ROADWORKS SUMMARY
Reed Street, SOUTH SHIELDS, NE33 5PE

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Reed Street, NE33 5PE and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Reed Street, SOUTH SHIELDS, NE33 5PE

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Reed Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
12 Dec 2025
Details
View Map
Share
Follow
Washington Road

Sunderland City Council are carrying out Highway improvement works on Washington Road, Usworth, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 09:00 and could run through until 12 December 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Sunderland City Council on 9 Dec 2024 at 13:34.

North Tyneside Council logo
LONG TERM
Between
2 Sep 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 12 Jul 2024 at 13:27.

South Tyneside Council logo
LONG TERM
Between
23 Sep 2024 and 20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are proposing to carry out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 21 Jun 2024 at 09:47.

South Tyneside Council logo
LONG TERM
Until
20 Mar 2026
Details
View Map
Share
Follow
St Rollox Street

South Tyneside Council are carrying out Highway improvement works on St Rollox Street, Hebburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 07:00 and could run through until 20 March 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 23 Sep 2024 at 07:56.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Front Street

North Tyneside Council are carrying out Highway repair and maintenance works on Front Street, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 30 Sep 2024 at 08:26.

North Tyneside Council logo
LONG TERM
Until
14 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are carrying out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 October 2024 at 09:00 and could run through until 14 January 2026. The works will impact the verge only.

This roadwork event was last updated by North Tyneside Council on 1 Oct 2024 at 10:28.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Promenade

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 30 September 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:08.

North Tyneside Council logo
LONG TERM
Between
2 Oct 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Park Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 17 Jul 2024 at 15:15.

North Tyneside Council logo
LONG TERM
Between
4 Oct 2024 and 2 Oct 2025
Details
View Map
Share
The Links

North Tyneside Council were proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 2 October 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:22.

North Tyneside Council logo
LONG TERM
Until
18 Aug 2026
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are carrying out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 18 August 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 2 Oct 2024 at 08:57.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Beverley Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Beverley Terrace, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:38.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:39.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Victoria Crescent North

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent North, Cullercoats.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:40.

North Tyneside Council logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Promontory Terrace

North Tyneside Council are carrying out Highway repair and maintenance works on Promontory Terrace, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 29 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:02.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Avenue

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Avenue, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 14 Oct 2024 at 08:42.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Windsor Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Windsor Crescent, Whitley Bay.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:01.

North Tyneside Council logo
LONG TERM
Until
16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are carrying out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 31 Jan 2025 at 09:04.

North Tyneside Council logo
LONG TERM
Between
17 Oct 2024 and 15 Oct 2025
Details
View Map
Share
Follow
Grand Parade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Grand Parade, Tynemouth.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2024 and could run through until 15 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 25 Jul 2024 at 14:31.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
Promenade

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Promenade, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:49.

North Tyneside Council logo
LONG TERM
Between
8 Nov 2024 and 16 Oct 2025
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 October 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 16 Aug 2024 at 13:48.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Wellington Street

North Tyneside Council are carrying out Highway repair and maintenance works on Wellington Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jul 2025 at 09:38.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Bedford Street

North Tyneside Council are carrying out Highway repair and maintenance works on Bedford Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by North Tyneside Council on 15 Jul 2025 at 09:38.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Russell Street

North Tyneside Council are carrying out Highway repair and maintenance works on Russell Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jul 2025 at 09:37.

North Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are carrying out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 12:00 and could run through until 30 September 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 15 Jul 2025 at 09:37.

South Tyneside Council logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Albert Road Flyover

South Tyneside Council are carrying out Highway repair and maintenance works on Albert Road Flyover, Jarrow.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 18:00 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 1 Aug 2025 at 08:31.

North Tyneside Council logo
LONG TERM
Between
18 Dec 2024 and 21 Jan 2026
Details
View Map
Share
Follow
The Links

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Links, Whitley Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 21 January 2026. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Sep 2024 at 10:09.

South Tyneside Council logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Broughton Road

South Tyneside Council are carrying out Highway repair and maintenance works on Broughton Road, South Shields.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 14:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 12 Aug 2025 at 16:14.

South Tyneside Council logo
LONG TERM
Between
20 Feb 2025 and 20 Feb 2026
Details
View Map
Share
Follow
Access Road To Taxi Office And Social Club On Victoria Road

South Tyneside Council are proposing to carry out Highway improvement works on Access Road To Taxi Office And Social Club On Victoria Road, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 20 February 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by South Tyneside Council on 2 Jul 2025 at 11:26.

South Tyneside Council logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Access Road To Taxi Office And Social Club On Victoria Road

South Tyneside Council are carrying out Highway improvement works on Access Road To Taxi Office And Social Club On Victoria Road, South Shields.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 February 2025 at 07:00 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 2 Jul 2025 at 12:16.

North Tyneside Council logo
LONG TERM
Between
16 May and 17 Nov 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 17 November 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 15:53.

North Tyneside Council logo
LONG TERM
Between
16 May and 20 Oct 2025
Details
View Map
Share
Follow
Saville Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 21 Feb 2025 at 15:53.

North Tyneside Council logo
LONG TERM
Between
26 May and 17 Nov 2025
Details
View Map
Share
Saville Street West

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 17 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 23 May 2025 at 15:41.

