ROADWORKS SUMMARY
Hampton Close, LONDON, N11 3PR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hampton Close, N11 3PR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hampton Close, LONDON, N11 3PR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hampton Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 12 January 2025. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 19:08.

Thames Water logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:03.

Thames Water logo
LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 12:50.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Pert Close

Thames Water are carrying out Utility asset works on Pert Close, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Alexandra Road

Thames Water are carrying out Utility asset works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 12:00 and could run through until 23 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Jul 2024 at 10:23.

Thames Water logo
LONG TERM
Until
23 Mar 2025
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 10:20 and could run through until 23 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 08:13.

London Borough Of Barnet logo
LONG TERM
Until
1 Mar 2025
Details
View Map
Share
Follow
Charcot Road

London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.

These works are categorised as Major.

The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Apr 2024 at 14:30.

Thames Water logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Station Road

Thames Water are carrying out Utility asset works on Station Road, Southgate.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:45.

London Borough Of Barnet logo
LONG TERM
Between
1 Mar 2024 and 1 Sep 2025
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 1 May 2024 at 07:27.

London Borough Of Barnet logo
LONG TERM
Between
28 Apr 2024 and 28 Apr 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 16 May 2024 at 07:13.

London Borough Of Barnet logo
LONG TERM
Until
10 Oct 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are carrying out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 07:27 and could run through until 10 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 May 2024 at 06:31.

London Borough Of Barnet logo
LONG TERM
Until
17 Jun 2025
Details
View Map
Share
Follow
Albert Road

London Borough Of Barnet are carrying out Highway improvement works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2024 at 00:00 and could run through until 17 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jun 2024 at 08:43.

London Borough Of Barnet logo
LONG TERM
Between
4 Jun 2024 and 31 Mar 2026
Details
View Map
Share
Follow
Colindale Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.

These works are categorised as Major.

The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.

London Borough Of Enfield logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are carrying out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 22 August 2024 at 08:00 and could run through until 24 January 2025. The works will impact the verge and footpath.

This roadwork event was last updated by London Borough Of Enfield on 2 Jan 2025 at 16:18.

Thames Water logo
LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are carrying out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 June 2024 at 09:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Jun 2024 at 09:50.

London Borough Of Enfield logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Sarnesfield Road

London Borough Of Enfield are carrying out Highway repair and maintenance works on Sarnesfield Road, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 17 Dec 2024 at 14:14.

London Borough Of Enfield logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Church Street

London Borough Of Enfield are carrying out Highway repair and maintenance works on Church Street, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 17 Dec 2024 at 14:13.

London Borough Of Enfield logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Little Park Gardens

London Borough Of Enfield are carrying out Highway improvement works on Little Park Gardens, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 17 Dec 2024 at 14:14.

London Borough Of Enfield logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Cecil Road

London Borough Of Enfield are carrying out Highway improvement works on Cecil Road, Enfield.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 July 2024 at 08:00 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 17 Dec 2024 at 14:15.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Leeside Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Leeside Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 28 Jun 2024 at 14:16.

London Borough Of Enfield logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Meridian Way

London Borough Of Enfield are carrying out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 9 Oct 2024 at 09:36.

London Borough Of Enfield logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Glover Drive

London Borough Of Enfield are proposing to carry out Highway improvement works on Glover Drive, Edmonton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 4 Jul 2024 at 15:51.

London Borough Of Barnet logo
LONG TERM
Until
12 Apr 2025
Details
View Map
Share
Follow
Hampden Way

London Borough Of Barnet are carrying out Highway improvement works on Hampden Way, Southgate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:00 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Oct 2024 at 10:40.

London Borough Of Camden logo
LONG TERM
Until
12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.

London Borough Of Barnet logo
LONG TERM
Between
15 Aug 2024 and 24 Dec 2025
Details
View Map
Share
Follow
Whitefield Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Whitefield Avenue, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 24 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 10 Jun 2024 at 08:12.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:35.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:37.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:41.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:42.

LONG TERM
Between
2 Sep 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 19 Aug 2024 at 12:43.

London Borough Of Barnet logo
LONG TERM
Between
10 Sep 2024 and 22 Feb 2025
Details
View Map
Share
Follow
Chase Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Chase Way, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 September 2024 and could run through until 22 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 13:10.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 16 September 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 10:58.

Cadent Gas logo
LONG TERM
Between
16 Sep 2024 and 14 Feb 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 16 September 2024 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 13:02.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Mar 2025
Details
View Map
Share
Harbet Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 20 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 15 Aug 2024 at 15:29.

London Borough Of Enfield logo
LONG TERM
Between
30 Sep 2024 and 20 Jul 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 20 July 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 21 Aug 2024 at 13:15.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Wilbury Way

Cadent Gas are proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works are categorised as Major.

The works will start on or after 21 October 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
21 Oct 2024 and 21 Mar 2025
Details
View Map
Share
Wilbury Way

Cadent Gas were proposing to carry out Utility asset works on Wilbury Way, Edmonton.

These works were categorised as Major.

The works were originally planned to start 21 October 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:25.

Thames Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Palmers Road

Thames Water are carrying out Utility asset works on Palmers Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 08:45 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 14:52.

