ROADWORKS SUMMARY
Hornsey Lane, LONDON, N6 5LN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hornsey Lane, N6 5LN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hornsey Lane, LONDON, N6 5LN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hornsey Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 14:30.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

Thames Water logo
LONG TERM
Until
30 Jul 2025
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 10:20 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 11:38.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

Transport for London (TfL) logo
LONG TERM
Between
24 May 2024 and 7 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out roadworks on New Bridge Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 24 May 2024 and could run through until 7 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 15:51.

London Borough Of Haringey logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are carrying out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 June 2024 at 00:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 11 Jun 2025 at 10:06.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are carrying out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 8 Jul 2024 at 07:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Jul 2024 and 31 Jul 2025
Details
View Map
Share
Follow
Curtain Road

Transport for London (TfL) are proposing to carry out roadworks on Curtain Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 13:20.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Valette Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Valette Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:50.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Morning Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Morning Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:29.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:30.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Mare Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Mare Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:26.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:48.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:43.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 11:44.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:42.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Spurstowe Terrace

London Borough Of Hackney are proposing to carry out Highway improvement works on Spurstowe Terrace, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:19.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:32.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are proposing to carry out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:40.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 23 Dec 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 23 December 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:22.

London Borough Of Hackney logo
LONG TERM
Between
31 Jul 2024 and 20 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 20 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:15.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

London Borough Of Lambeth logo
LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 Jul 2025 at 13:36.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 21 Aug 2024 at 13:15.

City Of Westminster logo
LONG TERM
Between
6 Oct 2024 and 31 Mar 2026
Details
View Map
Share
Oxford Street

City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Oct 2024 at 10:57.

London Borough Of Southwark logo
LONG TERM
Between
22 Oct 2024 and 21 Apr 2026
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2024 and could run through until 21 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 4 Oct 2024 at 12:17.

HS2 logo
LONG TERM
Between
28 Oct 2024 and 12 Dec 2025
Details
View Map
Share
Follow
Hampstead Road

HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.

HS2 logo
LONG TERM
Until
28 Feb 2026
Details
View Map
Share
Follow
Hampstead Road

HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 01:00 and could run through until 28 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 4 Jul 2025 at 16:39.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

Network Rail logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Jun 2025 at 09:45.

Network Rail logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are carrying out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:56.

Network Rail logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are carrying out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Jun 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2024 and 1 Aug 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 1 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2025 at 10:11.

London Borough Of Lambeth logo
LONG TERM
Until
31 Aug 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are carrying out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:00 and could run through until 31 August 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 1 Jul 2025 at 13:47.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Myddelton Square

Thames Water are carrying out Utility asset works on Myddelton Square, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:08 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 13:20.

Cadent Gas logo
LONG TERM
Between
6 Jan and 28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are proposing to carry out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 08:35.

Cadent Gas logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
Goswell Road

Cadent Gas are carrying out Utility asset works on Goswell Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 08:57 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 08:10.

London Borough Of Camden logo
LONG TERM
Until
26 Jul 2025
Details
View Map
Share
Follow
Gray's Inn Road

London Borough Of Camden are carrying out Highway improvement works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 16:00 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:19.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tempelhof Avenue

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Tilling Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Claremont Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:53.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

London Borough Of Camden logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Harrison Street

London Borough Of Camden are carrying out Highway improvement works on Harrison Street, King's Cross, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 09:00 and could run through until 31 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:18.

Thames Water logo
LONG TERM
Between
17 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 11:47.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:11 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:11.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are carrying out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:15 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 27 Feb 2025 at 11:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Brett Road

London Borough Of Hackney are carrying out Highway improvement works on Brett Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:14 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:14.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Malpas Road

London Borough Of Hackney are carrying out Highway improvement works on Malpas Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Kenmure Road

London Borough Of Hackney are carrying out Highway improvement works on Kenmure Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:13 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:13.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Marcon Place

London Borough Of Hackney are carrying out Highway improvement works on Marcon Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Until
28 Aug 2026
Details
View Map
Share
Follow
Institute Place

London Borough Of Hackney are carrying out Highway improvement works on Institute Place, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:12 and could run through until 28 August 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 17 Feb 2025 at 08:12.

London Borough Of Hackney logo
LONG TERM
Between
17 Feb 2025 and 28 Aug 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 August 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 25 Feb 2025 at 15:42.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 15:48.

City Of Westminster logo
LONG TERM
Until
23 Jul 2025
Details
View Map
Share
Follow
White Horse Street

City Of Westminster are carrying out Highway repair and maintenance works on White Horse Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 11:00 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 May 2025 at 12:54.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:17.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 14:59.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Follow
Sewardstone Road

Thames Water are proposing to carry out Utility asset works on Sewardstone Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 17:10.

Thames Water logo
LONG TERM
Between
28 Feb and 12 Sep 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 February 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2025 at 14:19.

London Borough Of Brent logo
LONG TERM
Between
3 Mar and 31 Aug 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Brent on 29 Jan 2025 at 11:57.

Thames Water logo
LONG TERM
Between
10 Mar and 6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are proposing to carry out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

City Of Westminster logo
LONG TERM
Between
14 Mar and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

Thames Water logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
High Road

Thames Water are carrying out Utility asset works on High Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 April 2025 at 10:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 08:00.

Thames Water logo
LONG TERM
Between
17 Mar and 25 Jul 2025
Details
View Map
Share
Follow
Greenleaf Road

Thames Water are proposing to carry out Utility asset works on Greenleaf Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 15:28.

London Borough Of Enfield logo
LONG TERM
Until
18 Feb 2026
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are carrying out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 March 2025 at 08:00 and could run through until 18 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 17 Mar 2025 at 08:04.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are carrying out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 08:00 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Jun 2025 at 17:16.

City Of Westminster logo
LONG TERM
Between
24 Mar and 28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 6 Mar 2025 at 09:04.

City Of Westminster logo
LONG TERM
Until
28 Nov 2025
Details
View Map
Share
Follow
Piccadilly

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:00 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Mar 2025 at 09:14.

Thames Water logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Chadwell Street

Thames Water are carrying out Utility asset works on Chadwell Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:45 and could run through until 21 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 15:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 13:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 15:24.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jan 2025 at 15:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Sep 2025
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Oct 2024 at 15:00.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 12:58.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jan 2025 at 15:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Jan 2025 at 16:11.

London Borough Of Haringey logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Brereton Road

London Borough Of Haringey are carrying out Highway repair and maintenance works on Brereton Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:28 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 May 2025 at 12:56.

London Borough Of Haringey logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Whitehall Street

London Borough Of Haringey are carrying out Highway repair and maintenance works on Whitehall Street, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:29 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 May 2025 at 12:56.

London Borough Of Haringey logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Moselle Place

London Borough Of Haringey are carrying out Highway repair and maintenance works on Moselle Place, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 March 2025 at 08:29 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 May 2025 at 12:56.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2025 at 09:00 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 16:05.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Canonbury Street

London Borough Of Islington are carrying out Highway improvement works on Canonbury Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2025 at 08:00 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 3 Jul 2025 at 17:40.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:52.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 14:08.

London Borough Of Hackney logo
LONG TERM
Between
3 Apr 2025 and 15 Oct 2026
Details
View Map
Share
Follow
Pembury Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Pembury Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 15 October 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 30 Jan 2025 at 13:40.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Southview Avenue

Thames Water are carrying out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2025 at 11:00 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 10:03.

Thames Water logo
LONG TERM
Between
5 Apr and 27 Aug 2025
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out Utility asset works on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Mar 2025 at 15:12.

London Borough Of Camden logo
LONG TERM
Between
6 Apr and 31 Dec 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are proposing to carry out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 16 Jan 2025 at 16:16.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Villiers Road

Thames Water are carrying out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2025 at 10:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2025 at 10:42.

Cadent Gas logo
LONG TERM
Between
14 Apr and 20 Jul 2025
Details
View Map
Share
Follow
St Anns Road

Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 11:30.

Cadent Gas logo
LONG TERM
Between
14 Apr and 20 Jul 2025
Details
View Map
Share
St Anns Road

Cadent Gas were proposing to carry out Utility asset works on St Anns Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:41.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 10 Aug 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 10 August 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Dec 2024 at 15:58.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Inglebert Street

Thames Water are carrying out Utility asset works on Inglebert Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 10:05 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 17:10.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Victoria Embankment

Transport for London (TfL) were proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:53.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:32.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Underpass

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:52.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Queen Victoria Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:41.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 15:33.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 31 Aug 2025
Details
View Map
Share
New Bridge Street

Transport for London (TfL) were proposing to carry out Highway improvement works on New Bridge Street, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 11:54.

Thames Water logo
LONG TERM
Between
21 Apr and 3 Nov 2025
Details
View Map
Share
Sewardstone Road

Thames Water were proposing to carry out Utility asset works on Sewardstone Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 3 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
21 Apr and 12 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2025 at 10:09.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Villiers Road

Thames Water are proposing to carry out Utility asset works on Villiers Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Tillotson Road

Thames Water are proposing to carry out Utility asset works on Tillotson Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:23.

Thames Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are carrying out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 12:29 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 15:40.

Thames Water logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are carrying out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 14:04 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 10:10.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 1 Apr 2025 at 14:04.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 10:57 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 11:06.

London Borough Of Southwark logo
LONG TERM
Between
22 Apr and 22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2025 at 16:25.

London Borough Of Southwark logo
LONG TERM
Until
22 Jul 2025
Details
View Map
Share
Follow
Bargehouse Street

London Borough Of Southwark are carrying out Highway improvement works on Bargehouse Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2025 at 06:25 and could run through until 22 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by London Borough Of Southwark on 22 Apr 2025 at 06:27.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:43.

City Of London Corporation logo
LONG TERM
Between
24 Apr and 10 Dec 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 10 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:53.

London Borough Of Barnet logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are carrying out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

The works started on 24 April 2025 at 11:00 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 11:37.

London Borough Of Haringey logo
LONG TERM
Between
24 Apr and 24 Jul 2025
Details
View Map
Share
Follow
Alexandra Park Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Alexandra Park Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 24 Apr 2025 at 10:13.

London Borough Of Haringey logo
LONG TERM
Between
24 Apr and 24 Jul 2025
Details
View Map
Share
Follow
Alexandra Park Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Alexandra Park Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 24 Apr 2025 at 10:23.

London Borough Of Haringey logo
LONG TERM
Between
24 Apr and 24 Jul 2025
Details
View Map
Share
Alexandra Park Road

London Borough Of Haringey were proposing to carry out Remedial works on Alexandra Park Road, Wood Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 April 2025 and run through until 24 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 24 Apr 2025 at 11:17.

Thames Water logo
LONG TERM
Between
28 Apr and 3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.

Thames Water logo
LONG TERM
Until
3 Nov 2025
Details
View Map
Share
Follow
Bishopswood Road

Thames Water are carrying out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 10:30 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 11:05.

London Borough Of Camden logo
LONG TERM
Until
27 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 08:27.

London Borough Of Camden logo
LONG TERM
Between
28 Apr and 25 Jul 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 26 Feb 2025 at 12:23.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Cheapside

City Of London Corporation are carrying out Highway repair and maintenance works on Cheapside, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
Newgate Street

City Of London Corporation are carrying out Highway repair and maintenance works on Newgate Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:09.

City Of London Corporation logo
LONG TERM
Between
28 Apr and 20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
King Edward Street

City Of London Corporation are carrying out Highway repair and maintenance works on King Edward Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 April 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Apr 2025 at 08:08.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Between
3 May and 31 Oct 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 09:38.

London Borough Of Barnet logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
New Brent Street

London Borough Of Barnet are carrying out Highway improvement works on New Brent Street, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 May 2025 at 09:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 14:29.

Cadent Gas logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Waterfall Road

Cadent Gas are proposing to carry out Utility asset works on Waterfall Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 16:50.

Cadent Gas logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Waterfall Road

Cadent Gas are proposing to carry out Utility asset works on Waterfall Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 00:10.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
5 May and 18 Jul 2025
Details
View Map
Share
Bayley Street

London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Apr 2025 at 11:41.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:46.

Transport for London (TfL) logo
LONG TERM
Between
5 May and 28 Jul 2025
Details
View Map
Share
Islington High Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 28 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2025 at 11:40.

LONG TERM
Between
5 May and 8 Aug 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:40.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Wadeson Street

Thames Water are proposing to carry out Utility asset works on Wadeson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:25.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:42.

City Of London Corporation logo
LONG TERM
Until
10 Dec 2025
Details
View Map
Share
Follow
Whittington Avenue

City Of London Corporation are carrying out Highway repair and maintenance works on Whittington Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:00 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 09:10.

City Of London Corporation logo
LONG TERM
Between
6 May and 10 Dec 2025
Details
View Map
Share
St Mary Axe

City Of London Corporation were proposing to carry out Highway repair and maintenance works on St Mary Axe, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 10 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 16 Apr 2025 at 15:01.

Thames Water logo
LONG TERM
Between
6 May and 20 Jul 2025
Details
View Map
Share
Follow
Southview Avenue

Thames Water are proposing to carry out Utility asset works on Southview Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

London Borough Of Haringey logo
LONG TERM
Between
12 May and 12 Aug 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 13 May 2025 at 08:11.

City Of London Corporation logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
London Wall

City Of London Corporation are proposing to carry out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 8 July 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 10:39.

City Of London Corporation logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 07:00 and could run through until 8 July 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 12 May 2025 at 09:21.

London Borough Of Camden logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Bayley Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Bayley Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 May 2025 at 08:00 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 12 May 2025 at 09:17.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2025 at 10:53.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 09:25.

London Borough Of Hackney logo
LONG TERM
Between
12 May and 12 Aug 2025
Details
View Map
Share
Follow
Amhurst Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 16 Dec 2024 at 12:04.

City Of London Corporation logo
LONG TERM
Between
15 May and 20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are proposing to carry out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2025 and could run through until 20 September 2025. The works will impact the footway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2025 at 09:51.

City Of London Corporation logo
LONG TERM
Until
20 Sep 2025
Details
View Map
Share
Follow
St Martin's-le-grand

City Of London Corporation are carrying out Highway repair and maintenance works on St Martin's-le-grand, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2025 at 08:00 and could run through until 20 September 2025. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 15 May 2025 at 08:43.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:29.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:20.

City Of Westminster logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are carrying out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 May 2025 at 08:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 May 2025 at 08:58.

City Of Westminster logo
LONG TERM
Between
16 May and 18 Jul 2025
Details
View Map
Share
Piccadilly Underpass

City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:14.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 16:42.

Transport for London (TfL) logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are carrying out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 08:44.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 May 2025 at 14:57.

Transport for London (TfL) logo
LONG TERM
Between
19 May and 18 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 September 2025. The works will impact the footway, carriageway, verge and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:21.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Russia Lane

Thames Water are carrying out Utility asset works on Russia Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 12:20 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 13:55.

LONG TERM
Between
19 May and 7 Aug 2025
Details
View Map
Share
Follow
Freeling Street

London Borough Of Islington are proposing to carry out Highway improvement works on Freeling Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Islington on 27 Feb 2025 at 07:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
19 May and 18 Jul 2025
Details
View Map
Share
Follow
Adelaide Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Apr 2025 at 13:03.

London Borough Of Barnet logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are carrying out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 09:30 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 09:30.

London Borough Of Barnet logo
LONG TERM
Between
19 May and 12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Edgware Road

London Borough Of Barnet are carrying out Highway improvement works on Edgware Road, Cricklewood, London.

These works are categorised as Major.

The works started on 19 May 2025 at 09:30 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 10:30.

Thames Water logo
LONG TERM
Between
19 May and 15 Jul 2025
Details
View Map
Share
Mansfield Road

Thames Water carried out Utility asset works on Mansfield Road, Walthamstow.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 19 May 2025 and 15 Jul 2025 and were actually completed between 20 May 2025 (08:40) and 8 Jul 2025 (11:55). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 11:58.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:23.

London Borough Of Barnet logo
LONG TERM
Finishing
Monday
Details
View Map
Share
The Vale

London Borough Of Barnet were proposing to carry out Highway improvement works on The Vale, Childs Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 May 2025 and run through until 14 July 2025. The works were due to impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:58.

Thames Water logo
LONG TERM
Between
26 May and 28 Jul 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are proposing to carry out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 May and 18 Jul 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 May 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 15:47.

Thames Water logo
LONG TERM
Between
26 May and 27 Jul 2025
Details
View Map
Share
Follow
St Pauls Avenue

Thames Water are proposing to carry out Utility asset works on St Pauls Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 17 Mar 2025 at 14:07.

Thames Water logo
LONG TERM
Between
27 May and 20 Jul 2025
Details
View Map
Share
Follow
Westview Close

Thames Water are proposing to carry out Utility asset works on Westview Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:33.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
The Park

Thames Water are carrying out Utility asset works on The Park, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 07:20 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 07:21.

