ROADWORKS SUMMARY
Cranley Gardens, LONDON, N13 4LT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Cranley Gardens, N13 4LT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Cranley Gardens, LONDON, N13 4LT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Cranley Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 12 January 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 19:08.

Thames Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:03.

Thames Water logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:50.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Pert Close

Thames Water are carrying out Utility asset works on Pert Close, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Alexandra Road

Thames Water are carrying out Utility asset works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 10:20 and could run through until 23 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 08:13.

London Borough Of Waltham Forest logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Waltham Forest are carrying out Highway repair and maintenance works on Sutherland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Waltham Forest on 9 Oct 2024 at 14:29.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:29.

Thames Water logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Station Road

Thames Water are carrying out Utility asset works on Station Road, Southgate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:45.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 1 May 2024 at 07:27.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 07:13.

London Borough Of Enfield logo
LONG TERM
Until
10 Dec 2024
Details
View Map
Share
Follow
Carterhatch Lane

London Borough Of Enfield are carrying out Highway improvement works on Carterhatch Lane, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 08:00 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 20 Nov 2024 at 08:58.

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Upper Park Road

Thames Water are carrying out Utility asset works on Upper Park Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 May 2024 at 08:40 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are carrying out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 00:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 08:43.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Erskine Road

Thames Water are carrying out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 May 2024 at 09:25 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:07.

London Borough Of Enfield logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are carrying out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 22 August 2024 at 08:00 and could run through until 15 December 2024. The works will impact the verge and footpath.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 15:18.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

London Borough Of Haringey logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Chesnut Road

London Borough Of Haringey are carrying out Highway improvement works on Chesnut Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 09:29 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 1 Jul 2024 at 08:34.

London Borough Of Enfield logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Sarnesfield Road

London Borough Of Enfield are carrying out Highway repair and maintenance works on Sarnesfield Road, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 11:55.

London Borough Of Enfield logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are carrying out Highway repair and maintenance works on Church Street, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 09:49.

London Borough Of Enfield logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Little Park Gardens

London Borough Of Enfield are carrying out Highway improvement works on Little Park Gardens, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 09:28.

London Borough Of Enfield logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Cecil Road

London Borough Of Enfield are carrying out Highway improvement works on Cecil Road, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 09:46.

London Borough Of Enfield logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Woolmer Road

London Borough Of Enfield are carrying out Section 50 on Woolmer Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 09:00 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 21 Nov 2024 at 16:42.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Leeside Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Leeside Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 28 Jun 2024 at 14:16.

London Borough Of Enfield logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Meridian Way

London Borough Of Enfield are carrying out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 9 Oct 2024 at 09:36.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are proposing to carry out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 4 Jul 2024 at 15:51.

London Borough Of Barnet logo
LONG TERM
Until
12 Apr 2025
Details
View Map
Share
Follow
Hampden Way

London Borough Of Barnet are carrying out Highway improvement works on Hampden Way, Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 10:40.

London Borough Of Enfield logo
LONG TERM
Between
19 Aug and 20 Dec 2024
Details
View Map
Share
Follow
Bullsmoor Lane

London Borough Of Enfield are proposing to carry out Works for road purposes on Bullsmoor Lane, Enfield.

These works are categorised as Major.

The works will start on or after 19 August 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 10:00.

London Borough Of Enfield logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bullsmoor Lane

London Borough Of Enfield are carrying out Works for road purposes on Bullsmoor Lane, Enfield.

These works are categorised as Major.

The works started on 19 August 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Aug 2024 at 16:03.

London Borough Of Barnet logo
LONG TERM
Between
10 Sep 2024 and 22 Feb 2025
Details
View Map
Share
Follow
Chase Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Chase Way, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 22 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 16 September 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:58.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 13:02.

Thames Water logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Borwick Avenue

Thames Water are carrying out Utility asset works on Borwick Avenue, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 September 2024 at 08:30 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:38.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Harbet Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 20 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 15:29.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 21 Aug 2024 at 13:15.

Thames Water logo
LONG TERM
Between
7 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:38.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:34.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:08.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are carrying out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:37.