North Tyneside Council logo
LONG TERM
Between
26 May and 20 Oct 2025
Details
View Map
Share
Saville Street

North Tyneside Council were proposing to carry out Highway repair and maintenance works on Saville Street, North Shields.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 20 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by North Tyneside Council on 23 May 2025 at 15:41.

North Tyneside Council logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Rotary Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Rotary Road, Backworth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:40.

North Tyneside Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
North Tyneside Boundary To Earsdon Road Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on North Tyneside Boundary To Earsdon Road Roundabout, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:39.

North Tyneside Council logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
North Tyneside Boundary To Earsdon Road Roundabout

North Tyneside Council are proposing to carry out Highway repair and maintenance works on North Tyneside Boundary To Earsdon Road Roundabout, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:38.

North Tyneside Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:34.

North Tyneside Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:29.

North Tyneside Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:37.

North Tyneside Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Monkseaton Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Monkseaton Drive, Whitley Bay.

These works are categorised as Major.

The works will start on or after 16 June 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 26 Mar 2025 at 10:30.

North Tyneside Council logo
LONG TERM
Between
18 Jun and 11 Sep 2025
Details
View Map
Share
Follow
The Broadway

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Mar 2025 at 07:55.

North Tyneside Council logo
LONG TERM
Between
18 Jun and 11 Sep 2025
Details
View Map
Share
Follow
The Broadway

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Broadway, Cullercoats.

These works are categorised as Major.

The works will start on or after 18 June 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 28 Mar 2025 at 07:55.

Northern Gas Networks logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Bridle Path

Northern Gas Networks are carrying out Utility repair and maintenance works on Bridle Path, East Boldon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:00 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 15:09.

North Tyneside Council logo
LONG TERM
Between
10 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Denbigh Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Denbigh Avenue, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:53.

North Tyneside Council logo
LONG TERM
Between
10 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Battle Hill Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Battle Hill Drive, Battle Hill, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:53.

North Tyneside Council logo
LONG TERM
Between
15 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Camberley Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Camberley Road, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:48.

North Tyneside Council logo
LONG TERM
Between
15 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Kendal Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Kendal Gardens, Howdon, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:54.

Northern Gas Networks logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Harton Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Harton Lane, South Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 July 2025 at 12:15 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Aug 2025 at 09:10.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 15 Apr 2025 at 10:27.

Northern Powergrid (Northeast) logo
LONG TERM
Between
21 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Prince Consort Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Prince Consort Road, Hebburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Jun 2025 at 14:14.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Waterville Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Waterville Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:44.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
The Silverlink

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Silverlink, Silverlink Industrial Park, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:42.

North Tyneside Council logo
LONG TERM
Between
22 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Deneholm

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Deneholm, Monkseaton, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 23 Apr 2025 at 09:43.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 25 Feb 2025 at 07:06.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 6 Jun 2025 at 14:05.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 30 Jun 2025 at 14:48.

Northumbrian Water logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
North Hylton Road

Northumbrian Water are carrying out Utility repair and maintenance works on North Hylton Road, Southwick, Sunderland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 08:00 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 2 Sep 2025 at 10:23.

Northern Gas Networks logo
LONG TERM
Between
28 Jul and 11 Sep 2025
Details
View Map
Share
Follow
Howdon Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howdon Road, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 14 Mar 2025 at 15:01.

Northern Gas Networks logo
LONG TERM
Between
1 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Howdon Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howdon Road, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 17 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 16 Jul 2025 at 08:35.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Avon Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Avon Avenue, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:06.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Ripley Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ripley Avenue, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:05.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Prudhoe Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Prudhoe Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:02.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Borough Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:10.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Borough Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road North, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:07.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
West Percy Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on West Percy Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:08.

North Tyneside Council logo
LONG TERM
Between
1 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Nile Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Nile Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by North Tyneside Council on 2 May 2025 at 09:03.

Northumbrian Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Savory Road

Northumbrian Water are carrying out Utility repair and maintenance works on Savory Road, Wallsend.

The works started on 4 August 2025 at 11:44 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 29 Aug 2025 at 14:28.

National Highways logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Coast Road

National Highways are carrying out Highway improvement works on Coast Road, North Tyneside.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 20:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Sep 2025 at 13:27.

National Highways logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Coast Road

National Highways are carrying out Highway improvement works on Coast Road, North Tyneside.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 20:00 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Sep 2025 at 13:27.

National Highways logo
Today
Details
View Map
Share
The Silverlink

National Highways carried out Highway improvement works on The Silverlink, Silverlink Industrial Park, Wallsend.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 4 Aug 2025 and 3 Sep 2025 and were actually completed between 4 Aug 2025 (20:00) and 3 Sep 2025 (06:00). The works impacted the carriageway only.

This roadwork event was last updated by National Highways on 3 Sep 2025 at 09:50.

Northern Powergrid (Northeast) logo
Finishing
Today
Details
View Map
Share
Follow
Malvern Road

Northern Powergrid (Northeast) are carrying out Utility asset works on Malvern Road, North Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 August 2025 at 14:30 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Aug 2025 at 16:00.

