ROADWORKS SUMMARY
Pennington Drive, LONDON, N21 1TF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pennington Drive, N21 1TF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Pennington Drive, LONDON, N21 1TF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pennington Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

London Borough Of Haringey logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Ashley Road

London Borough Of Haringey are carrying out Highway improvement works on Ashley Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2022 at 10:00 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 22 Apr 2024 at 15:04.

London Borough Of Enfield logo
LONG TERM
Until
7 Jun 2024
Details
View Map
Share
Follow
Stockton Road

London Borough Of Enfield are carrying out Section 50 on Stockton Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 July 2023 at 09:00 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:17.

London Borough Of Enfield logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 August 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:35.

Thames Water logo
LONG TERM
Between
13 Aug 2023 and 11 Jul 2024
Details
View Map
Share
Follow
Arnos Grove

Thames Water are proposing to carry out Utility asset works on Arnos Grove, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2023 and could run through until 11 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 Jun 2023 at 15:01.

London Borough Of Enfield logo
LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 September 2023 at 08:00 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:40.

Thames Water logo
LONG TERM
Until
19 Sep 2024
Details
View Map
Share
Follow
Pert Close

Thames Water are carrying out Utility asset works on Pert Close, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 11:00 and could run through until 19 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:55.

Thames Water logo
LONG TERM
Until
19 Sep 2024
Details
View Map
Share
Follow
Alexandra Road

Thames Water are carrying out Utility asset works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 11:00 and could run through until 19 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:55.

Thames Water logo
LONG TERM
Until
22 Sep 2024
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 09:20 and could run through until 22 September 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 20 Oct 2023 at 10:16.

London Borough Of Enfield logo
LONG TERM
Between
1 Jan and 1 Aug 2024
Details
View Map
Share
Follow
High Street

London Borough Of Enfield are proposing to carry out Section 50 on High Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 3 Jul 2023 at 09:39.

Cadent Gas logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Burtonhole Lane

Cadent Gas are carrying out Utility asset works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 January 2024 at 09:54 and could run through until 4 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 09:51.

London Borough Of Enfield logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Angel Walk

London Borough Of Enfield are carrying out Section 50 on Angel Walk, London.

These works are categorised as Major.

The works started on 13 January 2024 at 09:00 and could run through until 24 May 2024. The works will impact the verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Enfield on 25 Apr 2024 at 12:50.

London Borough Of Enfield logo
LONG TERM
Between
15 Jan and 12 Jul 2024
Details
View Map
Share
Follow
Warwick Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Warwick Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 11 Jan 2024 at 13:58.

London Borough Of Enfield logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
Maidstone Road

London Borough Of Enfield are carrying out Highway improvement works on Maidstone Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 19 Jan 2024 at 08:40.

London Borough Of Enfield logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Advent Way

London Borough Of Enfield are carrying out Section 50 on Advent Way, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 January 2024 at 08:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 28 Mar 2024 at 16:17.

Cadent Gas logo
LONG TERM
Until
13 May 2024
Details
View Map
Share
Follow
Mandeville Road

Cadent Gas are carrying out Utility asset works on Mandeville Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 13:54 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 15:17.

London Borough Of Haringey logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Burdock Road

London Borough Of Haringey are carrying out Highway improvement works on Burdock Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 08:00 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 22 Apr 2024 at 15:04.

Thames Water logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Station Road

Thames Water are carrying out Utility asset works on Station Road, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 06:44.

London Borough Of Haringey logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Fryatt Road

London Borough Of Haringey are carrying out Highway improvement works on Fryatt Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:41 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 26 Feb 2024 at 08:45.

Thames Water logo
LONG TERM
Until
10 Aug 2024
Details
View Map
Share
Follow
Arnos Grove

Thames Water are carrying out Utility asset works on Arnos Grove, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 10 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 08:37.

Cadent Gas logo
LONG TERM
Until
17 May 2024
Details
View Map
Share
Follow
Galley Lane

Cadent Gas are carrying out Utility asset works on Galley Lane, Arkley Barnet Section, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 05:31 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 08:05.