Thames Water logo
LONG TERM
Between
27 May and 28 Jul 2025
Details
View Map
Share
Follow
The Park

Thames Water are proposing to carry out Utility asset works on The Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 May 2025 at 09:42.

Thames Water logo
LONG TERM
Until
2 Aug 2025
Details
View Map
Share
Follow
St Pauls Avenue

Thames Water are carrying out Utility asset works on St Pauls Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 08:10 and could run through until 2 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 08:13.

Eunetworks logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Corbet Place

Eunetworks are proposing to carry out Utility asset works on Corbet Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Eunetworks on 2 Apr 2025 at 13:21.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Great Marlborough Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 31 January 2026. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 May 2025 at 16:38.

City Of Westminster logo
LONG TERM
Between
2 Jun 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Great Marlborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Marlborough Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 14:35.

Thames Water logo
LONG TERM
Until
28 Jul 2025
Details
View Map
Share
Follow
St James's Avenue

Thames Water are carrying out Utility asset works on St James's Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:30 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 11:29.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 11:10.

Transport for London (TfL) logo
LONG TERM
Between
2 Jun and 12 Dec 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:39.

London Borough Of Barnet logo
LONG TERM
Between
2 Jun and 21 Sep 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
2 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Green Lanes

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 30 July 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 15:35.

City Of London Corporation logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Crutched Friars

City Of London Corporation are carrying out Highway repair and maintenance works on Crutched Friars, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 13:40.

London Borough Of Camden logo
LONG TERM
Until
19 Jul 2025
Details
View Map
Share
Follow
Steele's Road

London Borough Of Camden are carrying out Highway improvement works on Steele's Road, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 June 2025 at 08:00 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:19.

London Borough Of Camden logo
LONG TERM
Until
19 Jul 2025
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 June 2025 at 08:00 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Jul 2025 at 16:19.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Edgware Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edgware Road, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:22.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Sussex Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Sussex Gardens, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2025 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 9 Sep 2025
Details
View Map
Share
Follow
Old Marylebone Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Marylebone Road, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2025 at 21:17.

LONG TERM
Between
9 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 1 May 2025 at 18:13.

LONG TERM
Between
9 Jun and 11 Dec 2025
Details
View Map
Share
Follow
Torrens Street

London Borough Of Islington are proposing to carry out Highway improvement works on Torrens Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 11 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 22 May 2025 at 06:52.

London Borough Of Camden logo
LONG TERM
Between
9 Jun and 16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are proposing to carry out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2025 at 12:57.

London Borough Of Camden logo
LONG TERM
Until
16 Aug 2025
Details
View Map
Share
Follow
North Villas

London Borough Of Camden are carrying out Highway improvement works on North Villas, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 June 2025 at 10:00 and could run through until 16 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 9 Jun 2025 at 10:06.

Thames Water logo
LONG TERM
Between
9 Jun and 27 Jul 2025
Details
View Map
Share
Follow
Richmond Avenue

Thames Water are proposing to carry out Utility asset works on Richmond Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 13:18.

Thames Water logo
LONG TERM
Between
9 Jun and 27 Jul 2025
Details
View Map
Share
Richmond Avenue

Thames Water were proposing to carry out Utility asset works on Richmond Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 27 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 16:13.

City Of Westminster logo
LONG TERM
Between
10 Jun and 23 Jul 2025
Details
View Map
Share
Mozart Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Mozart Street, Queen's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 23 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 14:57.

Thames Water logo
LONG TERM
Between
11 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Crowland Gardens

Thames Water are proposing to carry out Utility asset works on Crowland Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 11:55.

London Borough Of Hackney logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Pritchards Road

London Borough Of Hackney are carrying out Works for road purposes on Pritchards Road, Hackney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2025 at 09:30 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Jul 2025 at 15:58.

Cadent Gas logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are carrying out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 09:03 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 10:14.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Dudden Hill Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Dudden Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:42.

London Borough Of Brent logo
LONG TERM
Between
16 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 16 Mar 2025 at 16:18.

Thames Water logo
LONG TERM
Between
16 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Edison Close

Thames Water are proposing to carry out Utility asset works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 11:15.

Thames Water logo
LONG TERM
Until
18 Jul 2025
Details
View Map
Share
Follow
Edison Close

Thames Water are carrying out Utility asset works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 June 2025 at 11:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 11:27.

London Borough Of Haringey logo
LONG TERM
Between
16 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Wightman Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Wightman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 16 Jun 2025 at 10:19.

London Borough Of Haringey logo
LONG TERM
Between
16 Jun and 18 Sep 2025
Details
View Map
Share
Follow
Wightman Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Wightman Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Jun 2025 at 12:17.

London Borough Of Barnet logo
LONG TERM
Between
18 Jun and 18 Aug 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cannon Hill

Thames Water are carrying out Utility asset works on Cannon Hill, Southgate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 June 2025 at 12:00 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 11:15.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Jul 2025
Details
View Map
Share
Follow
Cock Lane

UK Power Networks Eastern & London are carrying out Utility asset works on Cock Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2025 at 08:00 and could run through until 20 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 09:04.

UK Power Networks Eastern & London logo
LONG TERM
Until
17 Aug 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are carrying out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2025 at 08:00 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 09:04.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brondesbury Park

Cadent Gas are carrying out Utility repair and maintenance works on Brondesbury Park, Kilburn, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2025 at 09:30 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 14:27.

Thames Water logo
LONG TERM
Until
21 Jul 2025
Details
View Map
Share
Follow
Northview Crescent

Thames Water are carrying out Utility repair and maintenance works on Northview Crescent, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2025 at 09:00 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 09:24.

London Borough Of Brent logo
LONG TERM
Between
20 Jun and 30 Jul 2025
Details
View Map
Share
Follow
Walm Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Walm Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 21 Mar 2025 at 07:37.

Transport for London (TfL) logo
LONG TERM
Between
20 Jun and 8 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 10:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jun and 22 Aug 2025
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jun 2025 at 15:49.

Cadent Gas logo
Until
15 Jul 2025
Details
View Map
Share
Follow
Strand

Cadent Gas are carrying out Utility repair and maintenance works on Strand, St James's, London.

The works started on 21 June 2025 at 22:48 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 14:48.

City Of Westminster logo
LONG TERM
Between
23 Jun and 24 Jul 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:01.

Southern Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Blackfriars Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Blackfriars Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:19 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2025 at 12:39.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:19 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 07:26.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Apr 2025 at 12:35.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:08.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Rennie Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Rennie Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 07:20 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jun 2025 at 07:27.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 May 2025 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 May 2025 at 07:03.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2025 at 13:42.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2025 at 09:42.

Electricity Network Company logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 8 Apr 2025 at 15:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Russell Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Russell Square, Bloomsbury, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 09:35.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 15:34.

Thames Water logo
LONG TERM
Between
23 Jun and 29 Sep 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:28.

HS2 logo
LONG TERM
Until
25 Jul 2025
Details
View Map
Share
Follow
Lidlington Place

HS2 are carrying out Works for Rail Purposes on Lidlington Place, Camden Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 23 Jun 2025 at 10:11.

London Borough Of Camden logo
LONG TERM
Between
23 Jun and 2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are proposing to carry out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:45.

London Borough Of Camden logo
LONG TERM
Until
2 Aug 2025
Details
View Map
Share
Follow
Chalcot Square

London Borough Of Camden are carrying out Remedial works on Chalcot Square, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 Jun 2025 at 08:46.

London Borough Of Camden logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Hadley Street

London Borough Of Camden are carrying out Highway improvement works on Hadley Street, Camden Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 09:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Jun 2025 at 09:17.

London Borough Of Camden logo
Finishing
Monday
Details
View Map
Share
Follow
Haverstock Hill

London Borough Of Camden are carrying out Highway improvement works on Haverstock Hill, Haverstock, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 09:00 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 23 Jun 2025 at 09:17.

Thames Water logo
Between
23 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 07:58.

Thames Water logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are carrying out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 10:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 10:00.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Ashmount Road

Thames Water are carrying out Utility repair and maintenance works on Ashmount Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 09:00 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 12:42.

Murphy Gas Networks logo
Between
23 Jun and 23 Jul 2025
Details
View Map
Share
Follow
Brook Road

Murphy Gas Networks are proposing to carry out Utility asset works on Brook Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 15 May 2025 at 15:19.

Murphy Gas Networks logo
LONG TERM
Until
24 Jul 2025
Details
View Map
Share
Follow
Brook Road

Murphy Gas Networks are carrying out Utility asset works on Brook Road, Wood Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 09:00 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 23 Jun 2025 at 09:03.

London Borough Of Enfield logo
LONG TERM
Between
23 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are proposing to carry out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Jun 2025 at 16:10.

London Borough Of Enfield logo
LONG TERM
Until
1 Aug 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are carrying out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 24 Jun 2025 at 13:32.

London Borough Of Enfield logo
Finishing
Today
Details
View Map
Share
Follow
Montagu Road

London Borough Of Enfield are carrying out Section 50 on Montagu Road, Edmonton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Jul 2025 at 12:48.

Thames Water logo
LONG TERM
Between
23 Jun and 15 Sep 2025
Details
View Map
Share
Follow
Moree Way

Thames Water are proposing to carry out Utility asset works on Moree Way, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:43.

Thames Water logo
LONG TERM
Until
15 Sep 2025
Details
View Map
Share
Follow
Moree Way

Thames Water are carrying out Utility asset works on Moree Way, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 15 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 08:44.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Woodside Grange Road

Thames Water were proposing to carry out Utility repair and maintenance works on Woodside Grange Road, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 13 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:16.

Thames Water logo
LONG TERM
Between
23 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Banstead Gardens

Thames Water are proposing to carry out Utility asset works on Banstead Gardens, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:45.

Thames Water logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Banstead Gardens

Thames Water are carrying out Utility asset works on Banstead Gardens, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 June 2025 at 08:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 08:44.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Middlesex Street

Cadent Gas are carrying out Utility repair and maintenance works on Middlesex Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 June 2025 at 09:01 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jul 2025 at 12:27.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Elm Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 20:54.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Elm Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Elm Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 09:45 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Jun 2025 at 09:58.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 13 May 2025 at 13:25.

National Highways logo
Finishing
Friday
Details
View Map
Share
Follow
North Circular Road

National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Jun 2025 at 10:37.

Thames Water logo
Until
22 Jul 2025
Details
View Map
Share
Follow
Woodside Road

Thames Water are carrying out Utility repair and maintenance works on Woodside Road, Wood Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 09:44 and could run through until 22 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 12:41.

Thames Water logo
LONG TERM
Until
18 Sep 2025
Details
View Map
Share
Follow
Stanley Road

Thames Water are carrying out Utility asset works on Stanley Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2025 at 08:00 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 08:23.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Park Crescent Mews West

City Of Westminster were proposing to carry out Highway repair and maintenance works on Park Crescent Mews West, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 13:11.

London Borough Of Camden logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Antrim Grove

London Borough Of Camden are carrying out Highway improvement works on Antrim Grove, Belsize, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2025 at 08:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Jun 2025 at 08:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jun and 29 Aug 2025
Details
View Map
Share
Adamson Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 June 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jun 2025 at 11:10.

Thames Water logo
LONG TERM
Between
27 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 10:22.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Highgate Road

Cadent Gas are carrying out Utility repair and maintenance works on Highgate Road, Highgate, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 June 2025 at 21:44 and could run through until 8 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 13:48.

Thames Water logo
LONG TERM
Between
30 Jun 2025 and 26 Jan 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 January 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:40.

Thames Water logo
LONG TERM
Between
30 Jun and 4 Aug 2025
Details
View Map
Share
Bisham Gardens

Thames Water were proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 11:03.

Thames Water logo
LONG TERM
Between
30 Jun and 4 Aug 2025
Details
View Map
Share
Follow
Bisham Gardens

Thames Water are proposing to carry out Utility asset works on Bisham Gardens, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 20:56.

Thames Water logo
LONG TERM
Until
4 Aug 2025
Details
View Map
Share
Follow
Bisham Gardens

Thames Water are carrying out Utility asset works on Bisham Gardens, Highgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 10:00 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 10:02.

London Borough Of Waltham Forest logo
Finishing
Monday
Details
View Map
Share
Follow
Selborne Road

London Borough Of Waltham Forest are proposing to carry out Section 50 on Selborne Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 11 Jun 2025 at 15:33.

Thames Water logo
Until
16 Jul 2025
Details
View Map
Share
Follow
Gainsford Road

Thames Water are carrying out Utility asset works on Gainsford Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 13:30 and could run through until 16 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:32.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:59.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:05.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 16 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 16 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 12:03.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 22 May 2025 at 14:00.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 11:57.

London Borough Of Barnet logo
LONG TERM
Between
30 Jun and 15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 14:29.

London Borough Of Barnet logo
LONG TERM
Until
15 Aug 2025
Details
View Map
Share
Follow
Finchley Road

London Borough Of Barnet are carrying out Highway improvement works on Finchley Road, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 08:00 and could run through until 15 August 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Jun 2025 at 08:38.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Mar 2025 at 13:41.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Upper Thames Street

Cadent Gas are carrying out Utility repair and maintenance works on Upper Thames Street, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 19:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 2 Jul 2025 at 10:37.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:16.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Avenue

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Avenue, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:56.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Temple Place

Transport for London (TfL) were proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:03.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Blackfriars Passage

Transport for London (TfL) were proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 13:58.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Carmelite Street

Transport for London (TfL) were proposing to carry out Highway improvement works on Carmelite Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 1 December 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Cadent Gas logo
Between
30 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:31.

UK Power Networks Eastern & London logo
Between
30 Jun and 26 Jul 2025
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:57.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Billiter Street

UK Power Networks Eastern & London are carrying out Utility asset works on Billiter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 08:00 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jun 2025 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
30 Jun and 1 Dec 2025
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 13:17.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
30 Jun and 5 Aug 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jun 2025 at 10:38.

UK Power Networks Eastern & London logo
Between
30 Jun and 19 Jul 2025
Details
View Map
Share
Follow
Camomile Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Camomile Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 19 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:32.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 May 2025 at 10:57.

Cadent Gas logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 11:20.

Cadent Gas logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are carrying out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 09:23 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jun 2025 at 09:33.

UK Power Networks Eastern & London logo
Until
17 Jul 2025
Details
View Map
Share
Follow
Tottenham Street

UK Power Networks Eastern & London are carrying out New service connection on Tottenham Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 09:02 and could run through until 17 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jun 2025 at 09:02.

Transport for London (TfL) logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 22:00 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2025 at 08:41.

Transport for London (TfL) logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 22:00 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2025 at 08:41.

Transport for London (TfL) logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway improvement works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 22:00 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2025 at 08:42.

Electricity Network Company logo
LONG TERM
Between
30 Jun and 1 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 10 Apr 2025 at 08:28.

Thames Water logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Kilburn Lane

Thames Water are carrying out Utility repair and maintenance works on Kilburn Lane, North Kensington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 June 2025 at 09:20 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 15:57.

Transport for London (TfL) logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Harrow Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Harrow Road, Westbourne, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 1 July 2025 at 08:00 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 16:30.

LONG TERM
Between
1 Jul and 1 Sep 2025
Details
View Map
Share
Frederica Street

London Borough Of Islington were proposing to carry out Highway improvement works on Frederica Street, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 July 2025 and run through until 1 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 9 Apr 2025 at 08:13.

London Borough Of Barnet logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Westbury Road

London Borough Of Barnet are carrying out Highway improvement works on Westbury Road, North Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2025 at 08:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 15:25.

London Borough Of Waltham Forest logo
Finishing
Friday
Details
View Map
Share
Follow
Selborne Road

London Borough Of Waltham Forest are carrying out Section 50 on Selborne Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 July 2025 at 09:15 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Jul 2025 at 09:53.

London Borough Of Camden logo
LONG TERM
Between
2 Jul and 31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are proposing to carry out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2025 at 12:11.

London Borough Of Camden logo
LONG TERM
Until
31 Oct 2025
Details
View Map
Share
Follow
Monmouth Street

London Borough Of Camden are carrying out Remedial works on Monmouth Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 July 2025 at 08:00 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Jul 2025 at 09:49.

Thames Water logo
Until
17 Jul 2025
Details
View Map
Share
Follow
Sidney Street

Thames Water are carrying out roadworks on Sidney Street, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 06:00 and could run through until 17 July 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 14:17.

UK Power Networks Eastern & London logo
Between
3 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 14:14.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ingham Road

Thames Water are carrying out roadworks on Ingham Road, Fortune Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 21:16 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 11:51.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Stanhope Gardens

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Stanhope Gardens, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 July 2025 at 11:33 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jul 2025 at 10:17.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Follow
St Margarets Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St Margarets Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:16.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Weston Park

Thames Water are carrying out Utility repair and maintenance works on Weston Park, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 July 2025 at 07:19 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:48.

Thames Water logo
Thursday
Details
View Map
Share
Clarges Street

Thames Water carried out Utility repair and maintenance works on Clarges Street, West End, London.