Northern Gas Networks logo
LONG TERM
Between
8 Aug and 12 Sep 2025
Details
View Map
Share
Albion Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Albion Road, North Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 10:26.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cleb 16

Northern Gas Networks are carrying out Utility repair and maintenance works on Cleb 16, East Boldon.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 August 2025 at 13:00 and could run through until 9 September 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 12 Aug 2025 at 13:50.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Cleb 3

Northern Gas Networks are carrying out Utility repair and maintenance works on Cleb 3, East Boldon.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 August 2025 at 13:00 and could run through until 9 September 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 2 Sep 2025 at 10:29.

Northern Powergrid (Northeast) logo
LONG TERM
Between
15 Aug and 26 Sep 2025
Details
View Map
Share
Victoria Road West

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 07:54.

Northern Gas Networks logo
LONG TERM
Until
19 Sep 2025
Details
View Map
Share
Follow
Rutland Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Rutland Road, Wallsend.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 August 2025 at 08:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 11:25.

North Tyneside Council logo
LONG TERM
Between
15 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Spencer Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Spencer Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:48.

North Tyneside Council logo
LONG TERM
Between
15 Aug and 31 Oct 2025
Details
View Map
Share
Follow
William Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on William Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:46.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tavistock Place

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Tavistock Place, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 09:27.

South Tyneside Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Tavistock Place

South Tyneside Council are carrying out Highway repair and maintenance works on Tavistock Place, Jarrow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 08:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 18 Aug 2025 at 08:13.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
St Vincent Street

Grain Communications (formerly Solway Communications) were proposing to carry out Remedial works on St Vincent Street, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 09:02.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Westcott Avenue

Grain Communications (formerly Solway Communications) were proposing to carry out Utility asset works on Westcott Avenue, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 15 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 09:22.

Between
18 Aug and 15 Sep 2025
Details
View Map
Share
Follow
Westcott Avenue

Grain Communications (formerly Solway Communications) are proposing to carry out Utility asset works on Westcott Avenue, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Grain Communications (formerly Solway Communications) on 19 May 2025 at 10:17.

North Tyneside Council logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wallsend Road

North Tyneside Council are proposing to carry out Section 50 on Wallsend Road, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by North Tyneside Council on 29 Jul 2025 at 10:54.

Northern Gas Networks logo
Until
15 Sep 2025
Details
View Map
Share
Follow
Howdon Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Howdon Road, North Shields.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 August 2025 at 09:53 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2025 at 09:01.

Northern Gas Networks logo
LONG TERM
Between
18 Aug and 22 Sep 2025
Details
View Map
Share
Follow
Albion Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:50.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Cecil Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cecil Street, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 May 2025 at 13:47.

Northern Powergrid (Northeast) logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Throckley Way

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Throckley Way, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Jun 2025 at 15:18.

Northern Powergrid (Northeast) logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Throckley Way

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Throckley Way, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2025 and run through until 10 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 08:46.

Northern Powergrid (Yorkshire) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Yorkshire) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 12 May 2025 at 13:20.

Northern Powergrid (Northeast) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Brack Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:33.

Northern Powergrid (Northeast) logo
LONG TERM
Between
20 Aug and 26 Sep 2025
Details
View Map
Share
Brack Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 August 2025 and run through until 26 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 07:56.

Northern Gas Networks logo
Between
22 Aug and 12 Sep 2025
Details
View Map
Share
Mcanany Avenue

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Mcanany Avenue, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 29 Aug 2025 at 11:47.

Northern Gas Networks logo
Between
22 Aug and 12 Sep 2025
Details
View Map
Share
Cecil Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Cecil Street, North Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 16 May 2025 at 10:29.

Northern Powergrid (Northeast) logo
LONG TERM
Between
22 Aug and 26 Sep 2025
Details
View Map
Share
Follow
New York Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on New York Road, Shiremoor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 Jul 2025 at 11:37.

Northern Powergrid (Northeast) logo
LONG TERM
Between
22 Aug and 26 Sep 2025
Details
View Map
Share
New York Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on New York Road, Shiremoor.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 18 Aug 2025 at 14:49.

Northern Powergrid (Northeast) logo
LONG TERM
Between
22 Aug and 26 Sep 2025
Details
View Map
Share
Follow
New York Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on New York Road, Shiremoor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Jul 2025 at 10:12.

Northern Powergrid (Northeast) logo
LONG TERM
Between
22 Aug and 26 Sep 2025
Details
View Map
Share
Follow
New York Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on New York Road, Shiremoor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 August 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 25 Jul 2025 at 11:31.

Northern Powergrid (Northeast) logo
LONG TERM
Between
22 Aug and 26 Sep 2025
Details
View Map
Share
New York Road

Northern Powergrid (Northeast) were proposing to carry out Utility asset works on New York Road, Shiremoor.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 August 2025 and run through until 26 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 1 Aug 2025 at 14:35.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:35.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Aug and 30 Sep 2025
Details
View Map
Share
Gosforth Terrace

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 07:59.

North Tyneside Council logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Howdon Road

North Tyneside Council are proposing to carry out Section 50 on Howdon Road, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 29 Jul 2025 at 10:09.

Northern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Rear Of Beach Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rear Of Beach Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 May 2025 at 15:03.

North Tyneside Council logo
LONG TERM
Between
26 Aug and 19 Dec 2025
Details
View Map
Share
Follow
East Howdon Bypass

North Tyneside Council are proposing to carry out Section 50 on East Howdon Bypass, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 29 Jul 2025 at 10:06.

