONG TERM
Between
14 Feb 2024 and 3 Jul 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2024 and could run through until 3 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 15:51.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar 2024 and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Mar 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 21 Jun 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 21 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 12:06.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 26 May 2025 at 19:46.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 22 Jul 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 19 May 2025 at 08:36.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 09:15 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:49.

Transport for London (TfL) logo
LONG TERM
Between
11 Oct 2024 and 9 Jan 2026
Details
View Map
Share
Follow
Grosvenor Gardens

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 9 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:26.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Finishing
Today
Details
View Map
Share
Kensington Park Road

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

Transport for London (TfL) logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 May 2025 at 12:28.

London Borough Of Lambeth logo
LONG TERM
Between
11 Nov 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.

Network Rail logo
LONG TERM
Until
16 Jun 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 16:30.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out roadworks on Balham Park Road, Balham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:49.

Thames Water logo
LONG TERM
Until
9 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Transport for London (TfL) logo
LONG TERM
Between
26 Nov 2024 and 5 Aug 2025
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out roadworks on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 5 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 10:14.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are carrying out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 19 May 2025 at 08:36.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:08.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 16 Jun 2025
Details
View Map
Share
Follow
Fenning Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenning Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 15 May 2025 at 08:24.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.

Thames Water logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

The works started on 6 January 2025 at 09:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:36.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:57 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 08:10.

London Borough Of Camden logo
LONG TERM
Between
6 Jan and 1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.

London Borough Of Camden logo
LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 16:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Jan 2025 at 16:48.

City Of Westminster logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Howick Place

City Of Westminster are carrying out Highway repair and maintenance works on Howick Place, Vincent Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 May 2025 at 09:31.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
St Anselm's Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Dec 2024 at 12:37.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 January 2025 and run through until 28 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 07:58.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

London Borough Of Southwark logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 15:31.

London Borough Of Southwark logo
LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2025 at 00:00 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 May 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
3 Feb and 18 Jun 2025
Details
View Map
Share
Follow
Imperial Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 22 Jan 2025 at 08:36.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2025 at 11:49.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 16 Dec 2024 at 08:02.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Dec 2024 at 05:36.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2024 at 08:57.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 19 Dec 2024 at 15:52.

London Borough Of Southwark logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are carrying out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 00:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 17:20.

London Borough Of Southwark logo
LONG TERM
Until
10 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are carrying out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 00:00 and could run through until 10 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 13:34.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility repair and maintenance works on Great Peter Street, St James's, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 February 2025 at 20:16 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:15.

Thames Water logo
LONG TERM
Between
10 Feb and 22 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 Jan 2025 at 15:01.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:05.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:04.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:47.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:07.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:43.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:10.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
10 Feb 2025 and 15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Feb 2025 at 11:45.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are carrying out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:06.

Transport for London (TfL) logo
LONG TERM
Until
15 Jun 2026
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 21:30 and could run through until 15 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 07:18.

Thames Water logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 11:51 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 13:16.

London Borough Of Camden logo
LONG TERM
Between
16 Feb and 1 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.

London Borough Of Camden logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Feb 2025 at 10:40.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:37.

Network Rail logo
LONG TERM
Between
17 Feb and 4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 8 Jan 2025 at 09:58.

Network Rail logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are carrying out Works for road purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 07:00 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Feb 2025 at 08:11.

Thames Water logo
LONG TERM
Between
17 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 11:47.

Thames Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are carrying out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:42 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 15:59.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:11 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:11.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:15 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 27 Feb 2025 at 11:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are carrying out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:14 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:14.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are carrying out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are carrying out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are carrying out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are carrying out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Between
17 Feb 2025 and 28 Aug 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 15:42.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:30.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Ranelagh Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 13:15.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 February 2025 at 22:00 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 09:18.

London Borough Of Southwark logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 February 2025 at 00:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 09:11.

Thames Water logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are carrying out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:55.

Thames Water logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are carrying out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:50 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 15:26.

City Of Westminster logo
LONG TERM
Until
23 Jul 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are carrying out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 11:00 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 May 2025 at 12:54.

Thames Water logo
LONG TERM
Between
24 Feb and 13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 13:05.

Thames Water logo
LONG TERM
Until
13 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 08:15 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Feb 2025 at 08:19.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Marylebone Flyover

Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:06.

Transport for London (TfL) logo
LONG TERM
Between
28 Feb and 16 Jun 2025
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:13.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:17.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 14:59.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 17:10.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 14:19.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are proposing to carry out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2025 at 20:24.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Dulwich Common

Transport for London (TfL) are carrying out Highway improvement works on Dulwich Common, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Feb 2025 at 15:12.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2025 at 09:22.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lordship Lane

Transport for London (TfL) are carrying out Highway improvement works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Mar 2025 at 08:30.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Salcott Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Winsham Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:42.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Jedburgh Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 1 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.

Thames Water logo
LONG TERM
Between
3 Mar and 4 Aug 2025
Details
View Map
Share
Mysore Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 14:41.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works will start on or after 7 March 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 13 Feb 2025 at 12:19.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Heygate Street

London Borough Of Southwark are carrying out Highway improvement works on Heygate Street, London.

These works are categorised as Major.

The works started on 7 March 2025 at 06:43 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2025 at 06:49.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Garnet Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Garnet Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 13:12.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Monza Street

London Borough Of Tower Hamlets are proposing to carry out roadworks on Monza Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 May 2025 at 12:10.

LONG TERM
Between
10 Mar and 6 Sep 2025
Details
View Map
Share
Follow
Wapping Wall

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Wapping Wall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 15:54.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Mildmay Road

London Borough Of Islington are carrying out Highway improvement works on Mildmay Road, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 May 2025 at 06:45.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 20 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:57.

Southern Gas Networks logo
LONG TERM
Between
12 Mar and 20 Jul 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 4 Feb 2025 at 12:28.

Southern Gas Networks logo
LONG TERM
Between
13 Mar and 20 Jul 2025
Details
View Map
Share
Zenoria Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Zenoria Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:26.

City Of Westminster logo
LONG TERM
Between
14 Mar and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

Transport for London (TfL) logo
LONG TERM
Between
15 Mar and 27 Sep 2025
Details
View Map
Share
High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 March 2025 and run through until 27 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 12:11.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are carrying out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 08:23.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:25.

London Borough Of Southwark logo
LONG TERM
Between
17 Mar and 10 Sep 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jan 2025 at 14:52.

Thames Water logo
LONG TERM
Between
19 Mar and 29 Jun 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are proposing to carry out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:02.

LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are carrying out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Mar 2025 at 08:26.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 13:45.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 08:59.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lewisham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Feb 2025 at 10:13.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Lewisham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:32.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar and 14 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Feb 2025 at 09:16.

Transport for London (TfL) logo
LONG TERM
Between
24 Mar and 18 Aug 2025
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:44.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are carrying out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:35 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

City Of Westminster logo
LONG TERM
Between
24 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.

Thames Water logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:52.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Jun 2025
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2025 at 10:30 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 10:23.

London Borough Of Lambeth logo
LONG TERM
Between
31 Mar and 28 Jun 2025
Details
View Map
Share
Amesbury Avenue

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 28 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 May 2025 at 08:32.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 15 Jun 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
31 Mar and 26 Jun 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2025 at 11:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 15:37.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
31 Mar and 24 Oct 2025
Details
View Map
Share
Eaton Square

Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Eaton Square, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 6 May 2025 at 10:52.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Parmiter Street

Thames Water are carrying out Utility asset works on Parmiter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 12:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:52.

London Borough Of Camden logo
LONG TERM
Until
14 Jun 2025
Details
View Map
Share
Follow
Camden Gardens

London Borough Of Camden are carrying out Highway improvement works on Camden Gardens, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 17:56.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 13 Feb 2025 at 12:08.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:56.

London Borough Of Camden logo
LONG TERM
Between
31 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Maple Street

London Borough Of Camden are proposing to carry out Remedial works on Maple Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 13 Mar 2025 at 20:49.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:51.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Follow
Shorts Gardens

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:00.

London Borough Of Camden logo
LONG TERM
Between
1 Apr and 27 Jun 2025
Details
View Map
Share
Shorts Gardens

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Shorts Gardens, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 11:07.

LONG TERM
Between
1 Apr 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Barbers Road

London Borough Of Newham are proposing to carry out Section 50 on Barbers Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 30 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:20.

LONG TERM
Between
1 Apr 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Marshgate Lane

London Borough Of Newham are proposing to carry out Section 50 on Marshgate Lane, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 25 Mar 2025 at 23:07.

LONG TERM
Until
1 Jul 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are carrying out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 08:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 2 Apr 2025 at 08:18.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:52.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:08.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 13:40.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:29.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Sloane Square

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2025 at 08:00 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 May 2025 at 15:35.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
New Quebec Street

Thames Water are carrying out Utility asset works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 12:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 11:47.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Gray's Inn Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:57.

Transport for London (TfL) logo
LONG TERM
Between
7 Apr and 14 Jun 2025
Details
View Map
Share
Swinton Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Swinton Street, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 14 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Apr 2025 at 16:49.

LONG TERM
Between
7 Apr and 3 Jul 2025
Details
View Map
Share
Follow
Rotherfield Street

London Borough Of Islington are proposing to carry out Highway improvement works on Rotherfield Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Jan 2025 at 07:55.

LONG TERM
Between
7 Apr and 5 Jul 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 15 Jan 2025 at 10:11.

LONG TERM
Between
7 Apr and 3 Jul 2025
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are proposing to carry out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 16 Jan 2025 at 07:56.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are carrying out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:00 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 12:29.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Tower Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Tower Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 3 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 13:21.

Transport for London (TfL) logo
LONG TERM
Until
19 Jun 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Transport for London (TfL) are carrying out Highway improvement works on Mount Pleasant Road, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 21:00 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 11:02.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:29.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:12.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 13:31.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 30 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 30 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 27 Aug 2024 at 11:11.

Thames Water logo
LONG TERM
Between
11 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Parmiter Street

Thames Water are proposing to carry out Utility asset works on Parmiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Feb 2025 at 13:11.

Thames Water logo
LONG TERM
Between
14 Apr and 23 Jun 2025
Details
View Map
Share
Follow
Catherine Place

Thames Water are proposing to carry out Utility asset works on Catherine Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 14:52.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 10 Aug 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 15:58.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Percival Street

Cadent Gas are carrying out Utility asset works on Percival Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:35 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 17:30.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ashby Street

Cadent Gas are carrying out Utility asset works on Ashby Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:30 and could run through until 8 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 17:16.

Thames Water logo
LONG TERM
Until
13 Jul 2025
Details
View Map
Share
Follow
Inglebert Street

Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:05 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 17:10.

Thames Water logo
LONG TERM
Between
14 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 6 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 15:00 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Jul 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2025 at 09:48 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:44.

LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 23 May 2025 at 14:39.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:53.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
New Bridge Street

Transport for London (TfL) were proposing to carry out Highway improvement works on New Bridge Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Thames Water logo
LONG TERM
Between
21 Apr and 3 Nov 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 12 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 10:09.

Thames Water logo
LONG TERM
Between
22 Apr and 16 Jun 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 10:54.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 14:04.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:57 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 11:06.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 16:25.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 06:25 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 06:27.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 4 Jul 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 12:00.

Transport for London (TfL) logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are carrying out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 08:00 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 10:51.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Drummond Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 11:04.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Catherine Place

Thames Water are carrying out Utility asset works on Catherine Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 11:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 11:08.

London Borough Of Southwark logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Horselydown Lane

London Borough Of Southwark are carrying out Highway improvement works on Horselydown Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2025 at 00:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 May 2025 at 15:21.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:43.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:53.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lessingham Avenue

Thames Water are carrying out roadworks on Lessingham Avenue, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:52.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Ansell Road

Thames Water are carrying out Utility asset works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:54.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Derinton Road

Thames Water are carrying out roadworks on Derinton Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 07:55.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are carrying out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2025 at 14:00 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:00.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Peterborough Road

Cadent Gas are carrying out Utility repair and maintenance works on Peterborough Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 10:27 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are carrying out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Kirtling Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 October 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2025 at 10:43.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 October 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2025 at 18:59.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Kirtling Street

Transport for London (TfL) are carrying out Highway improvement works on Kirtling Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are carrying out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Jan 2025 at 12:09.

Transport for London (TfL) logo
LONG TERM
Until
30 Oct 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are carrying out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 30 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Apr 2025 at 10:16.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Dec 2024 at 10:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 21 Jul 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 11:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2025 at 14:35.

UK Power Networks Eastern & London logo
LONG TERM
Until
2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 14:30 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 15:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Apr and 2 Jul 2025
Details
View Map
Share
Follow
Needleman Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:06.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Statutory Infrastructure Works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 18:54.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 8 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 24 Apr 2025 at 21:04.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Commercial Road

Transport for London (TfL) are proposing to carry out Permanent reinstatement on Commercial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:32.

London Borough Of Camden logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 08:27.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Feb 2025 at 12:23.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:09.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are carrying out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:08.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:27.

Thames Water logo
LONG TERM
Between
30 Apr and 15 Sep 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:41.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Berkeley Mews

Thames Water are carrying out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2025 at 13:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 15:36.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Aspen Way

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Aspen Way, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 May 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 09:12.

LONG TERM
Between
5 May and 23 Jul 2025
Details
View Map
Share
Wapping Wall

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Wapping Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Jan 2025 at 09:54.

LONG TERM
Between
5 May and 12 Jul 2025
Details
View Map
Share
Wapping Wall

London Borough Of Tower Hamlets were proposing to carry out Highway repair and maintenance works on Wapping Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:53.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Bayley Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 11:41.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 20 Jun 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 07:45.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:40.

LONG TERM
Between
5 May and 8 Aug 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:40.

Thames Water logo
LONG TERM
Between
5 May and 14 Jul 2025
Details
View Map
Share
Follow
Wadeson Street

Thames Water are proposing to carry out Utility asset works on Wadeson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:25.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 18:56.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
St Paul's Crescent

London Borough Of Camden are proposing to carry out Highway improvement works on St Paul's Crescent, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 12:20.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 06:23.

