ROADWORKS SUMMARY
Meadway, LONDON, NW11 6PJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Meadway, NW11 6PJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Meadway, LONDON, NW11 6PJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Meadway are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Network Rail logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Tanner Lane

Network Rail are carrying out Works for Rail Purposes on Tanner Lane, Westminster, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2022 at 07:30 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jul 2025 at 08:22.

Network Rail logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
South Wharf Road

Network Rail are carrying out Works for Rail Purposes on South Wharf Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2025 at 08:24.

Network Rail logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Junction Place

Network Rail are carrying out Works for Rail Purposes on Junction Place, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2022 at 07:30 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jul 2025 at 08:22.

Transport for London (TfL) logo
LONG TERM
Until
31 Mar 2026
Details
View Map
Share
Follow
Westway

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 22:00 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2025 at 11:24.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

London Borough Of Haringey logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Church Lane

London Borough Of Haringey are carrying out Remedial works on Church Lane, Hornsey, London.

The works started on 19 September 2024 at 10:07 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2025 at 07:31.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 4 Jul 2025 at 16:39.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 22 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 22 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Aug 2025 at 09:40.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:36.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Queen's Crescent

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 31 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Jul 2025 at 10:25.

London Borough Of Camden logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:18.

Thames Water logo
LONG TERM
Between
10 Mar and 6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Until
23 Jan 2026
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 14:20.

Thames Water logo
LONG TERM
Until
14 Dec 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:37.

London Borough Of Camden logo
LONG TERM
Between
6 Apr and 31 Dec 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.

Thames Water logo
LONG TERM
Between
28 Apr and 3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:34.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:41.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The works started on 19 May 2025 at 09:30 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
21 May 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 17 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 06:09.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Great Marlborough Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

London Borough Of Barnet logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Until
17 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are carrying out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 June 2025 at 08:00 and could run through until 17 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Aug 2025 at 12:43.

London Borough Of Haringey logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wightman Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Wightman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 11 Jul 2025 at 15:22.

London Borough Of Haringey logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Wightman Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Wightman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 17 Jun 2025 at 12:17.

Thames Water logo
LONG TERM
Until
29 Oct 2025
Details
View Map
Share
Follow
Denzil Road

Thames Water are carrying out Utility asset works on Denzil Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:45 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 15:00.

Thames Water logo
LONG TERM
Between
30 Jun 2025 and 26 Jan 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:40.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul and 24 Nov 2025
Details
View Map
Share
Follow
Gray's Inn Road

Transport for London (TfL) are proposing to carry out roadworks on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 08:54.

London Borough Of Barnet logo
LONG TERM
Until
27 Sep 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are carrying out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 20:00 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 10:41.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Burnt Oak Broadway

Cadent Gas are carrying out Utility asset works on Burnt Oak Broadway, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:26 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:28.

Cadent Gas logo
LONG TERM
Until
12 Oct 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Edgware.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 06:23 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 10:38.

UK Power Networks Eastern & London logo
LONG TERM
Until
27 Oct 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 July 2025 at 13:00 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Jul 2025 at 13:37.

London Borough Of Barnet logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are carrying out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2025 at 15:00 and could run through until 5 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 10:11.

Murphy Gas Networks logo
LONG TERM
Between
14 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Gas Networks on 15 May 2025 at 15:51.

Cadent Gas logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Garratt Road

Cadent Gas are carrying out Utility asset works on Garratt Road, Edgware.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 July 2025 at 06:07 and could run through until 21 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 09:42.

Thames Water logo
LONG TERM
Between
18 Jul 2025 and 15 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 February 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 10:33.

Thames Water logo
LONG TERM
Until
16 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are carrying out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 08:30 and could run through until 16 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 09:12.

Thames Water logo
LONG TERM
Between
19 Jul and 2 Nov 2025
Details
View Map
Share
Highbury Grove

Thames Water were proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 July 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Jul 2025 at 16:03.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 August 2025 at 08:00 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Aug 2025 at 09:13.

Transport for London (TfL) logo
LONG TERM
Between
21 Jul 2025 and 6 Jan 2026
Details
View Map
Share
Follow
King's Cross Road

Transport for London (TfL) are proposing to carry out roadworks on King's Cross Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 11:20.

HS2 logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and bus stop or stand.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 12:39.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Finchley Road

HS2 are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 10:55.

HS2 logo
LONG TERM
Between
21 Jul 2025 and 26 Jun 2026
Details
View Map
Share
Follow
College Crescent

HS2 are proposing to carry out Works for Rail Purposes on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 June 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 10 Mar 2025 at 16:30.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
College Crescent

HS2 are carrying out Section 50 on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 10 Sep 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Until
17 Jul 2026
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 July 2025 at 00:01 and could run through until 17 July 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Jul 2025 at 10:22.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Swain's Lane

Thames Water are proposing to carry out Utility asset works on Swain's Lane, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 17 Jul 2025 at 17:32.

Thames Water logo
LONG TERM
Until
25 Sep 2025
Details
View Map
Share
Follow
Swain's Lane

Thames Water are carrying out Utility asset works on Swain's Lane, Highgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 July 2025 at 08:00 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 08:01.

Thames Water logo
LONG TERM
Until
5 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Thames Water are carrying out roadworks on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 July 2025 at 12:55 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 08:26.

London Borough Of Haringey logo
LONG TERM
Between
25 Jul and 25 Oct 2025
Details
View Map
Share
Follow
Ferme Park Road

London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Ferme Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 29 Jul 2025 at 08:09.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Abbey Road

Thames Water were proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jul 2025 at 09:45.

Thames Water logo
LONG TERM
Between
28 Jul and 30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 16:00.

Thames Water logo
LONG TERM
Until
30 Dec 2025
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Statutory Infrastructure Works on Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 13:40 and could run through until 30 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Jul 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 19 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:38.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 14 Nov 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2025 at 10:07.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
St John Street

Thames Water were proposing to carry out Utility asset works on St John Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 13:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

London Borough Of Barnet logo
LONG TERM
Until
27 Sep 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are carrying out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 August 2025 at 12:00 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 10:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Aug and 31 Dec 2025
Details
View Map
Share
Chimes Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Chimes Avenue, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 August 2025 and run through until 31 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Jul 2025 at 21:49.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 21 Dec 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 21 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 23 Dec 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 August 2025 and run through until 23 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 09:58.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:38.

Cadent Gas logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Wood Lane

Cadent Gas were proposing to carry out Utility asset works on Wood Lane, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 August 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 26 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jul 2025 at 16:58.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Jul 2025 at 15:43.

Transport for London (TfL) logo
LONG TERM
Until
26 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are carrying out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 26 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 11:40.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Streatley Place

London Borough Of Camden are carrying out roadworks on Streatley Place, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 4 Aug 2025 at 08:20.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are carrying out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 4 Aug 2025 at 08:22.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 1 June 2026. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:12.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway

Thames Water were proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:49.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway Close

Thames Water were proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 08:19.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 08:52.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 13:12.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 13:44.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Murphy Gas Networks on 21 Jul 2025 at 14:41.

Murphy Gas Networks logo
LONG TERM
Until
24 Oct 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are carrying out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 13 Aug 2025 at 12:13.

Murphy Gas Networks logo
LONG TERM
Between
4 Aug and 24 Oct 2025
Details
View Map
Share
Hornsey Park Road

Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 15 Jul 2025 at 10:33.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 11:10.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Fortis Green

London Borough Of Haringey were proposing to carry out Remedial works on Fortis Green, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 14:55.

HS2 logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Park Village East

HS2 are carrying out Works for Rail Purposes on Park Village East, Regent's Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 August 2025 at 12:55 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 22 Aug 2025 at 15:26.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Chatsworth Road

Thames Water are proposing to carry out Utility asset works on Chatsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:37.

Transport for London (TfL) logo
LONG TERM
Between
18 Aug 2025 and 2 Mar 2026
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out roadworks on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The works will start on or after 18 August 2025 and could run through until 2 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2025 at 13:25.

Eunetworks logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Chamberlayne Road

Eunetworks are proposing to carry out Utility asset works on Chamberlayne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:03.

Thames Water logo
LONG TERM
Between
18 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:31.

Cadent Gas logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Old Church Lane

Cadent Gas are carrying out Utility asset works on Old Church Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2025 at 11:05.

Thames Water logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Road

Thames Water are proposing to carry out Utility asset works on Bishops Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Affinity Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Kenton Road

Affinity Water are carrying out Utility asset works on Kenton Road, Harrow.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 09:15 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 08:58.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Summers Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Summers Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 14:39.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 16:30.

City Of Westminster logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Harrow Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 August 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Jul 2025 at 15:34.

Transport for London (TfL) logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are carrying out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 08:34.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are carrying out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 08:33.

Transport for London (TfL) logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are carrying out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Until
3 Oct 2025
Details
View Map
Share
Follow
Bishops Road

Thames Water are carrying out Utility asset works on Bishops Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 August 2025 at 08:00 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 12:40.

Transport for London (TfL) logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Wood Lane

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 12 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2025 at 10:38.

Electricity Network Company logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Connaught Gardens

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Connaught Gardens, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2025 at 12:28.

HS2 logo
LONG TERM
Until
26 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

HS2 are carrying out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 00:01 and could run through until 26 October 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:00.

Thames Water logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are carrying out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 09:00 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 09:32.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 12:43.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:18.

Thames Water logo
LONG TERM
Until
19 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are carrying out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 09:06 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:49.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jul 2025 at 12:43.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:39.

Thames Water logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 11:12.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Meadway Close

Thames Water are carrying out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2025 at 14:40 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:57.

City Of Westminster logo
Finishing
Wednesday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 06:37.

City Of Westminster logo
Finishing
Wednesday
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Aug 2025 at 09:30.