London Borough Of Haringey logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Jellicoe Road

London Borough Of Haringey are carrying out Highway improvement works on Jellicoe Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 08:00 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Mar 2024 at 08:13.

London Borough Of Enfield logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are proposing to carry out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 26 March 2024 and could run through until 29 April 2024. The works will impact the verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 25 Mar 2024 at 15:06.

Thames Water logo
LONG TERM
Until
13 May 2024
Details
View Map
Share
Follow
Inverforth Road

Thames Water are carrying out Utility asset works on Inverforth Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 18:15 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 05:32.

London Borough Of Enfield logo
Finishing
Tuesday
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are carrying out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 25 Apr 2024 at 12:47.

Network Rail logo
Finishing
Today
Details
View Map
Share
Follow
Cattlegate Road

Network Rail are proposing to carry out Works for Rail Purposes on Cattlegate Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Mar 2024 at 08:53.

London Borough Of Barnet logo
LONG TERM
Between
7 Apr and 12 May 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Park Road, New Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Jan 2024 at 11:03.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Friern Barnet Lane

Thames Water are carrying out Utility repair and maintenance works on Friern Barnet Lane, Friern Barnet, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 10:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 12:25.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are carrying out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 07:30 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 11:27.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Brigadier Hill

Cadent Gas are carrying out Utility asset works on Brigadier Hill, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 07:00 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 08:12.

Cadent Gas logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Alma Road

Cadent Gas are carrying out Utility asset works on Alma Road, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:32 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 09:37.

Thames Water logo
Until
12 May 2024
Details
View Map
Share
Follow
Pegasus Way

Thames Water are carrying out Utility asset works on Pegasus Way, New Southgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 07:20 and could run through until 12 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:31.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brigadier Hill

Cadent Gas are proposing to carry out Utility asset works on Brigadier Hill, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Feb 2024 at 14:00.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are proposing to carry out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Feb 2024 at 14:30.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are proposing to carry out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 09:40.

UK Power Networks Eastern & London logo
Finishing
Wednesday
Details
View Map
Share
Follow
Chase Road

UK Power Networks Eastern & London are carrying out New service connection on Chase Road, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 09:39 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 09:39.

Finishing
Friday
Details
View Map
Share
Follow
Cockfosters Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cockfosters Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Mar 2024 at 16:09.

London Borough Of Haringey logo
Finishing
Today
Details
View Map
Share
Follow
Ossian Road

London Borough Of Haringey are carrying out Highway improvement works on Ossian Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:30 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 26 Apr 2024 at 07:58.

London Borough Of Barnet logo
Finishing
Friday
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Jan 2024 at 10:55.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Eve Road

Thames Water are carrying out Utility repair and maintenance works on Eve Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 08:04 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 10:57.

London Borough Of Enfield logo
LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Follow
Middlesborough Road

London Borough Of Enfield are proposing to carry out Section 50 on Middlesborough Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 16 Apr 2024 at 15:19.

London Borough Of Enfield logo
Until
19 May 2024
Details
View Map
Share
Follow
Kenninghall Road

London Borough Of Enfield are carrying out Section 50 on Kenninghall Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:00 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 23 Apr 2024 at 16:08.

Transport for London (TfL) logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Meridian Way

Transport for London (TfL) are carrying out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:01 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Ardra Road

Transport for London (TfL) are carrying out Highway improvement works on Ardra Road, Edmonton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 07:01 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Apr 2024 at 11:28.

Thames Water logo
Between
23 Apr and 7 May 2024
Details
View Map
Share
Footpath From Glendale Avenue To White Hart Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Footpath From Glendale Avenue To White Hart Lane, Wood Green, London.

The works were originally planned to start 23 April 2024 and run through until 7 May 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 13:09.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hillfield Avenue

Thames Water are carrying out roadworks on Hillfield Avenue, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 11:43 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 06:51.

Affinity Water logo
Finishing
Monday
Details
View Map
Share
Follow
Queens Parade Close

Affinity Water are carrying out Utility repair and maintenance works on Queens Parade Close, New Southgate, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 08:40 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 24 Apr 2024 at 10:09.