Cadent Gas logo
LONG TERM
Between
5 May and 31 Oct 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:14.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 17:07.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 16:44.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Nigel Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Nigel Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 08:18.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
6 May and 27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:25.

Southern Gas Networks logo
LONG TERM
Until
15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 13:52.

Southern Gas Networks logo
LONG TERM
Between
6 May and 15 Jun 2025
Details
View Map
Share
Follow
Rye Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rye Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 12:34.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:20.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Nelson Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Nelson Road, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:19.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Creek Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Creek Road, Deptford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:09.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 06:18.

Transport for London (TfL) logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Greenwich Church Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on Greenwich Church Street, Greenwich.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 09:08.

London Borough Of Southwark logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2025 at 09:58.

Electricity Network Company logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are carrying out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:00 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 30 May 2025 at 16:30.

London Borough Of Southwark logo
LONG TERM
Between
6 May and 10 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 17 Feb 2025 at 17:17.

London Borough Of Southwark logo
LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Iliffe Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Iliffe Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 13:23.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Kennington Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Kennington Park Road, Kennington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 May 2025 at 16:00.

London Borough Of Southwark logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Drummond Road

London Borough Of Southwark are carrying out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 00:00 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 14:37.

Thames Water logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Utility asset works on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 18:48.

Thames Water logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are carrying out Utility asset works on Drummond Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 12:12 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 09:44.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:42.

City Of London Corporation logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are carrying out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 09:10.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

Transport for London (TfL) logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 20:14.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 12:03.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Bishopsgate

Transport for London (TfL) were proposing to carry out Highway improvement works on Bishopsgate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2025 at 10:27.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 20 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 16:51.

Transport for London (TfL) logo
LONG TERM
Until
25 Jun 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 21:00 and could run through until 25 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 15:57.

Thames Water logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Norman Road

Thames Water are carrying out Utility asset works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2025 at 12:00 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 06:43.

London Borough Of Southwark logo
LONG TERM
Between
7 May and 4 Jul 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:47.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are carrying out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 May 2025 at 13:30 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:34.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 May 2025 at 09:14.

London Borough Of Southwark logo
LONG TERM
Between
9 May and 8 Aug 2025
Details
View Map
Share
Follow
Manor Grove

London Borough Of Southwark are proposing to carry out Highway improvement works on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 May 2025 at 13:15.

Southern Gas Networks logo
LONG TERM
Between
11 May and 22 Jun 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 14:48.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Apr 2025 at 14:41.

Southern Gas Networks logo
LONG TERM
Between
12 May and 29 Jun 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:55.

Southern Gas Networks logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 12:42.

Southern Gas Networks logo
LONG TERM
Between
12 May and 9 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 24 Feb 2025 at 08:13.

Southern Gas Networks logo
LONG TERM
Between
12 May and 16 Nov 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 15:02.

Southern Gas Networks logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Peckham Rye

Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Rye, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 13:40 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 13:54.

London Borough Of Southwark logo
LONG TERM
Until
12 Jun 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Southwark are carrying out Highway improvement works on Albany Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 08:24.

Thames Water logo
Today
Details
View Map
Share
Abingdon Road

Thames Water carried out Utility repair and maintenance works on Abingdon Road, London.

The road was closed for some or all of the period.

The works were originally planned between 12 May 2025 and 3 Jun 2025 and were actually completed between 12 May 2025 (10:20) and 3 Jun 2025 (13:50). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:53.

City Of London Corporation logo
LONG TERM
Between
12 May and 8 Jul 2025
Details
View Map
Share
Follow
London Wall

City Of London Corporation are proposing to carry out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 July 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 10:39.

City Of London Corporation logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 07:00 and could run through until 8 July 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 12 May 2025 at 09:21.

London Borough Of Camden logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 09:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 15 Jun 2025
Details
View Map
Share
Southampton Row

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:55.

Thames Water logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Mowlem Street

Thames Water are carrying out Utility asset works on Mowlem Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 09:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 10:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 09:25.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Bewdley Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Bewdley Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:33.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Islington Park Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 17:05.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 09:15.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Islington Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington Park Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:24.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Liverpool Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 15:25.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 09:22.

Transport for London (TfL) logo
Finishing
Friday
Details
View Map
Share
Follow
Liverpool Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Liverpool Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 10:09.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 29 Apr 2025 at 14:03.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 11:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 11:46.

London Borough Of Camden logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Eton Road

London Borough Of Camden are carrying out Highway improvement works on Eton Road, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:03.

London Borough Of Camden logo
Finishing
Friday
Details
View Map
Share
Haverstock Hill

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Haverstock Hill, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 25 Apr 2025 at 16:10.

London Borough Of Hackney logo
LONG TERM
Between
12 May and 12 Aug 2025
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Dec 2024 at 12:04.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Rye Lane

Thames Water are carrying out New service connection on Rye Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 May 2025 at 13:31 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:05.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are carrying out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 15 May 2025 at 08:43.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:29.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.

City Of Westminster logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 May 2025 at 08:58.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

London Borough Of Hackney logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Feb 2025 at 12:41.

London Borough Of Hackney logo
Finishing
Friday
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Feb 2025 at 12:31.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Eton Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Eton Avenue, Belsize, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 09:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
16 May and 20 Jun 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 12:27.

Transport for London (TfL) logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:05.

Transport for London (TfL) logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:06.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Seymour Street

Thames Water are carrying out Utility asset works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 09:43.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 16:42.

Transport for London (TfL) logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are carrying out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 14:57.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:21.

Between
19 May and 14 Jun 2025
Details
View Map
Share
Monza Street

London Borough Of Tower Hamlets were proposing to carry out roadworks on Monza Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:52.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 14:26.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Eagle Street

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Eagle Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 10:25.

Thames Water logo
Between
19 May and 13 Jun 2025
Details
View Map
Share
Old Ford Road

Thames Water carried out roadworks on Old Ford Road, London.

These works were categorised as Major.

Two-way signals were in place for some or all of the period.

The works were originally planned between 19 May 2025 and 13 Jun 2025 and were actually completed between 19 May 2025 (11:25) and 3 Jun 2025 (11:14). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Springfield Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Springfield Road, Sydenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 13:00 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:15.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 07:18.

Thames Water logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Mount Adon Park

Thames Water are carrying out roadworks on Mount Adon Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 11:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 12:49.

Network Rail logo
LONG TERM
Between
19 May and 3 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are proposing to carry out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 31 Mar 2025 at 15:58.

Network Rail logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Fernbrook Road

Network Rail are carrying out Works for Rail Purposes on Fernbrook Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 08:00 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 May 2025 at 08:08.

Thames Water logo
Between
19 May and 12 Jun 2025
Details
View Map
Share
Follow
Old York Road

Thames Water are proposing to carry out Utility asset works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 6 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 08:42.

Thames Water logo
LONG TERM
Between
19 May and 14 Jul 2025
Details
View Map
Share
Follow
Elverton Street

Thames Water are proposing to carry out Utility asset works on Elverton Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 06:34.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Elverton Street

Thames Water are carrying out Utility asset works on Elverton Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 14:00 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:08.

UK Power Networks Eastern & London logo
Between
19 May and 16 Jun 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Feb 2025 at 14:51.

Thames Water logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Russia Lane

Thames Water are carrying out Utility asset works on Russia Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 12:20 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 12:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wick Lane

Thames Water are carrying out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:11.

LONG TERM
Between
19 May and 7 Aug 2025
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are proposing to carry out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 13:03.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Jun 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 10:12.

London Borough Of Camden logo
Between
19 May and 14 Jun 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are proposing to carry out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 May 2025 at 16:20.

London Borough Of Camden logo
Until
14 Jun 2025
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, Islington, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.

London Borough Of Camden logo
LONG TERM
Between
19 May and 23 Jun 2025
Details
View Map
Share
Follow
Market Road

London Borough Of Camden are proposing to carry out Highway improvement works on Market Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 24 Apr 2025 at 07:24.

London Borough Of Camden logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Market Road

London Borough Of Camden are carrying out Highway improvement works on Market Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 19 May 2025 at 09:10.

London Borough Of Hackney logo
Finishing
Today
Details
View Map
Share
Follow
Hay Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Hay Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 14:01.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Strand

BT are carrying out Utility repair and maintenance works on Strand, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 09:00 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 12:18.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are proposing to carry out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 15:45.

Thames Water logo
LONG TERM
Between
20 May and 3 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are proposing to carry out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 14:01.

Thames Water logo
LONG TERM
Between
20 May and 28 Jul 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are proposing to carry out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 14:09.

UK Power Networks Eastern & London logo
LONG TERM
Until
24 Aug 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 13:00 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 13:49.

London Borough Of Hackney logo
Between
21 May and 11 Jun 2025
Details
View Map
Share
Follow
Goldsmiths Row

London Borough Of Hackney are proposing to carry out Highway improvement works on Goldsmiths Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2025 at 09:35.

London Borough Of Hackney logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pritchards Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pritchards Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2025 at 09:41.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are carrying out Utility repair and maintenance works on Offord Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 09:40 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:35.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Carlton Gardens

UK Power Networks Eastern & London are carrying out New service connection on Carlton Gardens, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 09:31 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 07:17.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Carlton House Terrace

UK Power Networks Eastern & London are carrying out New service connection on Carlton House Terrace, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2025 at 09:30 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 07:17.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway improvement works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 19 May 2025 at 09:08.

City Of London Corporation logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Abchurch Lane

City Of London Corporation are proposing to carry out Highway improvement works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 4 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 27 May 2025 at 12:40.

London Borough Of Southwark logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Elsie Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Elsie Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 08:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 08:02.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 11:46.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

London Borough Of Southwark logo
LONG TERM
Between
23 May and 30 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 12:08.

London Borough Of Southwark logo
LONG TERM
Until
29 Jun 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 May 2025 at 00:00 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:15.

London Borough Of Southwark logo
Between
23 May and 10 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 14:35.

Thames Water logo
Between
23 May and 18 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
23 May and 18 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 May 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:26.

UK Power Networks Eastern & London logo
Between
23 May and 17 Jun 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2025 at 09:17.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Holdernesse Road

Electricity Network Company were proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 13:47.

Electricity Network Company logo
Finishing
Thursday
Details
View Map
Share
Glenburnie Road

Electricity Network Company were proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 13:46.

Electricity Network Company logo
Finishing
Saturday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 09:15.

Electricity Network Company logo
Finishing
Saturday
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are carrying out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 09:55 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 24 May 2025 at 09:58.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Follow
Belgrave Place

City Of London Telecomms are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 08:59.

City Of London Telecomms logo
Between
24 May and 11 Jun 2025
Details
View Map
Share
Belgrave Place

City Of London Telecomms were proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 17 Mar 2025 at 11:18.

Thames Water logo
LONG TERM
Between
24 May and 7 Jul 2025
Details
View Map
Share
Follow
Kingsmill Terrace

Thames Water are proposing to carry out Utility asset works on Kingsmill Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:04.

Thames Water logo
Until
14 Jun 2025
Details
View Map
Share
Follow
Kingsland High Street

Thames Water are carrying out Utility repair and maintenance works on Kingsland High Street, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 May 2025 at 09:00 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 May 2025 at 09:08.

Southern Gas Networks logo
LONG TERM
Between
25 May and 6 Jul 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Rodenhurst Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Rodenhurst Road, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 5 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 14:34.

London Borough Of Lambeth logo
Finishing
Monday
Details
View Map
Share
Follow
Loughborough Park

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Loughborough Park, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 27 Jan 2025 at 09:09.

Southern Gas Networks logo
Between
26 May and 15 Jun 2025
Details
View Map
Share
Peckham Rye

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Peckham Rye, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 15 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 08:43.

London Borough Of Wandsworth logo
LONG TERM
Between
26 May and 1 Aug 2025
Details
View Map
Share
Follow
Wye Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Wye Street, Battersea, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 May 2025 at 10:57.

London Borough Of Wandsworth logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Wye Street

London Borough Of Wandsworth are carrying out Section 50 on Wye Street, Battersea, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 27 May 2025 at 10:57.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 Jan 2025 at 08:36.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 17 Feb 2025 at 09:26.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 May 2025 at 11:41.

Electricity Network Company logo
LONG TERM
Between
26 May and 4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 8 May 2025 at 09:22.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 11:05.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 11:02.

Thames Water logo
LONG TERM
Between
26 May and 28 Jul 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are proposing to carry out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 30 Jun 2025
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 11:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 18 Jul 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 15:47.

Southern Gas Networks logo
LONG TERM
Between
26 May and 29 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 09:17.

Southern Gas Networks logo
LONG TERM
Between
26 May and 29 Jun 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 08:42.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
Savoy Street

UK Power Networks Eastern & London are carrying out Utility asset works on Savoy Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:00 and could run through until 5 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 10:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Frith Street

Cadent Gas are carrying out Utility asset works on Frith Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:28 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:42.

UK Power Networks Eastern & London logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 19:55.

UK Power Networks Eastern & London logo
Between
26 May and 21 Jun 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 21 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 11:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 28 Jun 2025
Details
View Map
Share
Follow
South Crescent

UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.

Thames Water logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Dawson Street

Thames Water were proposing to carry out Utility repair and maintenance works on Dawson Street, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Feb 2025 at 11:41.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Millbank

Thames Water are carrying out Utility repair and maintenance works on Millbank, Vincent Square, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 09:44.

Thames Water logo
LONG TERM
Until
16 Jul 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are carrying out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:12.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Sloane Street

Thames Water are carrying out New service connection on Sloane Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 12:31.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cadogan Place

Thames Water are carrying out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:31 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:09.

Thames Water logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Halkin Street

Thames Water are carrying out Utility repair and maintenance works on Halkin Street, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:00 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 13:34.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Oct 2024 at 09:30.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Oct 2024 at 07:57.

City Of Westminster logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Shepherd Market

City Of Westminster are proposing to carry out Highway repair and maintenance works on Shepherd Market, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 May 2025 at 12:40.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 07:40.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Charles Ii Street

Thames Water were proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:38.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Feb 2025 at 14:26.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:09.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are carrying out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:29 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 10:47.

UK Power Networks Eastern & London logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 13:40.