North Tyneside Council logo
LONG TERM
Between
26 Aug and 31 Oct 2025
Details
View Map
Share
Follow
Buddle Terrace Lane At Rear Of 1-29

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Terrace Lane At Rear Of 1-29, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 27 May 2025 at 08:44.

Northern Powergrid (Northeast) logo
Between
28 Aug and 25 Sep 2025
Details
View Map
Share
Follow
New York Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on New York Road, Shiremoor.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 25 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Jul 2025 at 13:23.

South Tyneside Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Thornleigh Gardens

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Thornleigh Gardens, Cleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 10:38.

South Tyneside Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Thornleigh Gardens

South Tyneside Council are carrying out Highway repair and maintenance works on Thornleigh Gardens, Cleadon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:00 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 29 Aug 2025 at 08:04.

South Tyneside Council logo
Between
29 Aug and 11 Sep 2025
Details
View Map
Share
Follow
Norham Avenue North

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Norham Avenue North, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 09:29.

South Tyneside Council logo
Until
11 Sep 2025
Details
View Map
Share
Follow
Norham Avenue North

South Tyneside Council are carrying out Highway repair and maintenance works on Norham Avenue North, South Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 August 2025 at 08:00 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 29 Aug 2025 at 08:05.

South Tyneside Council logo
Finishing
Today
Details
View Map
Share
Follow
West Street

South Tyneside Council are carrying out Highway repair and maintenance works on West Street, Hebburn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 09:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 1 Sep 2025 at 09:11.

North Tyneside Council logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Hadrian Road

North Tyneside Council are proposing to carry out Section 50 on Hadrian Road, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 27 Aug 2025 at 16:20.

North Tyneside Council logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Hadrian Road

North Tyneside Council are proposing to carry out Section 50 on Hadrian Road, Wallsend.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by North Tyneside Council on 27 Aug 2025 at 16:23.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Crescent

North Tyneside Council are carrying out Highway repair and maintenance works on Victoria Crescent, Chirton, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Sep 2025 at 09:48.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
Spencer Street

North Tyneside Council are carrying out Highway repair and maintenance works on Spencer Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Sep 2025 at 09:49.

North Tyneside Council logo
Finishing
Friday
Details
View Map
Share
Follow
William Street

North Tyneside Council are carrying out Highway repair and maintenance works on William Street, North Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:05 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 1 Sep 2025 at 10:04.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Brightman Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brightman Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Jul 2025 at 12:34.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Whitley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 09:46.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Whitley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:54.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Whitley Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Whitley Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 12:51.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 09:47.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:55.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
York Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on York Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 12:52.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 09:47.

Northern Gas Networks logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 14:55.

Northern Gas Networks logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Park Avenue

Northern Gas Networks are carrying out Utility repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 10:00 and could run through until 19 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 10:01.

South Tyneside Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hazlitt Avenue

South Tyneside Council are carrying out Highway repair and maintenance works on Hazlitt Avenue, South Shields.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 08:00 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 2 Sep 2025 at 08:58.

South Tyneside Council logo
Until
26 Sep 2025
Details
View Map
Share
Follow
Finchale Road

South Tyneside Council are carrying out Highway repair and maintenance works on Finchale Road, Hebburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2025 at 08:00 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Sep 2025 at 08:09.

Northern Powergrid (Northeast) logo
Between
3 and 19 Sep 2025
Details
View Map
Share
Heddon Way

Northern Powergrid (Northeast) were proposing to carry out Utility repair and maintenance works on Heddon Way, South Shields.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 19 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 08:49.

Northern Powergrid (Northeast) logo
Between
3 and 19 Sep 2025
Details
View Map
Share
Follow
Heddon Way

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Heddon Way, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Jun 2025 at 15:21.

Northern Powergrid (Northeast) logo
Between
3 and 19 Sep 2025
Details
View Map
Share
Follow
Heddon Way

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Heddon Way, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 24 Jun 2025 at 08:33.

North Tyneside Council logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Prudhoe Street

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Prudhoe Street, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 14:16.

North Tyneside Council logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Borough Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 14:15.

North Tyneside Council logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Saville Street West

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Saville Street West, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 14:16.

North Tyneside Council logo
Between
3 and 10 Sep 2025
Details
View Map
Share
Follow
Borough Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Borough Road North, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 14:14.

South Tyneside Council logo
Between
5 and 19 Sep 2025
Details
View Map
Share
Follow
Norfolk Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Norfolk Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 10:16.

South Tyneside Council logo
Between
5 and 19 Sep 2025
Details
View Map
Share
Follow
Norfolk Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Norfolk Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 29 Jul 2025 at 12:29.

North Tyneside Council logo
Between
5 and 16 Sep 2025
Details
View Map
Share
Follow
The Silverlink

North Tyneside Council are proposing to carry out Highway repair and maintenance works on The Silverlink, Silverlink Industrial Park, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 13:30.

Northern Gas Networks logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Dipe Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dipe Lane, East Boldon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Aug 2025 at 08:36.

T-Mobile (UK) logo
Between
8 and 20 Sep 2025
Details
View Map
Share
Follow
Sunderland Road

T-Mobile (UK) are proposing to carry out Utility asset works on Sunderland Road, Cleadon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 20 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 4 Jul 2025 at 11:09.