Thames Water logo
LONG TERM
Between
11 Oct and 15 Dec 2024
Details
View Map
Share
Fonthill Road

Thames Water were proposing to carry out Utility asset works on Fonthill Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 October 2024 and run through until 15 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 10:51.

Thames Water logo
LONG TERM
Until
15 Dec 2024
Details
View Map
Share
Follow
Fonthill Road

Thames Water are carrying out Utility asset works on Fonthill Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:04.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Weston Park

Thames Water are carrying out Utility repair and maintenance works on Weston Park, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 09:20 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:46.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Somers Road

Thames Water are carrying out Utility asset works on Somers Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 11:14.

Thames Water logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Browning Road

Thames Water are proposing to carry out Utility asset works on Browning Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 11:26.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 21 October 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:25.

London Borough Of Barnet logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are carrying out Highway improvement works on Great North Road, Underhill, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 08:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 22 Nov 2024 at 09:55.

Thames Water logo
LONG TERM
Between
22 Oct 2024 and 5 Apr 2025
Details
View Map
Share
Station Road

Thames Water were proposing to carry out Utility asset works on Station Road, Chingford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 October 2024 and run through until 5 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Aug 2024 at 08:31.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Cecil Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cecil Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:08.

Thames Water logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Palmers Road

Thames Water are carrying out Utility asset works on Palmers Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:45 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 10:25.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2024 at 16:00.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 15:53.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 16:20.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 10:16.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Footpath From Gresham Avenue To Beaconsfield Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Footpath From Gresham Avenue To Beaconsfield Road, Whetstone, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 28 October 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 9 May 2024 at 13:41.

London Borough Of Barnet logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Footpath From Gresham Avenue To Beaconsfield Road

London Borough Of Barnet are carrying out Highway improvement works on Footpath From Gresham Avenue To Beaconsfield Road, Whetstone, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 28 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Oct 2024 at 09:44.

Thames Water logo
LONG TERM
Between
29 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:37.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Browning Road

Thames Water are carrying out Utility asset works on Browning Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 07:30.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:35.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Forest Road

Thames Water are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 15:40.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are proposing to carry out Utility asset works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:38.

Thames Water logo
LONG TERM
Between
1 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are proposing to carry out Utility asset works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 15:41.

Cadent Gas logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are carrying out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 13:39 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 13:49.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Brookdale

Thames Water are carrying out Utility asset works on Brookdale, Southgate.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 09:00 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:40.

London Borough Of Hackney logo
Finishing
Friday
Details
View Map
Share
Follow
Clissold Road

London Borough Of Hackney are carrying out New service connection on Clissold Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 November 2024 at 15:13 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 14 Nov 2024 at 13:17.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are proposing to carry out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:51.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clapton Common

Cadent Gas are carrying out Utility asset works on Clapton Common, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 07:52 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 08:08.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rosebank Villas

Thames Water are carrying out Utility asset works on Rosebank Villas, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Albion Road

Thames Water are carrying out Utility repair and maintenance works on Albion Road, Hackney, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:38.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Priory Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Priory Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:31.

Thames Water logo
Finishing
Today
Details
View Map
Share
Priory Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Priory Avenue, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 24 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 09:22.

London Borough Of Enfield logo
Between
11 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Albany Road

London Borough Of Enfield are proposing to carry out Section 50 on Albany Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 14 Oct 2024 at 13:02.

London Borough Of Enfield logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Albany Road

London Borough Of Enfield are proposing to carry out Section 50 on Albany Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 29 Oct 2024 at 15:25.

London Borough Of Enfield logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Albany Road

London Borough Of Enfield are proposing to carry out Section 50 on Albany Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 29 Oct 2024 at 15:32.

London Borough Of Enfield logo
LONG TERM
Until
14 Dec 2024
Details
View Map
Share
Follow
Plevna Road

London Borough Of Enfield are carrying out Section 50 on Plevna Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 15:21.

London Borough Of Enfield logo
Finishing
Saturday
Details
View Map
Share
Plevna Road

London Borough Of Enfield were proposing to carry out Section 50 on Plevna Road, Edmonton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Oct 2024 at 12:02.

London Borough Of Enfield logo
Finishing
Saturday
Details
View Map
Share
Follow
Plevna Road

London Borough Of Enfield are proposing to carry out Section 50 on Plevna Road, Edmonton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Oct 2024 at 12:06.