UK Power Networks Eastern & London logo
Between
27 May and 13 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:22.

UK Power Networks Eastern & London logo
Between
27 May and 11 Jun 2025
Details
View Map
Share
Maddox Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Maddox Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 10:26.

UK Power Networks Eastern & London logo
Between
27 May and 11 Jun 2025
Details
View Map
Share
Follow
Maddox Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Maddox Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 10:22.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Mar 2025 at 08:34.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Portsmouth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsmouth Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Mar 2025 at 06:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Edgware Road

Thames Water are carrying out Utility repair and maintenance works on Edgware Road, Hyde Park, London.

The works started on 27 May 2025 at 08:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:35.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Gresham Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:18.

Thames Water logo
Until
15 Jun 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:53.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Remedial works on Gresham Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:53.

Thames Water logo
Between
27 May and 15 Jun 2025
Details
View Map
Share
Gresham Road

Thames Water were proposing to carry out Remedial works on Gresham Road, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 May 2025 and run through until 15 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:05.

Electricity Network Company logo
LONG TERM
Until
4 Jul 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are carrying out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:30 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 27 May 2025 at 08:54.

London Borough Of Wandsworth logo
Finishing
Today
Details
View Map
Share
Follow
Prince Of Wales Drive

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 7 Mar 2025 at 15:11.

Thames Water logo
LONG TERM
Between
27 May and 2 Jul 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2025 at 11:29.

Southern Gas Networks logo
LONG TERM
Until
7 Jul 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are carrying out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:45 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 09:06.

Southern Gas Networks logo
LONG TERM
Between
27 May and 7 Jul 2025
Details
View Map
Share
Follow
Newington Butts

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newington Butts, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 14:02.

Thames Water logo
Until
11 Jun 2025
Details
View Map
Share
Follow
Hogarth Road

Thames Water are carrying out Utility repair and maintenance works on Hogarth Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:30 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:40.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Cadogan Place

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Cadogan Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 19:03 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 15:03.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:06.

Royal Borough Of Kensington And Chelsea logo
Finishing
Today
Details
View Map
Share
Follow
Lexham Mews

Royal Borough Of Kensington And Chelsea are proposing to carry out Section 50 on Lexham Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 27 May 2025 at 11:08.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Greville Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 May 2025 at 09:32.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chalk Farm Road

Cadent Gas are carrying out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 12:00 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 11:12.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Petherton Road

Thames Water are carrying out Utility repair and maintenance works on Petherton Road, Islington, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 09:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 09:54.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Greville Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Greville Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 15:12.

London Borough Of Southwark logo
LONG TERM
Between
28 May and 27 Jul 2025
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:04.

London Borough Of Southwark logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Queen Elizabeth Street

London Borough Of Southwark are carrying out Highway improvement works on Queen Elizabeth Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 05:32 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 05:34.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:02.

Thames Water logo
Finishing
Today
Details
View Map
Share
Buckland Street

Thames Water were proposing to carry out New service connection on Buckland Street, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 14:03.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Denmark Hill

UK Power Networks Eastern & London were proposing to carry out Utility repair and maintenance works on Denmark Hill, Herne Hill & Loughborough Junction, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 12:00.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Bardsley Lane

Thames Water are carrying out Utility repair and maintenance works on Bardsley Lane, Greenwich.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 08:55 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 11:10.

Thames Water logo
Until
17 Jun 2025
Details
View Map
Share
Follow
Camera Place

Thames Water are carrying out Utility repair and maintenance works on Camera Place, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2025 at 10:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:06.

London Borough Of Southwark logo
Finishing
Friday
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bovingdon Road

Thames Water are carrying out Utility repair and maintenance works on Bovingdon Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 06:47 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:05.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are carrying out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 10:50 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 May and 28 Jun 2025
Details
View Map
Share
Follow
Alscot Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alscot Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:56.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Clermont Road

Cadent Gas are carrying out Utility repair and maintenance works on Clermont Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:36 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 10:12.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Hay's Mews

Cadent Gas are carrying out Utility repair and maintenance works on Hay's Mews, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 11:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 14:19.

UK Power Networks Eastern & London logo
Between
29 May and 16 Jun 2025
Details
View Map
Share
Follow
Lexington Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 09:47.

UK Power Networks Eastern & London logo
Until
16 Jun 2025
Details
View Map
Share
Follow
Lexington Street

UK Power Networks Eastern & London are carrying out Utility asset works on Lexington Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2025 at 08:00 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:45.

Thames Water logo
Tomorrow
Details
View Map
Share
Phoenix Place

Thames Water carried out Utility repair and maintenance works on Phoenix Place, King's Cross, London.

The road was closed for some or all of the period.

The works were originally planned between 29 May 2025 and 4 Jun 2025 and were actually completed between 29 May 2025 (18:00) and 3 Jun 2025 (12:39). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:28.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:44.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 May 2025 at 22:00 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 08:43.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Fulham Road

Cadent Gas were proposing to carry out Utility repair and maintenance works on Fulham Road, London.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 May 2025 and run through until 5 June 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 18:44.

London Borough Of Southwark logo
Between
30 May and 25 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Point Pleasant

Thames Water are carrying out Utility repair and maintenance works on Point Pleasant, Wandsworth, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 12:54 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:21.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jacob Street

Thames Water are carrying out Utility repair and maintenance works on Jacob Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 10:45 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jacob Street

Thames Water were proposing to carry out Utility repair and maintenance works on Jacob Street, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 May 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:34.

BT logo
Tomorrow
Details
View Map
Share
South Audley Street

BT carried out Utility repair and maintenance works on South Audley Street, West End, London.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 31 May 2025 and 4 Jun 2025 and were actually completed between 31 May 2025 (08:00) and 3 Jun 2025 (08:14). The works impacted the carriageway only.

This roadwork event was last updated by BT on 3 Jun 2025 at 10:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Cork Street

Thames Water are carrying out Utility repair and maintenance works on Cork Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 07:54 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:18.

Eunetworks logo
Between
31 May and 13 Jun 2025
Details
View Map
Share
Follow
Jerome Street

Eunetworks are proposing to carry out Utility asset works on Jerome Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:22.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Jerome Street

Eunetworks are carrying out Utility asset works on Jerome Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:20 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:32.

Eunetworks logo
LONG TERM
Between
31 May and 13 Jul 2025
Details
View Map
Share
Follow
Corbet Place

Eunetworks are proposing to carry out Utility asset works on Corbet Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:21.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Corbet Place

Eunetworks are carrying out Utility asset works on Corbet Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:22 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:33.

Eunetworks logo
Between
31 May and 13 Jun 2025
Details
View Map
Share
Follow
Grey Eagle Street

Eunetworks are proposing to carry out Utility asset works on Grey Eagle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:22.

Eunetworks logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Grey Eagle Street

Eunetworks are carrying out Utility asset works on Grey Eagle Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 May 2025 at 08:28 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 31 May 2025 at 08:34.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 11:36.

Thames Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are proposing to carry out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:48.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Cope Place

Thames Water are carrying out Utility asset works on Cope Place, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:30 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:34.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.

City Of Westminster logo
Until
23 Jun 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are carrying out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 08:56.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Victoria Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jan 2025 at 14:59.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are proposing to carry out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:38.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lancelot Place

Thames Water are carrying out New service connection on Lancelot Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:20.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:51.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:41.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Crucifix Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Crucifix Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Crucifix Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Crucifix Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Snowsfields

Transport for London (TfL) were proposing to carry out Highway improvement works on Snowsfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:58.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
St Thomas Street

Transport for London (TfL) were proposing to carry out Highway improvement works on St Thomas Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 14:56.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
St Thomas Street

Transport for London (TfL) were proposing to carry out Highway improvement works on St Thomas Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:55.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Shand Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Shand Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 11:59.

Network Rail logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Blackfriars Road

Network Rail are proposing to carry out Works for Rail Purposes on Blackfriars Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 2 Jun 2025 at 11:50.

Network Rail logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Blackfriars Road

Network Rail are carrying out Works for Rail Purposes on Blackfriars Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 22:00 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 3 Jun 2025 at 08:01.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 May 2025 at 21:28.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bermondsey Street

Network Rail are proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 May 2025 at 17:21.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Bermondsey Street

Network Rail were proposing to carry out Works for Rail Purposes on Bermondsey Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jun 2025 at 12:00.

London Borough Of Lambeth logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Upper Ground

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Upper Ground, Waterloo & Southbank, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 17 Feb 2025 at 10:17.

City Of Westminster logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 May 2025 at 13:30.

Transport for London (TfL) logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Dock Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 21:31.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jermyn Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:25.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jermyn Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:31.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Jermyn Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:58.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 09:18.

Cadent Gas logo
Between
2 and 15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 16:02.

Cadent Gas logo
Until
15 Jun 2025
Details
View Map
Share
Follow
Leinster Terrace

Cadent Gas are carrying out Utility asset works on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:18 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:16.

UK Power Networks Eastern & London logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:33.

UK Power Networks Eastern & London logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:09.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 07:55.

Finishing
Tomorrow
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 5 Mar 2025 at 13:14.

Finishing
Tomorrow
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 20 May 2025 at 14:22.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Great Marlborough Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Thomas Road

Thames Water are carrying out Utility asset works on Thomas Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:46.

Thames Water logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Pixley Street

Thames Water are carrying out Utility asset works on Pixley Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 17 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
LONG TERM
Until
10 Aug 2025
Details
View Map
Share
Follow
Burdett Road

Thames Water are carrying out Utility asset works on Burdett Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:40 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Great Russell Street

Thames Water were proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 10:08.

Thames Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are carrying out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:37.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Charterhouse Street

Virgin Media are proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Mar 2025 at 11:48.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Charterhouse Street

Virgin Media were proposing to carry out Utility asset works on Charterhouse Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 6 Mar 2025 at 11:54.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carburton Street

Thames Water are proposing to carry out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 10:45.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Carburton Street

Thames Water are carrying out New service connection on Carburton Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:00 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 09:29.

City Of London Telecomms logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Britton Street

City Of London Telecomms are proposing to carry out roadworks on Britton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 14 Feb 2025 at 08:08.

Cadent Gas logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Eversholt Street

Cadent Gas are carrying out Utility repair and maintenance works on Eversholt Street, St Pancras And Somers Town, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 11:43 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 15:02.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 14:57.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 2 Jun 2025 at 16:23.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Follow
Temperley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temperley Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 15:53.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:08.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 13:14.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 10:25.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Margate Road

Thames Water were proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 08:33.

Thames Water logo
Between
2 and 30 Jun 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 30 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:23.

Cadent Gas logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Shuttleworth Road

Cadent Gas are carrying out Utility repair and maintenance works on Shuttleworth Road, Battersea, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 14:25 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 11:12.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Blackheath Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 15:46.

Southern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Peckham Grove

Southern Gas Networks are carrying out Utility repair and maintenance works on Peckham Grove, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 17:00 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 12:03.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 18 July 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 13:25.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:34.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Crossfield Street

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Crossfield Street, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

London Borough Of Lewisham logo
LONG TERM
Between
2 Jun and 17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 10:41.

London Borough Of Lewisham logo
LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Coffey Road

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Coffey Road, London.

These works are categorised as Major.

The works started on 2 June 2025 at 07:30 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Jun 2025 at 11:19.

Thames Water logo
Between
2 and 12 Jun 2025
Details
View Map
Share
Follow
Colomb Street

Thames Water are proposing to carry out Utility asset works on Colomb Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 10:31.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 8 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 May 2025 at 13:52.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 Mar 2025 at 11:54.

London Borough Of Southwark logo
LONG TERM
Between
2 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Rollins Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Rollins Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 12:59.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are carrying out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 20:00 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 09:46.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 27 Feb 2025 at 13:43.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 08:17.

Electricity Network Company logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Feb 2025 at 10:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Vauxhall Bridge Road

Thames Water are carrying out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:12 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:39.

Thames Water logo
Between
2 and 13 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:38.

Electricity Network Company logo
LONG TERM
Until
14 Jul 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are carrying out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 09:11.

Cadent Gas logo
LONG TERM
Between
2 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 May 2025 at 15:50.

Cadent Gas logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are carrying out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 10:30 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 11:46.

Thames Water logo
Until
30 Jun 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are carrying out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 13:48.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Apr 2025 at 10:29.

BT logo
Between
2 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Feb 2025 at 16:56.

BT logo
Until
1 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:57.

BT logo
Between
2 and 27 Jun 2025
Details
View Map
Share
Follow
Adelaide Road

BT are proposing to carry out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 May 2025 at 09:06.

BT logo
Until
27 Jun 2025
Details
View Map
Share
Follow
Adelaide Road

BT are carrying out Diversionary works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jun 2025 at 09:56.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:46.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

Thames Water logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Highbury Park

Thames Water are proposing to carry out Utility repair and maintenance works on Highbury Park, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 08:33.

Thames Water logo
Between
2 and 22 Jun 2025
Details
View Map
Share
Follow
Highbury Park

Thames Water are proposing to carry out Utility repair and maintenance works on Highbury Park, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 08:24.

Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
White Horse Street

Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 22 May 2025 at 14:29.

Between
3 and 16 Jun 2025
Details
View Map
Share
Follow
White Horse Street

Squire Energy are proposing to carry out Utility asset works on White Horse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 2 Jun 2025 at 15:45.

UK Power Networks Eastern & London logo
Between
3 and 13 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 09:52.

UK Power Networks Eastern & London logo
Until
13 Jun 2025
Details
View Map
Share
Follow
Denman Street

UK Power Networks Eastern & London are carrying out New service connection on Denman Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:11 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:11.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wardour Street

Thames Water are carrying out Remedial works on Wardour Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:09 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:43.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 15:10.

City Of London Corporation logo
LONG TERM
Between
3 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crutched Friars

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Crutched Friars, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Jun 2025 at 10:25.

City Of London Corporation logo
LONG TERM
Between
3 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Crutched Friars

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Crutched Friars, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 3 Jun 2025 at 13:46.

UK Power Networks Eastern & London logo
Between
3 and 14 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Farringdon Road

Thames Water are carrying out Utility repair and maintenance works on Farringdon Road, Islington, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 09:15 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:05.