Transport for London (TfL) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Swinton Street

Transport for London (TfL) are carrying out Highway improvement works on Swinton Street, King's Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2025 at 10:47.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Booth Road

Cadent Gas are carrying out Utility repair and maintenance works on Booth Road, Colindale, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:09.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Page Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Page Street, Mill Hill, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 August 2025 at 12:18 and could run through until 19 September 2025. The works will impact the verge only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:32.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Sale Place

Cadent Gas are carrying out Utility repair and maintenance works on Sale Place, Hyde Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 August 2025 at 10:38 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 06:35.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 08:18.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 08:18.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 May 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 09:00 and could run through until 14 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 10:11.

UK Power Networks Eastern & London logo
LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:14.

London Borough Of Camden logo
LONG TERM
Between
1 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:26.

UK Power Networks Eastern & London logo
LONG TERM
Until
7 Nov 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:30 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 13:13.

HS2 logo
Finishing
Saturday
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 14:34.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Dec 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 14:00 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2025 at 14:36.

Transport for London (TfL) logo
LONG TERM
Between
1 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 14:00.

Thames Water logo
LONG TERM
Between
1 Sep and 2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are proposing to carry out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Until
2 Nov 2025
Details
View Map
Share
Follow
Prout Grove

Thames Water are carrying out Utility asset works on Prout Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:59.

Thames Water logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Birse Crescent

Thames Water are carrying out Utility asset works on Birse Crescent, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 12:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:46.

Thames Water logo
LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:06.

Thames Water logo
LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 07:46.

Thames Water logo
LONG TERM
Between
1 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Broadlands Road

Thames Water are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2025 at 09:19.

Thames Water logo
LONG TERM
Until
21 Dec 2025
Details
View Map
Share
Follow
Broadlands Road

Thames Water are carrying out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 09:52.

Thames Water logo
Between
1 and 29 Sep 2025
Details
View Map
Share
Follow
Denewood Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 07:37.

Thames Water logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Denewood Road

Thames Water are carrying out Statutory Infrastructure Works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 08:13.

London Borough Of Barnet logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Regents Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Regents Park Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Jul 2025 at 15:57.

London Borough Of Barnet logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Jun 2025 at 14:30.

London Borough Of Barnet logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Aug 2025 at 16:09.

London Borough Of Barnet logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2025 at 12:40.

London Borough Of Barnet logo
LONG TERM
Until
14 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are carrying out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:49.

City Of Westminster logo
Finishing
Wednesday
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 11:04.

City Of Westminster logo
Finishing
Wednesday
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are carrying out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 08:00 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Sep 2025 at 09:24.

City Of Westminster logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Harewood Avenue

City Of Westminster are carrying out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Sep 2025 at 11:29.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Turnpike Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Turnpike Lane, Wood Green, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jul 2025 at 14:17.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 8 Oct 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:03.

Thames Water logo
Finishing
Today
Details
View Map
Share
Templewood Avenue

Thames Water were proposing to carry out Utility asset works on Templewood Avenue, Frognal And Fitzjohns, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 09:56.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Sep 2025 at 13:24.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 September 2025 and run through until 4 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Sep 2025 at 16:17.

London Borough Of Haringey logo
LONG TERM
Between
4 Sep and 4 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 4 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 10:42.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 06:55.

Thames Water logo
Between
5 and 25 Sep 2025
Details
View Map
Share
Grand Parade

Thames Water were proposing to carry out Utility repair and maintenance works on Grand Parade, Tottenham, London.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 September 2025 and run through until 25 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Acton Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Acton Lane, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 10:59.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Connaught Street

City Of Westminster are carrying out Highway repair and maintenance works on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Sep 2025 at 09:20.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:05.

City Of Westminster logo
LONG TERM
Until
17 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are carrying out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 08:00 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Sep 2025 at 09:20.

City Of Westminster logo
LONG TERM
Between
8 Sep and 14 Nov 2025
Details
View Map
Share
Connaught Square

City Of Westminster were proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Jul 2025 at 13:25.

Eunetworks logo
Finishing
Today
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 9 Jun 2025 at 15:26.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Westbourne Gardens

Cadent Gas are carrying out Utility repair and maintenance works on Westbourne Gardens, Bayswater, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 14:01 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 08:03.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 31 Oct 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:48.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:41.

London Borough Of Camden logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:12.

London Borough Of Camden logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:19.

Thames Water logo
LONG TERM
Between
8 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 8 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 14:51.

Thames Water logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Thames Water are carrying out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works started on 8 September 2025 at 13:26 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 13:53.

Thames Water logo
Between
8 and 28 Sep 2025
Details
View Map
Share
Kilburn Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Kilburn Lane, North Kensington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:25.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Murray Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2025 at 11:56.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 Dec 2024 at 11:57.

Cadent Gas logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Pound Lane

Cadent Gas are carrying out Utility asset works on Pound Lane, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:49 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 14:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2025 at 10:14.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 16:09.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are carrying out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 10:38 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:59.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Blackbird Hill

Cadent Gas are proposing to carry out Utility asset works on Blackbird Hill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2025 at 07:28.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Crouch End Hill

London Borough Of Haringey are proposing to carry out Highway improvement works on Crouch End Hill, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Sep 2025 at 10:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Seven Sisters Road

Cadent Gas are proposing to carry out Utility asset works on Seven Sisters Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 11:30.

UK Power Networks Eastern & London logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Turnpike Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Turnpike Lane, Wood Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:50.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 11:15.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 11:15.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 14:07.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 14:07.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 8 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Sep 2025 at 18:59.

London Borough Of Haringey logo
LONG TERM
Between
8 Sep and 8 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 8 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 07:25.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Halliwick Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Halliwick Road, Muswell Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 08:43.

Thames Water logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Powys Lane

Thames Water are carrying out Utility repair and maintenance works on Powys Lane, Southgate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 September 2025 at 09:30 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 10:07.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 10:51.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 15:12.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Amberley Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 09:40.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jul 2025 at 10:21.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 15:43.

Eunetworks logo
LONG TERM
Between
9 Sep and 11 Oct 2025
Details
View Map
Share
North Acton Road

Eunetworks were proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 11:49.

Eunetworks logo
LONG TERM
Between
9 Sep and 16 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are proposing to carry out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 3 Sep 2025 at 12:15.

Eunetworks logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
North Acton Road

Eunetworks are carrying out Utility asset works on North Acton Road, Park Royal.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 10 Sep 2025 at 08:13.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are carrying out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:09.

Thames Water logo
LONG TERM
Until
9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are carrying out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 09:00 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:08.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Colindale Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Colindale Avenue, Colindale, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2025 at 13:53 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 14:17.

London Borough Of Camden logo
Between
10 and 30 Sep 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:57.

London Borough Of Camden logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Sep 2025 at 10:33.

London Borough Of Camden logo
Between
10 and 30 Sep 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Sep 2025 at 08:10.

London Borough Of Camden logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 September 2025 at 10:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Sep 2025 at 10:33.

UK Power Networks Eastern & London logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Sutherland Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 15:45.

UK Power Networks Eastern & London logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Hall Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Sep 2025 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
10 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 14:08.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 11:04.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 13:22.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 14:29.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Bedford Road

London Borough Of Haringey were proposing to carry out Remedial works on Bedford Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 September 2025 and run through until 10 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 14:50.

London Borough Of Haringey logo
LONG TERM
Between
10 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bedford Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 10 Sep 2025 at 15:23.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Shirland Road

Cadent Gas are carrying out Utility repair and maintenance works on Shirland Road, Harrow Road, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 13:09 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 10:29.

Thames Water logo
Until
1 Oct 2025
Details
View Map
Share
Follow
Riverdene

Thames Water are carrying out Utility repair and maintenance works on Riverdene, Edgware.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2025 at 09:30 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:07.

Thames Water logo
Until
2 Oct 2025
Details
View Map
Share
Follow
Woodside Grange Road

Thames Water are carrying out Utility repair and maintenance works on Woodside Grange Road, North Finchley, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 09:30 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 14:48.

Eunetworks logo
Finishing
Monday
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 24 Jun 2025 at 13:49.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Woodlea Road

Thames Water are carrying out Utility repair and maintenance works on Woodlea Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2025 at 15:11 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:08.

Thames Water logo
Between
13 and 30 Sep 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 12:53.

Thames Water logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are carrying out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 13 September 2025 at 09:13 and could run through until 30 September 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 07:37.

Thames Water logo
Between
13 and 28 Sep 2025
Details
View Map
Share
Follow
Linacre Road

Thames Water are proposing to carry out Utility asset works on Linacre Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:09.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 14:51.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are carrying out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:43.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:22.

London Borough Of Barnet logo
Today
Details
View Map
Share
Woodgrange Avenue

London Borough Of Barnet carried out Highway improvement works on Woodgrange Avenue, North Finchley, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 15 Sep 2025 and 18 Sep 2025 and were actually completed between 15 Sep 2025 (08:00) and 18 Sep 2025 (16:02). The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Sep 2025 at 16:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 14 Nov 2025
Details
View Map
Share
Ecclesbourne Gardens

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 15:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Chimes Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Chimes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2025 at 12:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 14 Nov 2025
Details
View Map
Share
Chimes Avenue

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Chimes Avenue, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Sep 2025 at 15:18.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:25.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Remedial works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 13:14.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Leicester Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Jul 2025 at 10:48.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Leicester Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, East Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 14:20.

Affinity Water logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Leicester Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Sep 2025 at 14:25.

Transport for London (TfL) logo
Between
15 and 30 Sep 2025
Details
View Map
Share
Follow
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:31.

Transport for London (TfL) logo
Between
15 and 30 Sep 2025
Details
View Map
Share
Follow
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2025 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep 2025 and 26 May 2026
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out roadworks on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Sep 2025 at 14:52.

Thames Water logo
Between
15 and 28 Sep 2025
Details
View Map
Share
Follow
Southwick Street

Thames Water are proposing to carry out Utility repair and maintenance works on Southwick Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 06:07.