London Borough Of Haringey logo
Between
13 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Hale Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Hale Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 14 Aug 2024 at 14:39.

Thames Water logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Brookhill Road

Thames Water are carrying out Utility repair and maintenance works on Brookhill Road, New Barnet, Barnet.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 10:30 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:18.

Thames Water logo
Until
4 Dec 2024
Details
View Map
Share
Follow
Foyle Road

Thames Water are carrying out Utility repair and maintenance works on Foyle Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 10:30 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 10:40.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Philip Lane

Cadent Gas are carrying out Utility repair and maintenance works on Philip Lane, Tottenham, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 November 2024 at 12:04 and could run through until 26 November 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 12:31.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 10:47.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are carrying out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:17 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:27.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Aug 2024 at 14:20.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 16:19.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 9 Mar 2025
Details
View Map
Share
Follow
Hurst Road

Cadent Gas are proposing to carry out Utility asset works on Hurst Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Aug 2024 at 15:52.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 9 Mar 2025
Details
View Map
Share
Hurst Road

Cadent Gas were proposing to carry out Utility asset works on Hurst Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 9 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:59.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 16:12.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Forest Road

Cadent Gas were proposing to carry out Utility asset works on Forest Road, Walthamstow.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 13:57.

London Borough Of Haringey logo
Between
18 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Bounds Green Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 30 Oct 2024 at 16:39.

London Borough Of Haringey logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Bounds Green Road

London Borough Of Haringey are carrying out Highway improvement works on Bounds Green Road, Bounds Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 18 Nov 2024 at 09:26.

London Borough Of Enfield logo
Finishing
Wednesday
Details
View Map
Share
Follow
Grove Street

London Borough Of Enfield are carrying out Section 50 on Grove Street, Edmonton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 08:00 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 15:52.

UK Power Networks Eastern & London logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:26.

UK Power Networks Eastern & London logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are carrying out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:48 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:48.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Haslemere Road

Thames Water are carrying out Utility repair and maintenance works on Haslemere Road, Southgate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:50 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:02.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 16:27.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 11 May 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 11 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 16:20.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 6 Apr 2025
Details
View Map
Share
Follow
Station Road

Thames Water are proposing to carry out Utility asset works on Station Road, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 15:11.

London Borough Of Enfield logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Nov 2024 at 14:25.

London Borough Of Enfield logo
Finishing
Friday
Details
View Map
Share
Follow
Kingsway

London Borough Of Enfield are carrying out Highway improvement works on Kingsway, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 07:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 08:09.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Linwood Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Linwood Crescent, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Sep 2024 at 12:36.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Linwood Crescent

UK Power Networks Eastern & London are carrying out New service connection on Linwood Crescent, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:47.

Thames Water logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Newbury Avenue

Thames Water are proposing to carry out Utility asset works on Newbury Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

Cadent Gas logo
LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Severn Drive

Cadent Gas were proposing to carry out Utility asset works on Severn Drive, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 12:16.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sunnyside Road

Cadent Gas are carrying out Utility repair and maintenance works on Sunnyside Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:45 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 07:36.

London Borough Of Haringey logo
LONG TERM
Between
19 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Stanhope Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Stanhope Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 4 Jun 2024 at 11:56.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Southbury Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Southbury Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 12:24.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Southbury Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Southbury Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Nov 2024 at 10:29.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Genotin Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Genotin Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 12:25.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Genotin Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Genotin Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 20 Nov 2024 at 12:52.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
London Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on London Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 11:05.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
The Town

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on The Town, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 11:20.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Cecil Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Cecil Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 10:58.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Little Park Gardens

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Little Park Gardens, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 11:12.

London Borough Of Enfield logo
Between
19 Nov and 7 Dec 2024
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Church Street, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Nov 2024 at 10:51.

Thames Water logo
Until
10 Dec 2024
Details
View Map
Share
Follow
Brodie Road

Thames Water are carrying out Utility asset works on Brodie Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 14:10 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beaconsfield Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Beaconsfield Road, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 05:40 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:17.

