ROADWORKS SUMMARY
Oakleigh Road North, LONDON, N20 9ES
Introduction

View current and future planned roadworks and road closures for Oakleigh Road North, N20 9ES and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Oakleigh Road North, LONDON, N20 9ES
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Oakleigh Road North are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Jul 2025
Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 October 2023 at 10:20 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Thames Water on 13 Mar 2025 at 11:38.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
28 Apr 2024 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 1 May 2024 at 07:27.
28 Apr 2024 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 07:13.
10 Oct 2025
London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.
17 Jun 2025
London Borough Of Barnet are carrying out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 May 2024 at 00:00 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 08:43.
23 May 2025
London Borough Of Haringey are carrying out Highway improvement works on Stanhope Road, Hornsey, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 June 2024 at 00:00 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 3 Apr 2025 at 16:17.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
31 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Station Road, The Hale, Edgware.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:57 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:05.
15 Aug 2024 and 24 Dec 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.
25 Oct 2025
Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.
25 Nov 2024 and 16 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:54.
6 Jan and 30 Aug 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.
6 Jan and 30 Aug 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2025 at 11:53.
30 Apr 2025
UK Power Networks Eastern & London are carrying out Diversionary works on Gloucester Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2025 at 22:00 and could run through until 30 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2025 at 10:39.
9 May 2025
London Borough Of Enfield are carrying out Highway improvement works on Devonshire Road, Southgate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 07:30 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 12 Feb 2025 at 12:54.
20 Jan and 23 May 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 11:13.
7 May 2025
Cadent Gas are carrying out Utility asset works on Stag Lane, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 10:56 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Feb 2025 at 10:59.
17 Feb and 10 May 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 6 Feb 2025 at 17:05.
17 Feb and 10 May 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 14 Feb 2025 at 13:55.
4 Jul 2025
Cadent Gas are carrying out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 13:57 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Mar 2025 at 13:58.
3 Mar and 3 Jun 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Cross Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 14:01.
3 Mar and 3 Jun 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Queens Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 13:59.
3 Mar and 3 Jun 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Fotheringham Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 14:00.
3 Mar and 3 Jun 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Eaton Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 13:59.
Tuesday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 22 April 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:39.
4 Mar and 5 May 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jan 2025 at 15:57.
4 Mar and 5 May 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jan 2025 at 15:59.
4 Mar and 5 May 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Feb 2025 at 16:49.
Tomorrow
London Borough Of Haringey are proposing to carry out Highway improvement works on Waldegrave Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Haringey on 27 Jan 2025 at 15:53.
Tomorrow
London Borough Of Haringey are carrying out Highway improvement works on Waldegrave Road, Wood Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 March 2025 at 08:00 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 10 Mar 2025 at 08:11.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Stag Lane, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:16.
10 Mar and 25 Apr 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 7 Mar 2025 at 15:33.
10 Mar and 25 Apr 2025
London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on High Road, North Finchley, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 10 Mar 2025 at 08:27.
10 Mar and 25 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 10 Mar 2025 at 09:17.
10 Mar and 25 Apr 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on High Road, North Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Barnet on 24 Feb 2025 at 13:24.
10 Mar and 25 Apr 2025
London Borough Of Barnet were proposing to carry out Highway repair and maintenance works on High Road, North Finchley, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Mar 2025 at 15:19.
10 Mar and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Barnet Lane, Elstree.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:24.
29 Apr 2025
London Borough Of Haringey are carrying out Highway improvement works on Downhills Park Road, Tottenham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 10:34 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 8 Apr 2025 at 16:28.
Tomorrow
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 25 Feb 2025 at 11:24.
Tomorrow
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 25 Feb 2025 at 14:21.
24 Mar and 2 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Christchurch Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Mar 2025 at 10:04.
2 May 2025
London Borough Of Barnet are carrying out Highway improvement works on Christchurch Avenue, North Finchley, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 08:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 3 Apr 2025 at 09:06.
Tuesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Fairfield Way, Barnet.
These works are categorised as Major.