T-Mobile (UK) logo
Between
8 and 27 Sep 2025
Details
View Map
Share
Follow
Sunderland Road

T-Mobile (UK) are proposing to carry out Utility asset works on Sunderland Road, Cleadon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 27 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 21 Aug 2025 at 16:06.

South Tyneside Council logo
Between
8 and 11 Sep 2025
Details
View Map
Share
Follow
Severn Avenue

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Severn Avenue, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 12:16.

Newcastle City Council logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Rhodes Street

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Rhodes Street, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 4 Jun 2025 at 11:15.

Newcastle City Council logo
Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Station Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Station Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 4 Jun 2025 at 11:50.

Northumbrian Water logo
Between
8 and 16 Sep 2025
Details
View Map
Share
Follow
Rear Of Sunderland Road And Harton House Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Sunderland Road And Harton House Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Jun 2025 at 08:34.

Northumbrian Water logo
Between
8 and 16 Sep 2025
Details
View Map
Share
Follow
Rear Of Sunderland Road And Harton House Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rear Of Sunderland Road And Harton House Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 16 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Aug 2025 at 12:50.

South Tyneside Council logo
LONG TERM
Between
8 Sep and 20 Dec 2025
Details
View Map
Share
Follow
Sunderland Road

South Tyneside Council are proposing to carry out Highway improvement works on Sunderland Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 20 December 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South Tyneside Council on 9 Jul 2025 at 10:37.

Northern Powergrid (Northeast) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Claypath Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Claypath Lane, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 14:11.

Northern Powergrid (Northeast) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Claypath Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Claypath Lane, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 14:49.

Northern Powergrid (Northeast) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Westoe Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Westoe Road, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 May 2025 at 09:10.

Northern Powergrid (Northeast) logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Westoe Road

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Westoe Road, South Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 28 May 2025 at 08:08.

Northern Gas Networks logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Rear Of Beach Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rear Of Beach Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 May 2025 at 11:02.

North Tyneside Council logo
LONG TERM
Between
8 Sep 2025 and 6 Jan 2026
Details
View Map
Share
Follow
East Howdon Bypass

North Tyneside Council are proposing to carry out Section 50 on East Howdon Bypass, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 6 January 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 6 Aug 2025 at 16:14.

Northern Gas Networks logo
LONG TERM
Between
8 Sep and 22 Oct 2025
Details
View Map
Share
Follow
Howdon Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howdon Road, North Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Sep 2025 at 16:13.

Newcastle City Council logo
Between
10 and 19 Sep 2025
Details
View Map
Share
Follow
Rhodes Street

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Rhodes Street, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 2 Sep 2025 at 08:19.

Newcastle City Council logo
Between
10 and 19 Sep 2025
Details
View Map
Share
Follow
Station Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Station Road, Walker, Newcastle Upon Tyne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 2 Sep 2025 at 08:20.

T-Mobile (UK) logo
Between
15 and 20 Sep 2025
Details
View Map
Share
Follow
Sunderland Road

T-Mobile (UK) are proposing to carry out Utility asset works on Sunderland Road, Cleadon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 4 Jun 2025 at 14:45.

South Tyneside Council logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Geoffrey Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Geoffrey Street, Whitburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 11:10.

South Tyneside Council logo
Between
15 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Geoffrey Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Geoffrey Street, Whitburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 12 Aug 2025 at 10:38.

South Tyneside Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Hill Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Hill Street, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 13:30.

South Tyneside Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Hill Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Hill Street, Jarrow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 22 Aug 2025 at 08:17.

North Tyneside Council logo
LONG TERM
Between
15 Sep 2025 and 13 Jan 2026
Details
View Map
Share
Follow
Howdon Road

North Tyneside Council are proposing to carry out Section 50 on Howdon Road, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 13 January 2026. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by North Tyneside Council on 6 Aug 2025 at 15:10.

North Tyneside Council logo
Between
15 Sep and 9 Oct 2025
Details
View Map
Share
Follow
Wallsend Road

North Tyneside Council are proposing to carry out Section 50 on Wallsend Road, North Shields.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 9 October 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by North Tyneside Council on 6 Aug 2025 at 15:09.

North Tyneside Council logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Battle Hill Drive

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Battle Hill Drive, Battle Hill, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Aug 2025 at 10:46.

Northern Gas Networks logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Albion Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 15:44.

Northern Gas Networks logo
Between
15 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cecil Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cecil Street, North Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 15:40.

North Tyneside Council logo
Between
16 and 23 Sep 2025
Details
View Map
Share
Follow
Buddle Terrace Lane At Rear Of 1-29

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Buddle Terrace Lane At Rear Of 1-29, West Allotment.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 23 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 28 Aug 2025 at 10:46.

LONG TERM
Between
17 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Leam Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Leam Lane, West Boldon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 24 October 2025. The works will impact the verge only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Jun 2025 at 13:22.

Between
21 and 25 Sep 2025
Details
View Map
Share
Follow
Leam Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Leam Lane, West Boldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 25 September 2025. The works will impact the verge only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Jul 2025 at 08:22.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Hedworth Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hedworth Lane, Boldon Colliery.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:41.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Hedworth Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hedworth Lane, Boldon Colliery.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Jun 2025 at 08:00.

Northern Gas Networks logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Hedworth Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Hedworth Lane, Boldon Colliery.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 7 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 09:29.