Thames Water logo
LONG TERM
Until
25 Oct 2025
Details
View Map
Share
Follow
Barnet Road

Thames Water are carrying out Utility repair and maintenance works on Barnet Road, Barnet.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 09:30 and could run through until 25 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 09:25.

London Borough Of Camden logo
LONG TERM
Between
28 Oct 2024 and 12 Sep 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.

Electricity Network Company logo
LONG TERM
Between
29 Oct 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Booth Road

Electricity Network Company are proposing to carry out Utility asset works on Booth Road, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 21 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Electricity Network Company on 6 Aug 2024 at 13:20.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Browning Road

Thames Water are carrying out Utility asset works on Browning Road, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:56.

London Borough Of Barnet logo
LONG TERM
Between
6 Nov 2024 and 13 Mar 2025
Details
View Map
Share
Shirehall Lane

London Borough Of Barnet were proposing to carry out Highway improvement works on Shirehall Lane, Hendon, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:37.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are proposing to carry out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 28 Aug 2024 at 19:03.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Agar Grove

Network Rail are carrying out Works for Rail Purposes on Agar Grove, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Dec 2024 at 15:03.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are proposing to carry out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 17 Sep 2024 at 09:54.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Murray Street

Network Rail are carrying out Works for Rail Purposes on Murray Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:23.

Network Rail logo
LONG TERM
Between
11 Nov 2024 and 12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are proposing to carry out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 12 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 11:16.

Network Rail logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
St Augustine's Road

Network Rail are carrying out Works for Rail Purposes on St Augustine's Road, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 00:01 and could run through until 12 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 08:26.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:47.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Ferntower Road

London Borough Of Islington were proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:48.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:53.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Newington Green

London Borough Of Islington were proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:54.

LONG TERM
Between
11 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Matthias Road

London Borough Of Islington were proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 30 Oct 2024 at 08:55.

London Borough Of Enfield logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Albany Road

London Borough Of Enfield are carrying out Section 50 on Albany Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Jan 2025 at 16:19.

London Borough Of Barnet logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 5 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:20.

London Borough Of Barnet logo
LONG TERM
Between
25 Nov 2024 and 16 Jun 2025
Details
View Map
Share
Follow
West Hendon Broadway

London Borough Of Barnet are proposing to carry out Highway improvement works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 11:15.

London Borough Of Camden logo
LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 6 Sep 2024 at 12:17.

London Borough Of Camden logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 9 Sep 2024 at 10:25.

London Borough Of Enfield logo
LONG TERM
Until
20 Jan 2025
Details
View Map
Share
Follow
Carterhatch Lane

London Borough Of Enfield are carrying out Highway improvement works on Carterhatch Lane, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 17:00 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Dec 2024 at 08:58.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 07:50.

Cadent Gas logo
LONG TERM
Between
17 Dec 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Broadlands Road

Cadent Gas are proposing to carry out Utility asset works on Broadlands Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Denewood Road

Cadent Gas are proposing to carry out Utility asset works on Denewood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

Thames Water logo
LONG TERM
Until
21 Jan 2025
Details
View Map
Share
Follow
Crescent Road

Thames Water are carrying out Utility repair and maintenance works on Crescent Road, Wood Green, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 09:11 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 15:32.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Graham Road

Cadent Gas are carrying out Utility repair and maintenance works on Graham Road, Hendon, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 December 2024 at 16:36 and could run through until 5 January 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 30 Dec 2024 at 14:56.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Links Side

Thames Water are carrying out Utility repair and maintenance works on Links Side, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 December 2024 at 07:58 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Dec 2024 at 11:52.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
York Mews

Thames Water are proposing to carry out New service connection on York Mews, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 16:22.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
York Mews

Thames Water were proposing to carry out New service connection on York Mews, Kentish Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 6 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:25.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:55.

Thames Water logo
Until
22 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

Thames Water are carrying out Utility repair and maintenance works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 11:30 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 11:51.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Clarendon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:01.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Clarendon Road

Thames Water are carrying out Utility repair and maintenance works on Clarendon Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 09:00 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 09:29.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Mayes Road

Cadent Gas are carrying out Utility repair and maintenance works on Mayes Road, Wood Green, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 08:40 and could run through until 5 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jan 2025 at 10:59.

Cadent Gas logo
Thursday
Details
View Map
Share
Caxton Road

Cadent Gas carried out Utility repair and maintenance works on Caxton Road, Wood Green, London.

The road was closed for some or all of the period.

The works were originally planned between 2 Jan 2025 and 9 Jan 2025 and were actually completed between 2 Jan 2025 (08:35) and 5 Jan 2025 (11:06). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Jan 2025 at 11:43.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 08:04.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Dollis Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 10:43.

Thames Water logo
Until
22 Jan 2025
Details
View Map
Share
Follow
Dollis Avenue

Thames Water are carrying out Utility repair and maintenance works on Dollis Avenue, Finchley, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:30 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 12:16.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Foyle Road

Thames Water are proposing to carry out Utility repair and maintenance works on Foyle Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 07:48.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Follow
Nether Street

Thames Water are proposing to carry out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 14:51.

Thames Water logo
Until
22 Jan 2025
Details
View Map
Share
Follow
Nether Street

Thames Water are carrying out Utility repair and maintenance works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2025 at 10:45 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 12:36.