The works will start on or after 24 March 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Mar 2025 at 15:10.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Footpath From Green Lanes To Willoughby Road, Hornsey, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 26 March 2025 at 10:00 and could run through until 22 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 4 Apr 2025 at 09:42.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Parolles Road, Islington, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 11:30 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 05:54.
1 Apr and 20 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Barfield Avenue, Whetstone, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Mar 2025 at 17:04.
1 Apr and 20 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Russell Road, Oakleigh Park, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Mar 2025 at 17:05.
1 Apr and 20 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Simmons Way, Whetstone, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 20 May 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 13:52.
1 Apr and 20 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Simmons Way, Whetstone, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 20 May 2025. The works were due to impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Mar 2025 at 14:56.
1 Apr and 20 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Simmons Close, Whetstone, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 April 2025 and run through until 20 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Mar 2025 at 17:04.
Monday
London Borough Of Enfield are proposing to carry out Highway improvement works on Cross Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 3 Jan 2025 at 09:18.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2025 at 09:15 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 09:18.
Today
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Grosvenor Road, Finchley, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 April 2025 at 08:07 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2025 at 11:57.
Sunday
Cadent Gas are proposing to carry out Utility asset works on Avenue Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2025 and could run through until 20 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 10:30.
Sunday
Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Tottenham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 April 2025 and run through until 20 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:41.
Sunday
Cadent Gas were proposing to carry out Utility asset works on Avenue Road, Tottenham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 April 2025 and run through until 20 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:42.
Saturday
London Borough Of Barnet are carrying out Highway improvement works on Mays Lane, Underhill, Barnet.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 April 2025 at 08:00 and could run through until 19 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 13:41.
10 May 2025
London Borough Of Haringey are carrying out Highway improvement works on Hampstead Lane, Hornsey, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:26 and could run through until 10 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 7 Apr 2025 at 13:26.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 5 Mar 2025 at 13:21.
7 Apr and 25 Jun 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 7 Apr 2025 at 14:59.
15 Jun 2025
National Highways are carrying out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 22:26 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2025 at 12:05.
16 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Green Lanes, Hornsey, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 08:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 09:18.
19 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Salisbury Road, Tottenham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 08:00 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 09:19.
19 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Warham Road, Hornsey, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 08:00 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 09:20.
7 Apr and 19 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 07:28.
19 May 2025
Thames Water are carrying out Utility repair and maintenance works on High Street, Hornsey, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:45 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 11:51.
7 Apr and 16 May 2025
London Borough Of Haringey are proposing to carry out Highway improvement works on Burghley Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 27 Jan 2025 at 15:42.
16 May 2025
London Borough Of Haringey are carrying out Highway improvement works on Burghley Road, Wood Green, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 08:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 7 Apr 2025 at 08:58.
Monday
Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 21 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:28.
7 Apr and 3 May 2025
London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.
These works are categorised as Major.
The works will start on or after 7 April 2025 and could run through until 3 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 25 Mar 2025 at 10:42.
Today
London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Private Road, Enfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 18 Mar 2025 at 10:47.
7 Apr and 6 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Fairfield Way, Barnet.
These works are categorised as Major.
The works will start on or after 7 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 10:11.
24 Apr 2025
Cadent Gas are carrying out Utility repair and maintenance works on Church Street, Edmonton.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2025 at 20:45 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 10:28.
Tomorrow
London Borough Of Barnet are proposing to carry out Highway improvement works on Brent Park Road, Brent Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 23 Jan 2025 at 13:52.
Tomorrow
London Borough Of Barnet were proposing to carry out Highway improvement works on Brent Park Road, Brent Cross, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 April 2025 and run through until 18 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 3 Apr 2025 at 14:07.
Tuesday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hillfield Avenue, Hornsey, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2025 at 09:53 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2025 at 12:00.
Today
London Borough Of Barnet were proposing to carry out Highway improvement works on Trott Road, Muswell Hill, London.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 3 Apr 2025 at 09:37.
Today
Thames Water are carrying out Utility repair and maintenance works on Ridge Hill, Golders Green, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 13:44 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 10:48.
24 Apr 2025
Cadent Gas are carrying out Utility repair and maintenance works on Clay Hill, Enfield.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 10:00 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 16:03.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Clay Hill, Enfield.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 10:00 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 11:45.