London Borough Of Enfield logo
Between
20 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Sandal Road

London Borough Of Enfield are proposing to carry out Section 50 on Sandal Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 15:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Brancroft Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 12:07.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Brancroft Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Brancroft Way, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 12:08.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Bideford Road

Thames Water are carrying out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:09.

Thames Water logo
Between
20 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Brodie Road

Thames Water are proposing to carry out Utility asset works on Brodie Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Sep 2024 at 12:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Turkey Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Turkey Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 12:09.

UK Power Networks Eastern & London logo
Between
20 Nov and 13 Dec 2024
Details
View Map
Share
Bulls Cross

UK Power Networks Eastern & London were proposing to carry out New service connection on Bulls Cross, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:05.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
East End Road

Cadent Gas are carrying out Utility repair and maintenance works on East End Road, Finchley, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:40 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Briar Close

Cadent Gas are carrying out Utility repair and maintenance works on Briar Close, East Finchley, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 12:35 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 14:03.

London Borough Of Enfield logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 21 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 21 Nov 2024 at 16:15.

London Borough Of Barnet logo
Finishing
Wednesday
Details
View Map
Share
Follow
Woodside Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Woodside Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Aug 2024 at 09:20.

London Borough Of Enfield logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Crescent

London Borough Of Enfield are proposing to carry out Remedial works on Park Crescent, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 19 Sep 2024 at 15:12.

London Borough Of Enfield logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Park Crescent

London Borough Of Enfield are proposing to carry out Remedial works on Park Crescent, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 1 Oct 2024 at 12:22.

Thames Water logo
Until
6 Dec 2024
Details
View Map
Share
Follow
Tysoe Avenue

Thames Water are carrying out Utility repair and maintenance works on Tysoe Avenue, Enfield.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 12:30 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:16.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
St Thomas Road

Thames Water are carrying out Utility repair and maintenance works on St Thomas Road, Southgate.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 November 2024 at 17:18 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Nov 2024 at 17:18.

Thames Water logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Goodwin Street

Thames Water are proposing to carry out Utility asset works on Goodwin Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 10:44.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
West Bank

BT are proposing to carry out Utility asset works on West Bank, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 12:14.

Cadent Gas logo
Between
25 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:08.

Cadent Gas logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:32.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Nov 2024 at 10:25.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Nov 2024 at 10:19.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 8 Nov 2024 at 10:19.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Quernmore Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Quernmore Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 08:49.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Quernmore Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Quernmore Road, Hornsey, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 10:08.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Chesterfield Gardens

Thames Water are proposing to carry out New service connection on Chesterfield Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 10:27.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wellington Road

BT are proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Sep 2024 at 16:23.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Wellington Road

BT are proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 31 Oct 2024 at 15:15.

BT logo
Finishing
Wednesday
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Sep 2024 at 15:04.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility asset works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Aug 2024 at 15:10.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility asset works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Sep 2024 at 11:38.

London Borough Of Enfield logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Enfield are proposing to carry out Section 50 on The Ridgeway, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 17 Oct 2024 at 15:47.

London Borough Of Enfield logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Enfield are proposing to carry out Section 50 on The Ridgeway, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 18 Oct 2024 at 11:06.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ordnance Road

Network Rail are proposing to carry out Works for Rail Purposes on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Sep 2024 at 10:10.

Network Rail logo
Finishing
Wednesday
Details
View Map
Share
Follow
Ordnance Road

Network Rail are proposing to carry out Works for Rail Purposes on Ordnance Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Oct 2024 at 11:27.

London Borough Of Haringey logo
Finishing
Friday
Details
View Map
Share
Follow
Upper Tollington Park

London Borough Of Haringey are proposing to carry out Highway improvement works on Upper Tollington Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 13 Nov 2024 at 09:46.

Finishing
Thursday
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 25 Oct 2024 at 10:19.

London Borough Of Haringey logo
Finishing
Saturday
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Oct 2024 at 15:30.

Transport for London (TfL) logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Selborne Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Selborne Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 16:08.

Transport for London (TfL) logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Selborne Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Selborne Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:14.

Transport for London (TfL) logo
Between
29 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Selborne Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Selborne Road, Walthamstow.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:26.