Thames Water logo
Between
2 and 22 Jan 2025
Details
View Map
Share
Winchmore Hill Road

Thames Water were proposing to carry out Utility repair and maintenance works on Winchmore Hill Road, Southgate.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 07:27.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Ridge Road

Thames Water are carrying out Utility repair and maintenance works on Ridge Road, Hornsey, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 10:22 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 11:52.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Merton Road

Thames Water are carrying out roadworks on Merton Road, Enfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2025 at 10:30 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 13:48.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are carrying out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2025 at 08:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jan 2025 at 08:39.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Etheldene Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Etheldene Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:06.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Etheldene Avenue

Thames Water are carrying out Utility repair and maintenance works on Etheldene Avenue, Hornsey, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2025 at 08:00 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jan 2025 at 08:40.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Sunnyside Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Sunnyside Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 16:15 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jan 2025 at 16:16.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Holly Walk

Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:46.

Thames Water logo
Between
6 and 19 Jan 2025
Details
View Map
Share
Follow
Vale Of Health

Thames Water are proposing to carry out Statutory Infrastructure Works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:52.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Myddleton Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:47.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 11:27.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:34.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Rotherwick Road

Cadent Gas are proposing to carry out Utility asset works on Rotherwick Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:29.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Tilling Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tilling Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:12.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 30 Aug 2025
Details
View Map
Share
Follow
Claremont Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2024 at 13:13.

Cadent Gas logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Bishopswood Road

Cadent Gas are proposing to carry out Utility asset works on Bishopswood Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:10.

London Borough Of Barnet logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 11 Dec 2024 at 11:40.

London Borough Of Barnet logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
The Bishops Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 13 Dec 2024 at 16:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Perryfield Way

Thames Water were proposing to carry out New service connection on Perryfield Way, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Sep 2024 at 13:05.

London Borough Of Barnet logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Station Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 19 Dec 2024 at 10:37.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 25 Jun 2025
Details
View Map
Share
Follow
Monument Way

Transport for London (TfL) are proposing to carry out Section 50 on Monument Way, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 14:33.

Transport for London (TfL) logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Monument Way

Transport for London (TfL) are proposing to carry out Section 50 on Monument Way, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 10:56.

London Borough Of Haringey logo
Finishing
Friday
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 12:10.

London Borough Of Haringey logo
Finishing
Friday
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Gloucester Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 12:05.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 08:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 4 Mar 2025
Details
View Map
Share
Ecclesbourne Gardens

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:34.

London Borough Of Enfield logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
The Limes Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on The Limes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 29 May 2024 at 08:33.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Broomfield Lane

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:37.

London Borough Of Enfield logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Nov 2024 at 09:42.

London Borough Of Barnet logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Arlington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Arlington Road, Southgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 8 Jul 2024 at 08:18.

London Borough Of Enfield logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Jan 2025 at 17:46.

London Borough Of Enfield logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are proposing to carry out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Jan 2025 at 17:47.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:34.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:04.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Drive

Thames Water are proposing to carry out Utility repair and maintenance works on Queen Elizabeths Drive, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 09:17.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:37.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Winchmore Hill Road

Thames Water are proposing to carry out Utility asset works on Winchmore Hill Road, Southgate.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:01.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:38.

Thames Water logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Tintern Gardens

Thames Water are proposing to carry out Utility asset works on Tintern Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 17:02.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Sep 2024 at 11:05.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 13:52.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Monkfrith Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Monkfrith Way, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:38.

London Borough Of Enfield logo
Finishing
Wednesday
Details
View Map
Share
Follow
Southfield Road

London Borough Of Enfield are proposing to carry out Remedial works on Southfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:32.

London Borough Of Enfield logo
Finishing
Wednesday
Details
View Map
Share
Follow
Southfield Road

London Borough Of Enfield are proposing to carry out Remedial works on Southfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Oct 2024 at 10:05.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:57.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Pennington Drive

Thames Water were proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:19.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Pennington Drive

Thames Water were proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:21.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 16:48.

Thames Water logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:25.

Thames Water logo
LONG TERM
Between
6 Jan and 21 Apr 2025
Details
View Map
Share
Follow
Pennington Drive

Thames Water are proposing to carry out Utility asset works on Pennington Drive, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:51.

London Borough Of Enfield logo
Until
24 Jan 2025
Details
View Map
Share
Follow
Brick Lane

London Borough Of Enfield are carrying out Highway improvement works on Brick Lane, Enfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 09:00 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 20 Dec 2024 at 09:02.

Virgin Media logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Brandon Road

Virgin Media are proposing to carry out Utility asset works on Brandon Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 16 Sep 2024 at 07:48.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Corringham Road

Thames Water were proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:37.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Corringham Road

Thames Water were proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:52.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corringham Road

Thames Water are proposing to carry out New service connection on Corringham Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 09:15.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Lansdowne Road

Thames Water were proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 11:06.

UK Power Networks Eastern & London logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Carpenter Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 09:32.

UK Power Networks Eastern & London logo
Between
7 and 17 Jan 2025
Details
View Map
Share
Follow
Carpenter Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 08:59.