24 Apr 2025
Cadent Gas are carrying out Utility repair and maintenance works on Morley Hill, Enfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2025 at 14:00 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 13:14.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Lyndale Avenue, Cricklewood, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 10:47 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:06.
Tuesday
Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Cricklewood, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 22 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 11:07.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Clitterhouse Road, Cricklewood, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 11:15 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:09.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Ravenscroft Avenue, Golders Green, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 06:31 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 10:33.
Monday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hendon Way, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Apr 2025 at 14:14.
Tuesday
Thames Water are carrying out roadworks on Audley Road, Hendon, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:38 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:37.
14 Apr and 20 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on St Anns Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 11:30.
14 Apr and 20 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on St Anns Road, Tottenham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 20 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Apr 2025 at 08:41.
Today
Thames Water are proposing to carry out Utility repair and maintenance works on Church Crescent, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2025 at 07:51.
Today
Thames Water are carrying out Utility repair and maintenance works on Church Crescent, Hornsey, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:00 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 09:21.
14 Apr and 16 May 2025
UK Power Distribution are proposing to carry out Statutory Infrastructure Works on Ballards Lane, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 5 Feb 2025 at 15:52.
14 Apr and 16 May 2025
UK Power Distribution are proposing to carry out New service connection on Ballards Lane, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 27 Feb 2025 at 12:04.
14 Apr and 16 May 2025
UK Power Distribution are proposing to carry out New service connection on Ballards Lane, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 11 Mar 2025 at 13:44.
14 Apr and 28 May 2025
UK Power Distribution are proposing to carry out New service connection on Ballards Lane, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 24 Mar 2025 at 15:52.
30 Apr 2025
UK Power Distribution are carrying out New service connection on Ballards Lane, Finchley, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 09:00 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 14 Apr 2025 at 09:48.
Saturday
London Borough Of Barnet are carrying out Highway improvement works on Trott Road, Muswell Hill, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 08:00 and could run through until 19 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 09:49.
14 Apr and 24 May 2025
London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.
These works are categorised as Major.
The works will start on or after 14 April 2025 and could run through until 24 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 16 Apr 2025 at 11:22.
Today
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 15:36.
Today
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2025 at 16:00.
Today
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 16:30.
Today
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 31 Mar 2025 at 12:03.
Today
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 13:14.
Today
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Barnet Gate Lane, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 14:15.
14 and 29 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Jan 2025 at 11:54.
Wednesday
Cadent Gas are carrying out Disconnection or alteration of supply on Furzehill Road, Borehamwood.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 07:56 and could run through until 23 April 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 13:44.
Wednesday
UK Power Networks Eastern & London are proposing to carry out New service connection on Highview Gardens, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2025 at 13:20.
Wednesday
UK Power Networks Eastern & London are carrying out New service connection on Highview Gardens, Southgate.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 09:00 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 09:30.
Tomorrow
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Clarendon Road, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 08:11.
16 Apr and 16 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
The works will start on or after 16 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 17:01.
16 Apr and 16 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
The works will start on or after 16 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 17:01.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Highfield Avenue, Golders Green, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 12:05 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 08:46.
26 Apr 2025
Thames Water are carrying out Utility repair and maintenance works on Bush Hill, Southgate.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 April 2025 at 12:00 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 11:32.
16 and 28 Apr 2025
Cadent Gas carried out Utility repair and maintenance works on Barnet Lane, Borehamwood.
Two-way signals were in place for some or all of the period.
The works were originally planned between 16 Apr 2025 and 28 Apr 2025 and were actually completed between 16 Apr 2025 (11:33) and 17 Apr 2025 (01:10). The works impacted the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 08:20.
Tuesday
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Oakroyd Close, Potters Bar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 4 Feb 2025 at 11:30.
25 Apr 2025
Thames Water are carrying out Utility repair and maintenance works on High Street, Hornsey, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2025 at 01:06 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 10:32.
Wednesday
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 13:58.
Wednesday
London Borough Of Barnet were proposing to carry out Highway improvement works on High Road, Whetstone, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 9 Apr 2025 at 10:13.