The road was closed for some or all of the period.

The works were originally planned between 4 Jul 2025 and 10 Jul 2025 and were actually completed between 4 Jul 2025 (14:36) and 8 Jul 2025 (11:10). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 11:10.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hemstal Road

Thames Water are carrying out Utility repair and maintenance works on Hemstal Road, West Hampstead, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 July 2025 at 21:29 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 15:04.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Ferme Park Road

Thames Water are carrying out Utility repair and maintenance works on Ferme Park Road, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 July 2025 at 13:38 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 09:44.

London Borough Of Enfield logo
Between
5 and 26 Jul 2025
Details
View Map
Share
Follow
Kenninghall Road

London Borough Of Enfield are proposing to carry out Section 50 on Kenninghall Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 23 Jun 2025 at 09:29.

London Borough Of Enfield logo
Between
5 and 26 Jul 2025
Details
View Map
Share
Follow
Kenninghall Road

London Borough Of Enfield are proposing to carry out Section 50 on Kenninghall Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 23 Jun 2025 at 09:33.

London Borough Of Enfield logo
Between
5 and 26 Jul 2025
Details
View Map
Share
Follow
Kenninghall Road

London Borough Of Enfield are proposing to carry out Section 50 on Kenninghall Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Jun 2025 at 09:57.

London Borough Of Enfield logo
Between
5 and 26 Jul 2025
Details
View Map
Share
Kenninghall Road

London Borough Of Enfield were proposing to carry out Section 50 on Kenninghall Road, Edmonton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 July 2025 and run through until 26 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Jul 2025 at 12:50.

London Borough Of Enfield logo
Between
5 and 26 Jul 2025
Details
View Map
Share
Follow
Conduit Lane

London Borough Of Enfield are proposing to carry out Section 50 on Conduit Lane, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Jun 2025 at 09:44.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Truro Road

Thames Water are proposing to carry out Utility asset works on Truro Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Nov 2023 at 14:48.

Transport for London (TfL) logo
LONG TERM
Between
6 Jul and 26 Oct 2025
Details
View Map
Share
Follow
Gray's Inn Road

Transport for London (TfL) are proposing to carry out roadworks on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 July 2025 and could run through until 26 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 18:30.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Plender Street

Thames Water are carrying out Utility repair and maintenance works on Plender Street, St Pancras And Somers Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2025 at 15:15 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 15:02.

City Of Westminster logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Old Bond Street

City Of Westminster are carrying out Highway repair and maintenance works on Old Bond Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 7 Jul 2025 at 11:37.

City Of Westminster logo
LONG TERM
Between
7 Jul 2025 and 7 Jul 2026
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 7 July 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 12:08.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 10:27.

Cadent Gas logo
Between
7 and 25 Jul 2025
Details
View Map
Share
Follow
Gerrard Place

Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 09:07.

UK Power Networks Eastern & London logo
Until
25 Jul 2025
Details
View Map
Share
Follow
Fleet Street

UK Power Networks Eastern & London are carrying out New service connection on Fleet Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 13:00 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 13:01.

Electricity Network Company logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 6 May 2025 at 16:04.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Jun 2025 at 11:34.

City Of Westminster logo
Between
7 and 27 Jul 2025
Details
View Map
Share
Follow
Kendal Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kendal Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 10 Jun 2025 at 15:56.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2025 at 21:59.

UK Power Networks Eastern & London logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Stukeley Street

UK Power Networks Eastern & London are carrying out New service connection on Stukeley Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:31 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 09:34.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Basinghall Street

Thames Water are proposing to carry out New service connection on Basinghall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:34.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:49.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Great Russell Street

Thames Water are proposing to carry out New service connection on Great Russell Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 17:23.

Cadent Gas logo
Until
15 Jul 2025
Details
View Map
Share
Follow
Homer Row

Cadent Gas are carrying out Utility repair and maintenance works on Homer Row, Bryanston & Dorset Square, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 20:02 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:20.

UK Power Networks Eastern & London logo
Between
7 and 15 Jul 2025
Details
View Map
Share
Mount Pleasant

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 15 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 09:10.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Cleveland Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Cleveland Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Apr 2025 at 13:37.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Cleveland Street

Thames Water are carrying out Disconnection or alteration of supply on Cleveland Street, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:26 and could run through until 10 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 08:46.

Vodafone logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2025 at 13:11.

Cadent Gas logo
Until
15 Jul 2025
Details
View Map
Share
Follow
Rawstorne Street

Cadent Gas are carrying out Utility repair and maintenance works on Rawstorne Street, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 17:05 and could run through until 15 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 06:53.

Thames Water logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

Thames Water are proposing to carry out Utility asset works on Cambridge Heath Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 09:04.

Thames Water logo
Until
4 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

Thames Water are carrying out Utility asset works on Cambridge Heath Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 14:15 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 10:10.

Thames Water logo
Until
4 Aug 2025
Details
View Map
Share
Follow
Parmiter Street

Thames Water are carrying out Utility asset works on Parmiter Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 14:15 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:16.

Thames Water logo
Between
7 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Hackney Road

Thames Water are proposing to carry out roadworks on Hackney Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 10:29.

Thames Water logo
LONG TERM
Until
29 Sep 2025
Details
View Map
Share
Follow
Bishops Way

Thames Water are carrying out Utility asset works on Bishops Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 14:13 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:15.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Adelaide Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 10:35.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 14:44.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jun 2025 at 13:54.

UK Power Networks Eastern & London logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Avenue Road

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jul 2025 at 10:35.

London Borough Of Camden logo
Between
7 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 May 2025 at 20:57.

London Borough Of Camden logo
Until
1 Aug 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are carrying out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 7 Jul 2025 at 08:41.

Thames Water logo
Until
18 Jul 2025
Details
View Map
Share
Follow
Caledonian Road

Thames Water are carrying out Utility repair and maintenance works on Caledonian Road, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:00 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 10:45.

LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Boleyn Road

London Borough Of Islington are carrying out Highway improvement works on Boleyn Road, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 7 Jul 2025 at 08:39.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 16:53.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 29 Aug 2025
Details
View Map
Share
Parkhurst Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 16:37.

Transport for London (TfL) logo
LONG TERM
Between
7 Jul and 10 Sep 2025
Details
View Map
Share
Follow
Parkhurst Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Parkhurst Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 16:44.

Thames Water logo
Until
27 Jul 2025
Details
View Map
Share
Follow
Clarence Road

Thames Water are carrying out Utility repair and maintenance works on Clarence Road, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:30 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 12:11.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Holly Bush Vale

Thames Water are proposing to carry out New service connection on Holly Bush Vale, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 19:33.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Holly Bush Vale

Thames Water are carrying out New service connection on Holly Bush Vale, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:38 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 11:08.

London Borough Of Barnet logo
LONG TERM
Until
5 Sep 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are carrying out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 20:00 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 07:05.

London Borough Of Haringey logo
Finishing
Thursday
Details
View Map
Share
Follow
Stanhope Gardens

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Jun 2025 at 10:49.

Thames Water logo
LONG TERM
Between
7 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility asset works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Thames Water logo
LONG TERM
Until
18 Aug 2025
Details
View Map
Share
Follow
Talbot Road

Thames Water are carrying out Utility asset works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 10:30 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 11:47.

London Borough Of Haringey logo
Finishing
Thursday
Details
View Map
Share
Follow
Fairfax Road

London Borough Of Haringey are carrying out Highway improvement works on Fairfax Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:30 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 10:05.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on North Circular Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 11:56.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on North Circular Road, North Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:39.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Pinkham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pinkham Way, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2025 at 11:56.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Pinkham Way

Transport for London (TfL) are carrying out Highway repair and maintenance works on Pinkham Way, New Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:39.

Thames Water logo
Until
15 Jul 2025
Details
View Map
Share
Follow
Oak Lane

Thames Water are carrying out New service connection on Oak Lane, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 09:42 and could run through until 15 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 09:47.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Bounds Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Jun 2025 at 15:38.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Bounds Green Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:40.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Station Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Station Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:40.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Telford Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Telford Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 11:54.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Telford Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Telford Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:40.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Pinkham Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Pinkham Way, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 11:55.

Transport for London (TfL) logo
Finishing
Saturday
Details
View Map
Share
Follow
Pinkham Way

Transport for London (TfL) are carrying out Highway repair and maintenance works on Pinkham Way, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 22:00 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 07:40.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Alston Road

Thames Water are proposing to carry out New service connection on Alston Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 16:59.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodberry Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Woodberry Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:36.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Woodberry Avenue

Thames Water are carrying out Utility repair and maintenance works on Woodberry Avenue, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 12:35 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:19.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fernleigh Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fernleigh Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:36.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Fernleigh Road

Thames Water are carrying out Utility repair and maintenance works on Fernleigh Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 12:35 and could run through until 9 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:17.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Fernleigh Road

Thames Water were proposing to carry out Utility repair and maintenance works on Fernleigh Road, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2025 at 09:12.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
St Margarets Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St Margarets Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 09:35.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
St Margarets Avenue

London Borough Of Barnet are carrying out Highway improvement works on St Margarets Avenue, Whetstone, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2025 at 08:00 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 09:20.

Murphy Power Distribution logo
Between
8 and 29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are proposing to carry out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 15 Apr 2025 at 18:18.

Murphy Power Distribution logo
Until
29 Jul 2025
Details
View Map
Share
Follow
Greenwood Place

Murphy Power Distribution are carrying out Utility asset works on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2025 at 09:00 and could run through until 29 July 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Murphy Power Distribution on 8 Jul 2025 at 10:13.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
New End Square

Thames Water are carrying out Utility repair and maintenance works on New End Square, Hampstead Town, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2025 at 01:44 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:16.

London Borough Of Barnet logo
Finishing
Today
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 8 July 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 11:27.

Finishing
Thursday
Details
View Map
Share
Follow
Middlesex Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Middlesex Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 May 2025 at 15:25.

Cadent Gas logo
Until
16 Jul 2025
Details
View Map
Share
Follow
Porchester Road

Cadent Gas are carrying out Utility repair and maintenance works on Porchester Road, Bayswater, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 July 2025 at 07:31 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 09:10.

Sky UK logo
Finishing
Friday
Details
View Map
Share
Follow
Great Titchfield Street

Sky UK are proposing to carry out Utility repair and maintenance works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 12 May 2025 at 11:33.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Porchester Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 17:02.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Porchester Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Road, Bayswater, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Jul 2025 at 09:27.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Westbourne Terrace Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Jun 2025 at 16:51.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Follow
Westbourne Terrace Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jul 2025 at 09:25.

City Of Westminster logo
Until
21 Jul 2025
Details
View Map
Share
Follow
Westbourne Terrace Road

City Of Westminster are carrying out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2025 at 08:00 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Jul 2025 at 08:55.

City Of Westminster logo
Between
8 and 21 Jul 2025
Details
View Map
Share
Avenue Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Avenue Road, Abbey Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 July 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:21.

City Of Westminster logo
Between
9 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:00.

Finishing
Friday
Details
View Map
Share
Follow
Hanover Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on Hanover Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 22 May 2025 at 10:18.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Coleridge Road

Thames Water are proposing to carry out Utility asset works on Coleridge Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 14:11.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Greenleaf Road

Thames Water are proposing to carry out Utility asset works on Greenleaf Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 13:56.

London Borough Of Waltham Forest logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Claremont Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 22 May 2025 at 09:30.

London Borough Of Waltham Forest logo
Between
9 and 16 Jul 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Claremont Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 27 May 2025 at 10:53.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sherbrook Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Sherbrook Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 11:36.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Sherbrook Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Sherbrook Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Jun 2025 at 10:36.

London Borough Of Barnet logo
Finishing
Saturday
Details
View Map
Share
Follow
Hertford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:49.

London Borough Of Barnet logo
Finishing
Sunday
Details
View Map
Share
Follow
Hertford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

London Borough Of Enfield logo
Between
10 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barrowell Green

London Borough Of Enfield are proposing to carry out Section 50 on Barrowell Green, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Jun 2025 at 17:06.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Crowland Gardens

Thames Water are proposing to carry out Utility asset works on Crowland Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 12 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 13:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 29 Sep 2025
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 21:11.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Jul and 27 Oct 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 09:41.

City Of London Corporation logo
Finishing
Sunday
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:36.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Apr 2025 at 13:31.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 May 2025 at 11:19.

London Borough Of Haringey logo
Finishing
Monday
Details
View Map
Share
Follow
Stanhope Gardens

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 25 Jun 2025 at 12:01.

London Borough Of Haringey logo
Finishing
Monday
Details
View Map
Share
Follow
Fairfax Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Fairfax Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Jun 2025 at 10:49.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2025 at 14:58.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Apr 2025 at 13:35.

UK Power Networks Eastern & London logo
Between
12 and 20 Jul 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jun 2025 at 10:44.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:37.

UK Power Networks Eastern & London logo
Between
14 and 25 Jul 2025
Details
View Map
Share
Follow
Burlington Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Burlington Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 08:59.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 11:31.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 15:09.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 14 May 2025 at 14:30.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Jun 2025 at 08:59.

City Of Westminster logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Inverness Terrace

City Of Westminster are proposing to carry out Highway repair and maintenance works on Inverness Terrace, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Jul 2025 at 15:36.

Cadent Gas logo
Between
14 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 07:02.

UK Power Networks Eastern & London logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Livonia Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Livonia Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 May 2025 at 14:47.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Apr 2025 at 08:39.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 09:06.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
West Central Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 18:16.

Cadent Gas logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
West Central Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on West Central Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 16:46.

London Borough Of Camden logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Procter Street

London Borough Of Camden are proposing to carry out Highway improvement works on Procter Street, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 Jun 2025 at 08:22.

London Borough Of Camden logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Drake Street

London Borough Of Camden are proposing to carry out Highway improvement works on Drake Street, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 27 Jun 2025 at 08:19.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 09:27.

London Borough Of Camden logo
Between
14 and 30 Jul 2025
Details
View Map
Share
Follow
Tavistock Square

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Tavistock Square, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Jun 2025 at 15:13.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 May 2025 at 10:39.

City Of Westminster logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Clifton Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Clifton Road, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:13.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.

Thames Water logo
LONG TERM
Between
14 Jul and 21 Aug 2025
Details
View Map
Share
Follow
Pentonville Road

Thames Water are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The works will start on or after 14 July 2025 and could run through until 21 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 11:18.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Greenberry Street

Thames Water were proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2025 at 10:43.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 May 2025 at 15:17.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenberry Street

Thames Water are proposing to carry out New service connection on Greenberry Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2025 at 13:07.

Thames Water logo
LONG TERM
Between
14 Jul and 20 Oct 2025
Details
View Map
Share
Follow
Bonner Road

Thames Water are proposing to carry out Utility asset works on Bonner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 20 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 10:36.

Thames Water logo
LONG TERM
Between
14 Jul and 1 Sep 2025
Details
View Map
Share
Follow
Mowlem Street

Thames Water are proposing to carry out Utility asset works on Mowlem Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:27.

BT logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Greenland Street

BT are proposing to carry out Utility repair and maintenance works on Greenland Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Apr 2025 at 17:26.

T-Mobile (UK) logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Shakspeare Walk

T-Mobile (UK) are proposing to carry out Utility asset works on Shakspeare Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 29 May 2025 at 16:38.

T-Mobile (UK) logo
Between
14 and 23 Jul 2025
Details
View Map
Share
Follow
Shakspeare Walk

T-Mobile (UK) are proposing to carry out Utility asset works on Shakspeare Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 26 Jun 2025 at 09:49.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Platt's Lane

Thames Water are proposing to carry out New service connection on Platt's Lane, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:50.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Platt's Lane

Thames Water are proposing to carry out New service connection on Platt's Lane, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 10:32.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Wayside

Thames Water are proposing to carry out New service connection on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 15:06.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Sunnyside Road

Thames Water are proposing to carry out New service connection on Sunnyside Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 17:35.

Thames Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Sunnyside Road

Thames Water are proposing to carry out New service connection on Sunnyside Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 18:26.

Cadent Gas logo
Between
14 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way

Cadent Gas are proposing to carry out Utility asset works on Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.

London Borough Of Barnet logo
LONG TERM
Between
14 Jul and 21 Sep 2025
Details
View Map
Share
Follow
North Street

London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 14:22.

London Borough Of Barnet logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 10:49.

London Borough Of Barnet logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Bedford Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

Murphy Gas Networks logo
LONG TERM
Between
14 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 15 May 2025 at 15:51.

Murphy Gas Networks logo
LONG TERM
Between
14 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Mayes Road

Murphy Gas Networks are proposing to carry out Utility asset works on Mayes Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 15 May 2025 at 15:30.

Murphy Gas Networks logo
LONG TERM
Between
14 Jul and 14 Aug 2025
Details
View Map
Share
Follow
Mayes Road

Murphy Gas Networks are proposing to carry out Utility asset works on Mayes Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Gas Networks on 20 Jun 2025 at 11:33.