Thames Water logo
Until
28 Sep 2025
Details
View Map
Share
Follow
Southwick Street

Thames Water are carrying out Utility repair and maintenance works on Southwick Street, Hyde Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 10:25.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malton Road

Thames Water are proposing to carry out New service connection on Malton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2025 at 13:51.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malton Road

Thames Water are carrying out New service connection on Malton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:12 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 13:31.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Malton Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Malton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 11:57.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Malton Road

UK Power Networks Eastern & London are carrying out New service connection on Malton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 13:01 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 13:01.

Thames Water logo
Finishing
Today
Details
View Map
Share
Marylands Road

Thames Water were proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 11:56.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Marylands Road

Thames Water are proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:30.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Marylands Road

Thames Water are carrying out Highway improvement works on Marylands Road, Harrow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 13:45 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 15:39.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 12:23.

Transport for London (TfL) logo
Between
15 Sep and 10 Oct 2025
Details
View Map
Share
St John's Wood Road

Transport for London (TfL) were proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Aug 2025 at 11:23.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 19 Aug 2025 at 07:34.

London Borough Of Brent logo
LONG TERM
Between
15 Sep 2025 and 28 Feb 2026
Details
View Map
Share
Follow
High Street

London Borough Of Brent are proposing to carry out Highway improvement works on High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 15 Sep 2025 at 07:45.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:46.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Craven Park

Network Rail were proposing to carry out Works for Rail Purposes on Craven Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2025 at 13:50.

Thames Water logo
Between
15 Sep and 5 Oct 2025
Details
View Map
Share
Lancaster Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 5 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 10:08.

Thames Water logo
Until
29 Sep 2025
Details
View Map
Share
Follow
Linacre Road

Thames Water are carrying out Utility asset works on Linacre Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 12:00 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 14 Aug 2025 at 10:40.

London Borough Of Camden logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 Sep 2025 at 08:33.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Follow
Beaconsfield Road

Thames Water are proposing to carry out Utility asset works on Beaconsfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
15 Sep and 26 Oct 2025
Details
View Map
Share
Beaconsfield Road

Thames Water were proposing to carry out Utility asset works on Beaconsfield Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 09:05.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Keats Grove

Thames Water are carrying out Utility repair and maintenance works on Keats Grove, Hampstead Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 17:12 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 14:36.

Between
15 and 29 Sep 2025
Details
View Map
Share
Parkhurst Road

Aurora Utilities Limited were proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 13 Aug 2025 at 12:52.

Between
15 and 29 Sep 2025
Details
View Map
Share
Follow
Parkhurst Road

Aurora Utilities Limited are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 8 Sep 2025 at 12:09.

Transport for London (TfL) logo
Between
15 and 29 Sep 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 11:29.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 25 Jul 2025 at 14:51.

Energy Assets Pipelines logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Finchley Road

Energy Assets Pipelines were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 14:54.

London Borough Of Camden logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Bertram Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bertram Street, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Aug 2025 at 15:25.

London Borough Of Camden logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Bertram Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Bertram Street, Highgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 15 Sep 2025 at 08:33.

Cadent Gas logo
LONG TERM
Until
17 Oct 2025
Details
View Map
Share
Follow
Woodberry Grove

Cadent Gas are carrying out Utility asset works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 11:31 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 12:32.

LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Mount View Road

London Borough Of Islington are carrying out Highway improvement works on Mount View Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 15 Sep 2025 at 08:34.

LONG TERM
Between
15 Sep and 30 Nov 2025
Details
View Map
Share
Follow
Mount View Road

London Borough Of Islington are proposing to carry out Highway improvement works on Mount View Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 27 Aug 2025 at 13:16.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cranbourne Gardens

Thames Water are proposing to carry out New service connection on Cranbourne Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 09:19.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cranbourne Gardens

Thames Water are carrying out New service connection on Cranbourne Gardens, Golders Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:20 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:18.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 09:41.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are carrying out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:30 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:05.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Woodside Avenue

Cadent Gas are carrying out Utility repair and maintenance works on Woodside Avenue, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 10:00 and could run through until 23 September 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 15 Sep 2025 at 13:45.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:10.

London Borough Of Barnet logo
LONG TERM
Between
15 Sep and 27 Oct 2025
Details
View Map
Share
Follow
The Hyde

London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:49.

Murphy Gas Networks logo
Between
15 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Mayes Road

Murphy Gas Networks are proposing to carry out Utility asset works on Mayes Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 8 Sep 2025 at 12:09.

Murphy Gas Networks logo
Until
10 Oct 2025
Details
View Map
Share
Follow
Mayes Road

Murphy Gas Networks are carrying out Utility asset works on Mayes Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 00:00 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 15 Sep 2025 at 09:14.

London Borough Of Barnet logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Coppetts Road

Thames Water are proposing to carry out New service connection on Coppetts Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jul 2025 at 13:01.

Cadent Gas logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Mollison Way

Cadent Gas were proposing to carry out Utility asset works on Mollison Way, Edgware.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 9 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 14:50.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are carrying out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:42.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 11:11.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are carrying out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:40.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Orion Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Orion Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Orion Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Orion Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2025 at 12:32.

Transport for London (TfL) logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Orion Road

Transport for London (TfL) are carrying out Highway improvement works on Orion Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Pinkham Way Slip From North Circular West Bound To Colney Hatch Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular West Bound To Colney Hatch Lane, Muswell Hill, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Sep 2025 at 08:22.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 12:59.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Greenhill Park

Thames Water are carrying out Utility repair and maintenance works on Greenhill Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 10:31 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 11:33.

London Borough Of Camden logo
Until
27 Sep 2025
Details
View Map
Share
Follow
Lawford Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Lawford Road, Cantelowes, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 08:00 and could run through until 27 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Sep 2025 at 14:42.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Well Road

Thames Water are carrying out Utility repair and maintenance works on Well Road, Hampstead Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 06:49 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 17:59.

BT logo
Finishing
Today
Details
View Map
Share
Hillrise Road

BT were proposing to carry out Utility asset works on Hillrise Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 25 Jul 2025 at 13:14.

BT logo
Finishing
Today
Details
View Map
Share
Hillrise Road

BT were proposing to carry out Utility asset works on Hillrise Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 12 Jun 2025 at 08:17.

Thames Water logo
Until
3 Oct 2025
Details
View Map
Share
Follow
Linthorpe Road

Thames Water are carrying out Utility repair and maintenance works on Linthorpe Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 09:00 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:15.

London Borough Of Haringey logo
LONG TERM
Between
16 Sep and 16 Dec 2025
Details
View Map
Share
Follow
Middle Lane

London Borough Of Haringey are proposing to carry out Highway improvement works on Middle Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 16 Sep 2025 at 13:19.

London Borough Of Brent logo
Between
16 and 26 Sep 2025
Details
View Map
Share
Princes Avenue

London Borough Of Brent were proposing to carry out Highway repair and maintenance works on Princes Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2025 at 13:50.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Great North Way

National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Sep 2025 at 15:28.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Great North Way

National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2025 at 11:45.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Great North Way

National Highways were proposing to carry out Works for road purposes on Great North Way, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 15:12.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Great North Way

National Highways are carrying out Works for road purposes on Great North Way, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 16:34.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Ashley Lane

National Highways are proposing to carry out Works for road purposes on Ashley Lane, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Ashley Lane

National Highways are carrying out Works for road purposes on Ashley Lane, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:16.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Ashley Lane

National Highways are carrying out Works for road purposes on Ashley Lane, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:30.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Downage

National Highways are carrying out Works for road purposes on Downage, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:37.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Downage

National Highways are proposing to carry out Works for road purposes on Downage, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Downage

National Highways are carrying out Works for road purposes on Downage, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Chatsworth Avenue

National Highways are proposing to carry out Works for road purposes on Chatsworth Avenue, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Chatsworth Avenue

National Highways are carrying out Works for road purposes on Chatsworth Avenue, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Chatsworth Avenue

National Highways are carrying out Works for road purposes on Chatsworth Avenue, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:34.

National Highways logo
Between
16 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Sunny Gardens Road

National Highways are proposing to carry out Works for road purposes on Sunny Gardens Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 21 Aug 2025 at 11:12.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Sunny Gardens Road

National Highways are carrying out Works for road purposes on Sunny Gardens Road, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:40 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Sep 2025 at 11:07.

National Highways logo
Until
7 Oct 2025
Details
View Map
Share
Follow
Sunny Gardens Road

National Highways are carrying out Works for road purposes on Sunny Gardens Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2025 at 22:00 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 14:32.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Victoria Road

Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Road, Wood Green, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:46.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Harcourt Road

Thames Water were proposing to carry out Utility repair and maintenance works on Harcourt Road, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 22 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:46.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Watford Way

National Highways were proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 16 Sep 2025 at 11:48.

National Highways logo
Between
16 Sep and 7 Oct 2025
Details
View Map
Share
Watford Way

National Highways were proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 18 Sep 2025 at 15:12.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gresse Street

Cadent Gas are carrying out Utility repair and maintenance works on Gresse Street, Bloomsbury, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 16:59 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 06:28.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Field Street

Thames Water are proposing to carry out Remedial works on Field Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 11:00.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Field Street

Thames Water are proposing to carry out Remedial works on Field Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 09:20.

Eunetworks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Mortimer Road

Eunetworks are proposing to carry out roadworks on Mortimer Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:59.

Eunetworks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harvist Road

Eunetworks are proposing to carry out roadworks on Harvist Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Camden Mews

Thames Water are carrying out roadworks on Camden Mews, Cantelowes, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 11:06 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 18:21.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Harecourt Road

Thames Water are carrying out Utility repair and maintenance works on Harecourt Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 01:21 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 09:27.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Crediton Hill

Thames Water are carrying out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2025 at 08:55 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 10:41.

Thames Water logo
Between
17 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Bigwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bigwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:14.

London Borough Of Haringey logo
LONG TERM
Between
17 Sep and 17 Dec 2025
Details
View Map
Share
Follow
Walpole Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Walpole Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Sep 2025 at 10:33.