Wednesday
Affinity Water are carrying out Utility repair and maintenance works on Totteridge Lane, Whetstone, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2025 at 08:14 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 17 Apr 2025 at 11:07.
18 Apr and 2 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Nupton Drive, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Jan 2025 at 13:12.
18 Apr and 2 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Nupton Drive, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 Jan 2025 at 09:50.
18 and 24 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Whitings Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 Jan 2025 at 09:50.
Tuesday
Thames Water are proposing to carry out Utility asset works on Browning Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2025 and could run through until 22 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2025 at 21:45.
21 and 24 Apr 2025
Thames Water were proposing to carry out Utility repair and maintenance works on The Avenue, Tottenham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Jan 2025 at 12:03.
21 Apr and 19 May 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 10:02.
21 Apr and 12 May 2025
London Borough Of Enfield are proposing to carry out Highway improvement works on Fotheringham Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 16 Dec 2024 at 16:00.
21 Apr and 2 Jun 2025
London Borough Of Enfield are proposing to carry out Highway improvement works on Parkgate Crescent, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 17 Jan 2025 at 13:34.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:11.
22 Apr and 13 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Jan 2025 at 11:29.
22 and 24 Apr 2025
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 17 Apr 2025 at 11:26.
22 and 24 Apr 2025
London Borough Of Haringey were proposing to carry out Highway repair and maintenance works on Cromwell Avenue, Hornsey, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 16 Apr 2025 at 09:27.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on East End Road, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:19.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:19.
22 Apr and 9 Jun 2025
Thames Water are proposing to carry out Utility asset works on Park Avenue, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 15:29.
22 Apr and 9 Jun 2025
Thames Water are proposing to carry out Utility asset works on Park Avenue, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:44.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:27.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:19.
22 Apr and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Bexley Gardens, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:24.
22 Apr and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Bexley Gardens, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 16:11.
22 Apr and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Tillotson Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 11:23.
22 Apr and 14 Jul 2025
Thames Water are proposing to carry out Utility asset works on Tillotson Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 16:07.
22 and 26 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 14:34.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:36.
22 Apr and 20 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:05.
22 Apr and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Mar 2025 at 11:55.
22 Apr and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:50.
22 Apr and 2 May 2025
London Borough Of Enfield were proposing to carry out roadworks on Great Cambridge Road, Enfield.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 8 Apr 2025 at 10:17.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on East Barnet Road, Longmore Avenue To Cat Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:11.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:36.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on East Barnet Road, Station Road To Brookhill Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:36.
22 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Approach Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 11:03.
22 and 24 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Knebworth Path, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 10:33.
22 and 25 Apr 2025
Cadent Gas are proposing to carry out New service connection on Penscroft Gardens, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 11:04.
22 and 25 Apr 2025
Cadent Gas are proposing to carry out New service connection on Penscroft Gardens, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:25.
23 and 29 Apr 2025
Thames Water are proposing to carry out New service connection on Leighton Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 11:21.
23 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 22 Jan 2025 at 11:13.
23 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 5 Mar 2025 at 15:57.
23 and 28 Apr 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Ridgeview Close, Underhill, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 15:38.
23 and 28 Apr 2025
Thames Water are proposing to carry out New service connection on Calshot Way, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Feb 2025 at 21:23.
24 and 28 Apr 2025
London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Trinity Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 8 Apr 2025 at 08:48.
24 and 26 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Monksmead, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Feb 2025 at 10:24.
24 and 26 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Monksmead, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Feb 2025 at 09:51.
24 and 28 Apr 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alston Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 24 Jan 2025 at 09:19.
25 and 27 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bullhead Road, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Feb 2025 at 10:41.
25 and 27 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Bullhead Road, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Feb 2025 at 11:23.
25 and 29 Apr 2025
Thames Water are proposing to carry out Utility asset works on Browning Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 13:54.
26 and 28 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Knebworth Path, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Feb 2025 at 10:44.
26 and 28 Apr 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Knebworth Path, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 25 Feb 2025 at 11:21.
28 Apr and 3 Nov 2025
Thames Water are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 3 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.