London Borough Of Barnet logo
Between
14 Jul and 12 Aug 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

Transport for London (TfL) logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Angel Road

Transport for London (TfL) are proposing to carry out Remedial works on Angel Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 10:55.

London Borough Of Barnet logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 11:26.

London Borough Of Barnet logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:22.

London Borough Of Barnet logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Jul 2025 at 10:08.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Glenhurst Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Glenhurst Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 28 Apr 2025 at 14:20.

Affinity Water logo
Between
14 and 16 Jul 2025
Details
View Map
Share
Follow
Glenhurst Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Glenhurst Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 12 Jun 2025 at 13:53.

Thames Water logo
LONG TERM
Between
14 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Beckenham Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Beckenham Gardens, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 14:00.

Thames Water logo
LONG TERM
Between
14 Jul and 6 Oct 2025
Details
View Map
Share
Follow
Stanley Road

Thames Water are proposing to carry out Utility asset works on Stanley Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 16:12.

Thames Water logo
LONG TERM
Between
15 Jul and 5 Oct 2025
Details
View Map
Share
Follow
Chaplin Road

Thames Water are proposing to carry out Utility asset works on Chaplin Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 09:22.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 7 Apr 2025 at 08:40.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 25 Aug 2025
Details
View Map
Share
Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 25 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:54.

London Borough Of Barnet logo
Between
15 Jul and 4 Aug 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 12:55.

London Borough Of Barnet logo
LONG TERM
Between
15 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

Thames Water logo
Between
15 and 17 Jul 2025
Details
View Map
Share
Follow
Malvern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Malvern Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 10:06.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Montrose Crescent

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Montrose Crescent, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Woodberry Gardens

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Gardens, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Moss Hall Crescent

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Crescent, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Moss Hall Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Christchurch Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Alexandra Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Alexandra Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Woodberry Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Hutton Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Hutton Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

London Borough Of Barnet logo
Between
15 and 23 Jul 2025
Details
View Map
Share
Follow
Dale Grove

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Dale Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.

Thames Water logo
Between
16 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Elmsdale Road

Thames Water are proposing to carry out Utility asset works on Elmsdale Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 16:01.

London Borough Of Barnet logo
LONG TERM
Between
16 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 12 September 2025. The works will impact the footway and footpath.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 10:20.

London Borough Of Barnet logo
LONG TERM
Between
16 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Aerodrome Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Aerodrome Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2025 and could run through until 12 September 2025. The works will impact the footway and footpath.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 10:20.

London Borough Of Haringey logo
Between
17 and 21 Jul 2025
Details
View Map
Share
Follow
Stapleton Hall Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stapleton Hall Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 14:04.

London Borough Of Haringey logo
Between
17 and 21 Jul 2025
Details
View Map
Share
Follow
Stapleton Hall Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stapleton Hall Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 Jul 2025 at 07:29.

London Borough Of Barnet logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 09:45.

London Borough Of Barnet logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 11:52.

London Borough Of Barnet logo
Between
17 and 19 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 14:59.

London Borough Of Barnet logo
Between
17 and 20 Jul 2025
Details
View Map
Share
Follow
Huntingdon Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Huntingdon Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

London Borough Of Barnet logo
Between
17 and 18 Jul 2025
Details
View Map
Share
Follow
Friern Barnet Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Road, Friern Barnet, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 09:43.

City Of Westminster logo
LONG TERM
Between
17 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Porchester Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Porchester Place, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 2 Jul 2025 at 08:58.

City Of Westminster logo
LONG TERM
Between
17 Jul and 30 Aug 2025
Details
View Map
Share
Follow
Kendal Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kendal Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 30 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 2 Jul 2025 at 08:58.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.

City Of Westminster logo
Between
18 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Piccadilly Underpass

City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:23.

City Of London Corporation logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Finsbury Circus

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Finsbury Circus, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 2 May 2025 at 15:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Jul and 4 Sep 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:28.

Transport for London (TfL) logo
Between
18 and 20 Jul 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out roadworks on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 May 2025 at 09:52.

Thames Water logo
LONG TERM
Between
18 Jul 2025 and 15 Feb 2026
Details
View Map
Share
Follow
West Heath Road

Thames Water are proposing to carry out Utility asset works on West Heath Road, Hampstead Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 15 February 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 10:33.

London Borough Of Barnet logo
Between
18 and 25 Jul 2025
Details
View Map
Share
Follow
Friern Park

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 14:15.

Thames Water logo
LONG TERM
Between
19 Jul and 2 Nov 2025
Details
View Map
Share
Follow
Highbury Grove

Thames Water are proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2025 and could run through until 2 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 08:13.

Thames Water logo
LONG TERM
Between
20 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 07:39.

Thames Water logo
Between
21 Jul and 17 Aug 2025
Details
View Map
Share
Follow
Northview Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Northview Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 17:32.

Thames Water logo
LONG TERM
Between
21 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Swain's Lane

Thames Water are proposing to carry out Utility asset works on Swain's Lane, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 08:34.

Thames Water logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Renters Avenue Roundabout

Thames Water are proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:11.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Wightman Road

Thames Water are proposing to carry out New service connection on Wightman Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 11:26.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Linden Road

Thames Water are proposing to carry out New service connection on Linden Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:07.

London Borough Of Barnet logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Baronsmere Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Baronsmere Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 09:45.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 11:52.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 14:50.

London Borough Of Barnet logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 14:28.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 11:44.

Thames Water logo
LONG TERM
Between
21 Jul and 12 Sep 2025
Details
View Map
Share
Follow
Sunningfields Road

Thames Water are proposing to carry out Utility asset works on Sunningfields Road, Hendon, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 May 2025 at 09:23.

London Borough Of Enfield logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Firscroft

London Borough Of Enfield are proposing to carry out Works for road purposes on Firscroft, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 23 Jun 2025 at 16:32.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Haselbury Road

Cadent Gas are proposing to carry out Utility asset works on Haselbury Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Mar 2025 at 15:38.

Cadent Gas logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Haselbury Road

Cadent Gas are proposing to carry out Utility asset works on Haselbury Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 1 Jul 2025 at 15:25.

Thames Water logo
LONG TERM
Between
21 Jul and 22 Sep 2025
Details
View Map
Share
Follow
Beckenham Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Beckenham Gardens, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 14:49.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
The Green

Cadent Gas are proposing to carry out Utility asset works on The Green, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 15:04.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out New service connection on Green Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jun 2025 at 11:27.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Shepherd Street

Thames Water were proposing to carry out New service connection on Shepherd Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 May 2025 at 08:43.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Shepherd Street

Thames Water were proposing to carry out New service connection on Shepherd Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:55.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Upper Ground

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 07:25.

Southern Gas Networks logo
Between
21 Jul and 11 Aug 2025
Details
View Map
Share
Upper Ground

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Upper Ground, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2025 at 09:53.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Bear Street

Thames Water are proposing to carry out New service connection on Bear Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jun 2025 at 06:59.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 08:15.

UK Power Networks Eastern & London logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jun 2025 at 14:34.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Wardour Street

Thames Water were proposing to carry out Permanent reinstatement on Wardour Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 17:32.

Cadent Gas logo
Between
21 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Cadent Gas are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 07:09.

Cadent Gas logo
Between
21 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 12:15.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Berwick Street

Thames Water are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 May 2025 at 10:53.

UK Power Networks Eastern & London logo
Between
21 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Outwich Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Outwich Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:35.

Cadent Gas logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Fore Street

Cadent Gas are proposing to carry out Utility asset works on Fore Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 10:33.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
John's Mews

Thames Water are proposing to carry out New service connection on John's Mews, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 May 2025 at 16:56.

Thames Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Devonshire Row Mews

Thames Water were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 25 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 12:46.

Between
21 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barlby Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Barlby Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Apr 2025 at 16:10.

Between
21 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Barlby Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Barlby Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Jul 2025 at 11:43.

Electricity Network Company logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:14.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Gloucester Place

Thames Water are proposing to carry out New service connection on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 09:53.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Gloucester Place

Thames Water are proposing to carry out New service connection on Gloucester Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 16:57.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Ivor Place

Thames Water are proposing to carry out New service connection on Ivor Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2025 at 16:38.

Thames Water logo
Between
21 and 24 Jul 2025
Details
View Map
Share
Follow
Ivor Place

Thames Water are proposing to carry out New service connection on Ivor Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 24 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 16:56.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 23 Apr 2025 at 12:58.

City Of Westminster logo
LONG TERM
Between
21 Jul and 28 Nov 2025
Details
View Map
Share
Follow
Harrow Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 13 Jun 2025 at 15:23.

T-Mobile (UK) logo
Between
21 and 30 Jul 2025
Details
View Map
Share
Vyner Street

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 28 May 2025 at 08:49.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 29 Apr 2025 at 11:37.

City Of Westminster logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Acacia Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 May 2025 at 10:53.

London Borough Of Hackney logo
LONG TERM
Between
21 Jul and 29 Aug 2025
Details
View Map
Share
Follow
Downham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 2 Jul 2025 at 11:28.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 May 2025 at 11:46.

BT logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Glebe Road

BT are proposing to carry out Utility asset works on Glebe Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 May 2025 at 12:13.

HS2 logo
LONG TERM
Between
21 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 12:39.

HS2 logo
LONG TERM
Between
21 Jul and 21 Sep 2025
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 12:40.

HS2 logo
LONG TERM
Between
21 Jul 2025 and 26 Jun 2026
Details
View Map
Share
Follow
College Crescent

HS2 are proposing to carry out Works for Rail Purposes on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 26 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 10 Mar 2025 at 16:30.

HS2 logo
LONG TERM
Between
21 Jul and 21 Sep 2025
Details
View Map
Share
Follow
College Crescent

HS2 are proposing to carry out Section 50 on College Crescent, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 21 September 2025. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 11:11.

Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 30 Jun 2025 at 08:38.

Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Essex Road

London Borough Of Islington are proposing to carry out Highway improvement works on Essex Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 8 Jul 2025 at 07:05.

City Of Westminster logo
Between
22 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 22 May 2025 at 13:50.

City Of Westminster logo
Between
22 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Rowington Close

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rowington Close, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 16:07.

Thames Water logo
Between
22 and 25 Jul 2025
Details
View Map
Share
Follow
Roman Way

Thames Water are proposing to carry out Disconnection or alteration of supply on Roman Way, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 12:25.

Thames Water logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Princeton Street

Thames Water are proposing to carry out Remedial works on Princeton Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2025 at 17:08.

Between
23 and 26 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 10 Apr 2025 at 15:48.

Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Bath Street

London Borough Of Islington are proposing to carry out Highway repair and maintenance works on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 2 May 2025 at 11:20.

Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 May 2025 at 09:56.

Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Bethnal Green Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Jun 2025 at 14:05.

Thames Water logo
Between
23 Jul and 12 Aug 2025
Details
View Map
Share
Follow
Highbury Park

Thames Water are proposing to carry out Utility repair and maintenance works on Highbury Park, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Mar 2025 at 12:24.

London Borough Of Barnet logo
On
23 Jul 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 July 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 11:56.

London Borough Of Barnet logo
On
23 Jul 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 23 July 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 12:18.

London Borough Of Haringey logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
La Rose Lane

London Borough Of Haringey are proposing to carry out Highway improvement works on La Rose Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 11:55.

London Borough Of Haringey logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Gloucester Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 30 Jun 2025 at 09:24.

London Borough Of Haringey logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Gloucester Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 1 Jul 2025 at 10:13.

London Borough Of Barnet logo
Between
23 and 25 Jul 2025
Details
View Map
Share
Follow
Woodgrange Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Woodgrange Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 14:35.

Cadent Gas logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Myddelton Park

Cadent Gas are proposing to carry out New service connection on Myddelton Park, Whetstone, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 May 2025 at 14:48.

Cadent Gas logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Myddelton Park

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Myddelton Park, Whetstone, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 May 2025 at 13:47.

Cadent Gas logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Myddelton Park

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Myddelton Park, Whetstone, London.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jun 2025 at 13:51.

Cadent Gas logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Myddelton Park

Cadent Gas are proposing to carry out New service connection on Myddelton Park, Whetstone, London.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jun 2025 at 09:11.

Cadent Gas logo
Between
23 and 28 Jul 2025
Details
View Map
Share
Follow
Myddelton Park

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Myddelton Park, Whetstone, London.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 11:31.

London Borough Of Barnet logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 09:45.

London Borough Of Barnet logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 11:45.

London Borough Of Barnet logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 14:59.

London Borough Of Barnet logo
Between
24 and 27 Jul 2025
Details
View Map
Share
Follow
Lincoln Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Lincoln Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

Between
25 and 27 Jul 2025
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2025 at 15:45.

UK Power Networks Eastern & London logo
Between
26 Jul and 18 Aug 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Jun 2025 at 09:27.

UK Power Networks Eastern & London logo
Between
26 Jul and 18 Aug 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jun 2025 at 14:24.

UK Power Networks Eastern & London logo
Between
26 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Jun 2025 at 09:29.

UK Power Networks Eastern & London logo
Between
26 Jul and 18 Aug 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jun 2025 at 14:25.

London Borough Of Camden logo
Between
26 and 29 Jul 2025
Details
View Map
Share
Follow
West End Lane

London Borough Of Camden are proposing to carry out Highway improvement works on West End Lane, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 29 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Jun 2025 at 13:48.

UK Power Networks Eastern & London logo
Between
26 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Heriot Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Heriot Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 12:00.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Ronalds Road

Thames Water are proposing to carry out Utility repair and maintenance works on Ronalds Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2025 at 07:25.

Thames Water logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Finchley Road

Thames Water were proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 22 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 May 2025 at 13:25.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out Utility asset works on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 16:56.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ashford Road

Thames Water are proposing to carry out Utility asset works on Ashford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:33.

London Borough Of Barnet logo
Between
28 Jul and 24 Aug 2025
Details
View Map
Share
Follow
Depot Approach

London Borough Of Barnet are proposing to carry out Highway improvement works on Depot Approach, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 24 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 08:53.

UK Power Networks Eastern & London logo
Between
28 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Brunner Road

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Brunner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2025 at 15:51.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
North Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on North Hill, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
North Hill

Transport for London (TfL) are proposing to carry out Highway improvement works on North Hill, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 08:50.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Aylmer Parade

Transport for London (TfL) are proposing to carry out Highway improvement works on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jun 2025 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 5 Sep 2025
Details
View Map
Share
Follow
Aylmer Parade

Transport for London (TfL) are proposing to carry out Highway improvement works on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 07:24.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
The Hyde

Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 4 Jun 2025 at 10:37.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
The Hyde

Murphy Power Distribution are proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 9 May 2025 at 08:33.

Murphy Power Distribution logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
The Hyde

Murphy Power Distribution were proposing to carry out Utility asset works on The Hyde, Colindale, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 9 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 6 May 2025 at 08:47.

Thames Water logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 09:44.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2025 at 09:45.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 11:52.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Jun 2025 at 14:59.

London Borough Of Barnet logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Durham Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Durham Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Jul 2025 at 10:08.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Buller Road

Thames Water are proposing to carry out New service connection on Buller Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 May 2025 at 15:31.

BT logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Apr 2025 at 09:38.

BT logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Apr 2025 at 15:37.

BT logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Jun 2025 at 14:19.

BT logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jul 2025 at 18:20.

BT logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Jul 2025 at 12:57.

London Borough Of Barnet logo
Between
28 Jul and 19 Aug 2025
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Utility asset works on High Road, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Jun 2025 at 12:19.

London Borough Of Barnet logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Ballards Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Ballards Lane, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:36.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 15 Nov 2025
Details
View Map
Share
Follow
Sterling Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Sterling Way, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 2 Jun 2025 at 14:21.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 8 Jul 2025 at 09:35.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Mepham Street

Network Rail were proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Mar 2025 at 15:30.

Network Rail logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 May 2025 at 10:49.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Stanhope Row

Thames Water are proposing to carry out Disconnection or alteration of supply on Stanhope Row, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 May 2025 at 13:10.

UK Power Networks Eastern & London logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 15:13.

UK Power Networks Eastern & London logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Sackville Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 08:39.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 14:56.

Transport for London (TfL) logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 May 2025 at 15:13.

UK Power Networks Eastern & London logo
Between
28 Jul and 9 Aug 2025
Details
View Map
Share
Follow
Leadenhall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 9 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 15:06.

City Of London Corporation logo
LONG TERM
Between
28 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 6 May 2025 at 13:41.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2025 at 13:17.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Jul 2025 at 09:43.

Thames Water logo
Between
28 Jul and 4 Aug 2025
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 4 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2025 at 09:51.

UK Power Networks Eastern & London logo
Between
28 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Wood Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wood Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jul 2025 at 11:04.

Cadent Gas logo
Between
28 Jul and 11 Aug 2025
Details
View Map
Share
Commercial Road

Cadent Gas were proposing to carry out Utility asset works on Commercial Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 11 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 11:19.

UK Power Networks Eastern & London logo
Between
28 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Shoe Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Shoe Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jun 2025 at 10:36.