South Tyneside Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Galsworthy Road

South Tyneside Council are proposing to carry out Highway improvement works on Galsworthy Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 18 Jun 2025 at 12:36.

South Tyneside Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Galsworthy Road

South Tyneside Council are proposing to carry out Highway improvement works on Galsworthy Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 29 Aug 2025 at 09:54.

South Tyneside Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sheridan Road

South Tyneside Council are proposing to carry out Highway improvement works on Sheridan Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 25 Jun 2025 at 13:53.

South Tyneside Council logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Sheridan Road

South Tyneside Council are proposing to carry out Highway improvement works on Sheridan Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 29 Aug 2025 at 09:55.

Northumbrian Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Kent Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kent Avenue, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 21 Jul 2025 at 15:47.

BT logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Grey Street Lane At Rear Of 28-51

BT are proposing to carry out Utility repair and maintenance works on Grey Street Lane At Rear Of 28-51, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Jun 2025 at 12:11.

BT logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Follow
Grey Street Lane At Rear Of 28-51

BT are proposing to carry out Utility repair and maintenance works on Grey Street Lane At Rear Of 28-51, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 3 Sep 2025 at 12:00.

North Tyneside Council logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Whitley Road

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitley Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 21 Aug 2025 at 10:11.

North Tyneside Council logo
LONG TERM
Between
22 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Park Avenue

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Park Avenue, Whitley Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway, cycleway and footpath.

This roadwork event was last updated by North Tyneside Council on 21 Aug 2025 at 10:12.

North Tyneside Council logo
Between
23 and 29 Sep 2025
Details
View Map
Share
Follow
Dene Crescent

North Tyneside Council are proposing to carry out Highway improvement works on Dene Crescent, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 22 Aug 2025 at 16:48.

Northern Powergrid (Northeast) logo
LONG TERM
Between
26 Sep and 29 Oct 2025
Details
View Map
Share
Follow
Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 29 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Jul 2025 at 09:43.

South Tyneside Council logo
LONG TERM
Between
28 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Cleadon Hill Drive

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Cleadon Hill Drive, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 11:19.

South Tyneside Council logo
LONG TERM
Between
28 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Cleadon Hill Drive

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Cleadon Hill Drive, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 1 Sep 2025 at 11:47.

Northumbrian Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Reginald Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Reginald Street, Boldon Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Jul 2025 at 09:31.

Northern Powergrid (Northeast) logo
LONG TERM
Between
3 Oct and 5 Nov 2025
Details
View Map
Share
Follow
Victoria Road West

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Victoria Road West, Hebburn.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Aug 2025 at 11:39.

Hutchinson 3G logo
Between
6 and 12 Oct 2025
Details
View Map
Share
Sunderland Road

Hutchinson 3G were proposing to carry out Utility asset works on Sunderland Road, Cleadon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 12 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by Hutchinson 3G on 8 Jul 2025 at 09:06.

South Tyneside Council logo
Between
7 and 17 Oct 2025
Details
View Map
Share
Follow
Biddick Hall Drive

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Biddick Hall Drive, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 21 Mar 2025 at 11:50.

South Tyneside Council logo
Between
7 and 17 Oct 2025
Details
View Map
Share
Follow
Biddick Hall Drive

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Biddick Hall Drive, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 2 Sep 2025 at 09:31.

North Tyneside Council logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Hadrian Road Road Giving Access To Works

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Hadrian Road Road Giving Access To Works, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 08:54.

North Tyneside Council logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Orchard Gardens

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Orchard Gardens, Westmoreland Estate, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 08:01.

North Tyneside Council logo
Between
7 and 15 Oct 2025
Details
View Map
Share
Follow
St Peters Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on St Peters Road North, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 07:56.

North Tyneside Council logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Station Road North

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Station Road North, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 07:49.

North Tyneside Council logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Ayres Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Ayres Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Aug 2025 at 14:04.

North Tyneside Council logo
Between
7 and 13 Oct 2025
Details
View Map
Share
Follow
Lovaine Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Lovaine Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 08:57.

North Tyneside Council logo
Between
7 and 9 Oct 2025
Details
View Map
Share
Follow
Whitehouse Lane

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Whitehouse Lane, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 16 Jul 2025 at 08:02.

South Tyneside Council logo
Between
8 and 11 Oct 2025
Details
View Map
Share
Follow
A1290 Washington Road Slip Roads East And West Of A19

South Tyneside Council are proposing to carry out Highway repair and maintenance works on A1290 Washington Road Slip Roads East And West Of A19, West Boldon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 3 Sep 2025 at 11:55.

Northern Powergrid (Northeast) logo
LONG TERM
Between
8 Oct and 10 Nov 2025
Details
View Map
Share
Follow
Brack Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Brack Terrace, Bill Quay, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Aug 2025 at 14:29.

Northumbrian Water logo
Between
8 and 12 Oct 2025
Details
View Map
Share
Follow
Kent Avenue

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Kent Avenue, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Jul 2025 at 10:54.

North Tyneside Council logo
Between
10 and 16 Oct 2025
Details
View Map
Share
Follow
Lovaine Terrace

North Tyneside Council are proposing to carry out Highway repair and maintenance works on Lovaine Terrace, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by North Tyneside Council on 6 Aug 2025 at 10:49.