London Borough Of Haringey logo
LONG TERM
Between
17 Sep and 17 Dec 2025
Details
View Map
Share
Follow
Park Avenue

London Borough Of Haringey are proposing to carry out Highway improvement works on Park Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Sep 2025 at 11:28.

Cadent Gas logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Sussex Gardens

Cadent Gas are carrying out Utility repair and maintenance works on Sussex Gardens, Hyde Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 02:10 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 09:13.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Meadway

Thames Water are carrying out Utility repair and maintenance works on Meadway, Golders Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 14:30 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 16:18.

Thames Water logo
Today
Details
View Map
Share
Marlborough Road

Thames Water carried out Utility repair and maintenance works on Marlborough Road, Wood Green, London.

The road was closed for some or all of the period.

The works were completed on 18 September 2025 The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 17:53.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Green Lanes

Cadent Gas are carrying out Utility repair and maintenance works on Green Lanes, Southgate.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2025 at 13:03 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2025 at 16:12.

T-Mobile (UK) logo
Finishing
Monday
Details
View Map
Share
Follow
The Fairway

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on The Fairway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 15:38.

London Borough Of Barnet logo
Between
19 and 26 Sep 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.

Thames Water logo
Between
19 and 25 Sep 2025
Details
View Map
Share
Field Street

Thames Water were proposing to carry out New service connection on Field Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 09:37.

Between
19 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Sep 2025 at 09:29.

Thames Water logo
Between
19 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bigwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bigwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:57.

Thames Water logo
Between
19 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Bigwood Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bigwood Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 08:41.

London Borough Of Barnet logo
Between
19 and 30 Sep 2025
Details
View Map
Share
Follow
Sutton Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Sutton Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Network Rail logo
Between
21 and 25 Sep 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 10:00.

UK Power Networks Eastern & London logo
Between
22 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Aug 2025 at 09:44.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 17:01.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jun 2025 at 12:01.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Berners Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:26.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 13:40.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 12:11.

Royal Borough Of Kensington And Chelsea logo
Between
22 Sep and 10 Oct 2025
Details
View Map
Share
Follow
St Quintin Avenue

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on St Quintin Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Sep 2025 at 15:22.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Westbourne Terrace Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 12:02.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Howland Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Howland Street, Bloomsbury, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 10 Sep 2025 at 14:18.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 5 Dec 2025
Details
View Map
Share
Follow
Whitfield Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Whitfield Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 8 Sep 2025 at 16:30.

City Of Westminster logo
LONG TERM
Between
22 Sep and 26 Oct 2025
Details
View Map
Share
Elgin Avenue

City Of Westminster were proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jul 2025 at 14:23.

City Of Westminster logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Jul 2025 at 15:48.

City Of Westminster logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Elgin Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Sep 2025 at 07:14.

UK Power Networks Eastern & London logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jul 2025 at 15:10.

UK Power Networks Eastern & London logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2025 at 21:35.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 21:43.

London Borough Of Camden logo
LONG TERM
Between
22 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 Aug 2025 at 18:06.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Euston Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:03.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:32.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:52.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2025 at 12:07.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:57.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:47.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:35.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Aug 2025 at 09:29.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:45.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:51.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Works for Rail Purposes on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:08.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 15 May 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Works for Rail Purposes on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:16.

Thames Water logo
Between
22 Sep and 13 Oct 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 13 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 09:26.

Thames Water logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 12:23.

Thames Water logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 10:07.

Transport for London (TfL) logo
Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2025 at 11:41.

Between
22 Sep and 11 Oct 2025
Details
View Map
Share
Follow
Parkhurst Road

Aurora Utilities Limited are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Aurora Utilities Limited on 28 Aug 2025 at 11:52.

Thames Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Carysfort Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Carysfort Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 15:44.

Thames Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Carysfort Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Carysfort Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 11:54.

Affinity Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Empire Way

Affinity Water were proposing to carry out Utility asset works on Empire Way, Wembley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Sep 2025 at 11:19.

London Borough Of Barnet logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2025 at 15:50.

London Borough Of Barnet logo
LONG TERM
Between
22 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:44.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2025 at 10:48.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2025 at 10:48.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jul 2025 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2025 at 10:48.

UK Power Networks Eastern & London logo
Between
22 and 27 Sep 2025
Details
View Map
Share
Follow
Steele Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Steele Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2025 at 11:40.

UK Power Networks Eastern & London logo
Between
22 and 27 Sep 2025
Details
View Map
Share
Follow
Steele Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Steele Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 18:51.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Broomfield Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Aug 2025 at 15:11.

London Borough Of Barnet logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Jun 2025 at 14:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 15:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 10:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 14:30.

London Borough Of Barnet logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Cricklewood Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Sep 2025 at 11:26.

Eunetworks logo
Between
24 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Banister Road

Eunetworks are proposing to carry out roadworks on Banister Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:37.

London Borough Of Barnet logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Sep 2025 at 09:30.

T-Mobile (UK) logo
Between
24 and 29 Sep 2025
Details
View Map
Share
Follow
Bourne Hill

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Bourne Hill, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 17 Sep 2025 at 13:02.

London Borough Of Barnet logo
Between
24 Sep and 7 Oct 2025
Details
View Map
Share
York Road

London Borough Of Barnet were proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 September 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:48.

London Borough Of Barnet logo
Between
24 Sep and 9 Oct 2025
Details
View Map
Share
Follow
York Road

London Borough Of Barnet are proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 12:50.

London Borough Of Barnet logo
Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Aug 2025 at 15:13.

Thames Water logo
LONG TERM
Between
25 Sep 2025 and 23 Jul 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 23 July 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 11:31.

City Of Westminster logo
Between
26 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Portsea Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsea Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:05.

City Of Westminster logo
Between
26 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Portsea Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Portsea Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Sep 2025 at 14:43.

Between
26 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 08:57.

Between
27 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Methwold Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out roadworks on Methwold Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Sep 2025 at 12:01.

Between
27 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Rootes Drive

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out roadworks on Rootes Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Sep 2025 at 12:01.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Sep 2025 at 09:34.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
29 Sep 2025 and 22 Apr 2026
Details
View Map
Share
Follow
Kensington Park Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 22 April 2026. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 12 Sep 2025 at 15:08.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 10:50.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Newman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Newman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 13:13.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2025 at 14:32.

London Borough Of Camden logo
Between
29 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:49.

London Borough Of Camden logo
Between
29 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 Sep 2025 at 10:32.

Network Rail logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Willesden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Willesden Lane, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 09:26.

Thames Water logo
Between
29 Sep and 18 Oct 2025
Details
View Map
Share
Follow
Compton Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Compton Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 14:38.

Network Rail logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Hawkins Road

Network Rail are proposing to carry out Works for Rail Purposes on Hawkins Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 16:06.

Virgin Media logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Brondesbury Park

Virgin Media were proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Jul 2025 at 11:10.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park Gardens

Thames Water are proposing to carry out Utility asset works on Rutland Park Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 9 Nov 2025
Details
View Map
Share
Follow
Rutland Park

Thames Water are proposing to carry out Utility asset works on Rutland Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 9 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:33.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:32.

Thames Water logo
LONG TERM
Between
29 Sep and 21 Dec 2025
Details
View Map
Share
Follow
Wharton Close

Thames Water are proposing to carry out Utility asset works on Wharton Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 13:57.

T-Mobile (UK) logo
Between
29 Sep and 8 Oct 2025
Details
View Map
Share
Shakspeare Walk

T-Mobile (UK) were proposing to carry out Utility asset works on Shakspeare Walk, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 8 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 25 Jul 2025 at 12:29.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Utility asset works on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 12:14.

Affinity Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Empire Way

Affinity Water are proposing to carry out Utility asset works on Empire Way, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Sep 2025 at 08:38.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cenacle Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cenacle Close, Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 13:02.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cenacle Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cenacle Close, Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jul 2025 at 12:54.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cenacle Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cenacle Close, Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2025 at 09:49.

London Borough Of Brent logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crest Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 09:10.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Crummock Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:09.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Crummock Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Crummock Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 15:05.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Park Ridings

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Park Ridings, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:55.

Murphy Gas Networks logo
Between
29 Sep and 4 Oct 2025
Details
View Map
Share
Follow
Brook Road

Murphy Gas Networks are proposing to carry out Utility asset works on Brook Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 8 Sep 2025 at 11:57.

Murphy Gas Networks logo
Between
29 Sep and 10 Oct 2025
Details
View Map
Share
Follow
Brook Road

Murphy Gas Networks are proposing to carry out Utility asset works on Brook Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 12 Sep 2025 at 12:00.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:39.

Cadent Gas logo
LONG TERM
Between
29 Sep 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Whitchurch Lane

Cadent Gas are proposing to carry out Utility asset works on Whitchurch Lane, Edgware.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 23 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 00:10.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pike Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:59.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pike Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:26.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:52.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Fernside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

London Borough Of Barnet logo
Between
29 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 11:00.

London Borough Of Barnet logo
Between
29 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 Aug 2025 at 12:23.

London Borough Of Barnet logo
Between
29 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 13:14.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 14:07.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Sep 2025 at 11:54.

London Borough Of Barnet logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Ellesmere Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Sep 2025 at 07:33.

London Borough Of Barnet logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:44.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 22:12.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 May 2025 at 13:55.

City Of Westminster logo
Between
30 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jul 2025 at 12:47.

Thames Water logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Canonbury Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Canonbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 12:23.

Thames Water logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Canonbury Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Canonbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Aug 2025 at 17:07.

Virgin Media logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Wayside

Virgin Media are proposing to carry out Utility asset works on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 24 Jun 2025 at 11:06.

Virgin Media logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Wayside

Virgin Media were proposing to carry out Utility asset works on Wayside, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 8 Aug 2025 at 12:29.

Virgin Media logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Wayside

Virgin Media are proposing to carry out Utility asset works on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 14 Aug 2025 at 11:31.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Hampstead Way

Thames Water were proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 14 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 10:44.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 10:14.

Thames Water logo
LONG TERM
Between
1 Oct and 14 Dec 2025
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:11.