London Borough Of Haringey logo
Between
30 Nov and 2 Dec 2024
Details
View Map
Share
Wroxham Gardens

London Borough Of Haringey were proposing to carry out Highway improvement works on Wroxham Gardens, Wood Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 16 Oct 2024 at 08:11.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:36.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Gladstone Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Gladstone Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 12:58.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Gladstone Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Gladstone Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:04.

Thames Water logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Malvern Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Malvern Avenue, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:16.

Virgin Media logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Lyndhurst Road

Virgin Media are proposing to carry out Utility asset works on Lyndhurst Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 5 Sep 2024 at 12:08.

London Borough Of Enfield logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Green Lanes

London Borough Of Enfield are proposing to carry out Highway improvement works on Green Lanes, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 5 Sep 2024 at 14:50.

London Borough Of Enfield logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Whitmore Close

London Borough Of Enfield are proposing to carry out Highway improvement works on Whitmore Close, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 20 Nov 2024 at 10:27.

Cadent Gas logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Fotheringham Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Fotheringham Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 09:41.

Cadent Gas logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Fotheringham Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Fotheringham Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:05.

Thames Water logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Southbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southbury Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 10:00.

BT logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Wellington Road

BT were proposing to carry out Utility asset works on Wellington Road, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 16:11.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Old Park Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Old Park Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:58.

Thames Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Old Park Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Old Park Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 09:54.

BT logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Park Avenue

BT are proposing to carry out Utility asset works on Park Avenue, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Oct 2024 at 14:56.

BT logo
Between
5 and 9 Dec 2024
Details
View Map
Share
Follow
Ranelagh Road

BT are proposing to carry out Utility asset works on Ranelagh Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Oct 2024 at 14:13.

Transport for London (TfL) logo
Between
6 and 7 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 07:56.

London Borough Of Barnet logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 28 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
6 and 8 Dec 2024
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Cadent Gas logo
LONG TERM
Between
6 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Hatch Lane

Cadent Gas are proposing to carry out Utility asset works on Hatch Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 15:15.

London Borough Of Barnet logo
Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
St James Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Nov 2024 at 09:33.

London Borough Of Barnet logo
Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
St James Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on St James Avenue, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 21 Nov 2024 at 15:48.

BT logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Filey Avenue

BT are proposing to carry out Utility repair and maintenance works on Filey Avenue, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Nov 2024 at 13:26.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:47.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 11:20.

Transport for London (TfL) logo
Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Nov 2024 at 10:40.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

London Borough Of Islington are proposing to carry out Highway improvement works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 9 Sep 2024 at 07:55.

Between
9 and 13 Dec 2024
Details
View Map
Share
Stroud Green Road

London Borough Of Islington were proposing to carry out Highway improvement works on Stroud Green Road, Hornsey, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 13:58.

Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hornsey Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hornsey Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Islington on 6 Sep 2024 at 08:07.

Cadent Gas logo
Between
9 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 2 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 08:28.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Low Hall Lane

Thames Water were proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 12:44.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Haringey Park

Thames Water are proposing to carry out Utility repair and maintenance works on Haringey Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 07:44.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Haringey Park

Thames Water are proposing to carry out Utility repair and maintenance works on Haringey Park, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:45.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Hampstead Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 11:31.

UK Power Networks Eastern & London logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Talbot Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Talbot Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 10:12.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2023 at 15:24.

Thames Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Hatherley Mews

Thames Water are proposing to carry out New service connection on Hatherley Mews, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:16.

Affinity Water logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Sep 2024 at 14:47.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Torrington Park

Thames Water were proposing to carry out Utility asset works on Torrington Park, North Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 09:24.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Friary Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Friary Way, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 12:22.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Green

Thames Water are proposing to carry out Utility repair and maintenance works on The Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:07.

Thames Water logo
Between
9 and 13 Dec 2024
Details
View Map
Share
The Green

Thames Water were proposing to carry out Utility repair and maintenance works on The Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 17:26.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Chelmsford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 18:11.

Thames Water logo
Between
9 and 15 Dec 2024
Details
View Map
Share
Follow
Chelmsford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chelmsford Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 13:23.

London Borough Of Barnet logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Sep 2024 at 09:16.