28 Apr and 2 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Feb 2025 at 12:14.
28 Apr and 6 Jun 2025
London Borough Of Haringey are proposing to carry out Highway improvement works on Vernon Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 27 Jan 2025 at 15:53.
28 Apr and 1 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 1 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 07:28.
28 and 30 Apr 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Clarendon Road, Borehamwood.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 8 Jan 2025 at 15:53.
28 Apr and 15 May 2025
Advanced Electricty Networks Ltd were proposing to carry out Utility asset works on St Albans Road, South Mimms.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 15 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Advanced Electricty Networks Ltd on 15 Apr 2025 at 11:49.
29 Apr and 8 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 April 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Mar 2025 at 11:03.
29 Apr and 8 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 14:00.
29 Apr and 2 May 2025
London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Trinity Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 8 Apr 2025 at 08:49.
29 Apr and 2 May 2025
London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Trinity Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Enfield on 14 Apr 2025 at 16:59.
29 Apr and 6 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Chesterfield Road, Barnet.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 14:59.
29 Apr and 6 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Chesterfield Road, Barnet.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 14:06.
29 Apr and 6 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Chesterfield Road, Barnet.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 9 Apr 2025 at 09:55.
30 Apr and 6 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Feb 2025 at 08:58.
30 Apr and 30 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Mar 2025 at 14:37.
1 and 12 May 2025
Thames Water are proposing to carry out New service connection on Glenwood Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Feb 2025 at 10:18.
1 and 12 May 2025
Thames Water are proposing to carry out New service connection on St Anns Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Feb 2025 at 09:54.
1 May and 6 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, East Finchley, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 14:53.
1 May and 6 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, East Finchley, London.
These works are categorised as Major.
The works will start on or after 1 May 2025 and could run through until 6 June 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 14:46.
1 and 3 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Mayhill Road, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2025 and run through until 3 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 16:45.
1 and 5 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Cedar Lawn Avenue, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 May 2025 and run through until 5 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 17:33.
1 May and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:34.
1 May and 22 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 22 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 13:41.
5 May and 29 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on New Brent Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 29 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:38.
5 May and 13 Jun 2025
London Borough Of Haringey are proposing to carry out Highway improvement works on Vernon Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Haringey on 4 Feb 2025 at 11:07.
5 and 23 May 2025
Electricity Network Company were proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Feb 2025 at 10:51.
5 and 28 May 2025
UK Power Distribution are proposing to carry out Statutory Infrastructure Works on The Grove, Finchley, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Distribution on 20 Mar 2025 at 15:01.
5 May and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 4 July 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Jan 2025 at 15:59.
5 May and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 4 July 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Feb 2025 at 16:23.
5 May and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Waterfall Road, Southgate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Mar 2025 at 16:50.
5 May and 18 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Waterfall Road, Southgate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 00:10.
5 and 21 May 2025
London Borough Of Enfield are proposing to carry out Highway improvement works on Cross Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 16 Dec 2024 at 16:02.
6 May and 23 Jun 2025
Thames Water are proposing to carry out Utility asset works on Bloomfield Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:48.
6 and 8 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:30.
6 and 8 May 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 8 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 4 Feb 2025 at 11:55.
7 and 12 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Chesterfield Road, Barnet.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 09:18.
7 and 21 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 08:26.
7 and 21 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Lane, Underhill, Barnet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 17 Apr 2025 at 10:57.
8 and 22 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pavilion Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 22 May 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Feb 2025 at 16:16.
8 and 21 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:52.
8 and 21 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 08:56.
9 and 13 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ridgeview Close, Underhill, Barnet.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 15:38.
11 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Beechwood Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.
11 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Edge Hill Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 13 Feb 2025 at 10:10.
12 and 23 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Jan 2025 at 12:22.
12 and 23 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Apr 2025 at 13:10.
12 and 23 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Alderton Way, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2025 at 13:31.
12 and 16 May 2025
Thames Water are proposing to carry out New service connection on Langham Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 18:10.
12 and 30 May 2025
London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on Langham Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Haringey on 16 Apr 2025 at 09:15.
12 and 30 May 2025
Murphy Power Distribution are proposing to carry out New service connection on Mowbray Road Access Rear Of Numbers 58 To 96 Edgware Way, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 19 Feb 2025 at 14:26.