London Borough Of Barnet logo
Between
1 and 12 Oct 2025
Details
View Map
Share
Follow
Wilton Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wilton Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Eunetworks logo
Between
2 and 12 Oct 2025
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Oct and 16 Nov 2025
Details
View Map
Share
Follow
Barretts Green Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barretts Green Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:27.

London Borough Of Brent logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway improvement works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:23.

London Borough Of Barnet logo
Between
2 and 7 Oct 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 10:32.

Virgin Media logo
Between
3 and 7 Oct 2025
Details
View Map
Share
Cavendish Place

Virgin Media were proposing to carry out Utility asset works on Cavendish Place, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 October 2025 and run through until 7 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Jul 2025 at 15:19.

Thames Water logo
Between
3 and 9 Oct 2025
Details
View Map
Share
Follow
Swinton Street

Thames Water are proposing to carry out New service connection on Swinton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 9 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 13:48.

Thames Water logo
LONG TERM
Between
3 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:54.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:14.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:57.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Handel Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Handel Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Sep 2025 at 16:13.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:09.

London Borough Of Camden logo
Between
4 and 31 Oct 2025
Details
View Map
Share
Follow
Kenton Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Kenton Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Sep 2025 at 16:14.

London Borough Of Barnet logo
Between
4 and 9 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.

Network Rail logo
Between
5 and 8 Oct 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jul 2025 at 10:55.

Network Rail logo
Between
5 and 9 Oct 2025
Details
View Map
Share
Follow
North Circular Road

Network Rail are proposing to carry out Works for Rail Purposes on North Circular Road, Stonebridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Aug 2025 at 14:27.

Thames Water logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
New Quebec Street

Thames Water are proposing to carry out Remedial works on New Quebec Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 14:45.

Cadent Gas logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Du Cane Road

Cadent Gas were proposing to carry out Utility asset works on Du Cane Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 12:37.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Wood Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Wood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 12:20.

Transport for London (TfL) logo
LONG TERM
Between
6 Oct and 8 Dec 2025
Details
View Map
Share
Marylebone Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Marylebone Road, Marylebone High Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:34.

Thames Water logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 11:30.

Thames Water logo
Between
6 and 11 Oct 2025
Details
View Map
Share
Follow
Park Crescent Mews West

Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 10:10.

City Of Westminster logo
LONG TERM
Between
6 Oct 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Bernhardt Crescent

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 12 Sep 2025 at 06:45.

Network Rail logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 09:29.

Network Rail logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:23.

Network Rail logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
College Road

Network Rail are proposing to carry out Works for Rail Purposes on College Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Sep 2025 at 09:30.

London Borough Of Camden logo
LONG TERM
Between
6 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:48.

London Borough Of Camden logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Camden Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Camden Street, Camden Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 14:25.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:31.

Thames Water logo
LONG TERM
Between
6 Oct 2025 and 25 Jan 2026
Details
View Map
Share
Follow
Deacon Road

Thames Water are proposing to carry out Utility asset works on Deacon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 25 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 08:33.

Cadent Gas logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Lawrence Buildings

Cadent Gas are proposing to carry out New service connection on Lawrence Buildings, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 18:50.

London Borough Of Brent logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Forty Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Avenue, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:55.

London Borough Of Barnet logo
Between
6 and 10 Oct 2025
Details
View Map
Share
Follow
Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2025 at 15:52.

London Borough Of Barnet logo
LONG TERM
Between
6 Oct and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 10:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 11:06.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 7 Dec 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out Diversionary works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 7 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 14:17.

Electricity Network Company logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 16 Sep 2025 at 12:33.

London Borough Of Barnet logo
Between
6 and 24 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jul 2025 at 15:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct 2025 and 6 Nov 2026
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 6 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 11:32.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Broomfield Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2025 at 12:58.

National Highways logo
Between
7 and 11 Oct 2025
Details
View Map
Share
Follow
Watford Way

National Highways are proposing to carry out Works for road purposes on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Sep 2025 at 15:11.

Cadent Gas logo
LONG TERM
Between
7 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Du Cane Road

Cadent Gas are proposing to carry out Utility asset works on Du Cane Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:21.

UK Power Networks Eastern & London logo
Between
8 and 21 Oct 2025
Details
View Map
Share
Follow
Tavistock Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Tavistock Place, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jul 2025 at 16:09.

Virgin Media logo
Between
8 and 10 Oct 2025
Details
View Map
Share
Follow
Bayham Place

Virgin Media are proposing to carry out Utility asset works on Bayham Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 10 Jul 2025 at 13:29.

Between
8 and 20 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 17 Sep 2025 at 12:13.

London Borough Of Barnet logo
LONG TERM
Between
8 Oct and 11 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 October 2025 and run through until 11 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

London Borough Of Brent logo
Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
Hay Lane

London Borough Of Brent are proposing to carry out Highway improvement works on Hay Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 18 Aug 2025 at 14:19.

Eunetworks logo
Between
9 and 13 Oct 2025
Details
View Map
Share
Follow
Whitmore Gardens

Eunetworks are proposing to carry out roadworks on Whitmore Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 12 Aug 2025 at 16:05.

Cadent Gas logo
LONG TERM
Between
9 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 9 October 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 15:34.

Cadent Gas logo
LONG TERM
Between
9 Oct 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 9 October 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 16:40.

Cadent Gas logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Derwent Avenue

Cadent Gas are proposing to carry out Utility asset works on Derwent Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 15:35.

Cadent Gas logo
Between
9 and 20 Oct 2025
Details
View Map
Share
Follow
Derwent Avenue

Cadent Gas are proposing to carry out Utility asset works on Derwent Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 16:10.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Queensway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 08:56.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Wood Lane

Thames Water were proposing to carry out New service connection on Wood Lane, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 October 2025 and run through until 29 October 2025. The works were due to impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 13:26.

Thames Water logo
Between
10 and 29 Oct 2025
Details
View Map
Share
Follow
Wood Lane

Thames Water are proposing to carry out New service connection on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 29 October 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 12:29.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Porchester Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Square, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:59.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Gardens, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 18 Aug 2025 at 10:37.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Gloucester Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Gloucester Terrace, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

City Of Westminster logo
Between
10 and 23 Oct 2025
Details
View Map
Share
Follow
Westbourne Park Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Park Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 Aug 2025 at 12:09.

Thames Water logo
Between
10 and 14 Oct 2025
Details
View Map
Share
Follow
Waverley Place

Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

Thames Water logo
Between
10 and 14 Oct 2025
Details
View Map
Share
Follow
Finchley Place

Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Sep 2025 at 15:47.

London Borough Of Brent logo
Between
10 and 31 Oct 2025
Details
View Map
Share
Follow
Forty Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Forty Lane, Wembley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:53.

London Borough Of Camden logo
LONG TERM
Between
11 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:38.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Connaught Street

Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:43.

City Of Westminster logo
LONG TERM
Between
13 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 14:04.

London Borough Of Hammersmith & Fulham logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 2 Sep 2025 at 15:43.

Virgin Media logo
Between
13 and 15 Oct 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 15 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 2 Jul 2025 at 11:25.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Follow
Old Oak Common Lane

London Borough Of Ealing are proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 31 Jul 2025 at 16:01.

London Borough Of Ealing logo
Between
13 Oct and 7 Nov 2025
Details
View Map
Share
Old Oak Common Lane

London Borough Of Ealing were proposing to carry out Remedial works on Old Oak Common Lane, Acton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 7 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Ealing on 12 Sep 2025 at 14:04.

Thames Water logo
Between
13 Oct and 2 Nov 2025
Details
View Map
Share
Russell Square

Thames Water were proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 2 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Aug 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
13 Oct and 12 Nov 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2025 at 14:32.

Cadent Gas logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Whidborne Street

Cadent Gas were proposing to carry out Utility asset works on Whidborne Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2025 at 12:33.

Transport for London (TfL) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Park Road

Transport for London (TfL) are proposing to carry out roadworks on Park Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2025 at 10:16.

LONG TERM
Between
13 Oct and 22 Nov 2025
Details
View Map
Share
Follow
Frederica Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Frederica Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 10 Sep 2025 at 06:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Oct and 17 Nov 2025
Details
View Map
Share
Follow
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2025 at 14:38.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Clissold Crescent

Thames Water were proposing to carry out Disconnection or alteration of supply on Clissold Crescent, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:40.

Thames Water logo
Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 08:37.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Burghley Road

Thames Water are proposing to carry out New service connection on Burghley Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 15:30.

Thames Water logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Burghley Road

Thames Water are proposing to carry out New service connection on Burghley Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 13:16.

T-Mobile (UK) logo
Between
13 and 17 Oct 2025
Details
View Map
Share
Follow
Strawberry Vale

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Strawberry Vale, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 22 Jul 2025 at 10:41.

London Borough Of Barnet logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Sep 2025 at 13:47.

London Borough Of Barnet logo
Between
13 and 16 Oct 2025
Details
View Map
Share
Follow
Millway

London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 12:56.

Thames Water logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Chase Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chase Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 16:54.

Thames Water logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Chase Road

Thames Water were proposing to carry out Utility repair and maintenance works on Chase Road, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 12:07.

Thames Water logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Chase Road

Thames Water were proposing to carry out Utility repair and maintenance works on Chase Road, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 11:01.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 15:06.

London Borough Of Barnet logo
LONG TERM
Between
14 Oct and 15 Nov 2025
Details
View Map
Share
Friary Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 15 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:29.

BT logo
Between
14 and 17 Oct 2025
Details
View Map
Share
Follow
Darlands Drive

BT are proposing to carry out Utility repair and maintenance works on Darlands Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Sep 2025 at 15:29.

Thames Water logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out Remedial works on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 14:52.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:50.

Transport for London (TfL) logo
Between
14 Oct and 6 Nov 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 6 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:53.

Virgin Media logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Park Way

Virgin Media are proposing to carry out Utility asset works on Park Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Jul 2025 at 09:01.

Transport for London (TfL) logo
Between
15 and 18 Oct 2025
Details
View Map
Share
Follow
Euston Underpass

Transport for London (TfL) are proposing to carry out roadworks on Euston Underpass, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2025 at 11:37.