Thames Water logo
Finishing
Monday
Details
View Map
Share
High Street

Thames Water were proposing to carry out Utility repair and maintenance works on High Street, Waltham Cross.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 April 2024 and run through until 29 April 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 12:05.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, Waltham Cross.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 April 2024 at 11:44 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 14:01.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
Grove Road

BT are carrying out Utility asset works on Grove Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 10:06 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2024 at 10:58.

BT logo
Finishing
Monday
Details
View Map
Share
Follow
St Anns Road

BT are carrying out Utility asset works on St Anns Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 10:06 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Apr 2024 at 10:58.

Cadent Gas logo
Wednesday
Details
View Map
Share
Montagu Road

Cadent Gas carried out Utility repair and maintenance works on Montagu Road, Edmonton.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 25 Apr 2024 and 1 May 2024 and were actually completed between 25 Apr 2024 (17:07) and 27 Apr 2024 (09:35). The works impacted the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Apr 2024 at 10:20.

London Borough Of Barnet logo
Until
8 May 2024
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are carrying out Highway improvement works on Great North Road, Underhill, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 April 2024 at 19:00 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Apr 2024 at 06:44.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Harman Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Harman Road, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 April 2024 at 13:10 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 13:15.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Layard Road

Thames Water are carrying out Utility repair and maintenance works on Layard Road, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 April 2024 at 14:07 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 14:27.

Affinity Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Causeway

Affinity Water are proposing to carry out Utility repair and maintenance works on The Causeway, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 19 Apr 2024 at 12:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Thames Water are carrying out Utility repair and maintenance works on High Street, Barnet.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 April 2024 at 09:00 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Apr 2024 at 09:07.

London Borough Of Haringey logo
Between
28 Apr and 24 May 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 25 Apr 2024 at 13:29.

London Borough Of Haringey logo
Finishing
Friday
Details
View Map
Share
Follow
High Road

London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 23 Apr 2024 at 12:58.

London Borough Of Barnet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Trott Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Trott Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

Thames Water logo
Between
28 Apr and 16 May 2024
Details
View Map
Share
Follow
Shrubbery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 14:46.

London Borough Of Barnet logo
Finishing
Tuesday
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 26 Apr 2024 at 13:33.

Thames Water logo
Between
29 Apr and 10 May 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 12:11.

Thames Water logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Fore Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fore Street, Edmonton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 10:12.

London Borough Of Haringey logo
Finishing
Thursday
Details
View Map
Share
Follow
Tower Gardens Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Tower Gardens Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 18 Apr 2024 at 12:27.

London Borough Of Barnet logo
Finishing
Thursday
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

Thames Water logo
LONG TERM
Between
2 May and 28 Jun 2024
Details
View Map
Share
Follow
Upper Park Road

Thames Water are proposing to carry out Utility asset works on Upper Park Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 11:03.

London Borough Of Barnet logo
Between
4 and 7 May 2024
Details
View Map
Share
Follow
Colney Hatch Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jan 2024 at 13:05.

Transport for London (TfL) logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Crowland Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Crowland Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2024 at 12:24.

Cadent Gas logo
LONG TERM
Between
6 May and 13 Jul 2024
Details
View Map
Share
Follow
West Green Road

Cadent Gas are proposing to carry out Utility asset works on West Green Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 14:15.

Cadent Gas logo
LONG TERM
Between
6 May and 13 Jul 2024
Details
View Map
Share
Follow
Westerfield Road

Cadent Gas are proposing to carry out Utility asset works on Westerfield Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 14:17.

Cadent Gas logo
LONG TERM
Between
6 May and 13 Jul 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 23:10.

Thames Water logo
Between
6 and 13 May 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 07:39.

Cadent Gas logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Montagu Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Montagu Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 15:29.

Thames Water logo
Between
6 and 12 May 2024
Details
View Map
Share
Follow
Napier Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Napier Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 09:57.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 26 Jul 2024
Details
View Map
Share
Follow
Clive Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clive Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 13:59.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 26 Jul 2024
Details
View Map
Share
Follow
Access Road From Southbury Road To 188-204 Southbury Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Access Road From Southbury Road To 188-204 Southbury Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 13:58.