London Borough Of Camden logo
Finishing
Saturday
Details
View Map
Share
Follow
Regent's Park Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Regent's Park Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 19 Dec 2024 at 15:08.

London Borough Of Camden logo
Finishing
Saturday
Details
View Map
Share
Follow
Regent's Park Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Regent's Park Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Dec 2024 at 09:46.

UK Power Networks Eastern & London logo
Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Goldhurst Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 14:45.

UK Power Networks Eastern & London logo
Between
8 and 21 Jan 2025
Details
View Map
Share
Follow
Goldhurst Terrace

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 07:56.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Sep 2024 at 10:37.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 16 Dec 2024 at 10:01.

Affinity Water logo
Finishing
Friday
Details
View Map
Share
Follow
Granville Road

Affinity Water are proposing to carry out Utility asset works on Granville Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 07:57.

BT logo
Between
10 and 14 Jan 2025
Details
View Map
Share
Follow
Glendale Avenue

BT are proposing to carry out Utility asset works on Glendale Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 14:29.

Thames Water logo
Between
10 and 12 Jan 2025
Details
View Map
Share
Follow
Waterfall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waterfall Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 09:06.

Thames Water logo
Between
10 and 12 Jan 2025
Details
View Map
Share
Follow
Waterfall Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waterfall Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:56.

Transport for London (TfL) logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Dec 2024 at 14:34.

Transport for London (TfL) logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2024 at 09:35.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Apr 2025
Details
View Map
Share
Myddleton Avenue

Thames Water were proposing to carry out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 13:01.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:14.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Langdon Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Langdon Park Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:42.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Heysham Road

BT are proposing to carry out Utility asset works on Heysham Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

BT logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Manchester Road

BT are proposing to carry out Utility asset works on Manchester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Oct 2024 at 08:56.

Thames Water logo
Between
13 and 14 Jan 2025
Details
View Map
Share
Follow
Ermine Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Ermine Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 16:30.

London Borough Of Barnet logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Leeside Crescent

London Borough Of Barnet were proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 14:17.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Rowley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rowley Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Dec 2024 at 09:20.

Thames Water logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:59.

Thames Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Fairbourne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fairbourne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 11:26.

London Borough Of Haringey logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Park View Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Park View Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Haringey on 21 Nov 2024 at 14:25.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 08:25.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 11:02.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Dec 2024 at 09:19.

UK Power Networks Eastern & London logo
Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Lilac Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Lilac Mews, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 14:15.

London Borough Of Barnet logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Leslie Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leslie Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 21 Oct 2024 at 13:03.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Aerodrome Road

Virgin Media were proposing to carry out Utility asset works on Aerodrome Road, Colindale, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Aug 2024 at 08:38.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Edith Road

Thames Water are proposing to carry out New service connection on Edith Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:51.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Holden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 14:33.

Affinity Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Holden Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Holden Road, Westbury Road To Gainsborough Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 12:34.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 28 Oct 2024 at 11:20.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Ridgeway

T-Mobile (UK) are proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 15:48.

T-Mobile (UK) logo
Between
13 and 17 Jan 2025
Details
View Map
Share
The Ridgeway

T-Mobile (UK) were proposing to carry out Utility asset works on The Ridgeway, Friern Barnet, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 11 Oct 2024 at 11:45.

BT logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Friern Barnet Lane

BT were proposing to carry out Utility asset works on Friern Barnet Lane, Friern Barnet, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Dec 2024 at 11:01.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Corri Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Corri Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:47.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Corri Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Corri Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Dec 2024 at 15:58.

Virgin Media logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Crown Road

Virgin Media were proposing to carry out Utility asset works on Crown Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Dec 2024 at 11:20.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Vale Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Vale Drive, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Dec 2024 at 14:02.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Vale Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Vale Drive, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Dec 2024 at 10:24.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Dec 2024 at 14:09.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Dec 2024 at 10:24.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Dec 2024 at 16:02.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Dec 2024 at 14:12.

London Borough Of Barnet logo
Between
13 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Dec 2024 at 10:32.

UK Power Networks Eastern & London logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Calshot Way

UK Power Networks Eastern & London were proposing to carry out New service connection on Calshot Way, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 09:13.

London Borough Of Barnet logo
LONG TERM
Between
13 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Dec 2024 at 10:53.

London Borough Of Barnet logo
LONG TERM
Between
13 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Hadley Green

London Borough Of Barnet are proposing to carry out Highway improvement works on Hadley Green, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Dec 2024 at 14:08.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Overbury Road

BT are proposing to carry out Utility asset works on Overbury Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Oct 2024 at 09:26.

Transport for London (TfL) logo
Between
18 and 22 Jan 2025
Details
View Map
Share
Follow
Hendon Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Dec 2024 at 10:11.

UK Power Networks Eastern & London logo
Between
18 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Parkhurst Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Parkhurst Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:02.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Adelaide Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Adelaide Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 18:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:35.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:16.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Pilgrim's Lane

Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:54.

Transport for London (TfL) logo
Between
20 and 21 Jan 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Oct 2024 at 09:26.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 5 Apr 2025
Details
View Map
Share
Follow
Tempelhof Avenue

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tempelhof Avenue, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 5 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:22.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 11:41.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:41.

London Borough Of Enfield logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Victoria Road

London Borough Of Enfield are proposing to carry out Remedial works on Victoria Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:41.