Virgin Media logo
Between
15 and 17 Oct 2025
Details
View Map
Share
Follow
Brondesbury Park

Virgin Media are proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Jul 2025 at 16:57.

Between
15 and 31 Oct 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 09:10.

Between
15 and 31 Oct 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 20 Aug 2025 at 15:14.

London Borough Of Hackney logo
Between
15 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Wordsworth Road

London Borough Of Hackney are proposing to carry out roadworks on Wordsworth Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Aug 2025 at 12:13.

Virgin Media logo
Between
16 and 18 Oct 2025
Details
View Map
Share
Follow
Standard Road

Virgin Media are proposing to carry out Utility asset works on Standard Road, Park Royal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2025 and could run through until 18 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Aug 2025 at 10:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Oct and 12 Dec 2025
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 08:41.

Thames Water logo
Between
17 and 23 Oct 2025
Details
View Map
Share
Follow
Crediton Hill

Thames Water are proposing to carry out New service connection on Crediton Hill, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 23 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 12:25.

Thames Water logo
LONG TERM
Between
17 Oct and 22 Dec 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 13:29.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 26 Jun 2025 at 11:11.

Murphy Power Distribution logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Leinster Terrace

Murphy Power Distribution are proposing to carry out New service connection on Leinster Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 17 Jul 2025 at 07:08.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out Remedial works on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:24.

City Of Westminster logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Woodstock Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Woodstock Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jul 2025 at 09:12.

Thames Water logo
Between
20 and 27 Oct 2025
Details
View Map
Share
Follow
Albion Street

Thames Water are proposing to carry out New service connection on Albion Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Jul 2025 at 07:45.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Great Cumberland Place

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 14 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 30 Jul 2025 at 12:49.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Aug 2025 at 12:25.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Wallenberg Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Wallenberg Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 06:40.

UK Power Networks Eastern & London logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 14:20.

Thames Water logo
Between
20 and 23 Oct 2025
Details
View Map
Share
Broadley Street

Thames Water were proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 23 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 09:35.

Cadent Gas logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Tottenham Court Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tottenham Court Road, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Aug 2025 at 16:49.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 11:47.

City Of Westminster logo
Between
20 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Avenue Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Aug 2025 at 12:00.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 25 Jul 2025 at 14:58.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 9 Sep 2025 at 11:07.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 25 Jul 2025 at 15:01.

Energy Assets Pipelines logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Energy Assets Pipelines are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 9 Sep 2025 at 11:05.

Thames Water logo
Between
20 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2025 at 12:38.

Thames Water logo
Between
20 and 24 Oct 2025
Details
View Map
Share
Follow
Well Walk

Thames Water are proposing to carry out New service connection on Well Walk, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 15:08.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
The Vale

Transport for London (TfL) are proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Jul 2025 at 11:09.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 10:11.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Hendon Way

Transport for London (TfL) were proposing to carry out Highway improvement works on Hendon Way, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2025 at 17:30.

Transport for London (TfL) logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Aug 2025 at 13:41.

Cadent Gas logo
LONG TERM
Between
20 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Woodberry Down

Cadent Gas are proposing to carry out Utility asset works on Woodberry Down, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2025 at 16:26.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Pentyre Avenue

Cadent Gas are proposing to carry out Utility asset works on Pentyre Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2025 at 15:34.

Cadent Gas logo
Between
20 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Pentyre Avenue

Cadent Gas are proposing to carry out Utility asset works on Pentyre Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Sep 2025 at 16:10.

Thames Water logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
Haverstock Hill

Thames Water are proposing to carry out New service connection on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 15:00.

London Borough Of Barnet logo
Between
21 and 24 Oct 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Sep 2025 at 14:57.

UK Power Networks Eastern & London logo
Between
22 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Aug 2025 at 09:23.

UK Power Networks Eastern & London logo
Between
22 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Bolsover Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bolsover Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Aug 2025 at 13:14.

Cadent Gas logo
LONG TERM
Between
22 Oct and 2 Dec 2025
Details
View Map
Share
Follow
Woodberry Down

Cadent Gas are proposing to carry out Utility asset works on Woodberry Down, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 13:40.

Cadent Gas logo
LONG TERM
Between
22 Oct and 25 Nov 2025
Details
View Map
Share
Follow
Woodberry Grove

Cadent Gas are proposing to carry out Utility asset works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 25 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 12:29.

Thames Water logo
Between
22 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:40.

Thames Water logo
Between
22 and 31 Oct 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 08:59.

London Borough Of Barnet logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Cat Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, East Barnet Road To Brookhill Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:04.

London Borough Of Barnet logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Brookhill Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Brookhill Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.

London Borough Of Barnet logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Cat Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Cat Hill, Brookhill Road To Borough Boundary, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.

London Borough Of Barnet logo
Between
22 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Park Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Jul 2025 at 11:46.

City Of Westminster logo
Between
23 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Warwick Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Sep 2025 at 15:51.

Thames Water logo
Between
23 and 25 Oct 2025
Details
View Map
Share
Follow
Belsize Road

Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2025 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2025 at 17:25.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Place, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Porchester Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Gardens, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

City Of Westminster logo
Between
24 Oct and 6 Nov 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 6 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jul 2025 at 07:31.

Virgin Media logo
Between
24 and 28 Oct 2025
Details
View Map
Share
Follow
Chandos Street

Virgin Media are proposing to carry out Utility asset works on Chandos Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2025 at 13:29.

Thames Water logo
Between
24 and 30 Oct 2025
Details
View Map
Share
Tottenhall Road

Thames Water were proposing to carry out New service connection on Tottenhall Road, Palmers Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 08:21.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Holden Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Holden Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Ashbourne Close

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ashbourne Close, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Park Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 and 29 Oct 2025
Details
View Map
Share
Follow
Woodside Grange Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodside Grange Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Sep 2025 at 15:24.

London Borough Of Barnet logo
Between
25 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 14:28.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Sep 2025 at 11:15.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Osidge Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2025 and run through until 1 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 16:22.

London Borough Of Barnet logo
Between
25 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 1 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jul 2025 at 15:27.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

London Borough Of Barnet logo
Between
25 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Jul 2025 at 10:49.

Thames Water logo
Between
25 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2025 and could run through until 5 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Jul 2025 at 12:29.

London Borough Of Barnet logo
Between
26 and 31 Oct 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 12:58.

Thames Water logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
South Molton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 11:32.

Thames Water logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
South Molton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on South Molton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2025 at 08:23.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Dean Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Dean Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 15:16.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2025 at 11:33.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Blenheim Crescent

Thames Water were proposing to carry out Remedial works on Blenheim Crescent, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 29 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Aug 2025 at 13:49.

Thames Water logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
Blenheim Crescent

Thames Water are proposing to carry out Remedial works on Blenheim Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 16:30.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Bridstow Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bridstow Place, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Aug 2025 at 11:33.

London Borough Of Camden logo
LONG TERM
Between
27 Oct and 29 Nov 2025
Details
View Map
Share
Follow
Bedford Avenue

London Borough Of Camden are proposing to carry out Highway improvement works on Bedford Avenue, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:53.

City Of Westminster logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Paddington Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Paddington Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Sep 2025 at 15:55.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:50.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 12:30.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:10.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:57.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:58.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 12:03.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 09:09.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 10:02.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 10:46.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:47.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 09:55.

Transport for London (TfL) logo
Between
27 Oct and 24 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2025 at 07:22.

Transport for London (TfL) logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2025 at 16:54.

HS2 logo
LONG TERM
Between
27 Oct 2025 and 5 Apr 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 5 April 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:40.

HS2 logo
LONG TERM
Between
27 Oct 2025 and 12 Jul 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 12 July 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 8 Sep 2025 at 11:28.

Thames Water logo
Between
27 Oct and 16 Nov 2025
Details
View Map
Share
Lancaster Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 16 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 08:45.

Thames Water logo
LONG TERM
Between
27 Oct and 7 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 7 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:29.

Thames Water logo
LONG TERM
Between
27 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Meyrick Road

Thames Water are proposing to carry out Utility asset works on Meyrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Sep 2025 at 09:15.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 14 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 12:40.

Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 12:47.

Transport for London (TfL) logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out New service connection on Parkhurst Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2025 at 13:19.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 07:03.

Between
27 and 31 Oct 2025
Details
View Map
Share
Annette Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 31 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Sep 2025 at 16:32.

Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Sep 2025 at 08:58.

Thames Water logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Hornsey Road

Thames Water are proposing to carry out New service connection on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2025 at 06:10.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 10:26.

London Borough Of Barnet logo
Between
27 Oct and 8 Nov 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 11 Sep 2025 at 09:08.

Cadent Gas logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Tollington Way

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Tollington Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2025 at 07:36.

London Borough Of Camden logo
Between
27 and 29 Oct 2025
Details
View Map
Share
Follow
The Grove

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on The Grove, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Sep 2025 at 16:44.

London Borough Of Barnet logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Jul 2025 at 12:31.

London Borough Of Barnet logo
Between
27 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 3 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2025 at 08:39.

London Borough Of Barnet logo
Between
27 Oct and 15 Nov 2025
Details
View Map
Share
Ravenscroft Avenue

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 15 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 13:09.

UK Power Networks Eastern & London logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Princes Park Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Princes Park Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2025 at 14:03.

London Borough Of Barnet logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Norrice Lea

London Borough Of Barnet are proposing to carry out Highway improvement works on Norrice Lea, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 13:32.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Tottenhall Road

Thames Water are proposing to carry out New service connection on Tottenhall Road, Palmers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 12:09.

Thames Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Tottenhall Road

Thames Water are proposing to carry out New service connection on Tottenhall Road, Palmers Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 10:14.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Aug 2025 at 10:29.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 5 Sep 2025 at 10:44.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 09:22.

Affinity Water logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
Argyle Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Argyle Road, North Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Sep 2025 at 14:08.