12 and 29 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Whitings Road, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 29 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 10:11.
12 and 17 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Feb 2025 at 08:26.
12 May and 2 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Feb 2025 at 11:46.
12 May and 2 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Underhill, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 17 Feb 2025 at 10:22.
12 and 25 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Feb 2025 at 10:26.
12 and 19 May 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Barnet Road, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 19 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2025 at 09:18.
12 and 19 May 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Barnet Road, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Feb 2025 at 14:56.
12 and 14 May 2025
London Borough Of Enfield are proposing to carry out Highway improvement works on Myddelton Avenue, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 18 Feb 2025 at 11:56.
13 and 16 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Mutton Lane, South, Potters Bar.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 11 Apr 2025 at 14:54.
13 and 16 May 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Mutton Lane, South, Potters Bar.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 14 Apr 2025 at 10:50.
14 and 16 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Bridge Lane, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:07.
15 and 19 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Quinta Drive, Barnet.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 May 2025 and run through until 19 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 07:46.
17 May and 17 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ballards Lane, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 24 Feb 2025 at 09:52.
19 and 21 May 2025
BT are proposing to carry out Utility asset works on Sparkford Gardens, New Southgate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 5 Mar 2025 at 15:10.
19 and 23 May 2025
T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 10 Mar 2025 at 15:27.
19 and 23 May 2025
T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 14 Mar 2025 at 15:48.
19 and 23 May 2025
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on The Ridgeway, Friern Barnet, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 26 Feb 2025 at 12:36.
19 May and 2 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on St Thomas Road, Southgate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 2 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Feb 2025 at 11:41.
19 and 23 May 2025
Cadent Gas were proposing to carry out New service connection on Mayfield Crescent, Edmonton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2025 at 11:55.
19 May and 2 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 17 Feb 2025 at 12:12.
19 and 22 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Albans Road, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 1 Apr 2025 at 11:03.
19 and 22 May 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on St Albans Road, South Mimms.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Apr 2025 at 11:12.
20 May and 3 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wildwood Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Feb 2025 at 13:37.
20 May and 3 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Wildwood Road, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Feb 2025 at 10:36.
20 and 23 May 2025
Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on St Albans Road, South Mimms.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Mar 2025 at 15:51.
21 May and 2 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Baronsmere Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Apr 2025 at 14:46.
21 May and 18 Jun 2025
Electricity Network Company are proposing to carry out Utility asset works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Feb 2025 at 10:47.
21 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:52.
21 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:55.
21 May and 11 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 14:47.
21 and 23 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 09:47.
21 and 23 May 2025
BT are proposing to carry out Utility asset works on Abbey Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Feb 2025 at 13:32.
21 and 23 May 2025
BT are proposing to carry out Utility asset works on Abbey Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Mar 2025 at 13:04.
21 and 23 May 2025
BT were proposing to carry out Utility asset works on Abbey Road, Enfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 24 Feb 2025 at 15:36.
26 and 28 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 14:02.
26 and 28 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Carlingford Road, Tottenham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Feb 2025 at 07:38.
26 May and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edge Hill Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Apr 2025 at 12:12.
26 May and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Beechwood Avenue, Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 20 June 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 15 Apr 2025 at 11:05.
27 and 29 May 2025
BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 29 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 6 Mar 2025 at 15:50.
27 and 29 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Sturgess Avenue, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 11:32.
27 May and 15 Jun 2025
Murphy Gas Networks are proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Gas Networks on 26 Mar 2025 at 10:29.
27 May and 5 Jun 2025
Murphy Gas Networks were proposing to carry out Utility asset works on Hornsey Park Road, Wood Green, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 5 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Gas Networks on 9 Apr 2025 at 15:50.
27 May and 20 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mollison Way, Edgware.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 12:21.
27 May and 3 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 27 Feb 2025 at 13:23.
27 May and 3 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westside, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 11:30.
27 May and 6 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Christchurch Avenue, North Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 May 2025 and run through until 6 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:22.
28 and 30 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Pennine Drive, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 11:16.