Thames Water logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Shrubbery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 10:35.

Thames Water logo
Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Greenwood Place

Thames Water are proposing to carry out New service connection on Greenwood Place, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:24.

National Highways logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Chalk Farm Road

National Highways were proposing to carry out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:14.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Chalk Farm Road

Network Rail were proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:38.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 15:55.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 17 Dec 2024 at 14:05.

Thames Water logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Queens Drive

Thames Water were proposing to carry out Utility repair and maintenance works on Queens Drive, Hackney, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 13:05.

Thames Water logo
Between
27 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 10:06.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Chesterfield Gardens

Thames Water are proposing to carry out New service connection on Chesterfield Gardens, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:09.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 16:19.

Thames Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Twyford Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Twyford Avenue, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 14:31.

London Borough Of Enfield logo
LONG TERM
Between
27 Jan and 26 Oct 2025
Details
View Map
Share
Follow
Harbet Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Harbet Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 26 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 28 Oct 2024 at 14:28.

Affinity Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 11 Oct 2024 at 12:14.

Affinity Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Lytton Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Lytton Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 20 Dec 2024 at 14:24.

London Borough Of Enfield logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Brick Lane

London Borough Of Enfield are proposing to carry out Highway improvement works on Brick Lane, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 20 Dec 2024 at 09:01.

London Borough Of Camden logo
LONG TERM
Between
28 Jan and 31 Dec 2025
Details
View Map
Share
Follow
Queen's Crescent

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.

London Borough Of Barnet logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Dollis Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 2 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 24 Oct 2024 at 09:17.

Thames Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Carpenter Gardens

Thames Water are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 09:44.

Affinity Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 30 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 15:48.

London Borough Of Barnet logo
Between
29 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 20 Sep 2024 at 13:49.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 15:55.

Network Rail logo
Between
1 and 3 Feb 2025
Details
View Map
Share
Follow
Chalk Farm Road

Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Jan 2025 at 13:13.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:48.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 13:36.

UK Power Networks Eastern & London logo
Between
3 Feb and 4 Mar 2025
Details
View Map
Share
Finchley Road

UK Power Networks Eastern & London were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:10.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:08.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Ferntower Road

London Borough Of Islington are proposing to carry out Highway improvement works on Ferntower Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:49.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:09.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Newington Green

London Borough Of Islington are proposing to carry out Highway improvement works on Newington Green, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 08:12.

LONG TERM
Between
3 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Matthias Road

London Borough Of Islington are proposing to carry out Highway improvement works on Matthias Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 4 Nov 2024 at 07:50.

Cadent Gas logo
Between
3 and 9 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Cadent Gas are proposing to carry out Utility asset works on Finchley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 11:35.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 25 Oct 2024 at 13:45.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 12:12.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 08:03.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Burtonhole Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 09:48.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 20 Sep 2024 at 10:44.

London Borough Of Enfield logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
South Eastern Avenue

London Borough Of Enfield are proposing to carry out Remedial works on South Eastern Avenue, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 7 Oct 2024 at 11:42.

Affinity Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Fernside Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 23 Oct 2024 at 08:44.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Bells Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Bells Hill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 10:40.

Thames Water logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Leicester Road

Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 16 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 10:19.

Thames Water logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Hertford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:53.

Thames Water logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Hertford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hertford Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:32.

UK Power Networks Eastern & London logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Broad Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Broad Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 14:54.

UK Power Networks Eastern & London logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Broad Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Broad Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Dec 2024 at 20:16.

London Borough Of Barnet logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Oct 2024 at 15:18.

London Borough Of Enfield logo
Between
7 and 21 Feb 2025
Details
View Map
Share
Follow
Fotheringham Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Fotheringham Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 17 Dec 2024 at 07:48.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Annette Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Nov 2024 at 11:32.

LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Annette Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Annette Road, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Nov 2024 at 15:06.

Transport for London (TfL) logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Archway Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Archway Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:39.

UK Power Networks Eastern & London logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
The Bishops Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on The Bishops Avenue, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Dec 2024 at 14:47.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Harefield Road

Thames Water are proposing to carry out New service connection on Harefield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:04.

UK Power Networks Eastern & London logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Langstone Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Langstone Way, Mill Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 14:41.

London Borough Of Enfield logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Devonshire Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Devonshire Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Nov 2024 at 10:00.

London Borough Of Barnet logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Manor Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Manor Drive, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 16 Dec 2024 at 15:11.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sweet Briar Grove

Thames Water are proposing to carry out New service connection on Sweet Briar Grove, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:21.

BT logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Haselwood Drive

BT are proposing to carry out Utility asset works on Haselwood Drive, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 Dec 2024 at 08:39.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 11:22.

BT logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Winnington Road

BT are proposing to carry out Utility asset works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Nov 2024 at 15:34.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Philip Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Philip Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 11:15.

London Borough Of Barnet logo
Between
13 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Milton Avenue

London Borough Of Barnet are proposing to carry out Highway improvement works on Milton Avenue, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 13:35.

Thames Water logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 10:22.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 08:03.

Thames Water logo
Between
15 and 21 Feb 2025
Details
View Map
Share
Follow
Tenterden Grove

Thames Water are proposing to carry out Utility asset works on Tenterden Grove, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 15:43.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 25 Oct 2024 at 13:23.