Southern Gas Networks logo
Until
10 Jun 2025
Details
View Map
Share
Follow
High Level Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on High Level Drive, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 15:30 and could run through until 10 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 16:13.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Rosary Gardens

Thames Water are carrying out Utility repair and maintenance works on Rosary Gardens, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 14:30 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 16:35.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Manor Grove

Thames Water were proposing to carry out New service connection on Manor Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 10 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:14.

Thames Water logo
Between
4 and 10 Jun 2025
Details
View Map
Share
Follow
Manor Grove

Thames Water are proposing to carry out New service connection on Manor Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 06:45.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 11 Mar 2025 at 14:57.

London Borough Of Hammersmith & Fulham logo
Finishing
Friday
Details
View Map
Share
Follow
Lillie Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Lillie Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 24 Apr 2025 at 10:41.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 13:30.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 09:55.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:29.

Transport for London (TfL) logo
Between
4 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:32.

Cadent Gas logo
LONG TERM
Between
4 Jun and 2 Dec 2025
Details
View Map
Share
Follow
Medway Street

Cadent Gas are proposing to carry out Utility asset works on Medway Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:11.

City Of London Telecomms logo
Between
4 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Eccleston Street

City Of London Telecomms are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 11 Apr 2025 at 09:03.

Cadent Gas logo
LONG TERM
Between
4 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:12.

Cadent Gas logo
LONG TERM
Between
4 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Perkin's Rents

Cadent Gas are proposing to carry out Utility asset works on Perkin's Rents, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 08:11.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Ellesmere Road

Thames Water were proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 13:04.

Thames Water logo
Between
4 and 25 Jun 2025
Details
View Map
Share
Follow
Ellesmere Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ellesmere Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:17.

Cadent Gas logo
LONG TERM
Between
4 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 14:31.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:19.

London Borough Of Southwark logo
LONG TERM
Between
4 Jun and 3 Oct 2025
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are proposing to carry out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 3 October 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 20 May 2025 at 13:27.

UK Power Networks Eastern & London logo
Between
4 and 13 Jun 2025
Details
View Map
Share
Follow
South Molton Street

UK Power Networks Eastern & London are proposing to carry out New service connection on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2025 at 14:47.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:08.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

UK Power Networks Eastern & London logo
Between
5 and 20 Jun 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
5 and 20 Jun 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 May 2025 at 13:55.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Jan 2025 at 15:22.

City Of Westminster logo
Finishing
Saturday
Details
View Map
Share
Follow
Elizabeth Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 13:42.

Between
5 and 24 Jun 2025
Details
View Map
Share
Follow
Carnoustie Drive

London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:57.

Between
5 and 24 Jun 2025
Details
View Map
Share
Follow
Carnoustie Drive

London Borough Of Islington are proposing to carry out Highway improvement works on Carnoustie Drive, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 29 May 2025 at 06:58.

London Borough Of Camden logo
Between
5 and 21 Jun 2025
Details
View Map
Share
Follow
Steele's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.

London Borough Of Camden logo
Between
5 and 28 Jun 2025
Details
View Map
Share
Follow
Steele's Road

London Borough Of Camden are proposing to carry out Highway improvement works on Steele's Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:42.

London Borough Of Camden logo
Between
5 and 21 Jun 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:28.

London Borough Of Camden logo
Between
5 and 28 Jun 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 13:49.

City Of London Corporation logo
Finishing
Sunday
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Jan 2025 at 13:23.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Brixton Station Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 28 Feb 2025 at 13:33.

Thames Water logo
Between
6 and 17 Jun 2025
Details
View Map
Share
Follow
Lilford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lilford Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 09:46.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
North End Road

Thames Water are proposing to carry out Utility repair and maintenance works on North End Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 8 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 09:10.

London Borough Of Southwark logo
Between
6 and 14 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 13:29.

London Borough Of Southwark logo
Between
7 and 30 Jun 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

Thames Water logo
Between
7 and 18 Jun 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 15:53.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
New Oxford Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 28 May 2025 at 14:18.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
Bloomsbury Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 2 Jun 2025 at 16:30.

Its Technology Group logo
Between
7 and 23 Jun 2025
Details
View Map
Share
Follow
Bloomsbury Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Bloomsbury Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 3 Jun 2025 at 09:43.

Thames Water logo
Between
9 and 29 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out New service connection on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 13:25.

Thames Water logo
Between
9 and 29 Jun 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out New service connection on Drummond Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 11:06.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 10:11.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:28.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Millharbour

Transport for London (TfL) were proposing to carry out Highway improvement works on Millharbour, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 08:59.

Transport for London (TfL) logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Marsh Wall

Transport for London (TfL) were proposing to carry out Highway improvement works on Marsh Wall, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 09:00.

London Borough Of Southwark logo
Between
9 and 27 Jun 2025
Details
View Map
Share
Queen Elizabeth Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Queen Elizabeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2025 at 08:05.

UK Power Networks Eastern & London logo
Between
9 and 19 Jun 2025
Details
View Map
Share
Follow
Stafford Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2025 at 12:48.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:46.

UK Power Networks Eastern & London logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Bruton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bruton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 15:02.

UK Power Networks Eastern & London logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Bourdon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2025 at 10:49.

UK Power Networks Eastern & London logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:20.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Henrietta Street

Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:29.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Henrietta Street

Thames Water are proposing to carry out New service connection on Henrietta Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 06:34.

Between
9 and 11 Jun 2025
Details
View Map
Share
Brook Street

Abovenet Communications UK were proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 29 Apr 2025 at 09:15.

City Of Westminster logo
LONG TERM
Between
9 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 16:54.

Thames Water logo
Between
9 and 22 Jun 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 16:11.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:22.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 8 Apr 2025 at 12:11.

Vodafone logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Lochnagar Street

Vodafone are proposing to carry out Utility repair and maintenance works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 2 May 2025 at 10:31.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 09:30.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Berners Mews

Thames Water were proposing to carry out New service connection on Berners Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 13:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:17.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 6 Mar 2025 at 16:25.

Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Hannibal Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hannibal Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:55.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Sans Walk

Thames Water are proposing to carry out New service connection on Sans Walk, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2025 at 08:13.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Between
9 Jun and 11 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 May 2025 at 06:52.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crowndale Road

London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Crowndale Road

London Borough Of Camden are proposing to carry out Highway improvement works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:06.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Bayham Street

London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 May 2025 at 16:50.

London Borough Of Camden logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Bayham Street

London Borough Of Camden are proposing to carry out Highway improvement works on Bayham Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 May 2025 at 09:07.

Cadent Gas logo
Between
9 and 30 Jun 2025
Details
View Map
Share
Follow
Whiston Road

Cadent Gas are proposing to carry out Utility asset works on Whiston Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 11:51.

LONG TERM
Between
9 Jun and 11 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 17:09.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:57.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:53.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 May 2025 at 19:06.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:43.

UK Power Networks Eastern & London logo
Between
9 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 13:04.

UK Power Networks Eastern & London logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 May 2025 at 23:40.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2025 at 13:53.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Selsdon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Selsdon Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 07:57.

London Borough Of Lambeth logo
LONG TERM
Between
9 Jun and 1 Aug 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Jun 2025 at 07:50.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:16.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Overhill Road

Thames Water are proposing to carry out Utility asset works on Overhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 11:02.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Atkins Road

Thames Water were proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 15:21.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 May 2025 at 10:52.

Network Rail logo
LONG TERM
Between
9 Jun and 28 Aug 2025
Details
View Map
Share
Follow
Springbank Road

Network Rail are proposing to carry out Works for Rail Purposes on Springbank Road, Hither Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 11:29.

Thames Water logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out New service connection on Barry Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 14:03.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2025 at 15:21.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Surrey Road

Thames Water were proposing to carry out New service connection on Surrey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:58.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out New service connection on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 08:09.

Thames Water logo
Between
9 Jun and 7 Jul 2025
Details
View Map
Share
Limesford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Limesford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 7 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 11:46.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:46.

Transport for London (TfL) logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 10:49.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Clapham High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:05.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:26.

Transport for London (TfL) logo
Between
9 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:48.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 13 Jul 2025
Details
View Map
Share
Nelsons Row

Transport for London (TfL) were proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:42.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Nelsons Row

Transport for London (TfL) are proposing to carry out Highway improvement works on Nelsons Row, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 00:00.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:06.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 08:55.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:46.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Stonhouse Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Stonhouse Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:11.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Carpenter's Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:45.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Carpenter's Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Carpenter's Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:58.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 10:07.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 09:02.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:45.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Prescott Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Prescott Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:15.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:44.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
St Luke's Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:54.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
St Luke's Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on St Luke's Avenue, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 14:32.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 09:00.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:43.

Transport for London (TfL) logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Clapham Manor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Clapham Manor Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:12.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Rye Lane

Thames Water were proposing to carry out New service connection on Rye Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 12:51.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 11:02.

BT logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Follow
Albury Street

BT are proposing to carry out Utility asset works on Albury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 06:13.

Thames Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Tyler Street

Thames Water are proposing to carry out Utility asset works on Tyler Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 13:28.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Hollywood Road

Thames Water were proposing to carry out Utility asset works on Hollywood Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 16:06.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Mar 2025 at 13:35.

BT logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Vauxhall Street

BT are proposing to carry out Utility repair and maintenance works on Vauxhall Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Apr 2025 at 11:22.

London Borough Of Southwark logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 18:11.

Thames Water logo
Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 12:41.

Cadent Gas logo
Between
9 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 14:36.

London Borough Of Southwark logo
LONG TERM
Between
9 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 11:31.

London Borough Of Southwark logo
LONG TERM
Between
9 Jun and 30 Aug 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 14:47.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:30.

Thames Water logo
Between
9 and 26 Jun 2025
Details
View Map
Share
Follow
Quebec Way

Thames Water are proposing to carry out Utility asset works on Quebec Way, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 13:35.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:37.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Tremadoc Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 13 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 08:56.

Transport for London (TfL) logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Tremadoc Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tremadoc Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:59.

Its Technology Group logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Lavender Sweep

Its Technology Group were proposing to carry out Utility repair and maintenance works on Lavender Sweep, Battersea, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Its Technology Group on 19 May 2025 at 08:48.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:32.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 May 2025 at 08:22.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:40.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Edgeley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgeley Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:13.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:31.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 15:25.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 08:39.

Transport for London (TfL) logo
Between
10 and 19 Jun 2025
Details
View Map
Share
Follow
Gauden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Gauden Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 May 2025 at 09:12.

Virgin Media logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Woolwich Road

Virgin Media were proposing to carry out Utility asset works on Woolwich Road, Greenwich.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Mar 2025 at 10:41.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 11:28.

City Of Westminster logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 09:44.

City Of Westminster logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Knightsbridge

City Of Westminster are proposing to carry out Highway repair and maintenance works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 May 2025 at 10:07.

Thames Water logo
Between
10 and 13 Jun 2025
Details
View Map
Share
Follow
Carlton Vale

Thames Water are proposing to carry out New service connection on Carlton Vale, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 11:54.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
South Audley Street

BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 May 2025 at 12:14.

BT logo
Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 May 2025 at 12:13.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 12 Mar 2025 at 09:54.

Between
11 and 13 Jun 2025
Details
View Map
Share
Follow
Rectory Square

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Rectory Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2025 at 15:57.

Thames Water logo
Between
11 and 27 Jun 2025
Details
View Map
Share
Follow
Robinson Road

Thames Water are proposing to carry out Utility asset works on Robinson Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 13:53.

London Borough Of Southwark logo
Between
11 and 20 Jun 2025
Details
View Map
Share
Follow
Tintagel Crescent

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tintagel Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2025 at 16:15.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:26.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:32.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun and 25 Sep 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 10:29.

Transport for London (TfL) logo
LONG TERM
Between
11 Jun 2025 and 10 Apr 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 10 April 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:44.

Thames Water logo
Between
11 and 19 Jun 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out New service connection on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 16:07.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 13:16.

Thames Water logo
Between
11 and 16 Jun 2025
Details
View Map
Share
Follow
Eaton Gate

Thames Water are proposing to carry out New service connection on Eaton Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:17.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Elephant And Castle

Thames Water were proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works were categorised as Major.

The works were originally planned to start 11 June 2025 and run through until 15 June 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 21 Mar 2025 at 09:49.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Elephant And Castle

Thames Water are proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 14:47.

Thames Water logo
Between
11 and 15 Jun 2025
Details
View Map
Share
Follow
Elephant And Castle

Thames Water are proposing to carry out Utility repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The works will start on or after 11 June 2025 and could run through until 15 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:29.

Thames Water logo
Between
11 Jun and 1 Jul 2025
Details
View Map
Share
Roman Road

Thames Water were proposing to carry out Utility repair and maintenance works on Roman Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Mar 2025 at 07:52.

UK Power Networks Eastern & London logo
Between
12 and 18 Jun 2025
Details
View Map
Share
Follow
Bourdon Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bourdon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 11:32.

Thames Water logo
Between
12 and 18 Jun 2025
Details
View Map
Share
Follow
St John's Lane

Thames Water are proposing to carry out New service connection on St John's Lane, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 09:35.

Thames Water logo
Between
12 and 17 Jun 2025
Details
View Map
Share
Follow
Boveney Road

Thames Water are proposing to carry out New service connection on Boveney Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2025 and could run through until 17 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 09:05.

Thames Water logo
Between
13 and 26 Jun 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:40.

Thames Water logo
Between
13 and 26 Jun 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 June 2025 and run through until 26 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:39.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:09.

Transport for London (TfL) logo
Between
13 and 16 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:30.

Transport for London (TfL) logo
Between
13 and 15 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 15:11.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:26.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:24.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:32.

City Of Westminster logo
Between
13 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 May 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
14 Jun 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2025 and could run through until 20 June 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 16:02.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
East Dulwich Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 15:10.

Southern Gas Networks logo
Between
15 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:40.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Landor Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 09:05.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Landor Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Landor Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 23:59.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Clapham Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2025 at 11:08.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 07:17.

Transport for London (TfL) logo
Between
15 and 24 Jun 2025
Details
View Map
Share
Follow
Clapham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 May 2025 at 12:37.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Gateside Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gateside Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:21.

Thames Water logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Leigham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Leigham Avenue, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 14:44.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Hillside Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillside Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:26.