UK Power Networks Eastern & London logo
Between
28 Jul and 6 Aug 2025
Details
View Map
Share
Follow
Shoe Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Shoe Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 6 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 10:41.

UK Power Networks Eastern & London logo
Between
28 Jul and 10 Aug 2025
Details
View Map
Share
Follow
Bloomsbury Place

UK Power Networks Eastern & London are proposing to carry out New service connection on Bloomsbury Place, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 10:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Jul and 14 Sep 2025
Details
View Map
Share
Follow
Southampton Row

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Southampton Row, Holborn And Covent Garden, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 08:42.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

Thames Water logo
Between
28 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Devonshire Row Mews

Thames Water are proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 19:37.

Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Roger Street

Exponential-e are proposing to carry out Utility asset works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Exponential-e on 6 Jun 2025 at 18:06.

Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Roger Street

Exponential-e are proposing to carry out Utility asset works on Roger Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Exponential-e on 30 Jun 2025 at 14:20.

Vodafone logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Northburgh Street

Vodafone are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 5 Jun 2025 at 11:09.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 21 May 2025 at 08:36.

Electricity Network Company logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Jun 2025 at 06:23.

Electricity Network Company logo
Between
28 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Northburgh Street

Electricity Network Company are proposing to carry out Utility asset works on Northburgh Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 4 Jun 2025 at 09:58.

Transport for London (TfL) logo
LONG TERM
Between
28 Jul and 19 Dec 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:49.

Eunetworks logo
LONG TERM
Between
28 Jul and 16 Sep 2025
Details
View Map
Share
Follow
Chamberlayne Road

Eunetworks are proposing to carry out Utility asset works on Chamberlayne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 24 Jun 2025 at 14:09.

BT logo
Between
28 and 30 Jul 2025
Details
View Map
Share
Culford Mews

BT were proposing to carry out Utility asset works on Culford Mews, Hackney, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 30 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 16 May 2025 at 14:32.

Between
28 and 30 Jul 2025
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 30 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Apr 2025 at 16:06.

UK Power Networks Eastern & London logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Horse Guards Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2025 at 07:55.

UK Power Networks Eastern & London logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Horse Guards Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 May 2025 at 07:54.

Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
King Street

Abovenet Communications UK are proposing to carry out Highway repair and maintenance works on King Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Abovenet Communications UK on 28 May 2025 at 15:21.

Virgin Media logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Hanway Street

Virgin Media are proposing to carry out Utility asset works on Hanway Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 4 Jul 2025 at 14:57.

Thames Water logo
LONG TERM
Between
29 Jul 2025 and 1 Jun 2026
Details
View Map
Share
St John Street

Thames Water were proposing to carry out Utility asset works on St John Street, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 1 June 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 13:35.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 21 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:51.

Transport for London (TfL) logo
LONG TERM
Between
29 Jul and 21 Oct 2025
Details
View Map
Share
Follow
Islington High Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Islington High Street, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 21 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 31 Mar 2025 at 11:56.

London Borough Of Barnet logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Geron Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 08:24.

London Borough Of Barnet logo
Between
29 Jul and 15 Aug 2025
Details
View Map
Share
Edgware Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2025 and run through until 15 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:37.

London Borough Of Haringey logo
Between
29 and 31 Jul 2025
Details
View Map
Share
Follow
Twyford Avenue

London Borough Of Haringey are proposing to carry out Highway improvement works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 1 Jul 2025 at 10:45.

Thames Water logo
Between
30 Jul and 3 Aug 2025
Details
View Map
Share
Follow
Aylmer Parade

Thames Water are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Apr 2025 at 09:52.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
York Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on York Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Feb 2025 at 10:42.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Feb 2025 at 13:13.

City Of Westminster logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Upper Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Upper Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 11:12.

Thames Water logo
Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Buckland Street

Thames Water are proposing to carry out New service connection on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 14:11.

Electricity Network Company logo
Between
30 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Buckland Street

Electricity Network Company are proposing to carry out Utility asset works on Buckland Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 20 Jun 2025 at 15:13.

Electricity Network Company logo
Between
30 Jul and 22 Aug 2025
Details
View Map
Share
Follow
Pitfield Street

Electricity Network Company are proposing to carry out Utility asset works on Pitfield Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 8 Jul 2025 at 12:35.

London Borough Of Camden logo
Between
30 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Malden Road

London Borough Of Camden are proposing to carry out Highway improvement works on Malden Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Jun 2025 at 13:51.

Thames Water logo
Between
31 Jul and 3 Aug 2025
Details
View Map
Share
Seven Sisters Road

Thames Water were proposing to carry out Utility repair and maintenance works on Seven Sisters Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 July 2025 and run through until 3 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 11:21.

Murphy Gas Networks logo
LONG TERM
Between
31 Jul and 26 Sep 2025
Details
View Map
Share
Follow
Hornsey Park Road

Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Gas Networks on 7 Jul 2025 at 14:40.

London Borough Of Barnet logo
LONG TERM
Between
1 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Tempelhof Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.

City Of Westminster logo
Between
1 and 15 Aug 2025
Details
View Map
Share
Follow
Davies Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Davies Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Blackfriars Underpass

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Underpass, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Blackfriars Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment Slip Road (N)

Transport for London (TfL) are proposing to carry out Highway improvement works on Victoria Embankment Slip Road (N), London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Temple Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:30.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Temple Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Temple Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 14:18.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Blackfriars Passage

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackfriars Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Carmelite Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Carmelite Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
Queen Victoria Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Queen Victoria Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

Transport for London (TfL) logo
LONG TERM
Between
1 Aug 2025 and 31 Jan 2026
Details
View Map
Share
Follow
New Bridge Street

Transport for London (TfL) are proposing to carry out Highway improvement works on New Bridge Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 31 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Jun 2025 at 15:20.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:44.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Grafton Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Place, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2025 at 17:45.

London Borough Of Camden logo
Between
1 and 5 Aug 2025
Details
View Map
Share
Follow
Churchway

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Churchway, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 5 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 22 Apr 2025 at 18:13.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Midland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Apr 2025 at 14:37.

Thames Water logo
Between
1 and 3 Aug 2025
Details
View Map
Share
Follow
Copenhagen Street

Thames Water are proposing to carry out Utility repair and maintenance works on Copenhagen Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 August 2025 and could run through until 3 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 11:47.

LONG TERM
Between
2 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Jul 2025 at 16:30.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 21 Dec 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 21 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 14:29.

Transport for London (TfL) logo
LONG TERM
Between
2 Aug and 23 Dec 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 August 2025 and could run through until 23 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Jul 2025 at 11:56.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Down Street

Thames Water are proposing to carry out Utility asset works on Down Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 May 2025 at 12:30.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Farm Street

Thames Water are proposing to carry out New service connection on Farm Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 May 2025 at 15:28.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Farm Street

Thames Water are proposing to carry out New service connection on Farm Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 08:25.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Little Trinity Lane

Thames Water are proposing to carry out New service connection on Little Trinity Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 13:01.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Wellington Street

Cadent Gas are proposing to carry out Utility asset works on Wellington Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 May 2025 at 06:26.

Cadent Gas logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
Queen Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 May 2025 at 11:21.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Fenchurch Street

BT were proposing to carry out Utility asset works on Fenchurch Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Apr 2025 at 11:05.

UK Power Networks Eastern & London logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Marshall Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 10:55.

Thames Water logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Cornhill

Thames Water are proposing to carry out Utility repair and maintenance works on Cornhill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2025 at 11:39.

Eunetworks logo
Between
4 and 14 Aug 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 28 Apr 2025 at 09:23.

Cadent Gas logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jun 2025 at 09:59.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
St John Street

London Borough Of Islington are proposing to carry out Highway improvement works on St John Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 3 Apr 2025 at 11:45.

LONG TERM
Between
4 Aug 2025 and 27 Feb 2026
Details
View Map
Share
Follow
Cowcross Street

London Borough Of Islington are proposing to carry out Highway improvement works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 27 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 8 Apr 2025 at 13:19.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Feb 2025 at 17:11.

City Of Westminster logo
Between
4 and 26 Aug 2025
Details
View Map
Share
Follow
Harewood Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Mar 2025 at 14:05.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Marylands Road

Thames Water were proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 16:05.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 14 Apr 2025 at 12:56.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:38.

Transport for London (TfL) logo
LONG TERM
Between
4 Aug and 16 Sep 2025
Details
View Map
Share
Follow
Cunningham Place

Transport for London (TfL) are proposing to carry out Highway improvement works on Cunningham Place, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 12 May 2025 at 10:36.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Bath Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bath Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 17:42.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 14:17.

Transport for London (TfL) logo
Between
4 and 22 Aug 2025
Details
View Map
Share
Follow
City Road

Transport for London (TfL) are proposing to carry out Highway improvement works on City Road, Islington, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 15:43.

Electricity Network Company logo
Between
4 and 20 Aug 2025
Details
View Map
Share
Follow
Purcell Street

Electricity Network Company are proposing to carry out Utility asset works on Purcell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 9 Jun 2025 at 16:39.

Thames Water logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility asset works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 17:52.

London Borough Of Hackney logo
LONG TERM
Between
4 Aug and 19 Dec 2025
Details
View Map
Share
Follow
Colvestone Crescent

London Borough Of Hackney are proposing to carry out Highway improvement works on Colvestone Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 30 Dec 2024 at 13:50.

Transport for London (TfL) logo
Between
4 and 25 Aug 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 11:12.

Transport for London (TfL) logo
Between
4 and 29 Aug 2025
Details
View Map
Share
Camden Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 29 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 12:50.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Streatley Place

London Borough Of Camden are proposing to carry out roadworks on Streatley Place, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 18 Mar 2025 at 12:54.

London Borough Of Camden logo
LONG TERM
Between
4 Aug and 20 Sep 2025
Details
View Map
Share
Follow
New End Square

London Borough Of Camden are proposing to carry out Highway improvement works on New End Square, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 20 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 22 May 2025 at 11:16.

London Borough Of Camden logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Swain's Lane

London Borough Of Camden are proposing to carry out Highway improvement works on Swain's Lane, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Jun 2025 at 13:54.

Thames Water logo
LONG TERM
Between
4 Aug 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Hampstead Way

Thames Water are proposing to carry out Utility asset works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 1 June 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 May 2025 at 12:12.

London Borough Of Barnet logo
Between
4 and 15 Aug 2025
Details
View Map
Share
Follow
Brent Park Road

London Borough Of Barnet are proposing to carry out Remedial works on Brent Park Road, Brent Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 29 May 2025 at 16:32.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway

Thames Water were proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:49.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway

Thames Water are proposing to carry out Utility asset works on Meadway, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Meadway Close

Thames Water were proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 May 2025 at 08:19.

Thames Water logo
LONG TERM
Between
4 Aug and 8 Dec 2025
Details
View Map
Share
Follow
Meadway Close

Thames Water are proposing to carry out Utility asset works on Meadway Close, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 10:01.

Cadent Gas logo
Between
4 and 17 Aug 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out New service connection on Station Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Jun 2025 at 14:19.

Cadent Gas logo
Between
4 and 17 Aug 2025
Details
View Map
Share
Follow
Station Road

Cadent Gas are proposing to carry out New service connection on Station Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Jul 2025 at 12:10.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:32.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 12:48.

London Borough Of Barnet logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 10:29.

Cadent Gas logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
Stoneleigh Road

Cadent Gas are proposing to carry out New service connection on Stoneleigh Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 18:02.

Cadent Gas logo
Between
4 and 7 Aug 2025
Details
View Map
Share
Follow
St Loys Road

Cadent Gas are proposing to carry out New service connection on St Loys Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 7 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 10:28.

Thames Water logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Oak Lane

Thames Water were proposing to carry out New service connection on Oak Lane, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 August 2025 and run through until 12 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:05.

Thames Water logo
Between
4 and 12 Aug 2025
Details
View Map
Share
Follow
Oak Lane

Thames Water are proposing to carry out New service connection on Oak Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 12 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 12:40.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Follow
Fortis Green

London Borough Of Haringey are proposing to carry out Highway improvement works on Fortis Green, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2025 and could run through until 5 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 11:10.

London Borough Of Haringey logo
LONG TERM
Between
5 Aug and 5 Nov 2025
Details
View Map
Share
Fortis Green

London Borough Of Haringey were proposing to carry out Remedial works on Fortis Green, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 5 November 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 12 May 2025 at 14:55.

London Borough Of Barnet logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Woodgrange Avenue

London Borough Of Barnet were proposing to carry out Highway improvement works on Woodgrange Avenue, North Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:39.

City Of Westminster logo
Between
5 and 7 Aug 2025
Details
View Map
Share
George Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on George Street, Bryanston & Dorset Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 May 2025 at 14:39.

Thames Water logo
Between
5 and 7 Aug 2025
Details
View Map
Share
Offord Road

Thames Water were proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 7 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:19.

UK Power Networks Eastern & London logo
Between
6 and 23 Aug 2025
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Mar 2025 at 07:19.

T-Mobile (UK) logo
Between
6 and 16 Aug 2025
Details
View Map
Share
Vyner Street

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Vyner Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 August 2025 and run through until 16 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by T-Mobile (UK) on 1 Jul 2025 at 14:20.

London Borough Of Barnet logo
Between
6 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 3 September 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Barnet on 6 May 2025 at 15:19.

London Borough Of Barnet logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Hampstead Way

London Borough Of Barnet were proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:38.

London Borough Of Barnet logo
Between
7 and 14 Aug 2025
Details
View Map
Share
Follow
Greyhound Hill

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Greyhound Hill, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

London Borough Of Barnet logo
Between
7 and 11 Aug 2025
Details
View Map
Share
Follow
Hilton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hilton Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 09:29.

UK Power Networks Eastern & London logo
Between
7 and 23 Aug 2025
Details
View Map
Share
Follow
Broadwick Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Broadwick Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jun 2025 at 06:28.

Electricity Network Company logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Pitfield Street

Electricity Network Company are proposing to carry out Utility asset works on Pitfield Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 Jun 2025 at 15:07.

Electricity Network Company logo
Between
7 and 22 Aug 2025
Details
View Map
Share
Follow
Pitfield Street

Electricity Network Company are proposing to carry out Utility asset works on Pitfield Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 7 Jul 2025 at 19:13.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:03.

City Of Westminster logo
LONG TERM
Between
8 Aug and 18 Sep 2025
Details
View Map
Share
Follow
Waterloo Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 08:01.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:24.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Follow
Offord Road

Thames Water are proposing to carry out Utility repair and maintenance works on Offord Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 14:25.

London Borough Of Barnet logo
Between
8 and 11 Aug 2025
Details
View Map
Share
Cricklewood Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 11 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:39.

Thames Water logo
Between
8 and 10 Aug 2025
Details
View Map
Share
Isledon Road

Thames Water were proposing to carry out Utility repair and maintenance works on Isledon Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 August 2025 and run through until 10 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 12:32.

London Borough Of Haringey logo
Between
8 and 13 Aug 2025
Details
View Map
Share
Follow
Grosvenor Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Grosvenor Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 8 May 2025 at 11:03.

Transport for London (TfL) logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Finchley Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 10:46.

Transport for London (TfL) logo
LONG TERM
Between
11 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:00.

Transport for London (TfL) logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are proposing to carry out New service connection on Stoke Newington High Street, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:06.

Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Tyssen Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out New service connection on Tyssen Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Jul 2025 at 11:49.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Southwood Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Southwood Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:57.

London Borough Of Haringey logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Tynemouth Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Tynemouth Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 2 Jul 2025 at 08:51.

London Borough Of Haringey logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Tynemouth Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Tynemouth Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 08:36.

Thames Water logo
Between
11 and 13 Aug 2025
Details
View Map
Share
Follow
Spencer Road

Thames Water are proposing to carry out Utility repair and maintenance works on Spencer Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 13 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 14:54.

Thames Water logo
Between
11 and 14 Aug 2025
Details
View Map
Share
Follow
Hamilton Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 13:17.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Market Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 13:12.

UK Power Networks Eastern & London logo
Between
11 and 18 Aug 2025
Details
View Map
Share
Maiden Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Maiden Lane, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 May 2025 at 08:56.

UK Power Networks Eastern & London logo
Between
11 and 19 Aug 2025
Details
View Map
Share
Follow
Maiden Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 19 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 May 2025 at 08:07.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Cranbourn Street

Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:25.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Cranbourn Street

Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 10:45.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Cranbourn Street

Cadent Gas are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 13:12.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Charing Cross Road

Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 May 2025 at 06:24.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Charing Cross Road

Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Jun 2025 at 10:52.

Cadent Gas logo
Between
11 and 29 Aug 2025
Details
View Map
Share
Follow
Charing Cross Road

Cadent Gas are proposing to carry out Utility asset works on Charing Cross Road, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 13:09.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 19 May 2025 at 09:09.

City Of London Corporation logo
Between
11 and 31 Aug 2025
Details
View Map
Share
Follow
Vine Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Vine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 21 May 2025 at 10:47.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Tavistock Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Tavistock Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 07:44.