South Tyneside Council logo
Between
12 and 19 Oct 2025
Details
View Map
Share
Follow
North Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on North Road, Boldon Colliery.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 13:26.

South Tyneside Council logo
Between
12 and 19 Oct 2025
Details
View Map
Share
Follow
Boldon Lane

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Boldon Lane, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 13:32.

Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Riverside Road

Sunderland City Council are proposing to carry out Highway improvement works on Riverside Road, Marley Pots, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Sep 2025 at 12:03.

Between
13 and 20 Oct 2025
Details
View Map
Share
Follow
Ravenswood Road

Sunderland City Council are proposing to carry out Highway improvement works on Ravenswood Road, Hylton Red House, Sunderland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Sep 2025 at 12:02.

Northern Powergrid (Northeast) logo
LONG TERM
Between
13 Oct and 13 Nov 2025
Details
View Map
Share
Follow
Gosforth Terrace

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Gosforth Terrace, Pelaw, Felling.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 22 Aug 2025 at 14:35.

Northern Powergrid (Northeast) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Throckley Way

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Throckley Way, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Jul 2025 at 15:08.

Northern Powergrid (Northeast) logo
Between
13 and 31 Oct 2025
Details
View Map
Share
Follow
Throckley Way

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Throckley Way, South Shields.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Jul 2025 at 12:56.

Newcastle City Council logo
Between
13 and 24 Oct 2025
Details
View Map
Share
Follow
Shields Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Shields Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 7 Jul 2025 at 09:57.

Between
14 and 16 Oct 2025
Details
View Map
Share
Riverside Road

Sunderland City Council were proposing to carry out Highway improvement works on Riverside Road, Marley Pots, Sunderland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2025 and run through until 16 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sunderland City Council on 3 Sep 2025 at 11:32.

South Tyneside Council logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Lukes Lane

South Tyneside Council are proposing to carry out New service connection on Lukes Lane, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South Tyneside Council on 16 Jul 2025 at 10:09.

South Tyneside Council logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Follow
Access Road To Former Oakleigh Gardens School Site

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Access Road To Former Oakleigh Gardens School Site, Cleadon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 22 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 15:16.

South Tyneside Council logo
LONG TERM
Between
22 Oct 2025 and 23 Jan 2026
Details
View Map
Share
Follow
Sunderland Road

South Tyneside Council are proposing to carry out Highway improvement works on Sunderland Road, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2025 and could run through until 23 January 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 16:08.

Northern Gas Networks logo
Between
24 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Waterville Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Waterville Road, North Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 15:01.

South Tyneside Council logo
Between
26 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Victoria Road East

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Victoria Road East, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 11:54.

South Tyneside Council logo
Between
26 Oct and 2 Nov 2025
Details
View Map
Share
Follow
Westoe Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Westoe Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 12:09.

Northern Gas Networks logo
LONG TERM
Between
27 Oct and 28 Nov 2025
Details
View Map
Share
Follow
Cotswold Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cotswold Lane, Boldon Colliery.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 08:18.

South Tyneside Council logo
Between
27 Oct and 1 Nov 2025
Details
View Map
Share
Follow
Argyle Street

South Tyneside Council are proposing to carry out Section 50 on Argyle Street, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 1 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South Tyneside Council on 1 Sep 2025 at 14:52.

South Tyneside Council logo
Between
27 Oct and 4 Nov 2025
Details
View Map
Share
Follow
Lisle Road

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Lisle Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 25 Jun 2025 at 09:21.

Northumbrian Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Oakwood

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Oakwood, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Jul 2025 at 11:45.

Northumbrian Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Rear Of Frederick Street

Northumbrian Water are proposing to carry out New service connection on Rear Of Frederick Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 31 Jul 2025 at 11:32.

Northumbrian Water logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Rear Of Frederick Street

Northumbrian Water are proposing to carry out New service connection on Rear Of Frederick Street, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 31 Jul 2025 at 14:36.

South Tyneside Council logo
Between
29 and 31 Oct 2025
Details
View Map
Share
Follow
Mill Lane

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 19 Feb 2025 at 14:27.

South Tyneside Council logo
Between
2 and 16 Nov 2025
Details
View Map
Share
Follow
East Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on East Street, Whitburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 16 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 11:20.

South Tyneside Council logo
Between
2 and 23 Nov 2025
Details
View Map
Share
Follow
East Street

South Tyneside Council are proposing to carry out Highway repair and maintenance works on East Street, Whitburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 23 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 8 Jul 2025 at 15:19.

Northern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Felton Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Felton Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 09:19.

Northern Gas Networks logo
Between
3 and 21 Nov 2025
Details
View Map
Share
Follow
Marden Road South Service Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marden Road South Service Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Aug 2025 at 12:09.

Northern Gas Networks logo
LONG TERM
Between
3 Nov and 26 Dec 2025
Details
View Map
Share
Follow
Marden Road South

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marden Road South, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 26 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 09:42.

Newcastle City Council logo
Between
4 and 21 Nov 2025
Details
View Map
Share
Follow
Shields Road

Newcastle City Council are proposing to carry out Highway repair and maintenance works on Shields Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Newcastle City Council on 17 Jul 2025 at 11:45.

Northern Powergrid (Northeast) logo
Between
5 and 25 Nov 2025
Details
View Map
Share
Follow
Boldon Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Boldon Lane, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Jul 2025 at 15:05.