Thames Water logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Little Park Gardens

Thames Water are proposing to carry out New service connection on Little Park Gardens, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 07:55.

London Borough Of Enfield logo
LONG TERM
Between
6 May and 12 Jul 2024
Details
View Map
Share
Follow
Footpath From Tenniswood Road To Ladysmith Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Footpath From Tenniswood Road To Ladysmith Road, Enfield.

These works are categorised as Major.

The works will start on or after 6 May 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Enfield on 25 Apr 2024 at 10:00.

Cadent Gas logo
LONG TERM
Between
6 May and 15 Jun 2024
Details
View Map
Share
Follow
Santers Lane

Cadent Gas are proposing to carry out Utility asset works on Santers Lane, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 15 June 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 14:07.

Cadent Gas logo
LONG TERM
Between
6 May and 15 Jun 2024
Details
View Map
Share
Follow
Baker Street

Cadent Gas are proposing to carry out Utility asset works on Baker Street, Potters Bar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 15 June 2024. The works will impact the verge only.

This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 23:10.

Affinity Water logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Great Bushey Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Great Bushey Drive, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Feb 2024 at 12:38.

London Borough Of Enfield logo
LONG TERM
Between
7 May and 5 Jul 2024
Details
View Map
Share
Follow
Carterhatch Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Carterhatch Lane, Enfield.

These works are categorised as Major.

The works will start on or after 7 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 26 Apr 2024 at 10:32.

UK Power Networks Eastern & London logo
Between
7 and 10 May 2024
Details
View Map
Share
Follow
Church Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Church Lane, Cuffley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2024 at 11:57.

London Borough Of Barnet logo
Between
9 and 11 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:52.

London Borough Of Barnet logo
Between
12 and 14 May 2024
Details
View Map
Share
Follow
Nether Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Nether Street, Ballards Lane To High Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jan 2024 at 12:13.

Cadent Gas logo
Between
12 and 30 May 2024
Details
View Map
Share
Follow
Galley Lane

Cadent Gas are proposing to carry out Utility asset works on Galley Lane, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 23:10.

Cadent Gas logo
LONG TERM
Between
12 May and 16 Jun 2024
Details
View Map
Share
Follow
Footpath Starting At Footpath From St Stephens Road To Navigation Drive Ending At 227 Beaconsfield R

Cadent Gas are proposing to carry out Utility asset works on Footpath Starting At Footpath From St Stephens Road To Navigation Drive Ending At 227 Beaconsfield R, Enfield.

These works are categorised as Major.

The works will start on or after 12 May 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 13:08.

Network Rail logo
LONG TERM
Between
13 May and 12 Jul 2024
Details
View Map
Share
Follow
Bridport Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridport Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Mar 2024 at 16:06.

London Borough Of Barnet logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 07:51.

Thames Water logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
River Front

Thames Water are proposing to carry out New service connection on River Front, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 08:43.

London Borough Of Enfield logo
LONG TERM
Between
13 May and 19 Jul 2024
Details
View Map
Share
Follow
Footpath From Tenniswood Road To Ladysmith Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Footpath From Tenniswood Road To Ladysmith Road, Enfield.

These works are categorised as Major.

The works will start on or after 13 May 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Enfield on 26 Apr 2024 at 06:14.

Thames Water logo
Between
13 May and 3 Jun 2024
Details
View Map
Share
Follow
Holly Road

Thames Water are proposing to carry out Utility repair and maintenance works on Holly Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Jan 2024 at 13:17.

London Borough Of Barnet logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Nether Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jan 2024 at 13:44.

London Borough Of Barnet logo
Between
16 and 21 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 07:58.

Cadent Gas logo
Between
18 May and 9 Jun 2024
Details
View Map
Share
Follow
Mollison Avenue

Cadent Gas are proposing to carry out Utility asset works on Mollison Avenue, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 9 June 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cadent Gas on 25 Jan 2024 at 13:16.