28 and 31 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Feb 2025 at 18:37.
28 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 11:16.
29 and 31 May 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 May 2025 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 07:52.
29 May and 4 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:47.
29 May and 2 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Prince Of Wales Close, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 09:30.
29 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:18.
30 and 31 May 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Terrace, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:40.
2 Jun and 21 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on North Street, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 21 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 10:46.
3 and 5 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 09:30.
3 and 5 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Great North Road, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 12 Mar 2025 at 09:04.
3 and 5 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Great North Road, Underhill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Mar 2025 at 13:41.
4 and 6 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 21 Feb 2025 at 09:56.
4 and 6 Jun 2025
Virgin Media were proposing to carry out Utility asset works on Back Lane, Edgware.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 6 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 10:49.
4 and 6 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Mar 2025 at 11:15.
4 and 6 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Millway, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:54.
5 and 7 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Midholm Close, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.
5 and 7 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Church Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 14:26.
5 and 7 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 15:03.
7 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 27 Mar 2025 at 15:14.
7 and 14 Jun 2025
BT are proposing to carry out Utility asset works on Lyndhurst Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Mar 2025 at 12:57.
7 and 14 Jun 2025
BT are proposing to carry out Utility asset works on Lyndhurst Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2025 and could run through until 14 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 3 Apr 2025 at 16:34.
9 and 11 Jun 2025
BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 31 Mar 2025 at 16:09.
9 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Winnington Road, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Mar 2025 at 11:30.
9 and 11 Jun 2025
BT were proposing to carry out Utility asset works on Ossulton Way, East Finchley, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Mar 2025 at 14:34.
9 and 12 Jun 2025
BT are proposing to carry out Utility asset works on Garrick Drive, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Jan 2025 at 08:06.
9 and 13 Jun 2025
T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 10 Mar 2025 at 15:19.
9 and 13 Jun 2025
T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 14 Mar 2025 at 15:48.
9 and 12 Jun 2025
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Barnet Lane, Borehamwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 9 Dec 2024 at 13:18.
11 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 16:01.
11 and 13 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hermitage Lane, Childs Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 1 Apr 2025 at 11:38.
11 and 13 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Arkley Lane, Arkley, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 7 Mar 2025 at 08:15.
11 and 13 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Arkley Lane, Arkley, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 13 Mar 2025 at 08:52.
12 Jun and 1 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Chesterfield Road, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 7 Mar 2025 at 11:01.
16 and 17 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgware Road Slip From Staples Corner Roundabout South Bound To Geron Way, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:39.
16 Jun and 26 Jul 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Stag Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 17 Mar 2025 at 15:44.
16 and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 14:49.
17 and 19 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 1 Apr 2025 at 15:53.
17 and 19 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 4 Apr 2025 at 14:30.
17 and 19 Jun 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 June 2025 and run through until 19 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Mar 2025 at 10:21.
17 and 19 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Ellesmere Avenue, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:32.
17 and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Barnet Hill, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 20 Mar 2025 at 09:42.
18 Jun and 18 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.
18 and 20 Jun 2025
BT are proposing to carry out Utility asset works on Clarence Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Mar 2025 at 10:29.
18 and 20 Jun 2025
BT are proposing to carry out Utility asset works on Clarence Road, Wood Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Apr 2025 at 15:45.
18 and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Road, Friern Barnet, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 09:46.
19 and 20 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Road, Friern Barnet, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 09:54.
20 and 24 Jun 2025
BT are proposing to carry out Utility asset works on Haselwood Drive, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Mar 2025 at 13:32.
23 and 27 Jun 2025
Thames Water are proposing to carry out New service connection on Heathfield Gardens, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 14:59.
23 and 25 Jun 2025
Virgin Media are proposing to carry out Utility asset works on Frobisher Road, Hornsey, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 3 Apr 2025 at 13:27.
23 and 27 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Muswell Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 15:03.
23 and 27 Jun 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Alexandra Road, Muswell Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 27 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Feb 2025 at 09:15.
23 and 27 Jun 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Road, Muswell Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Mar 2025 at 10:12.
23 Jun and 15 Sep 2025
Thames Water are proposing to carry out Utility asset works on Moree Way, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 15 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:43.