UK Power Networks Eastern & London logo
Between
11 and 23 Aug 2025
Details
View Map
Share
Follow
Creechurch Lane

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Creechurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:59.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 08:37.

Thames Water logo
Between
11 and 18 Aug 2025
Details
View Map
Share
New Bond Street

Thames Water were proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 August 2025 and run through until 18 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Mar 2025 at 15:40.

Thames Water logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 09:32.

BT logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Mill Row

BT are proposing to carry out Utility asset works on Mill Row, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 May 2025 at 13:38.

City Of Westminster logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Great Cumberland Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 May 2025 at 09:45.

UK Power Networks Eastern & London logo
Between
12 and 18 Aug 2025
Details
View Map
Share
Follow
Cowcross Street

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jun 2025 at 12:37.

Cadent Gas logo
Between
12 and 18 Aug 2025
Details
View Map
Share
Follow
Commerce Road

Cadent Gas are proposing to carry out New service connection on Commerce Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jun 2025 at 15:30.

London Borough Of Barnet logo
Between
12 and 21 Aug 2025
Details
View Map
Share
Follow
Pursley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 09:37.

London Borough Of Barnet logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Hampden Way

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Hampden Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:41.

London Borough Of Barnet logo
Between
12 and 15 Aug 2025
Details
View Map
Share
Follow
Alverstone Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Alverstone Avenue, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 15 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 10:01.

Thames Water logo
Between
13 and 17 Aug 2025
Details
View Map
Share
Follow
Chetwynd Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chetwynd Road, Highgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:11.

London Borough Of Barnet logo
Between
13 and 22 Aug 2025
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, East Finchley, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.

Virgin Media logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Garman Road

Virgin Media were proposing to carry out Utility asset works on Garman Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 12 Jun 2025 at 15:23.

UK Power Networks Eastern & London logo
Between
13 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 May 2025 at 11:29.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
13 Aug and 15 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Feb 2025 at 12:03.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
City Road

Transport for London (TfL) were proposing to carry out Highway improvement works on City Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:13.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Feb 2025 at 13:46.

Transport for London (TfL) logo
Between
13 Aug and 5 Sep 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Feb 2025 at 13:17.

Verizon Business logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Pall Mall

Verizon Business are proposing to carry out Utility repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Verizon Business on 3 Jul 2025 at 12:05.

London Borough Of Barnet logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Cricklewood Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Cricklewood Lane, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.

London Borough Of Barnet logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Hampstead Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:59.

London Borough Of Barnet logo
Between
15 and 20 Aug 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:35.

London Borough Of Barnet logo
Between
15 and 21 Aug 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 Jun 2025 at 11:36.

London Borough Of Haringey logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Earlham Grove

London Borough Of Haringey are proposing to carry out Highway improvement works on Earlham Grove, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 15:21.

London Borough Of Haringey logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Earlham Grove

London Borough Of Haringey are proposing to carry out Highway improvement works on Earlham Grove, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 7 Jul 2025 at 15:32.

London Borough Of Barnet logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Woodgrange Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Woodgrange Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:51.

London Borough Of Barnet logo
Between
15 and 18 Aug 2025
Details
View Map
Share
Follow
Hilton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Hilton Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:36.

London Borough Of Enfield logo
Between
15 and 17 Aug 2025
Details
View Map
Share
Follow
Connaught Gardens

London Borough Of Enfield are proposing to carry out Highway improvement works on Connaught Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 17 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 3 Jul 2025 at 13:00.

London Borough Of Barnet logo
Between
15 and 19 Aug 2025
Details
View Map
Share
Follow
Alverstone Avenue

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Alverstone Avenue, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 14:27.

London Borough Of Camden logo
Between
16 and 18 Aug 2025
Details
View Map
Share
Follow
West End Lane

London Borough Of Camden are proposing to carry out Highway improvement works on West End Lane, West Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2025 and could run through until 18 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Jun 2025 at 14:17.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Clissold Crescent

Thames Water are proposing to carry out New service connection on Clissold Crescent, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 May 2025 at 17:08.

Thames Water logo
LONG TERM
Between
18 Aug and 28 Sep 2025
Details
View Map
Share
Follow
Clifford Way

Thames Water are proposing to carry out Utility repair and maintenance works on Clifford Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 28 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:31.

Thames Water logo
LONG TERM
Between
18 Aug and 29 Sep 2025
Details
View Map
Share
Follow
Bishops Road

Thames Water are proposing to carry out Utility asset works on Bishops Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

Thames Water logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Brent Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 May 2025 at 08:56.

Thames Water logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Brent Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 11:58.

London Borough Of Barnet logo
Between
18 and 27 Aug 2025
Details
View Map
Share
Follow
Greyhound Hill

London Borough Of Barnet are proposing to carry out Highway improvement works on Greyhound Hill, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 27 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:22.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Priory Court

Thames Water are proposing to carry out New service connection on Priory Court, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 15:24.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Clarence Road

BT are proposing to carry out Utility asset works on Clarence Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 May 2025 at 10:05.

BT logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Clarence Road

BT are proposing to carry out Utility asset works on Clarence Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 May 2025 at 09:44.

London Borough Of Barnet logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Pursley Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 22 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 11:37.

London Borough Of Barnet logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Pursley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Pursley Road, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2025 at 14:44.

London Borough Of Enfield logo
Between
18 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Springfield Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Springfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 5 Jun 2025 at 14:32.

London Borough Of Enfield logo
Between
18 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Springfield Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Springfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 1 Jul 2025 at 11:43.

London Borough Of Enfield logo
Between
18 Aug and 2 Sep 2025
Details
View Map
Share
Follow
Springfield Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Springfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 8 Jul 2025 at 12:04.

London Borough Of Barnet logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Friern Park

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Friern Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 May 2025 at 13:51.

Thames Water logo
Between
18 and 21 Aug 2025
Details
View Map
Share
Follow
Tudor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 21 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2025 at 11:26.

UK Power Networks Eastern & London logo
Between
18 and 29 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 13:38.

UK Power Networks Eastern & London logo
Between
18 and 23 Aug 2025
Details
View Map
Share
Follow
Bateman Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Bateman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 23 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 09:52.

Thames Water logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Connaught Street

Thames Water are proposing to carry out New service connection on Connaught Street, Hyde Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Jun 2025 at 07:56.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
High Holborn

UK Power Networks Eastern & London are proposing to carry out Utility asset works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:00.

UK Power Networks Eastern & London logo
Between
18 Aug and 13 Sep 2025
Details
View Map
Share
Follow
Museum Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Museum Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 13 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 May 2025 at 18:03.

UK Power Networks Eastern & London logo
Between
18 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Montague Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Montague Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Jun 2025 at 10:12.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Chiltern Street

Thames Water are proposing to carry out New service connection on Chiltern Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 06:56.

UK Power Networks Eastern & London logo
Between
18 and 25 Aug 2025
Details
View Map
Share
Follow
Foscote Mews

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Foscote Mews, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 May 2025 at 20:17.

City Of London Telecomms logo
Between
18 and 26 Aug 2025
Details
View Map
Share
Follow
Great Sutton Street

City Of London Telecomms are proposing to carry out Utility asset works on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 30 May 2025 at 10:54.

LONG TERM
Between
18 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Vallance Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Vallance Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Jun 2025 at 15:32.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Belgrove Street

Thames Water are proposing to carry out Utility repair and maintenance works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2025 at 18:29.

Thames Water logo
Between
18 and 22 Aug 2025
Details
View Map
Share
Follow
Belgrove Street

Thames Water are proposing to carry out Utility repair and maintenance works on Belgrove Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 12:12.

Eunetworks logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Leighton Gardens

Eunetworks are proposing to carry out roadworks on Leighton Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:52.

Eunetworks logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Okehampton Road

Eunetworks are proposing to carry out roadworks on Okehampton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:58.

Eunetworks logo
LONG TERM
Between
18 Aug and 6 Oct 2025
Details
View Map
Share
Follow
Chamberlayne Road

Eunetworks are proposing to carry out Utility asset works on Chamberlayne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:03.

Thames Water logo
Between
18 and 20 Aug 2025
Details
View Map
Share
Follow
Gaisford Street

Thames Water are proposing to carry out Utility asset works on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 15:42.

City Of Westminster logo
Between
19 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Jun 2025 at 10:56.

Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 30 Apr 2025 at 11:46.

Between
19 and 23 Aug 2025
Details
View Map
Share
Cambridge Heath Road

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2025 and run through until 23 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Jun 2025 at 13:47.

London Borough Of Camden logo
Between
19 and 23 Aug 2025
Details
View Map
Share
Follow
Westbere Road

London Borough Of Camden are proposing to carry out Highway improvement works on Westbere Road, Fortune Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 23 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 30 Jun 2025 at 16:37.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 12 May 2025 at 08:31.

London Borough Of Barnet logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 13 May 2025 at 15:52.

UK Power Networks Eastern & London logo
Between
19 and 26 Aug 2025
Details
View Map
Share
Follow
Park Ridings

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Park Ridings, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 May 2025 at 16:01.

Eunetworks logo
Between
21 and 25 Aug 2025
Details
View Map
Share
Follow
Whitmore Gardens

Eunetworks are proposing to carry out roadworks on Whitmore Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:04.

Eunetworks logo
Between
21 and 25 Aug 2025
Details
View Map
Share
Follow
Liddell Gardens

Eunetworks are proposing to carry out roadworks on Liddell Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 25 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:40.

London Borough Of Hackney logo
LONG TERM
Between
21 Aug and 17 Oct 2025
Details
View Map
Share
Follow
Downham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Downham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 18 Jun 2025 at 11:39.

Thames Water logo
Between
23 and 30 Aug 2025
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 16:30.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Lavington Street

Thames Water were proposing to carry out New service connection on Lavington Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 28 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 May 2025 at 13:27.

Thames Water logo
Between
25 and 28 Aug 2025
Details
View Map
Share
Follow
Bear Street

Thames Water are proposing to carry out New service connection on Bear Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 May 2025 at 10:00.

BT logo
Between
25 and 27 Aug 2025
Details
View Map
Share
Follow
Brook Street

BT are proposing to carry out Utility repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Jun 2025 at 15:23.

UK Power Networks Eastern & London logo
Between
25 Aug and 20 Sep 2025
Details
View Map
Share
Follow
Bury Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 20 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 14:58.

Electricity Network Company logo
Between
25 Aug and 19 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 15 May 2025 at 15:28.

City Of Westminster logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Rowington Close

City Of Westminster were proposing to carry out Highway repair and maintenance works on Rowington Close, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 16:05.

UK Power Networks Eastern & London logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
Cranleigh Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Cranleigh Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Jun 2025 at 19:03.

Thames Water logo
Between
25 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 12:03.

Thames Water logo
Between
25 Aug and 8 Sep 2025
Details
View Map
Share
Follow
Vyner Street

Thames Water are proposing to carry out Utility asset works on Vyner Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 8 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 15:51.

City Of Westminster logo
Between
26 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Curzon Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 Jun 2025 at 14:19.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 06:33.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Piccadilly

Thames Water are proposing to carry out Utility repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2025 at 08:03.

BT logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Brook Street

BT are proposing to carry out Utility repair and maintenance works on Brook Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Jun 2025 at 09:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
26 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Kemble Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kemble Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 08:03.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 May 2025 at 14:22.

Cadent Gas logo
Between
26 Aug and 10 Sep 2025
Details
View Map
Share
Follow
Old Compton Street

Cadent Gas are proposing to carry out Utility asset works on Old Compton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 May 2025 at 13:16.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 May 2025 at 14:57.

Electricity Network Company logo
Between
26 Aug and 7 Sep 2025
Details
View Map
Share
Follow
Dean Street

Electricity Network Company are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 May 2025 at 14:50.

Thames Water logo
Between
26 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Newman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Newman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:37.

Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Newington Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:19.

Affinity Water logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Torrington Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 10 Jun 2025 at 15:17.

Affinity Water logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Torrington Park

Affinity Water are proposing to carry out Utility repair and maintenance works on Torrington Park, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 7 Jul 2025 at 08:36.

London Borough Of Barnet logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Prince Of Wales Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2025 at 09:36.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Hertford Street

BT are proposing to carry out Utility repair and maintenance works on Hertford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Jun 2025 at 10:50.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Curzon Street

BT are proposing to carry out Utility repair and maintenance works on Curzon Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 20 Jun 2025 at 10:51.

City Of Westminster logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
St Martin's Lane

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Martin's Lane, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 12 May 2025 at 08:07.

Thames Water logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Remedial works on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 17:15.

Thames Water logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
High Holborn

Thames Water are proposing to carry out Utility repair and maintenance works on High Holborn, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 10:12.

BT logo
Between
27 and 29 Aug 2025
Details
View Map
Share
Follow
Mansfield Mews

BT are proposing to carry out Utility asset works on Mansfield Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 30 May 2025 at 09:39.

Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 11 Jun 2025 at 17:36.

Between
27 and 29 Aug 2025
Details
View Map
Share
Cambridge Heath Road

London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Jun 2025 at 07:35.

Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 20 Jun 2025 at 16:46.

Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 25 Jun 2025 at 12:19.

UK Power Networks Eastern & London logo
Between
27 Aug and 9 Sep 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Jun 2025 at 15:25.

Between
27 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Lever Street

London Borough Of Islington are proposing to carry out Highway improvement works on Lever Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:43.

Between
27 and 30 Aug 2025
Details
View Map
Share
Follow
Cambridge Heath Road

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Cambridge Heath Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 August 2025 and could run through until 30 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Jun 2025 at 14:09.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 10:38.

Network Rail logo
Between
28 Aug and 3 Sep 2025
Details
View Map
Share
Follow
Mepham Street

Network Rail are proposing to carry out Works for Rail Purposes on Mepham Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 May 2025 at 09:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jun 2025 at 18:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 Aug and 28 Oct 2025
Details
View Map
Share
Follow
Wild Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Wild Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 28 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jul 2025 at 09:23.

Eunetworks logo
Between
28 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Clifford Gardens

Eunetworks are proposing to carry out roadworks on Clifford Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:36.

Eunetworks logo
Between
28 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Wrentham Avenue

Eunetworks are proposing to carry out roadworks on Wrentham Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 4 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:02.

Cadent Gas logo
Between
28 Aug and 17 Sep 2025
Details
View Map
Share
Follow
Highbury Grove

Cadent Gas are proposing to carry out Utility asset works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 May 2025 at 14:00.

London Borough Of Barnet logo
Between
28 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Deansway

London Borough Of Barnet are proposing to carry out Highway improvement works on Deansway, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 14:25.

London Borough Of Barnet logo
Between
28 and 29 Aug 2025
Details
View Map
Share
Follow
Church Terrace

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 10:03.

Transport for London (TfL) logo
LONG TERM
Between
28 Aug and 15 Nov 2025
Details
View Map
Share
Follow
College Close

Transport for London (TfL) are proposing to carry out Highway improvement works on College Close, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 08:45.

Transport for London (TfL) logo
LONG TERM
Between
28 Aug and 15 Nov 2025
Details
View Map
Share
Follow
College Close

Transport for London (TfL) are proposing to carry out Highway improvement works on College Close, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
28 Aug and 15 Nov 2025
Details
View Map
Share
Follow
Sterling Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Sterling Way, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 August 2025 and could run through until 15 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 9 May 2025 at 13:58.

UK Power Networks Eastern & London logo
Between
29 Aug and 2 Sep 2025
Details
View Map
Share
Follow
College Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on College Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Jun 2025 at 10:59.

UK Power Networks Eastern & London logo
Between
29 Aug and 2 Sep 2025
Details
View Map
Share
Follow
College Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on College Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Jul 2025 at 17:38.

Thames Water logo
Between
29 Aug and 4 Sep 2025
Details
View Map
Share
Follow
Chapel Side

Thames Water are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 May 2025 at 14:45.

Thames Water logo
Between
29 and 31 Aug 2025
Details
View Map
Share
Follow
Acton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Acton Street, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2025 and could run through until 31 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 May 2025 at 15:37.

Network Rail logo
Between
1 and 3 Sep 2025
Details
View Map
Share
Follow
Borough High Street

Network Rail are proposing to carry out Works for Rail Purposes on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 May 2025 at 06:39.

Thames Water logo
Between
1 and 14 Sep 2025
Details
View Map
Share
Follow
Pall Mall

Thames Water are proposing to carry out Utility asset works on Pall Mall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:29.

Thames Water logo
Between
1 and 9 Sep 2025
Details
View Map
Share
Follow
Spring Gardens

Thames Water are proposing to carry out New service connection on Spring Gardens, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 10:08.

Thames Water logo
Between
1 and 9 Sep 2025
Details
View Map
Share
Follow
Spring Gardens

Thames Water are proposing to carry out New service connection on Spring Gardens, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Jun 2025 at 11:56.

City Of Westminster logo
Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:43.