Hertfordshire County Council logo
Between
18 and 20 May 2024
Details
View Map
Share
Follow
Sandringham Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Sandringham Road, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 09:56.

Cadent Gas logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out New service connection on Crescent Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 10:14.

Thames Water logo
Between
20 and 27 May 2024
Details
View Map
Share
Follow
Romney Close

Thames Water are proposing to carry out Utility repair and maintenance works on Romney Close, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Dec 2023 at 13:01.

London Borough Of Barnet logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Squires Lane

London Borough Of Barnet are proposing to carry out Utility asset works on Squires Lane, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2024 at 10:09.

London Borough Of Waltham Forest logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Sandpiper Close

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sandpiper Close, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Waltham Forest on 22 Apr 2024 at 15:50.

London Borough Of Enfield logo
LONG TERM
Between
20 May and 8 Aug 2024
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Brownlow Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 8 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 26 Apr 2024 at 09:04.

Thames Water logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Uvedale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uvedale Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Apr 2024 at 12:03.

Affinity Water logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
The Meadway

Affinity Water are proposing to carry out Utility repair and maintenance works on The Meadway, Cuffley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 Feb 2024 at 10:40.

London Borough Of Barnet logo
Between
21 and 25 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:47.

London Borough Of Barnet logo
Between
24 and 29 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:49.

Transport for London (TfL) logo
Between
26 and 29 May 2024
Details
View Map
Share
Follow
Folly Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Folly Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2024 at 15:40.

Electricity Network Company logo
Between
27 May and 13 Jun 2024
Details
View Map
Share
Follow
Albert Road

Electricity Network Company are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 27 Mar 2024 at 14:50.

London Borough Of Barnet logo
Between
27 May and 3 Jun 2024
Details
View Map
Share
Follow
Barnet Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Road, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 11:03.

London Borough Of Barnet logo
Between
27 May and 1 Jun 2024
Details
View Map
Share
Follow
Baring Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Baring Road, New Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Apr 2024 at 07:50.

Thames Water logo
Between
27 May and 3 Jun 2024
Details
View Map
Share
Follow
Beech Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Beech Hill, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Feb 2024 at 14:06.

Cadent Gas logo
Between
27 May and 23 Jun 2024
Details
View Map
Share
Follow
Ordnance Road

Cadent Gas are proposing to carry out Utility asset works on Ordnance Road, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Apr 2024 at 12:10.

Cadent Gas logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
Booker Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Booker Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 11:04.

Thames Water logo
Between
28 May and 1 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 13:19.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 10:44.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 11:27.

London Borough Of Barnet logo
Between
29 May and 5 Jun 2024
Details
View Map
Share
Follow
Church Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Way, Barnet.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2024 at 09:28.

Cadent Gas logo
Between
30 May and 9 Jun 2024
Details
View Map
Share
Follow
Talbot Road

Cadent Gas are proposing to carry out Utility asset works on Talbot Road, Wood Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 10:34.

Cadent Gas logo
Between
2 and 19 Jun 2024
Details
View Map
Share
Follow
Mollison Avenue

Cadent Gas are proposing to carry out Utility asset works on Mollison Avenue, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 19 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 12:40.

Thames Water logo
Between
3 and 23 Jun 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Apr 2024 at 07:42.

London Borough Of Barnet logo
Between
3 and 9 Jun 2024
Details
View Map
Share
Follow
Holders Hill Circus

London Borough Of Barnet are proposing to carry out Highway improvement works on Holders Hill Circus, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jan 2024 at 12:21.

Thames Water logo
LONG TERM
Between
3 Jun and 22 Jul 2024
Details
View Map
Share
Follow
Gilda Avenue

Thames Water are proposing to carry out Utility asset works on Gilda Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:25.

ESP Electricity logo
LONG TERM
Between
4 Jun and 16 Jul 2024
Details
View Map
Share
Follow
Theobalds Lane

ESP Electricity are proposing to carry out Utility asset works on Theobalds Lane, Cheshunt.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 8 Apr 2024 at 14:27.