London Borough Of Lambeth logo
LONG TERM
Between
16 Jun and 12 Sep 2025
Details
View Map
Share
Follow
Amesbury Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Amesbury Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Mar 2025 at 13:27.

Thames Water logo
LONG TERM
Between
16 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility asset works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:06.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 12:29.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Clapham Common North Side

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Common North Side, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 16:09.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 12:28.

Transport for London (TfL) logo
Between
16 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Elspeth Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elspeth Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 16:10.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
The Pavement

Thames Water are proposing to carry out New service connection on The Pavement, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:53.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
16 Jun and 24 Aug 2025
Details
View Map
Share
Follow
East Dulwich Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on East Dulwich Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 09:48.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
St Asaph Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Asaph Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:10.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 May 2025 at 13:18.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Holly Grove

BT are proposing to carry out Utility repair and maintenance works on Holly Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 14:26.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Lorn Road

BT are proposing to carry out Utility asset works on Lorn Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 08:29.

Murphy Power Distribution logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Emden Street

Murphy Power Distribution are proposing to carry out New service connection on Emden Street, London.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 Jun 2025 at 14:25.

Murphy Power Distribution logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Imperial Road

Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 2 May 2025 at 09:54.

Murphy Power Distribution logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Imperial Road

Murphy Power Distribution are proposing to carry out Utility asset works on Imperial Road, London.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 13 May 2025 at 09:13.

Electricity Network Company logo
Between
16 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Pellant Road

Electricity Network Company are proposing to carry out Utility asset works on Pellant Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Jun 2025 at 14:49.

London Borough Of Southwark logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 13:04.

London Borough Of Southwark logo
Between
16 and 21 Jun 2025
Details
View Map
Share
Follow
Walworth Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Walworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 May 2025 at 18:11.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 15:07.

BT logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Mar 2025 at 08:56.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 14 Mar 2025 at 14:48.

Electricity Network Company logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 08:46.

London Borough Of Lambeth logo
Between
16 and 19 Jun 2025
Details
View Map
Share
Follow
Gilbert Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Gilbert Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 7 Mar 2025 at 13:41.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:25.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 14:38.

UK Power Networks Eastern & London logo
Between
16 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:25.

London Borough Of Hackney logo
Between
16 Jun and 3 Jul 2025
Details
View Map
Share
Follow
New North Road

London Borough Of Hackney are proposing to carry out New service connection on New North Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Apr 2025 at 15:52.

London Borough Of Hackney logo
Between
16 Jun and 3 Jul 2025
Details
View Map
Share
Follow
New North Road

London Borough Of Hackney are proposing to carry out New service connection on New North Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 29 Apr 2025 at 16:51.

BT logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Mill Row

BT are proposing to carry out Utility asset works on Mill Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 May 2025 at 17:49.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
East Cross Route

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:29.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
East Cross Route

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East Cross Route, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 May 2025 at 09:59.

Transport for London (TfL) logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Cowdry Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Cowdry Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 14:39.

Thames Water logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Palace Street

Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 10:21.

City Of Westminster logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Great George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 31 Dec 2024 at 07:06.

City Of Westminster logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Great George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great George Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 19 Feb 2025 at 11:00.

UK Power Networks Eastern & London logo
Between
16 and 30 Jun 2025
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 08:17.

Between
16 Jun and 12 Jul 2025
Details
View Map
Share
Garnet Street

London Borough Of Tower Hamlets were proposing to carry out roadworks on Garnet Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 12 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 27 Feb 2025 at 10:54.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 09:30.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 09:08.

Cadent Gas logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:39.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 14:15.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Hessel Street

Thames Water are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 11:51.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 7 Mar 2025 at 11:45.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 16 May 2025 at 08:50.

Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Broad Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Old Broad Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 31 Mar 2025 at 16:30.

UK Power Networks Eastern & London logo
Between
16 and 28 Jun 2025
Details
View Map
Share
Follow
St Mary Axe

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Mary Axe, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:36.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Old Castle Street

Virgin Media were proposing to carry out Utility asset works on Old Castle Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 18 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 14 Mar 2025 at 13:31.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Castle Street

Virgin Media are proposing to carry out Utility asset works on Old Castle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Apr 2025 at 17:34.

Virgin Media logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Old Castle Street

Virgin Media are proposing to carry out Utility asset works on Old Castle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 3 Jun 2025 at 07:42.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 12:33.

Thames Water logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
John's Mews

Thames Water are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 14:56.

Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 17 Mar 2025 at 07:09.

BT logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:38.

City Of Westminster logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
St Martin's Lane

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 08:13.

UK Power Networks Eastern & London logo
Between
17 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:18.

BT logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 14:31.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 13:34.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Park Street

BT are proposing to carry out Utility repair and maintenance works on Park Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Apr 2025 at 15:13.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
South Audley Street

BT are proposing to carry out Utility repair and maintenance works on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Apr 2025 at 13:30.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Mount Street

BT are proposing to carry out Utility repair and maintenance works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Apr 2025 at 13:31.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 11:28.

UK Power Networks Eastern & London logo
Between
18 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Lawrie Park Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Crescent, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 08:28.

London Borough Of Wandsworth logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Cicada Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Cicada Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Mar 2025 at 15:03.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2025 at 10:55.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 08:49.

BT logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Kennington Road

BT are proposing to carry out Utility repair and maintenance works on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 09:03.

Thames Water logo
Between
18 and 25 Jun 2025
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out New service connection on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:53.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
18 Jun and 1 Jul 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 1 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:27.

City Of London Telecomms logo
Between
18 and 20 Jun 2025
Details
View Map
Share
Follow
Eaton Square

City Of London Telecomms are proposing to carry out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 14 Apr 2025 at 09:15.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 14:43.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Mayflower Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 June 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 07:51.

Transport for London (TfL) logo
Between
19 and 24 Jun 2025
Details
View Map
Share
Follow
Mayflower Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mayflower Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 14:54.

Transport for London (TfL) logo
LONG TERM
Between
19 Jun and 21 Dec 2025
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 21 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 15:38.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 10:12.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Pavilion Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pavilion Lane, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 15:07.

Transport for London (TfL) logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 16:07.

Sky UK logo
Between
20 and 23 Jun 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 16 Apr 2025 at 08:01.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 8 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:12.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Lordship Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Lordship Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 June 2025 and run through until 22 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 14:21.

London Borough Of Southwark logo
Between
20 and 22 Jun 2025
Details
View Map
Share
Follow
Bellenden Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Bellenden Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Apr 2025 at 13:45.

Transport for London (TfL) logo
Between
22 Jun and 20 Jul 2025
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

The works will start on or after 22 June 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 19:56.

City Of Westminster logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 20 Feb 2025 at 07:17.

City Of Westminster logo
Between
23 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Victoria Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 14 Mar 2025 at 08:03.

Thames Water logo
LONG TERM
Between
23 Jun and 11 Aug 2025
Details
View Map
Share
Follow
Wilfred Street

Thames Water are proposing to carry out Utility asset works on Wilfred Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 07:57.

Thames Water logo
LONG TERM
Between
23 Jun and 11 Aug 2025
Details
View Map
Share
Follow
Wilfred Street

Thames Water are proposing to carry out Utility asset works on Wilfred Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:56.

Thames Water logo
Between
23 Jun and 1 Jul 2025
Details
View Map
Share
Follow
Tanner Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 13:11.

UK Power Networks Eastern & London logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Hamilton Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 12:34.

City Of Westminster logo
LONG TERM
Between
23 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:01.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2025 at 09:04.

BT logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 May 2025 at 15:06.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 13:42.

UK Power Networks Eastern & London logo
Between
23 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:42.

UK Power Networks Eastern & London logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2025 at 09:50.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Winnett Street

Thames Water are proposing to carry out New service connection on Winnett Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:25.

City Of Westminster logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Ingestre Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ingestre Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Jan 2025 at 14:50.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 13 Mar 2025 at 10:16.

Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Brook Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 29 May 2025 at 08:14.

Electricity Network Company logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 15:02.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marylebone Lane

Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:38.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Marylebone Lane

Thames Water are proposing to carry out New service connection on Marylebone Lane, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:16.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:41.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out New service connection on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 11:15.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Burgess Street

Thames Water are proposing to carry out New service connection on Burgess Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Mar 2025 at 13:26.

Thames Water logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Little Portland Street

Thames Water are proposing to carry out New service connection on Little Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 11:20.

Virgin Media logo
Between
23 and 25 Jun 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 11 Mar 2025 at 12:21.

Thames Water logo
Between
23 and 30 Jun 2025
Details
View Map
Share
Follow
Moor Place

Thames Water are proposing to carry out New service connection on Moor Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2025 at 13:14.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 1 Apr 2025 at 10:47.

Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Hayfield Passage

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 May 2025 at 13:18.

UK Power Networks Eastern & London logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Ansell Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ansell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2025 at 09:19.

London Borough Of Lewisham logo
Between
23 and 28 Jun 2025
Details
View Map
Share
Follow
Dartmouth Place

London Borough Of Lewisham are proposing to carry out Highway improvement works on Dartmouth Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 3 Jun 2025 at 11:04.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 10:39.

Southern Gas Networks logo
Between
23 Jun and 13 Jul 2025
Details
View Map
Share
Follow
Bromley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 14:38.

Thames Water logo
Between
23 Jun and 21 Jul 2025
Details
View Map
Share
Follow
Honor Oak Road

Thames Water are proposing to carry out Utility repair and maintenance works on Honor Oak Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2025 at 07:52.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 16:28.

Thames Water logo
Between
23 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Old York Road

Thames Water are proposing to carry out Utility asset works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 15:28.

London Borough Of Lewisham logo
LONG TERM
Between
23 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Deptford Church Street

London Borough Of Lewisham are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 1 May 2025 at 15:57.

Thames Water logo
Between
23 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Tunnel Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 06:21.

Thames Water logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Markham Street

Thames Water are proposing to carry out New service connection on Markham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 15:04.

Thames Water logo
Between
23 and 26 Jun 2025
Details
View Map
Share
Follow
Sloane Gardens

Thames Water are proposing to carry out New service connection on Sloane Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 14:48.

Transport for London (TfL) logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Belgrave Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Belgrave Road, Warwick, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 07:53.

Transport for London (TfL) logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Gillingham Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gillingham Street, Warwick, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 07:45.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:37.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:28.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 13:54.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:52.

Thames Water logo
Between
23 and 29 Jun 2025
Details
View Map
Share
Follow
Tredegar Road

Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 10:05.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:45.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Mar 2025 at 17:52.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Hadley Street

London Borough Of Camden are proposing to carry out Highway improvement works on Hadley Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 2 Jun 2025 at 15:10.

London Borough Of Camden logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 16:27.

London Borough Of Camden logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:43.

London Borough Of Camden logo
Between
23 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Antrim Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 May 2025 at 15:31.

London Borough Of Camden logo
Between
23 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Antrim Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Antrim Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 May 2025 at 17:00.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Plimsoll Road

Thames Water were proposing to carry out Utility repair and maintenance works on Plimsoll Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 10:25.

Thames Water logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Upbrook Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 10:07.

Thames Water logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Upbrook Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Upbrook Mews, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:49.

City Of Westminster logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
North Wharf Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 10:44.

City Of Westminster logo
Between
24 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Park Crescent Mews West

City Of Westminster are proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:13.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Brudenell Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:48.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Brudenell Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Brudenell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Beechcroft Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:51.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Beechcroft Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Beechcroft Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Topsham Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 26 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:49.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Topsham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Topsham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:28.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Mandrake Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:52.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Mandrake Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Mandrake Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:27.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Upper Tooting Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Upper Tooting Road, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 09:11.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Upper Tooting Park

Transport for London (TfL) were proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:55.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:57.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Marius Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:36.

Transport for London (TfL) logo
Between
24 and 27 Jun 2025
Details
View Map
Share
Follow
Marius Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Marius Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:36.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Balham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2025 and run through until 3 July 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 08:42.

Transport for London (TfL) logo
Between
24 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Balham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 3 July 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 11:04.

UK Power Networks Eastern & London logo
Between
24 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Grange Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grange Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:56.

Thames Water logo
Between
24 and 26 Jun 2025
Details
View Map
Share
Follow
Kings Scholars' Passage

Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:11.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:26.

Thames Water logo
LONG TERM
Between
25 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Chesham Place

Thames Water are proposing to carry out Utility asset works on Chesham Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 16:30.

City Of Westminster logo
Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
St Martin's Lane

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:03.

Thames Water logo
Between
25 and 29 Jun 2025
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out New service connection on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 16:22.

UK Power Networks Eastern & London logo
Between
25 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Elm Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 20:54.

Thames Water logo
Between
26 Jun and 2 Jul 2025
Details
View Map
Share
Maiden Lane

Thames Water were proposing to carry out Highway improvement works on Maiden Lane, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 2 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:23.

City Of Westminster logo
Between
26 Jun and 9 Jul 2025
Details
View Map
Share
Park Crescent Mews West

City Of Westminster were proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:11.

London Borough Of Southwark logo
Between
26 Jun and 7 Jul 2025
Details
View Map
Share
Follow
Jasper Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Jasper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2025 at 10:49.

Virgin Media logo
Between
26 and 30 Jun 2025
Details
View Map
Share
Follow
Hawkstone Road

Virgin Media are proposing to carry out Utility asset works on Hawkstone Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Apr 2025 at 15:31.

Thames Water logo
Between
27 and 29 Jun 2025
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 May 2025 at 11:28.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Ritherdon Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ritherdon Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2025 at 11:26.

Transport for London (TfL) logo
Between
29 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Upper Tooting Park

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Tooting Park, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2025 at 15:34.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:51.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Norfolk House Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norfolk House Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 10:30.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Streatham High Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 13:13.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 14 May 2025 at 09:27.

London Borough Of Lambeth logo
LONG TERM
Between
30 Jun and 25 Aug 2025
Details
View Map
Share
Follow
Tulse Hill

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 May 2025 at 10:51.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Forest Hill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Forest Hill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 15:31.