Thames Water logo
Between
1 and 9 Sep 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jun 2025 at 07:32.

Transport for London (TfL) logo
Between
1 and 5 Sep 2025
Details
View Map
Share
Lower Thames Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 14:00.

Transport for London (TfL) logo
Between
1 and 4 Sep 2025
Details
View Map
Share
Follow
Lower Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 15:57.

Transport for London (TfL) logo
Between
1 and 4 Sep 2025
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Jun 2025 at 15:56.

Transport for London (TfL) logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Park Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 08:18.

Transport for London (TfL) logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Jun 2025 at 08:18.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Denman Street

Cadent Gas are proposing to carry out Utility asset works on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 May 2025 at 13:33.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Denman Street

Cadent Gas are proposing to carry out Utility asset works on Denman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jun 2025 at 09:51.

Cadent Gas logo
Between
1 and 10 Sep 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Shaftesbury Avenue, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Jun 2025 at 14:44.

Transport for London (TfL) logo
Between
1 and 4 Sep 2025
Details
View Map
Share
Follow
Puddle Dock

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Puddle Dock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:00.

UK Power Networks Eastern & London logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Haunch Of Venison Yard

UK Power Networks Eastern & London are proposing to carry out New service connection on Haunch Of Venison Yard, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 May 2025 at 12:46.

Cadent Gas logo
Between
1 and 8 Sep 2025
Details
View Map
Share
Follow
Bouverie Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Bouverie Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Jun 2025 at 11:47.

Thames Water logo
Between
1 and 5 Sep 2025
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 15:43.

UK Power Networks Eastern & London logo
Between
1 and 15 Sep 2025
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 13:45.

Thames Water logo
Between
1 and 3 Sep 2025
Details
View Map
Share
Follow
All Souls Place

Thames Water are proposing to carry out Permanent reinstatement on All Souls Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jun 2025 at 08:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep 2025 and 14 May 2026
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 13:20.

BT logo
Between
1 and 3 Sep 2025
Details
View Map
Share
Morpeth Street

BT were proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:24.

BT logo
Between
1 and 3 Sep 2025
Details
View Map
Share
Follow
Morpeth Street

BT are proposing to carry out Utility repair and maintenance works on Morpeth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:28.

UK Power Networks Eastern & London logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jan 2025 at 11:53.

UK Power Networks Eastern & London logo
Between
1 and 12 Sep 2025
Details
View Map
Share
Follow
Grove End Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Jan 2025 at 11:52.

Thames Water logo
LONG TERM
Between
1 Sep 2025 and 26 Jan 2026
Details
View Map
Share
Follow
Bishops Way

Thames Water are proposing to carry out Utility asset works on Bishops Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 14:13.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 11 Dec 2025
Details
View Map
Share
Follow
Acacia Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Acacia Road, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 13:21.

Cadent Gas logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Whiston Road

Cadent Gas are proposing to carry out Utility asset works on Whiston Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 May 2025 at 11:09.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 09:26.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 7 Nov 2025
Details
View Map
Share
Follow
St John's Wood Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on St John's Wood Park, Abbey Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 7 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Jun 2025 at 13:32.

HS2 logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 14:34.

HS2 logo
Between
1 and 20 Sep 2025
Details
View Map
Share
Follow
Alexandra Road

HS2 are proposing to carry out Section 50 on Alexandra Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 20 September 2025. The works will impact the footway, carriageway, parking place and cycle hire docking station.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 14:36.

UK Power Networks Eastern & London logo
Between
1 and 19 Sep 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
1 Sep and 28 Nov 2025
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 28 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Jul 2025 at 16:59.

Thames Water logo
Between
1 and 9 Sep 2025
Details
View Map
Share
Follow
Thurlow Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thurlow Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 18:04.

Thames Water logo
LONG TERM
Between
1 Sep and 24 Nov 2025
Details
View Map
Share
Follow
South Grove

Thames Water are proposing to carry out Utility asset works on South Grove, Highgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 13:31.

Thames Water logo
Between
1 and 5 Sep 2025
Details
View Map
Share
Cranbourne Gardens

Thames Water were proposing to carry out New service connection on Cranbourne Gardens, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Jun 2025 at 12:36.

London Borough Of Barnet logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Regents Park Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Regents Park Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2025 at 14:44.

Thames Water logo
Between
1 and 9 Sep 2025
Details
View Map
Share
Follow
Waterfall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waterfall Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 9 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 14:54.

Thames Water logo
Between
1 and 5 Sep 2025
Details
View Map
Share
Follow
Beechdale

Thames Water are proposing to carry out New service connection on Beechdale, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 5 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 08:39.

London Borough Of Barnet logo
LONG TERM
Between
1 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Jun 2025 at 14:30.

London Borough Of Barnet logo
Between
1 and 5 Sep 2025
Details
View Map
Share
Church Hill Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 5 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 14:17.

London Borough Of Barnet logo
Between
2 and 12 Sep 2025
Details
View Map
Share
Edgware Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Edgware Road, Cricklewood, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 16:36.

London Borough Of Barnet logo
Between
2 and 12 Sep 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2025 at 12:34.

London Borough Of Barnet logo
Between
2 and 12 Sep 2025
Details
View Map
Share
Follow
Geron Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Geron Way, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Apr 2025 at 08:49.

London Borough Of Barnet logo
Between
2 and 5 Sep 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on The Ridgeway, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 27 May 2025 at 13:27.

London Borough Of Barnet logo
Between
2 and 5 Sep 2025
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 13:42.

Thames Water logo
Between
2 and 4 Sep 2025
Details
View Map
Share
Renters Avenue Roundabout

Thames Water were proposing to carry out Utility repair and maintenance works on Renters Avenue Roundabout, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jun 2025 at 12:03.

UK Power Networks Eastern & London logo
Between
2 and 19 Sep 2025
Details
View Map
Share
Turnpike Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Turnpike Lane, Wood Green, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 19 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:32.

City Of Westminster logo
Between
2 and 24 Sep 2025
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 11:04.

City Of Westminster logo
Between
2 and 24 Sep 2025
Details
View Map
Share
Follow
Marylebone Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 15:25.

City Of Westminster logo
Between
2 and 24 Sep 2025
Details
View Map
Share
Follow
Harewood Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Harewood Avenue, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 24 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 3 Apr 2025 at 10:36.

Between
2 and 5 Sep 2025
Details
View Map
Share
Follow
Highbury Grove

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 23 May 2025 at 16:39.

Thames Water logo
Between
3 and 9 Sep 2025
Details
View Map
Share
Follow
Great Cumberland Place

Thames Water are proposing to carry out New service connection on Great Cumberland Place, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 9 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 10:43.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Sep and 6 Oct 2025
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Jun 2025 at 13:49.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.

London Borough Of Barnet logo
LONG TERM
Between
3 Sep and 8 Oct 2025
Details
View Map
Share
Tilling Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 September 2025 and run through until 8 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 13:03.

London Borough Of Enfield logo
Between
3 and 19 Sep 2025
Details
View Map
Share
Follow
Gloucester Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Gloucester Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 5 Jun 2025 at 10:53.

London Borough Of Enfield logo
Between
3 and 19 Sep 2025
Details
View Map
Share
Follow
Gloucester Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Gloucester Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Jun 2025 at 06:57.

London Borough Of Barnet logo
Between
4 and 12 Sep 2025
Details
View Map
Share
Follow
Alexandra Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Jul 2025 at 13:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
5 Sep and 14 Oct 2025
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 06:55.

Eunetworks logo
Between
5 and 11 Sep 2025
Details
View Map
Share
Follow
Station Terrace

Eunetworks are proposing to carry out roadworks on Station Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 11 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:01.

Eunetworks logo
Between
5 and 11 Sep 2025
Details
View Map
Share
Follow
Chevening Road

Eunetworks are proposing to carry out roadworks on Chevening Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 September 2025 and could run through until 11 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:54.

Thames Water logo
Between
6 and 8 Sep 2025
Details
View Map
Share
Harley Street

Thames Water were proposing to carry out Utility repair and maintenance works on Harley Street, Marylebone High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 September 2025 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Jun 2025 at 13:44.

Thames Water logo
Between
6 and 8 Sep 2025
Details
View Map
Share
Follow
Marylebone Road

Thames Water are proposing to carry out Utility repair and maintenance works on Marylebone Road, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 May 2025 at 15:58.

London Borough Of Barnet logo
Between
6 and 11 Sep 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 11 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:50.

Between
8 and 12 Sep 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 4 Jun 2025 at 09:41.

Between
8 and 15 Sep 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 5 Jun 2025 at 12:34.

London Borough Of Barnet logo
Between
8 and 23 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:29.

London Borough Of Barnet logo
Between
8 and 23 Sep 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2025 at 10:16.

Cadent Gas logo
Between
8 and 22 Sep 2025
Details
View Map
Share
Follow
Seven Sisters Road

Cadent Gas are proposing to carry out Utility asset works on Seven Sisters Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Jun 2025 at 11:30.

UK Power Networks Eastern & London logo
Between
8 and 26 Sep 2025
Details
View Map
Share
Follow
Turnpike Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Turnpike Lane, Wood Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jun 2025 at 10:50.

London Borough Of Barnet logo
Between
8 and 18 Sep 2025
Details
View Map
Share
Follow
Halliwick Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Halliwick Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Vodafone logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Cannon Street

Vodafone were proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Vodafone on 11 Jun 2025 at 08:20.

Vodafone logo
Between
8 and 14 Sep 2025
Details
View Map
Share
Follow
Cannon Street

Vodafone are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 14 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Jul 2025 at 17:37.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Exeter Street

Cadent Gas are proposing to carry out Utility asset works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:26.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Exeter Street

Cadent Gas are proposing to carry out Utility asset works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 08:54.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Catherine Street

Cadent Gas are proposing to carry out Utility asset works on Catherine Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jun 2025 at 10:26.

Cadent Gas logo
Between
8 and 19 Sep 2025
Details
View Map
Share
Follow
Catherine Street

Cadent Gas are proposing to carry out Utility asset works on Catherine Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 19 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 7 Jul 2025 at 08:54.

Eunetworks logo
Between
8 and 18 Sep 2025
Details
View Map
Share
Follow
Wardour Street

Eunetworks are proposing to carry out Utility asset works on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 9 Jun 2025 at 15:26.

Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Old Montague Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Old Montague Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Apr 2025 at 08:58.

Network Rail logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 20 Jun 2025 at 09:12.

Transport for London (TfL) logo
Between
8 and 12 Sep 2025
Details
View Map
Share
St John's Wood Road

Transport for London (TfL) were proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 12 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 May 2025 at 16:53.

Transport for London (TfL) logo
Between
8 and 12 Sep 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 May 2025 at 11:05.

BT logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Bacton Street

BT were proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 10 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:29.

BT logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Bacton Street

BT are proposing to carry out Utility repair and maintenance works on Bacton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 1 Jul 2025 at 11:33.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Hackney Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Hackney Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Jun 2025 at 09:27.

London Borough Of Hackney logo
LONG TERM
Between
8 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Hackney Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Hackney Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 11 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 4 Jul 2025 at 08:02.

Thames Water logo
Between
8 and 28 Sep 2025
Details
View Map
Share
Kilburn Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Kilburn Lane, North Kensington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 28 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:25.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Mar 2025 at 15:47.

London Borough Of Camden logo
LONG TERM
Between
8 Sep and 15 Nov 2025
Details
View Map
Share
Follow
Murray Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 15 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 Dec 2024 at 11:57.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2025 at 14:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Jun 2025 at 18:19.

UK Power Networks Eastern & London logo
Between
9 and 18 Sep 2025
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 10:51.

Virgin Media logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Wells Street

Virgin Media were proposing to carry out Utility asset works on Wells Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2025 and run through until 11 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 2 Jun 2025 at 10:31.

Virgin Media logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Wells Street

Virgin Media are proposing to carry out Utility asset works on Wells Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Jun 2025 at 11:32.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 15:12.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Amberley Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Amberley Road, Westbourne, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 15:16.

UK Power Networks Eastern & London logo
Between
9 Sep and 7 Oct 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 09:40.

Thames Water logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Paul Street

Thames Water are proposing to carry out Remedial works on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 19:09.

Thames Water logo
Between
9 and 11 Sep 2025
Details
View Map
Share
Follow
Paul Street

Thames Water are proposing to carry out Remedial works on Paul Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 10:36.

UK Power Networks Eastern & London logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Sutherland Avenue

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 8 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Jul 2025 at 10:23.

UK Power Networks Eastern & London logo
Between
10 Sep and 8 Oct 2025
Details
View Map
Share
Follow
Hall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 09:51.

Thames Water logo
Between
11 and 17 Sep 2025
Details
View Map
Share
Tavistock Road

Thames Water were proposing to carry out New service connection on Tavistock Road, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 September 2025 and run through until 17 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 13:15.

Eunetworks logo
Between
12 and 22 Sep 2025
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 22 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 24 Jun 2025 at 13:49.

Thames Water logo
LONG TERM
Between
12 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Jan 2025 at 13:13.

Thames Water logo
LONG TERM
Between
12 Sep and 14 Nov 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2025 at 16:30.

Eunetworks logo
Between
12 and 16 Sep 2025
Details
View Map
Share
Follow
Mostyn Gardens

Eunetworks are proposing to carry out roadworks on Mostyn Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:03.

Eunetworks logo
Between
12 and 16 Sep 2025
Details
View Map
Share
Follow
Kempe Road

Eunetworks are proposing to carry out roadworks on Kempe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 16 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:58.

National Grid Electricity Transmission logo
Between
12 and 14 Sep 2025
Details
View Map
Share
Follow
Watermead Way

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Watermead Way, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 September 2025 and could run through until 14 September 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 2 Jul 2024 at 15:07.

National Grid Electricity Transmission logo
Between
12 and 14 Sep 2025
Details
View Map
Share
Watermead Way

National Grid Electricity Transmission were proposing to carry out Utility repair and maintenance works on Watermead Way, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 September 2025 and run through until 14 September 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by National Grid Electricity Transmission on 28 Apr 2025 at 09:09.

London Borough Of Barnet logo
Between
13 and 18 Sep 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.

Thames Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Cranbourne Gardens

Thames Water are proposing to carry out New service connection on Cranbourne Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 09:19.

Thames Water logo
Between
15 and 22 Sep 2025
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Jun 2025 at 09:41.

Thames Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 12:48.

Thames Water logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Malvern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Malvern Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Jun 2025 at 14:19.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 13:01.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Orion Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Orion Road, New Southgate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2025 at 12:59.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 21 Nov 2025
Details
View Map
Share
Follow
Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Pinkham Way Slip From North Circular East Bound To Colney Hatch Lane, North Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Jul 2025 at 18:15.

Thames Water logo
LONG TERM
Between
15 Sep and 17 Nov 2025
Details
View Map
Share
Follow
Arthur Road

Thames Water are proposing to carry out Utility asset works on Arthur Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 14:45.

Thames Water logo
LONG TERM
Between
15 Sep and 17 Nov 2025
Details
View Map
Share
Follow
Arthur Road

Thames Water are proposing to carry out Utility asset works on Arthur Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 13:56.

Transport for London (TfL) logo
Between
15 and 30 Sep 2025
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 September 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 10:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep and 28 Oct 2025
Details
View Map
Share
Follow
Park Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Jun 2025 at 12:45.

Transport for London (TfL) logo
Between
15 and 30 Sep 2025
Details
View Map
Share
Follow
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:31.

Transport for London (TfL) logo
Between
15 and 30 Sep 2025
Details
View Map
Share
Follow
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Sep 2025 and 20 Jan 2026
Details
View Map
Share
Follow
Gresham Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gresham Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 20 January 2026. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jul 2025 at 11:38.

City Of London Corporation logo
LONG TERM
Between
15 Sep 2025 and 15 Sep 2026
Details
View Map
Share
Follow
South Place

City Of London Corporation are proposing to carry out Highway improvement works on South Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 15 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:06.

Thames Water logo
Between
15 and 18 Sep 2025
Details
View Map
Share
Follow
Marylands Road

Thames Water are proposing to carry out Highway improvement works on Marylands Road, Harrow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jul 2025 at 09:07.

Network Rail logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 12:17.

Network Rail logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Follow
Bethnal Green Road

Network Rail are proposing to carry out Works for Rail Purposes on Bethnal Green Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Jun 2025 at 08:54.

Transport for London (TfL) logo
LONG TERM
Between
15 Sep and 17 Oct 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 12:23.

Thames Water logo
Between
15 and 19 Sep 2025
Details
View Map
Share
Follow
Granary Street

Thames Water are proposing to carry out New service connection on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2025 at 11:46.

Thames Water logo
Between
15 Sep and 5 Oct 2025
Details
View Map
Share
Lancaster Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Lancaster Drive, Belsize, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 5 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 10:08.

Thames Water logo
LONG TERM
Between
15 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Dudden Hill Lane

Thames Water are proposing to carry out Utility asset works on Dudden Hill Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:52.