BT logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Carew Road

BT are proposing to carry out Utility asset works on Carew Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Mar 2024 at 15:23.

Thames Water logo
LONG TERM
Between
7 Jun and 1 Sep 2024
Details
View Map
Share
Follow
Palmers Road

Thames Water are proposing to carry out Utility asset works on Palmers Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 1 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 11:06.

Cadent Gas logo
Between
9 and 23 Jun 2024
Details
View Map
Share
Follow
Waltham Way

Cadent Gas are proposing to carry out Utility asset works on Waltham Way, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 13:07.

UK Power Networks Eastern & London logo
Between
10 and 26 Jun 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 08:51.

London Borough Of Haringey logo
Between
10 and 16 Jun 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Fairfield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Apr 2024 at 08:47.

Cadent Gas logo
Between
10 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Hornsey, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 10:50.

Affinity Water logo
Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
The Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on The Drive, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 8 Apr 2024 at 11:11.

Affinity Water logo
Between
12 and 14 Jun 2024
Details
View Map
Share
Follow
Church Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Church Lane, Cuffley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 3 Apr 2024 at 11:04.

Hertfordshire County Council logo
Between
13 and 15 Jun 2024
Details
View Map
Share
Follow
Aberdale Gardens

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Aberdale Gardens, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 23 Apr 2024 at 12:15.

Thames Water logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
St Andrews Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Andrews Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:25.

Thames Water logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 08:38.

UK Power Networks Eastern & London logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Argon Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Argon Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Apr 2024 at 12:45.

Thames Water logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Lanercost Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Lanercost Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 09:54.

Hertfordshire County Council logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Station Road

Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Station Road, Cuffley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 25 Mar 2024 at 16:10.

Thames Water logo
LONG TERM
Between
19 Jun 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are proposing to carry out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 14:36.

Thames Water logo
Between
23 and 28 Jun 2024
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out New service connection on High Street, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 10:00.

Thames Water logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Gloucester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:19.

London Borough Of Barnet logo
Between
24 and 27 Jun 2024
Details
View Map
Share
Follow
Friern Barnet Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Road, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2024 at 10:37.

BT logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Carpenter Gardens

BT are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Mar 2024 at 12:29.

BT logo
Between
24 and 26 Jun 2024
Details
View Map
Share
Follow
Strafford Gate

BT are proposing to carry out Utility repair and maintenance works on Strafford Gate, Potters Bar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 26 June 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 20 Mar 2024 at 09:45.

Cadent Gas logo
LONG TERM
Between
30 Jun and 5 Sep 2024
Details
View Map
Share
Follow
Slades Gardens

Cadent Gas are proposing to carry out Utility asset works on Slades Gardens, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 11:10.

BT logo
Between
1 and 5 Jul 2024
Details
View Map
Share
Follow
Risley Avenue

BT are proposing to carry out Utility asset works on Risley Avenue, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 4 Apr 2024 at 17:18.

London Borough Of Barnet logo
Between
1 and 6 Jul 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 6 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Apr 2024 at 12:40.

Thames Water logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Morton Crescent

Thames Water are proposing to carry out Utility asset works on Morton Crescent, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Feb 2024 at 14:47.

Network Rail logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Waltham Cross.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 14:44.

Cadent Gas logo
Between
7 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Westbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Westbury Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 15:40.

Cadent Gas logo
Between
7 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Crawley Road

Cadent Gas are proposing to carry out Utility asset works on Crawley Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2024 at 15:47.

Cadent Gas logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Suez Road

Cadent Gas are proposing to carry out Utility asset works on Suez Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 14:14.

Cadent Gas logo
LONG TERM
Between
15 Jul and 13 Sep 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 14:00.

Thames Water logo
On
15 Jul 2024
Details
View Map
Share
Follow
Coverdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Coverdale Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 15 July 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 15:30.

Affinity Water logo
Between
15 and 18 Jul 2024
Details
View Map
Share
Follow
Fenstanton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fenstanton Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Apr 2024 at 14:05.