London Borough Of Barnet logo
Between
15 and 22 Feb 2025
Details
View Map
Share
Follow
Dollis Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dollis Road, Church End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 12:13.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 09:18.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 17 Dec 2024 at 11:54.

Affinity Water logo
Between
16 and 18 Feb 2025
Details
View Map
Share
Follow
St Albans Road

Affinity Water are proposing to carry out Utility repair and maintenance works on St Albans Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 19 Dec 2024 at 09:17.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Road

Thames Water are proposing to carry out New service connection on North Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:54.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:20.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 14:33.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Finchley Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 14:42.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Gillespie Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gillespie Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:49.

London Borough Of Barnet logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Claremont Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Claremont Road, Cricklewood, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 18 Oct 2024 at 13:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Bank

Thames Water are proposing to carry out New service connection on The Bank, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:20.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:51.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Borthwick Road

Affinity Water are proposing to carry out Utility asset works on Borthwick Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Sep 2024 at 08:17.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 22 Nov 2024 at 14:58.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 26 Nov 2024 at 16:06.

Affinity Water logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
West Hendon Broadway

Affinity Water are proposing to carry out Utility asset works on West Hendon Broadway, Colindale, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 23 Dec 2024 at 14:49.

Hyperoptic logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Frobisher Road

Hyperoptic are proposing to carry out Utility asset works on Frobisher Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 9 Dec 2024 at 13:18.

Thames Water logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Colin Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Colin Park Road, Colindale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 10:19.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 12:20.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
East End Road

Affinity Water were proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 8 Oct 2024 at 14:42.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Oct 2024 at 11:50.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 22 Oct 2024 at 12:13.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
East End Road

Affinity Water are proposing to carry out Utility repair and maintenance works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 24 Oct 2024 at 15:15.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:52.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Poynton Road

Thames Water are proposing to carry out New service connection on Poynton Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 13:09.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Lansdowne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:57.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 10:51.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Gardens

UK Power Networks Eastern & London are proposing to carry out New service connection on Brockenhurst Gardens, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 09:22.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Ashbourne Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 09:20.

UK Power Networks Eastern & London logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Ashbourne Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Ashbourne Grove, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 15:17.

Affinity Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
High Road

Affinity Water are proposing to carry out Utility repair and maintenance works on High Road, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 11:31.

London Borough Of Barnet logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
LONG TERM
Between
17 Feb and 24 Mar 2025
Details
View Map
Share
Leicester Road

London Borough Of Barnet were proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Nov 2024 at 13:54.

London Borough Of Barnet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Nov 2024 at 09:59.

London Borough Of Barnet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Dec 2024 at 09:37.

London Borough Of Barnet logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Leicester Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Dec 2024 at 14:12.

BT logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Albert Road

BT are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Nov 2024 at 12:31.

London Borough Of Enfield logo
Between
17 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Genotin Road

London Borough Of Enfield are proposing to carry out Highway repair and maintenance works on Genotin Road, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 19 Nov 2024 at 10:27.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Salisbury Road

Cadent Gas are proposing to carry out New service connection on Salisbury Road, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:03.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Hadley Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 1 Nov 2024 at 08:41.

Affinity Water logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Hadley Road

Affinity Water were proposing to carry out Utility repair and maintenance works on Hadley Road, Potters Road To Hadley Common, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 20 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 18 Nov 2024 at 15:38.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Firs Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Firs Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:46.

Affinity Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Arkley Lane

Affinity Water were proposing to carry out Utility repair and maintenance works on Arkley Lane, Arkley, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 31 Oct 2024 at 14:56.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Harman Close

London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

Thames Water logo
LONG TERM
Between
21 Feb and 24 Mar 2025
Details
View Map
Share
Somerfield Road

Thames Water were proposing to carry out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 February 2025 and run through until 24 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 13:02.

London Borough Of Barnet logo
Between
21 and 27 Feb 2025
Details
View Map
Share
Follow
Leeside Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 14:13.

London Borough Of Barnet logo
Between
21 and 25 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 11:16.

London Borough Of Barnet logo
Between
21 and 26 Feb 2025
Details
View Map
Share
Follow
Capel Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Capel Road, East Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2024 at 14:35.

BT logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Church Walk

BT are proposing to carry out Utility asset works on Church Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Nov 2024 at 11:24.

Thames Water logo
Between
24 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 11:18.

London Borough Of Barnet logo
Until
10 Mar 2025
Details
View Map
Share
Follow
Shirehall Lane

London Borough Of Barnet are carrying out Highway improvement works on Shirehall Lane, Hendon, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 6 Nov 2024 at 09:28.

Thames Water logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Carpenter Gardens

Thames Water are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:31.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 13 Nov 2024 at 14:50.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 14 Nov 2024 at 11:05.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Nov 2024 at 11:12.

Affinity Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Netherlands Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Netherlands Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 10 Dec 2024 at 11:04.

London Borough Of Barnet logo
Between
24 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Westcombe Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Westcombe Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 15:51.

Transport for London (TfL) logo
Between
25 and 26 Feb 2025
Details
View Map
Share
Follow
Stroud Green Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Stroud Green Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 13:54.

London Borough Of Barnet logo
Between
25 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Leeside Crescent

London Borough Of Barnet are proposing to carry out Highway improvement works on Leeside Crescent, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.