City Of Westminster logo
Between
28 Oct and 24 Nov 2025
Details
View Map
Share
Great Cumberland Place

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2025 and run through until 24 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jul 2025 at 12:49.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Great Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Great Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:49.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Weymouth Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weymouth Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 11:26.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Weymouth Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weymouth Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:47.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Aug 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
29 Oct and 18 Nov 2025
Details
View Map
Share
Follow
Hallam Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hallam Street, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 18 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 09:48.

UK Power Networks Eastern & London logo
Between
30 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jul 2025 at 13:08.

BT logo
Between
30 Oct and 3 Nov 2025
Details
View Map
Share
Follow
Mitford Road

BT are proposing to carry out Utility asset works on Mitford Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2025 and could run through until 3 November 2025. The works will impact the footway only.

This roadwork event was last updated by BT on 30 Jul 2025 at 09:13.

Thames Water logo
Between
3 and 14 Nov 2025
Details
View Map
Share
Follow
Mary Place

Thames Water are proposing to carry out Utility repair and maintenance works on Mary Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 11:33.

London Borough Of Hammersmith & Fulham logo
Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2025 at 08:04.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 16:00.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Russell Square

Thames Water were proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 23 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:52.

Thames Water logo
Between
3 and 23 Nov 2025
Details
View Map
Share
Follow
Russell Square

Thames Water are proposing to carry out Statutory Infrastructure Works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 08:55.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2025 at 11:26.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 09:57.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

London Borough Of Camden logo
LONG TERM
Between
3 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Redhill Street

London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Sep 2025 at 07:50.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Chamberlayne Road

Thames Water are proposing to carry out New service connection on Chamberlayne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:50.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are proposing to carry out New service connection on Kilburn Lane, Queen's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:25.

Thames Water logo
Between
3 and 11 Nov 2025
Details
View Map
Share
Follow
Banister Road

Thames Water are proposing to carry out New service connection on Banister Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:40.

UK Power Networks Eastern & London logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Charles Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Charles Lane, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Sep 2025 at 08:38.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 11:38.

Cadent Gas logo
Between
3 and 24 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Sep 2025 at 08:26.

Cadent Gas logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2025 at 11:40.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Greenland Street

Thames Water are proposing to carry out New service connection on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2025 at 08:00.

Thames Water logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jul 2025 at 07:43.

Thames Water logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Dartmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dartmouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:34.

Between
3 and 13 Nov 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 13 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jul 2025 at 09:21.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 08:30.

Thames Water logo
LONG TERM
Between
3 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Bermans Way

Thames Water are proposing to carry out Utility asset works on Bermans Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 09:51.

London Borough Of Barnet logo
Between
3 and 18 Nov 2025
Details
View Map
Share
Follow
Deansway

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Deansway, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Aug 2025 at 12:47.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:04.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2025 at 09:35.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2025 at 13:41.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Selvage Lane

Transport for London (TfL) were proposing to carry out Highway improvement works on Selvage Lane, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 November 2025 and run through until 25 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2025 at 10:15.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:19.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Watford Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Watford Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Edgware Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Way, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:21.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Barnet Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Barnet Way, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:18.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Jul 2025 at 13:20.

Transport for London (TfL) logo
Between
3 and 25 Nov 2025
Details
View Map
Share
Follow
Northway Circus

Transport for London (TfL) are proposing to carry out Highway improvement works on Northway Circus, Apex Corner, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Sep 2025 at 14:17.

London Borough Of Barnet logo
LONG TERM
Between
4 Nov and 17 Dec 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 17 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 15:19.

London Borough Of Barnet logo
LONG TERM
Between
4 Nov and 17 Dec 2025
Details
View Map
Share
Follow
Brunswick Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2025 at 15:21.

London Borough Of Barnet logo
Between
4 and 11 Nov 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2025 and run through until 11 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Aug 2025 at 13:19.

Electricity Network Company logo
Between
5 and 19 Nov 2025
Details
View Map
Share
Follow
Colindale Avenue

Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 15 Sep 2025 at 11:56.

Thames Water logo
Between
6 and 13 Nov 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 15:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
7 Nov 2025 and 16 Feb 2026
Details
View Map
Share
Follow
Ordnance Hill

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ordnance Hill, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 November 2025 and could run through until 16 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 13:34.

London Borough Of Barnet logo
Between
8 and 9 Nov 2025
Details
View Map
Share
Follow
Mays Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 08:14.

London Borough Of Barnet logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Hartley Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hartley Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 13:20.

London Borough Of Enfield logo
Between
10 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Barrowell Green

London Borough Of Enfield are proposing to carry out Section 50 on Barrowell Green, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Jul 2025 at 16:35.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Barnet Lane

BT were proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 12 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Aug 2025 at 16:01.

BT logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Barnet Lane

BT are proposing to carry out Utility asset works on Barnet Lane, Totteridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Aug 2025 at 12:39.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Blackburne's Mews

Thames Water were proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 11:47.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Between
10 Nov and 11 Dec 2025
Details
View Map
Share
Follow
Connaught Square

City Of Westminster are proposing to carry out Highway repair and maintenance works on Connaught Square, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 21 Aug 2025 at 13:58.

City Of Westminster logo
LONG TERM
Between
10 Nov 2025 and 30 Jan 2026
Details
View Map
Share
Follow
Seymour Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Seymour Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 30 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Aug 2025 at 11:34.

Virgin Media logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Cambridge Gardens

Virgin Media were proposing to carry out Utility repair and maintenance works on Cambridge Gardens, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 13 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Sep 2025 at 14:56.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Broadley Street

Thames Water are proposing to carry out Utility repair and maintenance works on Broadley Street, Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 14:43.

UK Power Networks Eastern & London logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Abercorn Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Abercorn Close, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 09:48.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 17:39.

Thames Water logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Messina Avenue

Thames Water are proposing to carry out New service connection on Messina Avenue, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 10:24.

UK Power Networks Eastern & London logo
Between
10 and 14 Nov 2025
Details
View Map
Share
Follow
Jackman Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Jackman Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Sep 2025 at 15:02.

London Borough Of Brent logo
Between
11 and 28 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 14:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Nov 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Central Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Central Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 13 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2025 at 16:23.

London Borough Of Barnet logo
Between
12 and 20 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Aug 2025 at 16:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 21 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:10.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 May 2025 at 12:06.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
Between
12 and 21 Nov 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

Virgin Media logo
Between
12 and 14 Nov 2025
Details
View Map
Share
Follow
Jacksons Lane

Virgin Media are proposing to carry out Utility repair and maintenance works on Jacksons Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Aug 2025 at 15:30.

London Borough Of Barnet logo
LONG TERM
Between
12 Nov and 19 Dec 2025
Details
View Map
Share
Brunswick Park Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on Brunswick Park Road, New Southgate, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2025 and run through until 19 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 14:38.

UK Power Networks Eastern & London logo
Between
13 Nov and 12 Dec 2025
Details
View Map
Share
Follow
Hazelwood Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hazelwood Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Aug 2025 at 12:55.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Underhill Passage

UK Power Networks Eastern & London were proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 26 November 2025. The works were due to impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Aug 2025 at 13:05.

UK Power Networks Eastern & London logo
Between
13 and 26 Nov 2025
Details
View Map
Share
Follow
Underhill Passage

UK Power Networks Eastern & London are proposing to carry out New service connection on Underhill Passage, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2025 and could run through until 26 November 2025. The works will impact the footpath only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2025 at 11:06.

London Borough Of Barnet logo
Between
13 and 18 Nov 2025
Details
View Map
Share
West Heath Road

London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on West Heath Road, Hampstead, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2025 and run through until 18 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Aug 2025 at 14:28.

London Borough Of Hammersmith & Fulham logo
Between
14 Nov and 10 Dec 2025
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2025 at 08:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Nov 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2025 at 07:20.

Between
14 and 17 Nov 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are proposing to carry out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 17 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Aug 2025 at 08:21.

London Borough Of Hackney logo
On
14 Nov 2025
Details
View Map
Share
Follow
Painsthorpe Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Painsthorpe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 14 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 28 Aug 2025 at 13:24.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 14:37.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Sep 2025 at 11:30.

Thames Water logo
Between
14 and 16 Nov 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 11:51.

UK Power Networks Eastern & London logo
Between
14 and 21 Nov 2025
Details
View Map
Share
Follow
Berkeley Crescent

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Berkeley Crescent, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 08:26.

London Borough Of Camden logo
Between
15 and 28 Nov 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 17 Jul 2025 at 16:47.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2025 at 08:45.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Upper Grosvenor Street

Thames Water were proposing to carry out Disconnection or alteration of supply on Upper Grosvenor Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 20 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 12:06.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Blackburne's Mews

Thames Water were proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 20 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 15:24.

Thames Water logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Blackburne's Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Blackburne's Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2025 at 13:20.

Electricity Network Company logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Queensway

Electricity Network Company are proposing to carry out Utility asset works on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 28 Aug 2025 at 09:27.

UK Power Networks Eastern & London logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Chilworth Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Chilworth Mews, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2025 at 07:49.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Upper Berkeley Street

Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2025 at 09:19.

City Of Westminster logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Jun 2025 at 11:48.

City Of Westminster logo
Between
17 and 20 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 20 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Sep 2025 at 13:11.

UK Power Networks Eastern & London logo
Between
17 and 27 Nov 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 27 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 15:19.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Berners Mews

Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 08:02.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 08:26.

City Of Westminster logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 31 Jul 2025 at 13:17.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Harcourt Street

Thames Water are proposing to carry out New service connection on Harcourt Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 13:29.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Euston Underpass

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 19 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Aug 2025 at 13:04.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Underpass

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Underpass, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 11:51.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Camden Street

Transport for London (TfL) were proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Aug 2025 at 11:10.

London Borough Of Camden logo
LONG TERM
Between
17 Nov and 29 Dec 2025
Details
View Map
Share
Follow
Albert Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Albert Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 29 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:48.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Pratt Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Pratt Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:58.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
St Martin's Close

Transport for London (TfL) are proposing to carry out Highway improvement works on St Martin's Close, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:59.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Greenland Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Greenland Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:42.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Georgiana Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Carol Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carol Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2025 at 21:41.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2025 at 13:04.