Thames Water logo
LONG TERM
Between
15 Jul and 14 Oct 2024
Details
View Map
Share
Follow
Lytton Avenue

Thames Water are proposing to carry out Utility asset works on Lytton Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 14 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:34.

Cadent Gas logo
LONG TERM
Between
21 Jul and 5 Sep 2024
Details
View Map
Share
Follow
Slades Hill

Cadent Gas are proposing to carry out Utility asset works on Slades Hill, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 5 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 11:10.

Cadent Gas logo
Between
21 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Chase Ridings

Cadent Gas are proposing to carry out Utility asset works on Chase Ridings, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 14 Sep 2023 at 08:12.

Thames Water logo
LONG TERM
Between
22 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Rosedale Way

Thames Water are proposing to carry out Statutory Infrastructure Works on Rosedale Way, Cheshunt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 1 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 14:15.

Thames Water logo
LONG TERM
Between
22 Jul and 13 Oct 2024
Details
View Map
Share
Follow
Cuffley Hill

Thames Water are proposing to carry out Utility asset works on Cuffley Hill, Goffs Oak.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:00.

Thames Water logo
LONG TERM
Between
25 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Bowes Road

Thames Water are proposing to carry out Utility asset works on Bowes Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2024 and could run through until 1 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 10:48.

Thames Water logo
LONG TERM
Between
25 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Brookdale

Thames Water are proposing to carry out Utility asset works on Brookdale, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 July 2024 and could run through until 1 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Feb 2024 at 14:38.


Roadworks Map near to Pennington Drive, LONDON, N21 1TF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Apr 2024 11:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pennington Drive, LONDON, N21 1TF (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks Eastern & London logo
URGENT
  
THE BIRCHES 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - Give and take
In Progress
Since: 27 Apr 2024 11:16
(Scheduled: 27 Apr 2024 - 7 May 2024)
0.3
Details
Share
Follow
2
London Borough Of Enfield logo
VERA AVENUE 
(0.5 miles)
London Borough Of Enfield
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 26 Apr 2024 10:15
(Scheduled: 25 Apr 2024 - 30 Apr 2024)
0.5
Details
Share
Follow
3
Thames Water logo
URGENT
  
LAKENHEATH 
(0.5 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 26 Apr 2024 09:24
(Scheduled: 26 Apr 2024 - 30 Apr 2024)
0.5
Details
Share
Follow
4
Cadent Gas logo
ENFIELD ROAD 
(0.6 miles)
Cadent Gas
Utility asset works - Carriageway, Footpath - Some carriageway incursion
Planned
Scheduled: 22 Apr 2024 - 2 May 2024
0.6
Details
Share
Follow
5
Cadent Gas logo
COTSWOLD WAY 
(0.6 miles)
Cadent Gas
Utility asset works - Carriageway, Footpath - Some carriageway incursion
Planned
Scheduled: 22 Apr 2024 - 2 May 2024
0.6
Details
Share
Follow
6
UK Power Networks Eastern & London logo
MAJOR
  
CHASE ROAD 
(0.6 miles)
UK Power Networks Eastern & London
New service connection - Footway, Carriageway - Multi-way signals
In Progress
Since: 17 Apr 2024 09:39
(Scheduled: 17 Apr 2024 - 1 May 2024)
0.6
Details
Share
Follow
7
London Borough Of Enfield logo
CHASE ROAD 
(0.7 miles)
London Borough Of Enfield
New service connection - Footway, Carriageway - Two-way signals
Planned
Scheduled: 24 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
8
Cadent Gas logo
MAJOR
  
ENFIELD ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 26 Mar 2024 09:57
(Scheduled: 18 Mar 2024 - 5 May 2024)
0.7
Details
Share
Follow
9
Cadent Gas logo
BRAMLEY ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 26 Apr 2024 - 30 Apr 2024
0.7
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
ENFIELD ROAD 
(0.7 miles)
Cadent Gas
Utility asset works - Verge - Some carriageway incursion
Planned
Scheduled: 15 Apr 2024 - 5 May 2024
0.7
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data