Thames Water logo
Until
15 Dec 2024
Details
View Map
Share
Follow
Stroud Green Road

Thames Water are carrying out Utility repair and maintenance works on Stroud Green Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 13:10 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Feb 2024 at 14:17.

London Borough Of Barnet logo
Between
10 and 12 Dec 2024
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Sep 2024 at 17:25.

London Borough Of Enfield logo
Between
10 and 16 Dec 2024
Details
View Map
Share
Follow
Carterhatch Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Carterhatch Lane, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Nov 2024 at 12:26.

Thames Water logo
Between
11 and 17 Dec 2024
Details
View Map
Share
Follow
Sweet Briar Grove

Thames Water are proposing to carry out New service connection on Sweet Briar Grove, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 18:08.

Thames Water logo
Between
13 and 15 Dec 2024
Details
View Map
Share
Follow
Low Hall Lane

Thames Water are proposing to carry out Utility asset works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Dec 2024 and 2 Apr 2025
Details
View Map
Share
Whitewebbs Lane

UK Power Networks Eastern & London were proposing to carry out New service connection on Whitewebbs Lane, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 2 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:06.

UK Power Networks Eastern & London logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Aylmer Parade

UK Power Networks Eastern & London are proposing to carry out New service connection on Aylmer Parade, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 11:13.

London Borough Of Enfield logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Ingleton Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Ingleton Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 22 Nov 2024 at 11:35.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

UK Power Networks Eastern & London logo
Between
17 and 26 Dec 2024
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 09:51.

Cadent Gas logo
Between
18 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Gloucester Road

BT were proposing to carry out Utility asset works on Gloucester Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 16:24.

Thames Water logo
Between
20 and 22 Dec 2024
Details
View Map
Share
Chingford Road

Thames Water were proposing to carry out Utility repair and maintenance works on Chingford Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 December 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:35.

Thames Water logo
Between
23 and 28 Dec 2024
Details
View Map
Share
Follow
Langham Road

Thames Water are proposing to carry out New service connection on Langham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 16:20.

Thames Water logo
Between
23 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Carlingford Road

Thames Water are proposing to carry out New service connection on Carlingford Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 07:59.

London Borough Of Barnet logo
Between
24 and 31 Dec 2024
Details
View Map
Share
Woodside

London Borough Of Barnet were proposing to carry out Highway improvement works on Woodside, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 7 Oct 2024 at 08:55.

London Borough Of Barnet logo
Until
26 Dec 2024
Details
View Map
Share
Follow
Claverley Villas

London Borough Of Barnet are carrying out Highway improvement works on Claverley Villas, Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 December 2024 at 00:00 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 30 Sep 2024 at 09:19.

London Borough Of Barnet logo
Between
24 and 26 Dec 2024
Details
View Map
Share
Follow
Granville Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Granville Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Aug 2024 at 11:08.

BT logo
Between
27 and 31 Dec 2024
Details
View Map
Share
Green Lanes

BT were proposing to carry out Utility asset works on Green Lanes, Hornsey, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 3 Oct 2024 at 08:35.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:55.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 14:47.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:01.

Thames Water logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:48.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 08:04.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 10:43.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Dollis Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 11:50.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Foyle Road

Thames Water are proposing to carry out Utility repair and maintenance works on Foyle Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 07:48.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Nether Street

Thames Water are proposing to carry out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:51.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Winchmore Hill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winchmore Hill Road, Southgate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 07:27.

Thames Water logo
LONG TERM
Between
2 Jan and 1 May 2025
Details
View Map
Share
Follow
East Duck Lees Lane

Thames Water are proposing to carry out Utility asset works on East Duck Lees Lane, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:42.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:24.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:50.

Thames Water logo
LONG TERM
Between
2 Jan and 20 Mar 2025
Details
View Map
Share
Follow
Bideford Road

Thames Water are proposing to carry out Utility asset works on Bideford Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:33.

Thames Water logo
LONG TERM
Between
3 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Westbury Road

Thames Water are proposing to carry out Utility asset works on Westbury Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:13.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Myddleton Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:47.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

London Borough Of Haringey logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 12:10.

London Borough Of Haringey logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 07:17.

London Borough Of Enfield logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
The Limes Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on The Limes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:33.