Virgin Media logo
Between
28 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Mount

Virgin Media are proposing to carry out Utility asset works on The Mount, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 22 Nov 2024 at 17:36.

Transport for London (TfL) logo
Between
2 and 6 Mar 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:38.

Transport for London (TfL) logo
Between
2 and 6 Mar 2025
Details
View Map
Share
Follow
Camden Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Camden Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Dec 2024 at 11:53.

Thames Water logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Brent Street

Thames Water are proposing to carry out Utility repair and maintenance works on Brent Street, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:46.

UK Power Networks Eastern & London logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 09:12.

UK Power Networks Eastern & London logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Downhurst Avenue

UK Power Networks Eastern & London are proposing to carry out New service connection on Downhurst Avenue, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Dec 2024 at 15:17.

London Borough Of Enfield logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
The Limes Avenue

London Borough Of Enfield are proposing to carry out Highway improvement works on The Limes Avenue, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 25 Nov 2024 at 09:25.

London Borough Of Enfield logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Highlands Avenue

London Borough Of Enfield were proposing to carry out Highway improvement works on Highlands Avenue, Southgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Dec 2024 at 09:14.

London Borough Of Barnet logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
Westcombe Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Westcombe Drive, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 15:59.

London Borough Of Enfield logo
LONG TERM
Between
3 Mar and 3 Jun 2025
Details
View Map
Share
Southbury Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Southbury Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 14:01.

London Borough Of Enfield logo
LONG TERM
Between
3 Mar and 3 Jun 2025
Details
View Map
Share
Cross Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Cross Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 14:01.

Thames Water logo
Between
3 and 6 Mar 2025
Details
View Map
Share
Leicester Road

Thames Water were proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 11:22.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
King Edward Road

Affinity Water were proposing to carry out Utility repair and maintenance works on King Edward Road, New Barnet, Barnet.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Affinity Water on 29 Nov 2024 at 12:38.

Affinity Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
King Edward Road

Affinity Water are proposing to carry out Utility repair and maintenance works on King Edward Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Affinity Water on 2 Dec 2024 at 08:33.

London Borough Of Enfield logo
LONG TERM
Between
3 Mar and 3 Jun 2025
Details
View Map
Share
Queens Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Queens Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 13:59.

London Borough Of Enfield logo
LONG TERM
Between
3 Mar and 3 Jun 2025
Details
View Map
Share
Fotheringham Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Fotheringham Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 14:00.

London Borough Of Enfield logo
LONG TERM
Between
3 Mar and 3 Jun 2025
Details
View Map
Share
Eaton Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Eaton Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 3 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 12 Dec 2024 at 13:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Mar and 22 Apr 2025
Details
View Map
Share
Green Lanes

UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Green Lanes, Southgate.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 22 April 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:39.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Mar and 5 May 2025
Details
View Map
Share
Follow
Ecclesbourne Gardens

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Ecclesbourne Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:36.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Mar and 5 May 2025
Details
View Map
Share
Follow
Broomfield Lane

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Broomfield Lane, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 5 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Jan 2025 at 11:38.

Thames Water logo
Between
10 and 18 Mar 2025
Details
View Map
Share
Follow
Hermitage Lane

Thames Water are proposing to carry out New service connection on Hermitage Lane, Childs Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 10:11.

Cadent Gas logo
Between
10 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way

Cadent Gas are proposing to carry out Utility asset works on Footpath Side Of Farm Walk North Side From Temple Fortune Lane To Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works will start on or after 10 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:32.

BT logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Devonshire Hill Lane

BT are proposing to carry out Utility asset works on Devonshire Hill Lane, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Dec 2024 at 13:57.

UK Power Networks Eastern & London logo
Between
11 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 13:19.

Between
12 and 21 Mar 2025
Details
View Map
Share
Follow
Highbury Crescent

London Borough Of Islington are proposing to carry out Highway improvement works on Highbury Crescent, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 18 Dec 2024 at 14:39.

London Borough Of Hackney logo
LONG TERM
Between
12 Mar and 9 May 2025
Details
View Map
Share
Follow
Northwold Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Northwold Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Dec 2024 at 11:54.

London Borough Of Barnet logo
Between
13 and 18 Mar 2025
Details
View Map
Share
Follow
Manor Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Manor Drive, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 25 Nov 2024 at 15:00.

BT logo
Between
17 and 20 Mar 2025
Details
View Map
Share
Garrick Drive

BT were proposing to carry out Utility asset works on Garrick Drive, Hendon, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 20 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 3 Jan 2025 at 08:49.

Thames Water logo
Between
17 and 30 Mar 2025
Details
View Map
Share
Follow
Coppetts Road

Thames Water are proposing to carry out Utility repair and maintenance works on Coppetts Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 14:26.

London Borough Of Barnet logo
Between
17 Mar and 5 Apr 2025
Details
View Map
Share
Follow
Underhill

London Borough Of Barnet are proposing to carry out Highway improvement works on Underhill, Barnet.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 5 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 14 Nov 2024 at 12:16.

Thames Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Waltheof Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Waltheof Avenue, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 16:53.

UK Power Networks Eastern & London logo
Between
19 Mar and 10 Apr 2025
Details
View Map
Share
Follow
Finchley Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Dec 2024 at 16:13.