23 Jun and 13 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Woodside Grange Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 12:35.
23 Jun and 4 Aug 2025
Thames Water are proposing to carry out Utility asset works on Banstead Gardens, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2025 at 11:45.
23 and 25 Jun 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Feb 2025 at 09:44.
23 and 25 Jun 2025
Affinity Water were proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Feb 2025 at 13:47.
23 Jun and 6 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Rosewood Drive, Enfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 14:33.
25 Jun and 11 Jul 2025
National Highways are proposing to carry out Works for road purposes on North Circular Road, Brent Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 15 Apr 2025 at 09:43.
25 and 27 Jun 2025
BT are proposing to carry out Utility asset works on Private Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Apr 2025 at 21:43.
25 and 27 Jun 2025
BT are proposing to carry out Utility asset works on Private Road, Enfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 10 Apr 2025 at 11:44.
27 Jun and 3 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Westbury Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:08.
30 Jun and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Feb 2025 at 15:59.
30 Jun and 15 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Finchley Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 15 August 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 6 Mar 2025 at 11:05.
30 Jun and 5 Jul 2025
Thames Water are proposing to carry out New service connection on Chase Road, Southgate.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 17:33.
3 and 8 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on St Margarets Avenue, Whetstone, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:16.
7 and 9 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Woodberry Avenue, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:36.
7 and 9 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fernleigh Road, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 14:36.
7 and 9 Jul 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Fernleigh Road, Southgate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 July 2025 and run through until 9 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 09:12.
8 and 10 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on York Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2025 and could run through until 10 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Feb 2025 at 10:16.
9 and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sherbrook Gardens, Southgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 10:07.
9 and 31 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Mays Lane, Underhill, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 31 July 2025. The works will impact the footway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Mar 2025 at 11:08.
9 and 31 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Valley Way, Barnet.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 7 Mar 2025 at 11:08.
10 and 13 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hertford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
10 and 16 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Hale Drive, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 10:53.
10 and 16 Jul 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 16 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 08:10.
11 and 14 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Hutton Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 July 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 14:36.
14 and 18 Jul 2025
Thames Water are proposing to carry out New service connection on Wayside, Golders Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 15:06.
14 Jul and 3 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way, Golders Green, London.
These works are categorised as Major.
The works will start on or after 14 July 2025 and could run through until 3 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 15:34.
14 and 16 Jul 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Bedford Road, East Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 14 Apr 2025 at 10:37.
14 Jul and 12 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, East Finchley, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 August 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2025 at 14:20.
14 and 16 Jul 2025
Transport for London (TfL) are proposing to carry out Remedial works on Angel Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 10:55.
14 and 16 Jul 2025
Affinity Water are proposing to carry out Utility repair and maintenance works on Glenhurst Road, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 9 Apr 2025 at 15:56.
14 Jul and 6 Oct 2025
Thames Water are proposing to carry out Utility asset works on Stanley Road, Edmonton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 6 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 16:12.
15 Jul and 4 Aug 2025
London Borough Of Barnet were proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 July 2025 and run through until 4 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2025 at 12:55.
15 Jul and 18 Aug 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Tempelhof Avenue, Cricklewood, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 8 Apr 2025 at 13:51.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Montrose Crescent, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Gardens, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Crescent, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Moss Hall Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Christchurch Avenue, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Alexandra Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Woodberry Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:08.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Hutton Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 23 Jul 2025
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Dale Grove, North Finchley, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2025 at 09:16.
15 and 17 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Bulwer Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 09:42.
15 and 17 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Bulwer Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 11 Apr 2025 at 11:04.
15 and 17 Jul 2025
Affinity Water are proposing to carry out Utility asset works on Bulwer Road, New Barnet, Barnet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Apr 2025 at 09:20.
Roadworks Map near to Oakleigh Road North, LONDON, N20 9ES (47 Events)





































































- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Oakleigh Road North, LONDON, N20 9ES (47 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Apr 2025 - 20 May 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data