London Borough Of Enfield logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Nov 2024 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Arlington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Arlington Road, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:34.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:04.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:17.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:37.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:01.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:38.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:02.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 11:05.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 13:52.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:38.

London Borough Of Enfield logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southfield Road

London Borough Of Enfield are proposing to carry out Remedial works on Southfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:32.

London Borough Of Enfield logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southfield Road

London Borough Of Enfield are proposing to carry out Remedial works on Southfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Oct 2024 at 10:05.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:57.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Pennington Drive

Thames Water were proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:19.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Pennington Drive

Thames Water were proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:21.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:27.

UK Power Networks Eastern & London logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Uckfield Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Uckfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Sep 2024 at 11:50.

G2 Energy IDNO logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Access Road From Bullsmoor Lane To 1604-1750 Great Cambridge Road

G2 Energy IDNO are proposing to carry out New service connection on Access Road From Bullsmoor Lane To 1604-1750 Great Cambridge Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by G2 Energy IDNO on 11 Nov 2024 at 11:47.

UK Power Networks Eastern & London logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Carpenter Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:32.

UK Power Networks Eastern & London logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Carpenter Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 08:59.

Thames Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:37.

BT logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Glendale Avenue

BT are proposing to carry out Utility asset works on Glendale Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:29.

Thames Water logo
Between
10 and 12 Jan 2025
Details
View Map
Share
Follow
Waterfall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waterfall Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:06.

Thames Water logo
Between
12 and 14 Jan 2025
Details
View Map
Share
Rushcroft Road

Thames Water were proposing to carry out roadworks on Rushcroft Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:47.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Apr 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:54.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:14.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:42.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

Thames Water logo
Between
13 and 14 Jan 2025
Details
View Map
Share
Follow
Ermine Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ermine Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 16:30.

Thames Water logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Selborne Road

Thames Water are proposing to carry out roadworks on Selborne Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 11:45.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fairbourne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairbourne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 11:26.

London Borough Of Haringey logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 08:25.

London Borough Of Barnet logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 13:03.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Edith Road

Thames Water are proposing to carry out New service connection on Edith Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Holden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 14:33.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 28 Oct 2024 at 11:20.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 15:48.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
The Ridgeway

T-Mobile (UK) were proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Oct 2024 at 11:45.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Corri Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Corri Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:47.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Crown Road

Virgin Media are proposing to carry out Utility asset works on Crown Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 7 Oct 2024 at 15:18.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Calshot Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Calshot Way, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 14:44.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Marrilyne Avenue

Thames Water were proposing to carry out New service connection on Marrilyne Avenue, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 14:39.

Thames Water logo
Between
14 and 18 Jan 2025
Details
View Map
Share
Follow
Stainton Road

Thames Water are proposing to carry out New service connection on Stainton Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:51.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 09:26.

UK Power Networks Eastern & London logo
Between
18 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.

Transport for London (TfL) logo
Between
20 and 21 Jan 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 09:26.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Gainsford Road

Thames Water are proposing to carry out Utility asset works on Gainsford Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:41.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:41.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Shrubbery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 4 Mar 2025
Details
View Map
Share
Mollison Avenue

UK Power Networks Eastern & London were proposing to carry out New service connection on Mollison Avenue, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:07.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Marrilyne Avenue

Thames Water were proposing to carry out New service connection on Marrilyne Avenue, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:18.

Thames Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Queens Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queens Drive, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:43.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chesterfield Gardens

Thames Water are proposing to carry out New service connection on Chesterfield Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:09.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Shrubland Road

Thames Water are proposing to carry out Utility asset works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2023 at 15:27.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 09:54.

London Borough Of Enfield logo
LONG TERM
Between
27 Jan and 26 Oct 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 28 Oct 2024 at 14:28.

Affinity Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 12:14.

London Borough Of Barnet logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 09:17.

Affinity Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 15:48.

Thames Water logo
Between
28 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Stainton Road

Thames Water are proposing to carry out New service connection on Stainton Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:26.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Rolls Park Road

Thames Water were proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:21.

Thames Water logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Rolls Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rolls Park Road, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:31.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 13:45.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 12:12.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:44.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:42.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Bells Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:40.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Leicester Road

Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:19.