Thames Water logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Margate Road

Thames Water are proposing to carry out Utility repair and maintenance works on Margate Road, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:49.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Sunray Avenue

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Sunray Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Apr 2025 at 09:40.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Champion Grove

London Borough Of Southwark were proposing to carry out Highway improvement works on Champion Grove, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 12:06.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Grove Lane

London Borough Of Southwark were proposing to carry out Highway improvement works on Grove Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 11:53.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 23 Aug 2025
Details
View Map
Share
Stories Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Stories Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 23 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 12:04.

Thames Water logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 15:28.

BT logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Lorn Road

BT are proposing to carry out Utility asset works on Lorn Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Apr 2025 at 08:32.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Prince Charles Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Charles Road, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:45.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Charlton Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Charlton Way, Blackheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:48.

Transport for London (TfL) logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Maze Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Maze Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:47.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 16:10.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 22 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 15:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 May 2025 at 09:44.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Sep 2025
Details
View Map
Share
Follow
Ilderton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 13:40.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Copenhagen Street

Thames Water were proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:27.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Glebe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 12:23.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Glebe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 10:57.

City Of Westminster logo
Between
30 Jun and 3 Jul 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:24.

London Borough Of Southwark logo
LONG TERM
Between
30 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Shad Thames

London Borough Of Southwark are proposing to carry out Highway improvement works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 May 2025 at 09:56.

UK Power Networks Eastern & London logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:52.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 10:46.

Cadent Gas logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out New service connection on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 12:03.

Cadent Gas logo
Between
30 Jun and 6 Jul 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out New service connection on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 6 July 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:08.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Temple Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 31 May 2025 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Temple Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 12:08.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Passage

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Carmelite Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carmelite Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 May 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:38.

Cadent Gas logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:31.

UK Power Networks Eastern & London logo
Between
30 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:57.

UK Power Networks Eastern & London logo
Between
30 Jun and 12 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 07:36.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 11:55.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:54.

UK Power Networks Eastern & London logo
Between
30 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Marshall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 May 2025 at 16:09.

UK Power Networks Eastern & London logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:48.

UK Power Networks Eastern & London logo
Between
30 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Camomile Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Camomile Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:32.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Coleman Street

Thames Water are proposing to carry out New service connection on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:13.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Coleman Street

Thames Water are proposing to carry out New service connection on Coleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 10:37.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:19.

Thames Water logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Rathbone Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rathbone Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 15:22.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2025 at 10:57.

Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Hatton Garden

G. Network Communications were proposing to carry out Utility asset works on Hatton Garden, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 31 Mar 2025 at 14:32.

UK Power Networks Eastern & London logo
Between
30 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Tottenham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 19:01.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 10:18.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Apr 2025 at 08:28.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Mile End Road

Thames Water are proposing to carry out Utility asset works on Mile End Road, London.

These works are categorised as Major.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:24.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:47.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:26.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:48.

Thames Water logo
LONG TERM
Between
30 Jun and 5 Oct 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 12:27.

City Of Westminster logo
Between
1 and 3 Jul 2025
Details
View Map
Share
Follow
Newman Passage

City Of Westminster are proposing to carry out Highway repair and maintenance works on Newman Passage, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Apr 2025 at 10:46.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Follow
Horatio Street

Thames Water are proposing to carry out roadworks on Horatio Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:55.

Thames Water logo
Between
1 and 7 Jul 2025
Details
View Map
Share
Queensbridge Road

Thames Water were proposing to carry out Utility repair and maintenance works on Queensbridge Road, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 7 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:19.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:24.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Follow
Bexhill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:12.

Thames Water logo
Between
1 and 4 Jul 2025
Details
View Map
Share
Bexhill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Bexhill Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:16.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Follow
Redriff Road

Thames Water are proposing to carry out Utility asset works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Redriff Road

Thames Water were proposing to carry out Utility asset works on Redriff Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 22 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:28.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

Thames Water are proposing to carry out Utility asset works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2025 and could run through until 22 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 13:23.

Thames Water logo
Between
1 and 22 Jul 2025
Details
View Map
Share
Surrey Quays Road

Thames Water were proposing to carry out Utility asset works on Surrey Quays Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 22 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jan 2025 at 15:27.

LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Frederica Street

London Borough Of Islington were proposing to carry out Highway improvement works on Frederica Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 9 Apr 2025 at 08:13.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 21:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out New service connection on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 15:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Notting Hill Gate

UK Power Networks Eastern & London are proposing to carry out New service connection on Notting Hill Gate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 15:26.

UK Power Networks Eastern & London logo
Between
3 and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 May 2025 at 14:02.

City Of London Corporation logo
Between
4 and 6 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:35.

Thames Water logo
Between
4 and 10 Jul 2025
Details
View Map
Share
Follow
Cale Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cale Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 12:57.

London Borough Of Southwark logo
Between
4 and 26 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 May 2025 at 14:21.

Southern Gas Networks logo
Between
6 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 14:53.

UK Power Networks Eastern & London logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Gleneldon Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Gleneldon Mews, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Apr 2025 at 09:35.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 10:48.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 16:07.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Rothschild Street

Thames Water are proposing to carry out Utility repair and maintenance works on Rothschild Street, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:59.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Knight's Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Knight's Hill, Knight's Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 16:07.

Thames Water logo
LONG TERM
Between
7 Jul and 28 Aug 2025
Details
View Map
Share
Follow
Knight's Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Knight's Hill, Knight's Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:56.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

Transport for London (TfL) logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:05.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Sherbrooke Road

Virgin Media were proposing to carry out Utility asset works on Sherbrooke Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Sherbrooke Road

Virgin Media are proposing to carry out Utility asset works on Sherbrooke Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Apr 2025 at 14:20.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Allestree Road

Virgin Media were proposing to carry out Utility asset works on Allestree Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Apr 2025 at 13:19.

Virgin Media logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Allestree Road

Virgin Media are proposing to carry out Utility asset works on Allestree Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Apr 2025 at 08:52.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 12:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2025 at 07:49.

Transport for London (TfL) logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Albert Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 27 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 12:46.

City Of Westminster logo
Between
7 and 12 Jul 2025
Details
View Map
Share
Follow
Belgrave Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 12:17.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 May 2025 at 15:50.

Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
White Post Lane

London Borough Of Tower Hamlets are proposing to carry out Section 50 on White Post Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 15:54.

London Borough Of Camden logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:57.

London Borough Of Camden logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Jun 2025 at 14:57.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Victoria Street

Thames Water were proposing to carry out New service connection on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 11 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 10:28.

Thames Water logo
LONG TERM
Between
7 Jul and 23 Oct 2025
Details
View Map
Share
Follow
Lowndes Place

Thames Water are proposing to carry out Utility asset works on Lowndes Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 14:26.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
7 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Needleman Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Needleman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 14:26.

Thames Water logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Palmer Street

Thames Water are proposing to carry out Utility asset works on Palmer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:15.

Thames Water logo
LONG TERM
Between
7 Jul and 15 Sep 2025
Details
View Map
Share
Follow
Palmer Street

Thames Water are proposing to carry out Utility asset works on Palmer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:13.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:27.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:07.

Electricity Network Company logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 May 2025 at 16:04.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:02.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Kendal Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kendal Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 29 May 2025 at 12:09.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 21:59.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 18:06.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Basinghall Street

Thames Water are proposing to carry out New service connection on Basinghall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:34.

Thames Water logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:49.

Thames Water logo
Between
7 and 10 Jul 2025
Details
View Map
Share
Follow
Cleveland Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Cleveland Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 13:37.

Vodafone logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2025 at 13:11.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 25 Sep 2024 at 16:53.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Oct 2024 at 13:31.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:50.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:33.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 29 Aug 2024 at 13:50.

City Of London Corporation logo
Between
8 and 12 Jul 2025
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 30 Aug 2024 at 09:31.

Between
8 and 10 Jul 2025
Details
View Map
Share
Follow
Middlesex Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 May 2025 at 15:25.

Sky UK logo
Between
8 and 11 Jul 2025
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 12 May 2025 at 11:33.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Porchester Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 May 2025 at 14:32.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Westbourne Terrace Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 May 2025 at 13:57.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2025 at 13:09.

Transport for London (TfL) logo
Between
8 and 23 Jul 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 May 2025 at 14:44.

Transport for London (TfL) logo
Between
8 and 23 Jul 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2025 at 11:35.

London Borough Of Southwark logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

London Borough Of Southwark logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 24 Jan 2025 at 13:56.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Avenue Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:21.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 15 Apr 2025 at 18:18.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 23 May 2025 at 19:36.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Buckingham Gate

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Gate, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Feb 2025 at 07:43.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Spenser Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Spenser Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Feb 2025 at 10:22.

City Of Westminster logo
Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Buckingham Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jan 2025 at 16:00.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 29 Apr 2025 at 11:21.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Prestons Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 May 2025 at 10:56.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 24 Apr 2025 at 13:27.

Electricity Network Company logo
Between
9 and 23 Jul 2025
Details
View Map
Share
Follow
Ordnance Crescent

Electricity Network Company are proposing to carry out Utility asset works on Ordnance Crescent, Greenwich.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Apr 2025 at 07:19.

City Of Westminster logo
Between
9 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:55.

Between
9 and 11 Jul 2025
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 22 May 2025 at 10:18.

Southern Gas Networks logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Sydenham Hill

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Sydenham Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 May 2025 at 10:29.

London Borough Of Southwark logo
LONG TERM
Between
9 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Jun 2025 at 13:48.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Loughborough Street

Electricity Network Company were proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 July 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Apr 2025 at 12:52.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 May 2025 at 19:34.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 14 May 2025 at 11:04.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 18:40.

Electricity Network Company logo
Between
9 and 24 Jul 2025
Details
View Map
Share
Follow
Kennington Lane

Electricity Network Company are proposing to carry out Utility asset works on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 15:17.

City Of London Corporation logo
Between
11 and 13 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:36.

UK Power Networks Eastern & London logo
Between
12 and 20 Jul 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:33.

Network Rail logo
Between
12 and 14 Jul 2025
Details
View Map
Share
Mcneil Road

Network Rail were proposing to carry out Works for Rail Purposes on Mcneil Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Apr 2025 at 09:52.

Thames Water logo
LONG TERM
Between
13 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Dean Bradley Street

Thames Water are proposing to carry out Utility asset works on Dean Bradley Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 06:21.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Beeches Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beeches Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 May 2025 at 10:08.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:04.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:55.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:12.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Remedial works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:24.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Remedial works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:41.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:18.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Hawarden Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 10:34.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Remedial works on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:42.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:16.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:11.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Remedial works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Remedial works on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:42.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 10:32.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 08:18.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Guernsey Grove

Thames Water were proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 10:34.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:11.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 10:07.

Thames Water logo
LONG TERM
Between
14 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:06.

Southern Gas Networks logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Thurleigh Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Thurleigh Road, Balham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 09:57.

London Borough Of Lambeth logo
LONG TERM
Between
14 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Cottage Grove

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 Apr 2025 at 09:28.

London Borough Of Wandsworth logo
LONG TERM
Between
14 Jul and 12 Dec 2025
Details
View Map
Share
Follow
Falcon Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Falcon Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 22 May 2025 at 08:21.

Transport for London (TfL) logo
LONG TERM
Between
14 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 10:34.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 15:36.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 10:57.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Troutbeck Road

Thames Water are proposing to carry out Utility asset works on Troutbeck Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 11:40.

London Borough Of Southwark logo
Between
14 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Picton Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Picton Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Apr 2025 at 17:09.

Virgin Media logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Clapham Road

Virgin Media were proposing to carry out Utility asset works on Clapham Road, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Apr 2025 at 13:42.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Elizabeth Street

Thames Water are proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:15.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:06.

Thames Water logo
LONG TERM
Between
14 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 10:36.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Mowlem Street

Thames Water are proposing to carry out Utility asset works on Mowlem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:27.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenland Street

BT are proposing to carry out Utility repair and maintenance works on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 17:26.

T-Mobile (UK) logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Shakspeare Walk

T-Mobile (UK) are proposing to carry out Utility asset works on Shakspeare Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 16:38.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out New service connection on Kennington Road, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:34.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Victoria Street

Thames Water were proposing to carry out New service connection on Victoria Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 16:40.

Thames Water logo
Between
14 and 17 Jul 2025
Details
View Map
Share
Follow
Cadogan Place

Thames Water are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:28.

Thames Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Hans Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 May 2025 at 12:33.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:37.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:59.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 May 2025 at 14:30.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:06.

Cadent Gas logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 07:02.

UK Power Networks Eastern & London logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 14:47.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 08:39.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
West Central Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 18:16.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 May 2025 at 10:39.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:13.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 12:44.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Greenberry Street

Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:43.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:17.

Electricity Network Company logo
LONG TERM
Between
15 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Millennium Way

Electricity Network Company are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 23 Apr 2025 at 07:15.

Cadent Gas logo
Between
17 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Fenelon Place

Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 13 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 11:54.

Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Belgrave Square

Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 13 May 2025 at 10:47.

Between
18 and 22 Jul 2025
Details
View Map
Share
Follow
Belgrave Square

Interoute (Formerly I-21 Holdings) are proposing to carry out Highway repair and maintenance works on Belgrave Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Interoute (Formerly I-21 Holdings) on 30 May 2025 at 17:06.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:23.

City Of London Corporation logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jul and 4 Sep 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:28.

Transport for London (TfL) logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out roadworks on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:52.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 14:00.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2025 at 11:21.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:06.

Transport for London (TfL) logo
LONG TERM
Between
19 Jul and 18 Oct 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 May 2025 at 17:07.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 14:58.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2025 at 14:16.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 17:14.

Transport for London (TfL) logo
Between
19 and 21 Jul 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Feb 2025 at 15:23.

Thames Water logo
LONG TERM
Between
19 Jul and 2 Nov 2025
Details
View Map
Share
Follow
Highbury Grove

Thames Water are proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 08:13.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Morville Street

Virgin Media were proposing to carry out Utility asset works on Morville Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 May 2025 at 15:42.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 May 2025 at 11:38.

Virgin Media logo
Between
21 and 26 Jul 2025
Details
View Map
Share
Follow
Morville Street

Virgin Media are proposing to carry out Utility asset works on Morville Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 May 2025 at 14:02.