Northern Powergrid (Northeast) logo
Between
5 and 25 Nov 2025
Details
View Map
Share
Follow
Boldon Lane

Northern Powergrid (Northeast) are proposing to carry out Utility repair and maintenance works on Boldon Lane, South Shields.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2025 and could run through until 25 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 17 Jul 2025 at 16:28.

Northern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Station Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Station Road, Boldon Colliery.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 November 2025 and run through until 28 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 27 May 2025 at 10:25.

Northern Gas Networks logo
Between
10 and 28 Nov 2025
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Boldon Colliery.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Jun 2025 at 08:26.

Northumbrian Water logo
Between
10 and 21 Nov 2025
Details
View Map
Share
Follow
Shields Road

Northumbrian Water are proposing to carry out Highway repair and maintenance works on Shields Road, Byker, Newcastle Upon Tyne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Aug 2025 at 10:33.

Northern Powergrid (Northeast) logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Rear Of Beach Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Rear Of Beach Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Aug 2025 at 14:08.

Northern Powergrid (Northeast) logo
Between
17 and 28 Nov 2025
Details
View Map
Share
Follow
Rear Of Beach Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Rear Of Beach Road, South Shields.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Aug 2025 at 15:34.

Northern Gas Networks logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Claremont Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Claremont Road, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 15:14.

Northern Gas Networks logo
Between
17 Nov and 5 Dec 2025
Details
View Map
Share
Follow
Links Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Links Avenue, Whitley Bay.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2025 at 15:40.

South Tyneside Council logo
Between
1 and 12 Dec 2025
Details
View Map
Share
Follow
Lambley Crescent

South Tyneside Council are proposing to carry out Highway repair and maintenance works on Lambley Crescent, Hebburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 12 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Tyneside Council on 2 Sep 2025 at 13:21.

Northern Gas Networks logo
LONG TERM
Between
1 Dec 2025 and 13 Feb 2026
Details
View Map
Share
Follow
Bbnts 10

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bbnts 10, South Shields.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 December 2025 and could run through until 13 February 2026. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 22 Jul 2025 at 12:33.

Virgin Media logo
Between
1 and 9 Dec 2025
Details
View Map
Share
Follow
Melrose Gardens

Virgin Media are proposing to carry out Utility asset works on Melrose Gardens, Wallsend.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 9 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 3 Sep 2025 at 07:55.


Roadworks Map near to Reed Street, SOUTH SHIELDS, NE33 5PE (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Reed Street, SOUTH SHIELDS, NE33 5PE (54 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South Tyneside Council logo
ALICE STREET 
(0.1 miles)
South Tyneside Council
Highway repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 2 Sep 2025 08:00
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
0.1
Details
Share
Follow
2
South Tyneside Council logo
LAYGATE 
(0.1 miles)
South Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 22 Aug 2025 08:00
(Scheduled: 22 Aug 2025 - 5 Sep 2025)
0.1
Details
Share
Follow
3
MAJOR
  
ALICE STREET 
(0.2 miles)
Grain Communications (formerly Solway Communications)
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 20 Aug 2025 11:27
(Scheduled: 20 Aug 2025 - 29 Sep 2025)
0.2
Details
Share
Follow
4
Northern Powergrid (Northeast) logo
GILBERT STREET 
(0.2 miles)
Northern Powergrid (Northeast)
New service connection - Footway, Carriageway - Give and take
In Progress
Since: 2 Sep 2025 08:35
(Scheduled: 1 Sep 2025 - 8 Sep 2025)
0.2
Details
Share
Follow
5
MAJOR
  
SOUTH FREDERICK STREET 
(0.2 miles)
Grain Communications (formerly Solway Communications)
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 12 Aug 2025 10:00
(Scheduled: 11 Aug 2025 - 19 Sep 2025)
0.2
Details
Share
Follow
6
Northumbrian Water logo
SOUTH ELDON STREET 
(0.2 miles)
Northumbrian Water
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.2
Details
Share
Follow
7
Northern Powergrid (Northeast) logo
URGENT
  
ARMSTRONG TERRACE 
(0.3 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 23 Aug 2025 20:20
(Scheduled: 23 Aug 2025 - 5 Sep 2025)
0.3
Details
Share
Follow
8
South Tyneside Council logo
URGENT
  
JOHN WILLIAMSON STREET 
(0.3 miles)
South Tyneside Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 10 Mar 2025 11:00
(Scheduled: 10 Mar 2025 - 14 Nov 2025)
0.3
Details
Share
Follow
9
Northumbrian Water logo
SOUTH ELDON STREET 
(0.3 miles)
Northumbrian Water
Utility asset works - Carriageway, Verge - Priority working
In Progress
Since: 1 Sep 2025 08:30
(Scheduled: 1 Sep 2025 - 3 Sep 2025)
0.3
Details
Share
Follow
10
South Tyneside Council logo
ACCESS ROAD FROM DOWNHAM COURT TO NEWMARK WALK 
(0.4 miles)
South Tyneside Council
Highway repair and maintenance works - Footpath - Some carriageway incursion
In Progress
Since: 29 Aug 2025 10:00
(Scheduled: 29 Aug 2025 - 5 Sep 2025)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.