UK Power Networks Eastern & London logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Elsinge Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Elsinge Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 09:07.

Thames Water logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Hertford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:07.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 22 Nov 2024 at 14:53.

Transport for London (TfL) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 15:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 9 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 10:29.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Edison Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Edison Close, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2023 at 13:47.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Harefield Road

Thames Water are proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 11:52.

London Borough Of Enfield logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 10:00.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sweet Briar Grove

Thames Water are proposing to carry out New service connection on Sweet Briar Grove, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:21.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Haselwood Drive

BT are proposing to carry out Utility asset works on Haselwood Drive, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Nov 2024 at 09:07.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 12:25.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 15:34.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Philip Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Philip Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:15.

London Borough Of Barnet logo
Between
13 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 09:18.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 6 Nov 2024 at 09:19.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gillespie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gillespie Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:49.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Bank

Thames Water are proposing to carry out New service connection on The Bank, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:20.

Hyperoptic logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Frobisher Road

Hyperoptic are proposing to carry out Utility asset works on Frobisher Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 13 Nov 2024 at 14:33.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 12:20.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
East End Road

Affinity Water were proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 14:42.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 11:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:13.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 15:15.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:52.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:09.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:57.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:31.

London Borough Of Barnet logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Leicester Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:54.

London Borough Of Barnet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Nov 2024 at 09:59.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Albert Road

BT are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 14 Nov 2024 at 15:45.

London Borough Of Enfield logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Genotin Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Genotin Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Nov 2024 at 10:27.

Thames Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
The Ride

Thames Water are proposing to carry out New service connection on The Ride, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 08:12.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Cadent Gas are proposing to carry out New service connection on Salisbury Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:30.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lovell Road

Thames Water are proposing to carry out New service connection on Lovell Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:47.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hadley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:41.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 15:38.

Thames Water logo
LONG TERM
Between
20 Feb and 15 May 2025
Details
View Map
Share
Follow
Marrilyne Avenue

Thames Water are proposing to carry out Utility asset works on Marrilyne Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 15 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:57.

Thames Water logo
LONG TERM
Between
21 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Somerfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 15:54.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 11:16.

London Borough Of Barnet logo
Between
21 and 26 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 14:35.


Roadworks Map near to Cranley Gardens, LONDON, N13 4LT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Cranley Gardens, LONDON, N13 4LT (25 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
URGENT
  
BOURNE HILL 
(0.1 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 19 Nov 2024 15:54
(Scheduled: 19 Nov 2024 - 25 Nov 2024)
0.1
Details
Share
Follow
2
Thames Water logo
URGENT
  
FOX LANE 
(0.2 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 21 Nov 2024 16:39
(Scheduled: 21 Nov 2024 - 27 Nov 2024)
0.2
Details
Share
Follow
3
London Borough Of Enfield logo
BROAD WALK 
(0.3 miles)
London Borough Of Enfield
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 22 Nov 2024 09:18
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.3
Details
Share
Follow
4
BT logo
GREEN LANES 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 25 Nov 2024
0.3
Details
Share
Follow
5
London Borough Of Enfield logo
GREEN LANES 
(0.4 miles)
London Borough Of Enfield
Highway improvement works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 26 Nov 2024)
0.4
Details
Share
6
London Borough Of Enfield logo
BROAD WALK 
(0.4 miles)
London Borough Of Enfield
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 22 Nov 2024 09:18
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
7
London Borough Of Enfield logo
BROAD WALK 
(0.4 miles)
London Borough Of Enfield
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 22 Nov 2024 09:18
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.4
Details
Share
Follow
8
BT logo
HEDGE LANE 
(0.5 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
22 Nov 2024 11:15 - 15:00
0.5
Details
Share
9
London Borough Of Enfield logo
BROAD WALK 
(0.5 miles)
London Borough Of Enfield
Utility asset works - Verge - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 29 Nov 2024
0.5
Details
Share
Follow
10
UK Power Networks Eastern & London logo
URGENT
  
GREEN LANES 
(0.5 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway, Cycleway - No carriageway incursion
In Progress
Since: 22 Nov 2024 11:57
(Scheduled: 22 Nov 2024 - 28 Nov 2024)
0.5
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data