T-Mobile (UK) logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Vyner Street

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 28 May 2025 at 08:49.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 11:37.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:53.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 11:46.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 May 2025 at 12:13.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Shepherd Street

Thames Water were proposing to carry out New service connection on Shepherd Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 08:43.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Shepherd Street

Thames Water are proposing to carry out New service connection on Shepherd Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 09:30.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 07:25.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 13:39.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 14:34.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Wardour Street

Thames Water were proposing to carry out Permanent reinstatement on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:32.

Cadent Gas logo
Between
21 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 07:09.

Cadent Gas logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 16:00.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Berwick Street

Thames Water are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 10:53.

UK Power Networks Eastern & London logo
Between
21 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Outwich Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Outwich Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

Thames Water logo
Between
21 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Ackroyd Drive

Thames Water are proposing to carry out Statutory Infrastructure Works on Ackroyd Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:44.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:33.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
John's Mews

Thames Water are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 16:56.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Devonshire Row Mews

Thames Water were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:46.

Electricity Network Company logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:14.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Gloucester Place

Thames Water are proposing to carry out New service connection on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 09:53.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Ivor Place

Thames Water are proposing to carry out New service connection on Ivor Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 8 Sep 2025
Details
View Map
Share
Follow
Fishponds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fishponds Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:21.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Derby Hill

Thames Water were proposing to carry out New service connection on Derby Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:42.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:31.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:33.

Transport for London (TfL) logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Streatham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Place, Clapham Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 12:29.

Thames Water logo
Between
21 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 14:45.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 12 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Mar 2025 at 09:07.

London Borough Of Southwark logo
Between
21 and 28 Jul 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Apr 2025 at 12:03.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Apr 2025 at 15:43.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Buckhold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 2 May 2025 at 14:54.

Thames Water logo
Between
21 Jul and 3 Aug 2025
Details
View Map
Share
Dymock Street

Thames Water were proposing to carry out Utility asset works on Dymock Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:48.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Overton Road

BT are proposing to carry out Utility asset works on Overton Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Apr 2025 at 14:50.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jul and 10 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 16:16.

London Borough Of Southwark logo
Between
21 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Deans Buildings

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Deans Buildings, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 16:23.

UK Power Networks Eastern & London logo
Between
21 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Grange Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grange Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 2 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 15:06.

City Of Westminster logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Greencoat Place

City Of Westminster were proposing to carry out Highway repair and maintenance works on Greencoat Place, Vincent Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 13:59.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 7 Mar 2025 at 11:20.

London Borough Of Lewisham logo
Between
22 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Westwood Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Westwood Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 13 Mar 2025 at 16:23.

Thames Water logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Culvert Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Culvert Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 08:46.

City Of Westminster logo
Between
22 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 13:50.

Thames Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Princeton Street

Thames Water are proposing to carry out Remedial works on Princeton Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 17:08.

Between
23 and 26 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 10 Apr 2025 at 15:48.

Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 2 May 2025 at 11:20.

Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 May 2025 at 09:56.

Thames Water logo
Between
23 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Highbury Park

Thames Water are proposing to carry out Utility repair and maintenance works on Highbury Park, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 12:24.

Thames Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Atkins Road

Thames Water were proposing to carry out Utility repair and maintenance works on Atkins Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 09:14.

Thames Water logo
Between
24 Jul and 13 Aug 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 July 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 12:25.

Thames Water logo
Between
24 Jul and 13 Aug 2025
Details
View Map
Share
Cavendish Road

Thames Water were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 July 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:42.

Thames Water logo
Between
24 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Cavendish Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 12:55.

Southern Gas Networks logo
LONG TERM
Between
25 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Playfield Crescent

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Playfield Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 12:49.

Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2025 at 15:45.

London Borough Of Southwark logo
Between
26 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 1 May 2025 at 19:53.

Thames Water logo
Between
28 Jul and 5 Aug 2025
Details
View Map
Share
Auckland Hill

Thames Water were proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 15:52.

Network Rail logo
Between
28 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Leigham Vale

Network Rail are proposing to carry out Works for Rail Purposes on Leigham Vale, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 14 May 2025 at 13:02.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 11:08.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:05.

Thames Water logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Thurlow Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Park Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 14:06.

Thames Water logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Temperley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Temperley Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 12:09.

London Borough Of Southwark logo
Between
28 Jul and 20 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 12:51.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:47.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Lordship Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 May 2025 at 10:05.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 11:39.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Spurling Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Spurling Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 14:32.

London Borough Of Southwark logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2025 at 16:16.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 12:08.

Southern Gas Networks logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Worlingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worlingham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 7 May 2025 at 13:48.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Ferndale Road

Thames Water are proposing to carry out New service connection on Ferndale Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 08:30.

Thames Water logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Rye Lane

Thames Water are proposing to carry out New service connection on Rye Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 16:19.

Southern Gas Networks logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Kennington Oval

Southern Gas Networks were proposing to carry out Remedial works on Kennington Oval, Oval, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 08:10.

Southern Gas Networks logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Kennington Oval

Southern Gas Networks are proposing to carry out Remedial works on Kennington Oval, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 08:43.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 May 2025 at 17:48.

Thames Water logo
LONG TERM
Between
28 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Lassell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Lassell Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 12:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 17 Oct 2025
Details
View Map
Share
Follow
Raymouth Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:38.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Eccleston Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 16:34.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ebury Street

Thames Water are proposing to carry out Utility asset works on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 07:56.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Mepham Street

Network Rail were proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Mar 2025 at 15:30.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 10:49.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:10.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Ladbroke Walk

Thames Water are proposing to carry out New service connection on Ladbroke Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 15:27.

UK Power Networks Eastern & London logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:13.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:56.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 15:13.

Cadent Gas logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Cannon Street Road

Cadent Gas are proposing to carry out roadworks on Cannon Street Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 12:30.

Cadent Gas logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Cable Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cable Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 13:56.

UK Power Networks Eastern & London logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 15:06.

City Of London Corporation logo
LONG TERM
Between
28 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 13:41.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Hessel Street

Thames Water are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 22:16.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:17.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 09:51.

Cadent Gas logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Commercial Road

Cadent Gas were proposing to carry out Utility asset works on Commercial Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 11:19.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 10:57.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 11:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:42.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:36.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 3 Jun 2025 at 15:40.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Culford Mews

BT were proposing to carry out Utility asset works on Culford Mews, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 May 2025 at 14:32.

Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2025 at 16:06.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Ronalds Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ronalds Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 07:25.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Chadwick Road

Thames Water are proposing to carry out Utility asset works on Chadwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 20 Jun 2026
Details
View Map
Share
Follow
Grove Park

Thames Water are proposing to carry out Utility asset works on Grove Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 20 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 May 2025 at 10:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 15:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Jul and 31 Aug 2025
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Apr 2025 at 16:02.

UK Power Networks Eastern & London logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Horse Guards Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 07:55.

UK Power Networks Eastern & London logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Horse Guards Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 07:54.

Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 28 May 2025 at 15:21.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
Follow
St John Street

Thames Water are proposing to carry out Utility asset works on St John Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:55.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2025 at 11:35.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
York Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on York Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Feb 2025 at 10:42.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Feb 2025 at 13:13.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:12.

UK Power Networks Eastern & London logo
Between
30 Jul and 13 Aug 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 13:14.

Thames Water logo
Between
31 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Seven Sisters Road

Thames Water are proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 09:33.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:47.

City Of Westminster logo
Between
1 and 15 Aug 2025
Details
View Map
Share
Follow
Davies Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Davies Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:19.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:44.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:45.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Midland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 May 2025 at 09:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 11:04.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 2 Nov 2025
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:02.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:04.

Transport for London (TfL) logo
LONG TERM
Between
3 Aug and 1 Nov 2025
Details
View Map
Share
Follow
Brixton Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 13:06.

Thames Water logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Auckland Hill

Thames Water are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 15:59.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Derby Hill

Thames Water are proposing to carry out New service connection on Derby Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2025 at 14:22.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 9 Mar 2025 at 18:57.

London Borough Of Lewisham logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 05:47.

London Borough Of Lewisham logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Perry Hill

London Borough Of Lewisham are proposing to carry out Highway improvement works on Perry Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Mar 2025 at 07:56.

London Borough Of Lambeth logo
LONG TERM
Between
4 Aug and 26 Sep 2025
Details
View Map
Share
Follow
High Trees

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on High Trees, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 7 May 2025 at 09:59.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 20:57.

Southern Gas Networks logo
Between
4 and 31 Aug 2025
Details
View Map
Share
Follow
Weir Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Weir Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 10:25.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Plough Lane

Thames Water are proposing to carry out Utility asset works on Plough Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:16.

Southern Gas Networks logo
LONG TERM
Between
4 Aug and 26 Oct 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:28.

Thames Water logo
LONG TERM
Between
4 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are proposing to carry out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Thames Water logo
LONG TERM
Between
4 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Glengarry Road

Thames Water are proposing to carry out Remedial works on Glengarry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Lewisham Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lewisham Road, Lewisham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Road, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Blackheath Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackheath Hill, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Greenwich South Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenwich South Street, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:54.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Anselm Road

Thames Water are proposing to carry out New service connection on Anselm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 09:42.

Thames Water logo
Between
4 and 10 Aug 2025
Details
View Map
Share
Follow
Regency Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Regency Street, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 10 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2025 at 14:14.

Cadent Gas logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Onslow Gardens

Cadent Gas are proposing to carry out Utility asset works on Onslow Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 12:28.

Thames Water logo
Between
4 and 13 Aug 2025
Details
View Map
Share
Follow
Sydney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:02.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Lower Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lower Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 15:43.

Thames Water logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wick Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Wick Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:23.

London Borough Of Hackney logo
LONG TERM
Between
4 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Colvestone Crescent

London Borough Of Hackney are proposing to carry out Highway improvement works on Colvestone Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Dec 2024 at 13:50.

Transport for London (TfL) logo
Between
4 and 25 Aug 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:53.

Transport for London (TfL) logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Camden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out New service connection on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 16:42.

Its Technology Group logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Great College Street

Its Technology Group are proposing to carry out Utility repair and maintenance works on Great College Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Its Technology Group on 3 Jun 2025 at 07:44.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Kensington Church Court

Thames Water are proposing to carry out New service connection on Kensington Church Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 09:33.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redcross Way

Thames Water are proposing to carry out Utility asset works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 13:47.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Redcross Way

Thames Water are proposing to carry out Utility asset works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 May 2025 at 13:19.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Down Street

Thames Water are proposing to carry out Utility asset works on Down Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:30.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Farm Street

Thames Water are proposing to carry out New service connection on Farm Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:28.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Little Trinity Lane

Thames Water are proposing to carry out New service connection on Little Trinity Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:01.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wellington Street

Cadent Gas are proposing to carry out Utility asset works on Wellington Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 06:26.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:21.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Fenchurch Street

BT were proposing to carry out Utility asset works on Fenchurch Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Apr 2025 at 11:05.

Vodafone logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 May 2025 at 14:17.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:02.

Cadent Gas logo
Between
4 and 24 Aug 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 09:19.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Cornhill

Thames Water are proposing to carry out Utility repair and maintenance works on Cornhill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 11:39.

Eunetworks logo
Between
4 and 14 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 28 Apr 2025 at 09:23.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Nelson Street

Thames Water were proposing to carry out Utility asset works on Nelson Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:25.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:56.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Nelson Street

Thames Water are proposing to carry out Utility asset works on Nelson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:59.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Turner Street

Thames Water were proposing to carry out Utility asset works on Turner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:11.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 16:46.

Thames Water logo
Between
4 and 18 Aug 2025
Details
View Map
Share
Follow
Turner Street

Thames Water are proposing to carry out Utility asset works on Turner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:00.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Ashfield Street

Thames Water were proposing to carry out Utility asset works on Ashfield Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 09:22.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:50.

Thames Water logo
LONG TERM
Between
4 Aug and 13 Oct 2025
Details
View Map
Share
Follow
Ashfield Street

Thames Water are proposing to carry out Utility asset works on Ashfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:59.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are proposing to carry out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 3 Apr 2025 at 11:45.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Cowcross Street

London Borough Of Islington are proposing to carry out Highway improvement works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 8 Apr 2025 at 13:19.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 17:11.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Harewood Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Mar 2025 at 14:05.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Marylands Road

Thames Water are proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 10:23.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:56.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:36.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 14:17.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:43.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Palace Street

Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:45.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Follow
Palace Street

Thames Water are proposing to carry out Utility repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:39.

UK Power Networks Eastern & London logo
Between
5 and 24 Aug 2025
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 15:14.

UK Power Networks Eastern & London logo
Between
5 and 24 Aug 2025
Details
View Map
Share
Follow
Kensington Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Kensington Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 24 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 15:27.

City Of Westminster logo
Between
5 and 7 Aug 2025
Details
View Map
Share
George Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 14:39.

Thames Water logo
LONG TERM
Between
5 Aug 2025 and 5 Jan 2026
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

Thames Water logo
LONG TERM
Between
5 Aug and 16 Oct 2025
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:47.

City Of Westminster logo
Between
5 and 18 Aug 2025
Details
View Map
Share
Follow
Lyall Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lyall Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 15:37.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Offord Road

Thames Water were proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:19.

T-Mobile (UK) logo
Between
6 and 16 Aug 2025
Details
View Map
Share
Follow
Vyner Street

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 16 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 15:31.

UK Power Networks Eastern & London logo
Between
6 and 23 Aug 2025
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Mar 2025 at 07:19.

UK Power Networks Eastern & London logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Bramber Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Bramber Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:07.

UK Power Networks Eastern & London logo
Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
North End Road

UK Power Networks Eastern & London are proposing to carry out New service connection on North End Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 13:40.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Vereker Road

BT are proposing to carry out Utility asset works on Vereker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 May 2025 at 09:30.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 09:55.

BT logo
Between
6 and 8 Aug 2025
Details
View Map
Share
Follow
Perham Road

BT are proposing to carry out Utility asset works on Perham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 May 2025 at 15:26.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Openview

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Openview, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 8 May 2025 at 07:16.

London Borough Of Wandsworth logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Wroughton Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Wroughton Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 May 2025 at 08:24.

UK Power Networks Eastern & London logo
Between
7 and 13 Aug 2025
Details
View Map
Share
Follow
Friary Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Friary Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 May 2025 at 15:39.

London Borough Of Southwark logo
LONG TERM
Between
8 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 13:24.