London Borough Of Brent logo
Between
16 and 26 Sep 2025
Details
View Map
Share
Follow
Randall Avenue

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Randall Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 11 Jun 2025 at 17:26.

BT logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Follow
Hillrise Road

BT are proposing to carry out Utility asset works on Hillrise Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 18 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 12 Jun 2025 at 11:40.

BT logo
Between
16 and 18 Sep 2025
Details
View Map
Share
Hillrise Road

BT were proposing to carry out Utility asset works on Hillrise Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2025 and run through until 18 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 12 Jun 2025 at 08:17.

Thames Water logo
Between
16 and 22 Sep 2025
Details
View Map
Share
Follow
Victoria Road

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 17:06.

Thames Water logo
Between
16 and 22 Sep 2025
Details
View Map
Share
Follow
Harcourt Road

Thames Water are proposing to carry out Utility repair and maintenance works on Harcourt Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 14:26.

Network Rail logo
Between
17 and 19 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 15:16.

Transport for London (TfL) logo
Between
17 and 30 Sep 2025
Details
View Map
Share
Follow
Curzon Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Curzon Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:26.

Transport for London (TfL) logo
Between
17 and 30 Sep 2025
Details
View Map
Share
Follow
Curzon Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Curzon Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Jun 2025 at 11:58.

Eunetworks logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Mortimer Road

Eunetworks are proposing to carry out roadworks on Mortimer Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:59.

Eunetworks logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Harvist Road

Eunetworks are proposing to carry out roadworks on Harvist Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

Thames Water logo
Between
17 and 23 Sep 2025
Details
View Map
Share
Follow
Ashwin Street

Thames Water are proposing to carry out New service connection on Ashwin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2025 and could run through until 23 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jun 2025 at 16:28.

City Of London Corporation logo
LONG TERM
Between
19 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 23 Jun 2025 at 15:03.

Thames Water logo
Between
19 and 25 Sep 2025
Details
View Map
Share
Field Street

Thames Water were proposing to carry out New service connection on Field Street, King's Cross, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 09:37.

London Borough Of Brent logo
Between
19 and 30 Sep 2025
Details
View Map
Share
Follow
Walm Lane

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Walm Lane, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 11 Jun 2025 at 17:52.

London Borough Of Barnet logo
Between
19 and 30 Sep 2025
Details
View Map
Share
Follow
Sutton Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Sutton Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

London Borough Of Barnet logo
Between
19 and 26 Sep 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.

Network Rail logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Amhurst Road

Network Rail are proposing to carry out Works for Rail Purposes on Amhurst Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Jun 2025 at 15:17.

Thames Water logo
Between
22 Sep and 12 Oct 2025
Details
View Map
Share
Follow
Carysfort Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Carysfort Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Jun 2025 at 15:44.

London Borough Of Barnet logo
LONG TERM
Between
22 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 23 May 2025 at 15:35.

London Borough Of Barnet logo
LONG TERM
Between
22 Sep and 10 Dec 2025
Details
View Map
Share
Follow
Tilling Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 10 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 27 Jun 2025 at 09:44.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jun 2024 at 14:41.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Hove Avenue

Cadent Gas are proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 09:45.

Cadent Gas logo
Between
22 Sep and 16 Oct 2025
Details
View Map
Share
Hove Avenue

Cadent Gas were proposing to carry out Utility asset works on Hove Avenue, Walthamstow.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 16 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 16:21.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Leopold Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Leopold Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:39.

London Borough Of Waltham Forest logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Sylvan Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:44.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Fortis Green

Transport for London (TfL) are proposing to carry out Highway improvement works on Fortis Green, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 15:54.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
East End Road

Transport for London (TfL) are proposing to carry out Highway improvement works on East End Road, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 15:57.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Jun 2025 at 15:45.

Transport for London (TfL) logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
Follow
High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on High Road, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Jun 2025 at 16:00.

London Borough Of Southwark logo
LONG TERM
Between
22 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Lavington Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Lavington Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 23 May 2025 at 17:35.

City Of Westminster logo
LONG TERM
Between
22 Sep and 23 Oct 2025
Details
View Map
Share
Follow
Pall Mall

City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 23 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 09:40.

Thames Water logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Charles Ii Street

Thames Water were proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 30 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 08:45.

Thames Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 09:48.

Thames Water logo
Between
22 and 26 Sep 2025
Details
View Map
Share
Follow
Charles Ii Street

Thames Water are proposing to carry out New service connection on Charles Ii Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 08:26.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 17:01.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Montagu Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Montagu Street, Bryanston & Dorset Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 24 Jun 2025 at 07:01.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Portland Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 23 Jun 2025 at 12:01.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Berners Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 2 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 12:26.

City Of Westminster logo
Between
22 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Berners Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 May 2025 at 13:40.

City Of Westminster logo
Between
22 Sep and 3 Oct 2025
Details
View Map
Share
Westbourne Terrace Road

City Of Westminster were proposing to carry out Highway repair and maintenance works on Westbourne Terrace Road, Westbourne, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jun 2025 at 12:02.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Euston Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:03.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Euston Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:09.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
King's Cross Bridge

Transport for London (TfL) were proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:52.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
King's Cross Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Bridge, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:56.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:57.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 12:02.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Pentonville Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:35.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Pentonville Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:43.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Caledonian Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:45.

Transport for London (TfL) logo
Between
22 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Caledonian Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Jul 2025 at 11:50.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 6 Feb 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Works for Rail Purposes on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 6 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:08.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 1 Mar 2026
Details
View Map
Share
Follow
Hilgrove Road

HS2 are proposing to carry out Section 50 on Hilgrove Road, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 1 March 2026. The works will impact the footway, carriageway and bus stop or stand.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 14:05.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 15 May 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Works for Rail Purposes on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 15 May 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 10 Feb 2025 at 11:16.

HS2 logo
LONG TERM
Between
22 Sep 2025 and 7 Jun 2026
Details
View Map
Share
Follow
Finchley Road

HS2 are proposing to carry out Section 50 on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 7 June 2026. The works will impact the footway, carriageway, parking place and bus stop or stand.

This roadwork event was last updated by HS2 on 3 Jul 2025 at 13:48.

UK Power Networks Eastern & London logo
Between
22 Sep and 20 Oct 2025
Details
View Map
Share
Follow
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 20 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Mar 2025 at 13:40.

City Of Westminster logo
LONG TERM
Between
23 Sep 2025 and 17 Feb 2027
Details
View Map
Share
Winnett Street

City Of Westminster were proposing to carry out Highway repair and maintenance works on Winnett Street, West End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 17 February 2027. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 25 Jun 2025 at 16:35.

City Of Westminster logo
LONG TERM
Between
24 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 3 Jun 2025 at 07:07.

City Of Westminster logo
LONG TERM
Between
24 Sep and 5 Nov 2025
Details
View Map
Share
Follow
Old Queen Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Old Queen Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 5 November 2025. The works will impact the footway only.

This roadwork event was last updated by City Of Westminster on 6 Jun 2025 at 07:46.

Eunetworks logo
Between
24 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Banister Road

Eunetworks are proposing to carry out roadworks on Banister Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 1 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:37.

Verizon Business logo
Between
26 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Pall Mall

Verizon Business are proposing to carry out Utility repair and maintenance works on Pall Mall, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Verizon Business on 25 Jun 2025 at 10:03.

City Of London Corporation logo
Between
26 and 28 Sep 2025
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Leadenhall Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 28 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 24 Apr 2025 at 11:41.

Network Rail logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Embankment Place

Network Rail are proposing to carry out Works for Rail Purposes on Embankment Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Mar 2025 at 08:21.

Vodafone logo
Between
29 Sep and 5 Oct 2025
Details
View Map
Share
Follow
Waterloo Place

Vodafone are proposing to carry out Utility repair and maintenance works on Waterloo Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 5 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 2 Jul 2025 at 10:24.

Thames Water logo
Between
29 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Craven Street

Thames Water are proposing to carry out Utility repair and maintenance works on Craven Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 2 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Jul 2025 at 09:40.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Bentinck Mews

Thames Water are proposing to carry out Disconnection or alteration of supply on Bentinck Mews, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 10:50.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Newman Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Newman Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jun 2025 at 09:30.

Thames Water logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Great Sutton Street

Thames Water are proposing to carry out New service connection on Great Sutton Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 May 2025 at 08:15.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 19 May 2025 at 16:03.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
St John's Wood Road

Transport for London (TfL) are proposing to carry out Highway improvement works on St John's Wood Road, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 3 Jun 2025 at 14:56.

Transport for London (TfL) logo
LONG TERM
Between
29 Sep and 12 Nov 2025
Details
View Map
Share
Follow
Hamilton Terrace

Transport for London (TfL) are proposing to carry out Highway improvement works on Hamilton Terrace, Abbey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 12 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 4 Jun 2025 at 14:32.

Thames Water logo
LONG TERM
Between
29 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Old Ford Road

Thames Water are proposing to carry out Utility asset works on Old Ford Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 14:17.

Electricity Network Company logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Purcell Street

Electricity Network Company are proposing to carry out Utility asset works on Purcell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 20 Jun 2025 at 15:16.

Electricity Network Company logo
Between
29 Sep and 15 Oct 2025
Details
View Map
Share
Follow
Purcell Street

Electricity Network Company are proposing to carry out Utility asset works on Purcell Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 26 Jun 2025 at 15:31.

Network Rail logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Willesden Lane

Network Rail are proposing to carry out Works for Rail Purposes on Willesden Lane, Kilburn, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2025 at 09:26.

Virgin Media logo
Between
29 Sep and 1 Oct 2025
Details
View Map
Share
Brondesbury Park

Virgin Media were proposing to carry out Utility asset works on Brondesbury Park, Brondesbury, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 1 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 8 Jul 2025 at 11:10.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Homerton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Homerton Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jun 2025 at 20:59.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Homerton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Homerton Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 15:50.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cenacle Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cenacle Close, Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Jun 2025 at 13:02.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Cenacle Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Cenacle Close, Hampstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Jul 2025 at 12:54.

London Borough Of Brent logo
Between
29 Sep and 24 Oct 2025
Details
View Map
Share
Follow
Crest Road

London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crest Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Brent on 30 Jun 2025 at 09:10.

London Borough Of Waltham Forest logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Onra Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Onra Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 17 Jun 2025 at 15:50.

Thames Water logo
LONG TERM
Between
29 Sep and 10 Nov 2025
Details
View Map
Share
Follow
Hillside Gardens

Thames Water are proposing to carry out Utility asset works on Hillside Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 10 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 May 2025 at 10:10.

UK Power Networks Eastern & London logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Park Ridings

UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Park Ridings, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 September 2025 and run through until 3 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 May 2025 at 08:55.

Thames Water logo
LONG TERM
Between
29 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Solomon Avenue

Thames Water are proposing to carry out Utility asset works on Solomon Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 14:47.

Thames Water logo
LONG TERM
Between
29 Sep and 8 Dec 2025
Details
View Map
Share
Follow
Solomon Avenue

Thames Water are proposing to carry out Utility asset works on Solomon Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 14:06.

Thames Water logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Purley Road

Thames Water are proposing to carry out Utility asset works on Purley Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jul 2025 at 14:50.

Thames Water logo
LONG TERM
Between
29 Sep and 3 Nov 2025
Details
View Map
Share
Follow
Purley Road

Thames Water are proposing to carry out Utility asset works on Purley Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 14:05.

London Borough Of Barnet logo
Between
29 Sep and 16 Oct 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out New service connection on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 16 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Jul 2025 at 11:00.

London Borough Of Barnet logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:44.

Thames Water logo
Between
29 Sep and 19 Oct 2025
Details
View Map
Share
Follow
Eversley Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Eversley Crescent, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 19 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 12:14.

Virgin Media logo
Between
30 Sep and 2 Oct 2025
Details
View Map
Share
Follow
Wayside

Virgin Media are proposing to carry out Utility asset works on Wayside, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 24 Jun 2025 at 11:06.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 4 Apr 2025 at 22:12.

London Borough Of Camden logo
Between
30 Sep and 4 Oct 2025
Details
View Map
Share
Follow
New Oxford Street

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on New Oxford Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 4 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 6 May 2025 at 13:55.

Thames Water logo
Between
30 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Canonbury Square

Thames Water are proposing to carry out Disconnection or alteration of supply on Canonbury Square, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 12:23.

Thames Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Shaftesbury Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Shaftesbury Avenue, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 10:16.

London Borough Of Barnet logo
Between
1 and 12 Oct 2025
Details
View Map
Share
Follow
Wilton Road

London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Wilton Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 12 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Apr 2025 at 10:09.

Eunetworks logo
Between
2 and 12 Oct 2025
Details
View Map
Share
Follow
Kilburn Lane

Eunetworks are proposing to carry out Utility asset works on Kilburn Lane, North Kensington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 15:00.

Eunetworks logo
Between
2 and 6 Oct 2025
Details
View Map
Share
Follow
Buller Road

Eunetworks are proposing to carry out roadworks on Buller Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 6 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Jun 2025 at 14:34.

Virgin Media logo
Between
3 and 7 Oct 2025
Details
View Map
Share
Follow
Cavendish Place

Virgin Media are proposing to carry out Utility asset works on Cavendish Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 26 Jun 2025 at 09:07.

London Borough Of Hackney logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
De Beauvoir Road

London Borough Of Hackney are proposing to carry out Highway improvement works on De Beauvoir Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 19 Jun 2025 at 15:12.

London Borough Of Hackney logo
Between
3 and 8 Oct 2025
Details
View Map
Share
Follow
Cecilia Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Cecilia Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 8 Jul 2025 at 10:39.

London Borough Of Hackney logo
Between
3 and 7 Oct 2025
Details
View Map
Share
Follow
Lee Conservancy Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lee Conservancy Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 7 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 7 Jul 2025 at 14:15.

London Borough Of Hackney logo
Between
3 and 6 Oct 2025
Details
View Map
Share
Follow
Oswald Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Oswald Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 October 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 19 Jun 2025 at 13:46.

London Borough Of Barnet logo
Between
4 and 9 Oct 2025
Details
View Map
Share
Follow
Church Hill Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Hill Road, East Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2025 and could run through until 9 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 May 2025 at 13:51.


Roadworks Map near to Hornsey Lane, LONDON, N6 5LN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 8 Jul 2025 12:39
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hornsey Lane, LONDON, N6 5LN (63 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Haringey logo
MAJOR
  
STANHOPE ROAD, HORNSEY 
(0.2 miles)
London Borough Of Haringey
Highway improvement works - Carriageway - Two-way signals
In Progress
Since: 4 Jun 2024 00:00
(Scheduled: 4 Jun 2024 - 31 Jul 2025)
0.2
Details
Share
Follow
2
UK Power Networks Eastern & London logo
HORNSEY LANE, HORNSEY 
(0.3 miles)
UK Power Networks Eastern & London
New service connection - Footway - Two-way signals
Cancelled
(Scheduled: 7 Jul 2025 - 11 Jul 2025)
0.3
Details
Share
3
Transport for London (TfL) logo
MAJOR
  
ARCHWAY ROAD, ISLINGTON 
(0.3 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 7 Apr 2024 - 6 Apr 2026
0.3
Details
Share
Follow
4
Cadent Gas logo
EMERGENCY
  
SUNNYSIDE ROAD, ISLINGTON 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 7 Jul 2025 09:14
(Scheduled: 7 Jul 2025 - 15 Jul 2025)
0.3
Details
Share
Follow
5
Thames Water logo
URGENT
  
CHOLMELEY PARK, HORNSEY 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
In Progress
Since: 8 Jul 2025 07:24
(Scheduled: 8 Jul 2025 - 10 Jul 2025)
0.3
Details
Share
Follow
6
UK Power Networks Eastern & London logo
URGENT
  
STANHOPE ROAD, HORNSEY 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 4 Jul 2025 21:46
(Scheduled: 4 Jul 2025 - 11 Jul 2025)
0.3
Details
Share
Follow
7
Transport for London (TfL) logo
MAJOR
  
ARCHWAY ROAD, ISLINGTON 
(0.3 miles)
Transport for London (TfL)
Optional permit (no fee) e.g. for traffic management etc - Footway - No carriageway incursion
Planned
Scheduled: 7 Apr 2024 - 6 Apr 2026
0.3
Details
Share
Follow
8
London Borough Of Haringey logo
MAJOR
  
HORNSEY LANE, HORNSEY 
(0.3 miles)
London Borough Of Haringey
Highway improvement works - Footway - Some carriageway incursion
Planned
Scheduled: 10 Jun 2025 - 14 Jul 2025
0.3
Details
Share
Follow
9
Cadent Gas logo
EMERGENCY
  
ST JOHN'S WAY, ISLINGTON 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Complete
18 Jun 2025 17:28 - 1 Jul 2025 13:07
0.3
Details
Share
10
BT logo
ST JOHN'S WAY, ISLINGTON 
(0.4 miles)
BT
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 7 Jul 2025 - 9 Jul 2025
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data