Transport for London (TfL) logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Camden Street

Transport for London (TfL) are proposing to carry out Section 58 on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 11:03.

London Borough Of Camden logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Agar Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Mar 2025 at 15:03.

London Borough Of Camden logo
Between
17 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Agar Grove

London Borough Of Camden are proposing to carry out Highway improvement works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 24 Mar 2025 at 10:38.

Thames Water logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Nevill Road

Thames Water are proposing to carry out Utility repair and maintenance works on Nevill Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 21:04.

London Borough Of Barnet logo
Between
17 and 29 Nov 2025
Details
View Map
Share
Finchley Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Finchley Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 29 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Jul 2025 at 16:10.

London Borough Of Barnet logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Ravenscroft Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Ravenscroft Avenue, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 13:24.

Cadent Gas logo
Between
17 and 19 Nov 2025
Details
View Map
Share
Follow
Myddleton Road

Cadent Gas are proposing to carry out Utility asset works on Myddleton Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 19 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Sep 2025 at 09:00.

UK Power Networks Eastern & London logo
Between
17 and 21 Nov 2025
Details
View Map
Share
Follow
Derwent Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Derwent Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Sep 2025 at 09:41.

London Borough Of Barnet logo
Between
17 Nov and 10 Dec 2025
Details
View Map
Share
Friary Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 12:41.

London Borough Of Barnet logo
LONG TERM
Between
17 Nov and 22 Dec 2025
Details
View Map
Share
Follow
Friary Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Sep 2025 at 15:34.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Lawrence Street

London Borough Of Barnet were proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 November 2025 and run through until 22 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Aug 2025 at 15:33.

London Borough Of Barnet logo
Between
17 and 22 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 11:53.

City Of Westminster logo
Between
18 and 25 Nov 2025
Details
View Map
Share
Follow
Cleveland Street

City Of Westminster are proposing to carry out Highway improvement works on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2025 and could run through until 25 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 3 Sep 2025 at 07:42.

London Borough Of Brent logo
Between
19 and 23 Nov 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway improvement works on Crest Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:26.

Thames Water logo
Between
20 and 26 Nov 2025
Details
View Map
Share
Follow
Mortimer Street

Thames Water are proposing to carry out New service connection on Mortimer Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 26 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2025 at 10:44.

Eunetworks logo
Between
20 and 24 Nov 2025
Details
View Map
Share
Follow
Buller Road

Eunetworks are proposing to carry out roadworks on Buller Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2025 and could run through until 24 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 13 Aug 2025 at 08:20.

Thames Water logo
Between
21 and 23 Nov 2025
Details
View Map
Share
Follow
Isledon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Isledon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 14:56.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Crescent Road

Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Crescent Road

Virgin Media are proposing to carry out Utility asset works on Crescent Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 11 Sep 2025 at 12:37.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Dollis Road

Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Sep 2025 at 14:04.

Virgin Media logo
Between
21 and 25 Nov 2025
Details
View Map
Share
Follow
Dollis Road

Virgin Media are proposing to carry out Utility asset works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 11 Sep 2025 at 12:36.

Vodafone logo
Between
24 and 30 Nov 2025
Details
View Map
Share
Follow
Oxford Street

Vodafone are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 1 Sep 2025 at 13:28.

UK Power Networks Eastern & London logo
Between
24 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Rathbone Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Rathbone Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Aug 2025 at 12:45.

London Borough Of Camden logo
Between
24 Nov and 19 Dec 2025
Details
View Map
Share
Follow
Great Russell Street

London Borough Of Camden are proposing to carry out Highway improvement works on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Sep 2025 at 15:29.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 18:01.

Thames Water logo
Between
24 and 28 Nov 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2025 at 15:47.

London Borough Of Barnet logo
Between
24 Nov and 6 Dec 2025
Details
View Map
Share
Follow
Briardale Gardens

London Borough Of Barnet are proposing to carry out roadworks on Briardale Gardens, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Jul 2025 at 15:15.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Lawrence Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Lawrence Street, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

London Borough Of Barnet logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Highwood Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Highwood Hill, Holcombe Hill To Marsh Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Aug 2025 at 10:55.

Thames Water logo
Between
26 Nov and 16 Dec 2025
Details
View Map
Share
Follow
Compton Terrace

Thames Water are proposing to carry out Utility repair and maintenance works on Compton Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2025 and could run through until 16 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 13:32.

Thames Water logo
Between
28 and 30 Nov 2025
Details
View Map
Share
Follow
Isledon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Isledon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2025 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Aug 2025 at 08:13.

London Borough Of Hackney logo
On
28 Nov 2025
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Hackney are proposing to carry out Highway improvement works on Woodberry Grove, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 28 November 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 14 Aug 2025 at 17:15.

London Borough Of Camden logo
Between
29 Nov and 13 Dec 2025
Details
View Map
Share
Follow
Delancey Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Delancey Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 1 Aug 2025 at 16:47.

Thames Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Queensway

Thames Water are proposing to carry out New service connection on Queensway, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 10:43.

City Of Westminster logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 17 Sep 2025 at 09:58.

HS2 logo
LONG TERM
Between
1 Dec 2025 and 17 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 17 July 2026. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 2 Jul 2025 at 14:40.

Network Rail logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Sep 2025 at 17:30.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 4 Jul 2025 at 15:11.

Affinity Water logo
Between
1 and 5 Dec 2025
Details
View Map
Share
Follow
Dunster Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Dunster Drive, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Jul 2025 at 21:23.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 12:49.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:44.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

London Borough Of Barnet logo
Between
1 and 10 Dec 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:30.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 26 Aug 2025 at 09:20.

London Borough Of Brent logo
Between
1 and 13 Dec 2025
Details
View Map
Share
Follow
Fryent Way

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Fryent Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Sep 2025 at 13:37.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Follow
Torrington Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 3 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Sep 2025 at 09:00.

Affinity Water logo
Between
1 and 3 Dec 2025
Details
View Map
Share
Torrington Park

Affinity Water were proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 December 2025 and run through until 3 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Sep 2025 at 09:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Dec 2025 and 11 Feb 2026
Details
View Map
Share
Follow
Oakthorpe Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Oakthorpe Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 11 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Sep 2025 at 16:30.

Thames Water logo
Between
2 and 22 Dec 2025
Details
View Map
Share
Follow
Lancaster Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Jul 2025 at 17:01.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Dec 2025 and 12 Feb 2026
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2025 and could run through until 12 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2025 at 14:27.

London Borough Of Barnet logo
Between
5 and 22 Dec 2025
Details
View Map
Share
Follow
Wentworth Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wentworth Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Sep 2025 at 13:33.

Thames Water logo
Between
8 and 14 Dec 2025
Details
View Map
Share
Follow
Swinton Street

Thames Water are proposing to carry out New service connection on Swinton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2025 at 14:56.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Follow
Mora Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mora Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 11:01.

UK Power Networks Eastern & London logo
Between
8 and 12 Dec 2025
Details
View Map
Share
Follow
Christchurch Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Christchurch Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Sep 2025 at 09:40.

Thames Water logo
Between
8 and 11 Dec 2025
Details
View Map
Share
Tenterden Grove

Thames Water were proposing to carry out Remedial works on Tenterden Grove, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 December 2025 and run through until 11 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2025 at 13:34.

London Borough Of Hammersmith & Fulham logo
LONG TERM
Between
10 Dec 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Wood Lane

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Wood Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 23 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 3 Sep 2025 at 08:20.

Network Rail logo
Between
10 and 12 Dec 2025
Details
View Map
Share
Follow
Bunns Lane

Network Rail are proposing to carry out Works for Rail Purposes on Bunns Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Aug 2025 at 15:50.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
The Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Broadway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:58.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Weymouth Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Weymouth Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:57.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Russell Grove

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Russell Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:56.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Millway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:55.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Selvage Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Selvage Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:54.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Marsh Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Marsh Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:51.

Transport for London (TfL) logo
Between
15 and 17 Dec 2025
Details
View Map
Share
Follow
Pike Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pike Road, Edgware.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:48.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Westfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westfield Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:52.

Transport for London (TfL) logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Courtland Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Courtland Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Sep 2025 at 14:53.

Thames Water logo
Between
15 and 18 Dec 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Remedial works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2025 and could run through until 18 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2025 at 13:50.


Roadworks Map near to Meadway, LONDON, NW11 6PJ (99 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
Marker
MarkerMarkerMarkerMarker
Last Updated: 18 Sep 2025 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Meadway, LONDON, NW11 6PJ (99 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 26 Aug 2025 - 19 Dec 2025
0.0
Details
Share
Follow
2
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 4 Aug 2025 - 8 Dec 2025
0.0
Details
Share
Follow
3
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 26 Aug 2025 - 19 Dec 2025
0.0
Details
Share
Follow
4
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 4 Aug 2025 - 8 Dec 2025)
0.0
Details
Share
5
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 26 Aug 2025 - 19 Dec 2025
0.0
Details
Share
Follow
6
Thames Water logo
MAJOR
  
MEADWAY CLOSE, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility asset works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 26 Aug 2025 14:40
(Scheduled: 26 Aug 2025 - 23 Sep 2025)
0.0
Details
Share
Follow
7
Thames Water logo
MAJOR
  
BIGWOOD ROAD, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 19 Sep 2025 - 13 Oct 2025
0.0
Details
Share
Follow
8
Thames Water logo
MAJOR
  
BIGWOOD ROAD, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 19 Sep 2025 - 13 Oct 2025
0.0
Details
Share
Follow
9
Thames Water logo
MAJOR
  
BIGWOOD ROAD, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 17 Sep 2025 - 8 Oct 2025
0.0
Details
Share
Follow
10
Thames Water logo
URGENT
  
MEADWAY, GOLDERS GREEN 
(0.0 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 18 Sep 2025 14:30
(Scheduled: 18 Sep 2025 - 24 Sep 2025)
0.0
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data