London Borough Of Southwark logo
Between
8 and 26 Aug 2025
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Southwark on 9 May 2025 at 12:41.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:24.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:25.

Thames Water logo
Between
8 and 11 Aug 2025
Details
View Map
Share
Follow
Southwark Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwark Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 16:12.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 12:04.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 11:40.

Thames Water logo
Between
11 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Little College Street

Thames Water are proposing to carry out Utility asset works on Little College Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2025 at 09:44.

Thames Water logo
Between
11 and 20 Aug 2025
Details
View Map
Share
Follow
Kensington High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Kensington High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 14:43.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Shad Thames

Thames Water are proposing to carry out Utility repair and maintenance works on Shad Thames, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:33.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Jacob Street

Thames Water were proposing to carry out Utility repair and maintenance works on Jacob Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 13 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 09:15.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Hamilton Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

UK Power Networks Eastern & London logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Maiden Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Maiden Lane, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 08:56.

UK Power Networks Eastern & London logo
Between
11 and 19 Aug 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 08:07.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Cranbourn Street

Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:25.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Charing Cross Road

Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:24.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 19 May 2025 at 09:09.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 21 May 2025 at 10:47.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:44.

UK Power Networks Eastern & London logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:59.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:37.

Thames Water logo
Between
11 and 18 Aug 2025
Details
View Map
Share
New Bond Street

Thames Water were proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 15:40.

Thames Water logo
Between
11 and 28 Aug 2025
Details
View Map
Share
Follow
Glaucus Street

Thames Water are proposing to carry out Utility repair and maintenance works on Glaucus Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 May 2025 at 14:56.

London Borough Of Southwark logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Croxted Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Croxted Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 14 May 2025 at 16:23.

UK Power Networks Eastern & London logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Electric Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Electric Lane, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 09:59.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Ashburnham Road

Thames Water are proposing to carry out New service connection on Ashburnham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 14:15.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Mill Row

BT are proposing to carry out Utility asset works on Mill Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 13:38.

Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Senrab Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Senrab Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Apr 2025 at 10:34.

City Of Westminster logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:45.

Thames Water logo
LONG TERM
Between
12 Aug and 8 Oct 2025
Details
View Map
Share
Follow
Winsham Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Thames Water logo
LONG TERM
Between
12 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:39.

Transport for London (TfL) logo
Between
12 and 18 Aug 2025
Details
View Map
Share
Follow
York Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 14:57.

Thames Water logo
Between
12 and 31 Aug 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:12.

UK Power Networks Eastern & London logo
Between
13 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:29.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
13 Aug and 15 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 12:03.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:13.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:46.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:17.

Thames Water logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 13:51.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:46.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 08:53.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 09:54.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 10:19.

Transport for London (TfL) logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 11:21.

Network Rail logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Deptford High Street

Network Rail are proposing to carry out Works for Rail Purposes on Deptford High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2025 at 13:10.

Thames Water logo
LONG TERM
Between
18 Aug and 20 Oct 2025
Details
View Map
Share
Follow
Tuskar Street

Thames Water are proposing to carry out Utility asset works on Tuskar Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:58.

Thames Water logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Azof Street

Thames Water are proposing to carry out Utility asset works on Azof Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 May 2025 at 06:54.

Thames Water logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Mauritius Road

Thames Water are proposing to carry out New service connection on Mauritius Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 07:17.

Southern Gas Networks logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
East Street

Southern Gas Networks are proposing to carry out New service connection on East Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 May 2025 at 11:45.

Thames Water logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Gaisford Street

Thames Water are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:42.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Clissold Crescent

Thames Water are proposing to carry out New service connection on Clissold Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 17:08.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Gainsford Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gainsford Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 09:41.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Mar 2025 at 14:12.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Bazely Street

Cadent Gas are proposing to carry out Utility asset works on Bazely Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 May 2025 at 10:53.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2025 at 09:01.

Cadent Gas logo
Between
18 Aug and 7 Sep 2025
Details
View Map
Share
Follow
East India Dock Road

Cadent Gas are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:34.

Thames Water logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Tudor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:26.

Vodafone logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
White Horse Road

Vodafone are proposing to carry out Utility repair and maintenance works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 May 2025 at 22:10.

UK Power Networks Eastern & London logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 13:38.

UK Power Networks Eastern & London logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:52.

Thames Water logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Connaught Street

Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 14:43.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:00.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:03.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 10:36.

UK Power Networks Eastern & London logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Foscote Mews

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 20:17.

City Of London Telecomms logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 30 May 2025 at 10:54.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Jun 2025 at 15:32.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 08:31.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Belgrove Street

Thames Water are proposing to carry out Utility repair and maintenance works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 18:29.

City Of Westminster logo
Between
19 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 10:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 11:41.

Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Apr 2025 at 11:46.

Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 3 Jun 2025 at 11:11.

Thames Water logo
LONG TERM
Between
20 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Aberavon Road

Thames Water are proposing to carry out Utility asset works on Aberavon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:18.

Thames Water logo
LONG TERM
Between
20 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Tredegar Square

Thames Water are proposing to carry out Utility asset works on Tredegar Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 11:17.

London Borough Of Southwark logo
Between
20 and 27 Aug 2025
Details
View Map
Share
Townley Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Townley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 27 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 27 Mar 2025 at 11:29.

London Borough Of Southwark logo
Between
20 and 29 Aug 2025
Details
View Map
Share
Follow
Townley Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 14:26.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Camberwell New Road

Thames Water were proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 10:50.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Camberwell New Road

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 May 2025 at 21:18.

Thames Water logo
Between
20 and 23 Aug 2025
Details
View Map
Share
Follow
Camberwell New Road

Thames Water are proposing to carry out Utility repair and maintenance works on Camberwell New Road, Myatt's Fields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 14:02.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 19 May 2025 at 11:45.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 May 2025 at 10:51.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 13:23.

Electricity Network Company logo
Between
20 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Loughborough Street

Electricity Network Company are proposing to carry out Utility asset works on Loughborough Street, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 23 May 2025 at 09:01.

Thames Water logo
Between
20 and 22 Aug 2025
Details
View Map
Share
Follow
Aberdour Street

Thames Water are proposing to carry out Utility repair and maintenance works on Aberdour Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 18:15.

London Borough Of Hackney logo
LONG TERM
Between
21 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Downham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 21 May 2025 at 13:34.

Thames Water logo
Between
22 and 31 Aug 2025
Details
View Map
Share
Sydney Street

Thames Water were proposing to carry out Utility repair and maintenance works on Sydney Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 16:59.

BT logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Avenue Park Road

BT are proposing to carry out Utility asset works on Avenue Park Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 12:37.

BT logo
Between
23 and 31 Aug 2025
Details
View Map
Share
Follow
Birkbeck Hill

BT are proposing to carry out Utility asset works on Birkbeck Hill, Thurlow Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 12:37.

Thames Water logo
Between
23 and 27 Aug 2025
Details
View Map
Share
Follow
Balham Station Road

Thames Water are proposing to carry out Utility repair and maintenance works on Balham Station Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 16:40.

Thames Water logo
Between
23 and 30 Aug 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 16:30.

Transport for London (TfL) logo
Between
24 and 26 Aug 2025
Details
View Map
Share
Follow
Bressenden Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Jan 2025 at 17:28.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Hawarden Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 13:43.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Croxted Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Croxted Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
24 Aug and 9 Oct 2025
Details
View Map
Share
Follow
Guernsey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Guernsey Grove, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 14:36.

Thames Water logo
Between
24 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gresham Road, Brixton Windrush, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:31.

Thames Water logo
Between
25 and 31 Aug 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Utility asset works on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 May 2025 at 11:02.

Thames Water logo
Between
25 Aug and 6 Sep 2025
Details
View Map
Share
Follow
Mount Ephraim Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Ephraim Lane, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 13:43.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 13:06.

Southern Gas Networks logo
Between
25 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Glenwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Glenwood Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 08:26.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Elizabeth Street

Thames Water were proposing to carry out New service connection on Elizabeth Street, Knightsbridge & Belgravia, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 16:34.

Thames Water logo
LONG TERM
Between
25 Aug and 3 Nov 2025
Details
View Map
Share
Follow
Chadwick Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:36.

Thames Water logo
Between
25 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 14:38.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Lavington Street

Thames Water were proposing to carry out New service connection on Lavington Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2025 at 13:27.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Follow
Bear Street

Thames Water are proposing to carry out New service connection on Bear Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:00.

UK Power Networks Eastern & London logo
Between
25 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Bury Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:58.

Electricity Network Company logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.

Virgin Media logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Yeoman's Row

Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 28 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 May 2025 at 16:02.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 06:33.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 08:03.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:22.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 14:57.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 14:50.

Southern Gas Networks logo
Between
26 Aug and 23 Sep 2025
Details
View Map
Share
Follow
Lansdowne Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lansdowne Hill, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 14:29.

Network Rail logo
Between
26 and 30 Aug 2025
Details
View Map
Share
Follow
Glasshouse Walk

Network Rail are proposing to carry out Works for Rail Purposes on Glasshouse Walk, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 May 2025 at 11:45.

Thames Water logo
LONG TERM
Between
26 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Romney Street

Thames Water are proposing to carry out Utility repair and maintenance works on Romney Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 06:21.

Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Newington Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:19.

City Of Westminster logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
St Martin's Lane

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 08:07.

Thames Water logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
High Holborn

Thames Water are proposing to carry out Utility repair and maintenance works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:13.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Mansfield Mews

BT are proposing to carry out Utility asset works on Mansfield Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 09:39.

Between
27 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lever Street

London Borough Of Islington are proposing to carry out Highway improvement works on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:43.

Thames Water logo
Between
27 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Westwood Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Westwood Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 May 2025 at 06:29.

Thames Water logo
Between
27 Aug and 1 Sep 2025
Details
View Map
Share
Swaffield Road

Thames Water were proposing to carry out New service connection on Swaffield Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 August 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 May 2025 at 15:51.

London Borough Of Southwark logo
Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 May 2025 at 12:56.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Surrey Quays Road

BT are proposing to carry out Utility repair and maintenance works on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

BT logo
LONG TERM
Between
27 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Redriff Road

BT are proposing to carry out Utility repair and maintenance works on Redriff Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 27 May 2025 at 08:11.

Cadent Gas logo
Between
28 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Highbury Grove

Cadent Gas are proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:00.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 10:38.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 09:10.

Thames Water logo
Between
29 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 14:45.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Follow
Acton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 15:37.

Thames Water logo
Between
29 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2025 at 15:22.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Doria Road

Thames Water were proposing to carry out Utility asset works on Doria Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 August 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 May 2025 at 13:13.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Follow
Doria Road

Thames Water are proposing to carry out Utility asset works on Doria Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 May 2025 at 13:57.

Thames Water logo
Between
29 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Whitehead's Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Whitehead's Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 14:37.

Transport for London (TfL) logo
Between
31 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Battersea Park Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Park Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 15 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:33.

Transport for London (TfL) logo
Between
31 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 15 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:25.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Cremorne Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Cremorne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:58.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:22.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 15 May 2025 at 15:20.

Transport for London (TfL) logo
Between
31 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway improvement works on Cheyne Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2025 at 16:31.

Transport for London (TfL) logo
Between
31 Aug and 2 Sep 2025
Details
View Map
Share
Bressenden Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Bressenden Place, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 August 2025 and run through until 2 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 16:43.


Roadworks Map near to Southwark, LONDON, SE11 9BB (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 19:37
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southwark, LONDON, SE11 9BB (325 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Southwark logo
MAJOR
  
AMELIA STREET 
(0.0 miles)
London Borough Of Southwark
Highway improvement works - Footpath - Some carriageway incursion
In Progress
Since:
(Scheduled: 6 Sep 2024 - 5 Feb 2026)
0.0
Details
Share
Follow
2
London Borough Of Southwark logo
MAJOR
  
AMELIA STREET 
(0.0 miles)
London Borough Of Southwark
Highway improvement works - Footpath - Some carriageway incursion
In Progress
Since: 6 Sep 2024 00:00
(Scheduled: 6 Sep 2024 - 5 Feb 2026)
0.0
Details
Share
Follow
3
London Borough Of Southwark logo
MAJOR
  
WALWORTH ROAD 
(0.1 miles)
London Borough Of Southwark
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 10 Sep 2024 00:00
(Scheduled: 10 Sep 2024 - 8 Aug 2025)
0.1
Details
Share
Follow
4
London Borough Of Southwark logo
MAJOR
  
ILIFFE STREET 
(0.1 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway, Carriageway - Road closure
In Progress
Since: 6 May 2025 08:00
(Scheduled: 6 May 2025 - 27 Jun 2025)
0.1
Details
Share
Follow
5
London Borough Of Southwark logo
MAJOR
  
ILIFFE STREET 
(0.1 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway, Carriageway - Road closure
Planned
Scheduled: 6 May 2025 - 10 Jun 2025
0.1
Details
Share
Follow
6
London Borough Of Southwark logo
MAJOR
  
PENTON PLACE 
(0.1 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 6 May 2025 - 10 Jun 2025
0.1
Details
Share
Follow
7
London Borough Of Southwark logo
MAJOR
  
PENTON PLACE 
(0.1 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 6 May 2025 08:00
(Scheduled: 6 May 2025 - 27 Jun 2025)
0.1
Details
Share
Follow
8
London Borough Of Southwark logo
MAJOR
  
WALWORTH ROAD 
(0.1 miles)
London Borough Of Southwark
Highway improvement works - Footway - No carriageway incursion
In Progress
Since:
(Scheduled: 24 Mar 2025 - 31 Oct 2025)
0.1
Details
Share
Follow
9
London Borough Of Southwark logo
MAJOR
  
WALWORTH ROAD 
(0.1 miles)
London Borough Of Southwark
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 24 Mar 2025 00:00
(Scheduled: 24 Mar 2025 - 31 Oct 2025)
0.1
Details
Share
Follow
10
London Borough Of Southwark logo
MAJOR
  
WALWORTH ROAD 
(0.2 miles)
London Borough Of Southwark
Highway improvement works - Footway - No carriageway incursion
In Progress
Since: 6 Dec 2024 07:49
(Scheduled: 6 Dec 2024 - 5 Dec 2025)
0.2
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data