London Borough Of Barnet logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Alexandra Grove

London Borough Of Barnet are proposing to carry out Highway improvement works on Alexandra Grove, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 20 Dec 2024 at 15:27.

London Borough Of Barnet logo
Between
22 Mar and 1 Apr 2025
Details
View Map
Share
Follow
Raleigh Drive

London Borough Of Barnet are proposing to carry out Highway improvement works on Raleigh Drive, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 March 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 25 Nov 2024 at 15:07.

BT logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Church Road

BT are proposing to carry out Utility asset works on Church Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Dec 2024 at 15:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 9 May 2025
Details
View Map
Share
Follow
Southbury Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Southbury Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 14:34.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 Mar and 9 May 2025
Details
View Map
Share
Follow
Crown Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Crown Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Dec 2024 at 14:34.

Virgin Media logo
Between
27 and 29 Mar 2025
Details
View Map
Share
Crown Road

Virgin Media were proposing to carry out Utility asset works on Crown Road, Enfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Dec 2024 at 11:48.

Thames Water logo
Between
28 and 30 Mar 2025
Details
View Map
Share
Follow
Tottenham Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Tottenham Lane, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 08:03.

BT logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Deacons Rise

BT are proposing to carry out Utility asset works on Deacons Rise, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Jan 2025 at 09:22.

National Grid Electricity Transmission logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Watermead Way

National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Watermead Way, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the verge only.

This roadwork event was last updated by National Grid Electricity Transmission on 22 Nov 2024 at 11:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Southbury Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Southbury Road, Enfield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 16 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jan 2025 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Southbury Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Southbury Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jan 2025 at 13:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
31 Mar and 16 May 2025
Details
View Map
Share
Follow
Crown Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Crown Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Jan 2025 at 13:54.

London Borough Of Enfield logo
Between
2 and 21 Apr 2025
Details
View Map
Share
Follow
Cross Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Cross Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 3 Jan 2025 at 09:18.

Thames Water logo
Between
2 and 15 Apr 2025
Details
View Map
Share
Follow
Leicester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 11:04.

Thames Water logo
Between
2 and 22 Apr 2025
Details
View Map
Share
Follow
Leicester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Leicester Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 11:44.

Virgin Media logo
Between
3 and 5 Apr 2025
Details
View Map
Share
Follow
Crown Road

Virgin Media are proposing to carry out Utility asset works on Crown Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 5 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Dec 2024 at 10:06.


Roadworks Map near to Hampton Close, LONDON, N11 3PR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Jan 2025 16:58
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hampton Close, LONDON, N11 3PR (29 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
REGAL DRIVE, NEW SOUTHGATE 
(0.1 miles)
Thames Water
Utility asset works - Carriageway - Some carriageway incursion
In Progress
Since: 23 Nov 2023 14:45
(Scheduled: 20 Nov 2023 - 23 Apr 2025)
0.1
Details
Share
Follow
2
Thames Water logo
MAJOR
  
STATION ROAD 
(0.1 miles)
Thames Water
Utility asset works - Footway, Carriageway, Verge - Lane closure
In Progress
Since: 25 Feb 2024 12:00
(Scheduled: 25 Feb 2024 - 25 Feb 2025)
0.1
Details
Share
Follow
3
London Borough Of Enfield logo
WOODLAND ROAD 
(0.1 miles)
London Borough Of Enfield
Highway improvement works - Footway - No carriageway incursion
Complete
3 Jan 2025 14:09 - 14:24
0.1
Details
Share
4
BT logo
GROVE ROAD 
(0.2 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.2
Details
Share
Follow
5
London Borough Of Enfield logo
BOWES ROAD 
(0.3 miles)
London Borough Of Enfield
Highway improvement works - Footway - No carriageway incursion
Complete
24 Dec 2024 13:29 - 27 Dec 2024 14:26
0.3
Details
Share
6
Cadent Gas logo
EMERGENCY
  
BOWES ROAD 
(0.3 miles)
Cadent Gas
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 15 Dec 2024 09:53
(Scheduled: 15 Dec 2024 - 9 Jan 2025)
0.3
Details
Share
Follow
7
Thames Water logo
MAJOR
  
ATLAS ROAD, NEW SOUTHGATE 
(0.3 miles)
Thames Water
Utility asset works - Footway, Carriageway, Verge, Cycleway - Lane closure
In Progress
Since: 20 Oct 2023 10:20
(Scheduled: 17 Oct 2023 - 23 Mar 2025)
0.3
Details
Share
Follow
8
Affinity Water logo
BRUNSWICK PARK ROAD, NEW SOUTHGATE 
(0.3 miles)
Affinity Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.3
Details
Share
Follow
9
Affinity Water logo
BRUNSWICK PARK ROAD, NEW SOUTHGATE 
(0.3 miles)
Affinity Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 6 Jan 2025 - 8 Jan 2025
0.3
Details
Share
Follow
10
Thames Water logo
MAJOR
  
ALEXANDRA ROAD, MUSWELL HILL 
(0.4 miles)
Thames Water
Utility asset works - Carriageway, Verge - Two-way signals
In Progress
Since: 16 Oct 2023 12:00
(Scheduled: 16 Oct 2023 - 23 Mar 2025)
0.4
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data