ROADWORKS SUMMARY
Capital Trading Estate, Alfreds Way, BARKING, IG11 0AR
Introduction
View current and future planned roadworks and road closures for Capital Trading Estate, Alfreds Way, IG11 0AR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Capital Trading Estate, Alfreds Way, BARKING, IG11 0AR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Capital Trading Estate, Alfreds Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Oct 2022 and 30 Jan 2025
Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.
30 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.
29 Nov 2024
Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.
31 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 June 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 8 May 2024 at 09:17.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
19 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 September 2023 at 08:00 and could run through until 19 October 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 13:21.
20 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 September 2023 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2024 at 11:59.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
6 Nov 2024
Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Plumstead High Street, Plumstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 11:00 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Mar 2024 at 10:28.
31 Jan 2025
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:36.
31 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 15 Jul 2024 at 10:36.
29 Nov 2024
Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2023 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Sep 2024 at 12:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.
19 Dec 2024
London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.
23 Dec 2024
London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.
31 Dec 2024
London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 16 Feb 2024 at 10:14.
4 Mar 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.
28 Apr 2025
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.
29 Apr 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.
4 Oct 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.
13 May and 22 Nov 2024
London Borough Of Newham are proposing to carry out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 11:41.
22 Nov 2024
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 13 May 2024 at 08:19.
22 Nov 2024
London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 13 May 2024 at 08:20.
22 Nov 2024
Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 08:05 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:25.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
31 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 19 Sep 2024 at 19:04.
7 Feb 2025
Thames Water are carrying out Utility asset works on Manchester Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 June 2024 at 16:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Jun 2024 at 06:26.
31 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 31 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 19 Sep 2024 at 19:03.
19 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Prince Regent Lane, West Beckton, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 July 2024 at 20:00 and could run through until 19 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Jul 2024 at 14:44.
Tuesday
Thames Water are carrying out Disconnection or alteration of supply on Ripley Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 July 2024 at 15:00 and could run through until 8 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Jul 2024 at 14:07.
Wednesday
Thames Water are carrying out Utility asset works on Bramble Croft, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:15 and could run through until 9 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 16:34.
11 Feb 2025
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2024 at 08:20.
24 Jul and 31 Oct 2024
Thames Water are proposing to carry out Utility asset works on Eagle Lane, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2024 and could run through until 31 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 15 Jul 2024 at 09:50.
Wednesday
UK Power Networks Eastern & London are carrying out Utility asset works on Trafalgar Way, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 August 2024 at 08:00 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 12:08.
Wednesday
UK Power Networks Eastern & London are carrying out Utility asset works on Baffin Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 08:45 and could run through until 9 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 10:13.
Wednesday
UK Power Networks Eastern & London are carrying out Utility asset works on Blackwall Way, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2024 at 08:00 and could run through until 9 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 10:13.
Today
London Borough Of Newham were proposing to carry out Highway improvement works on Angel Lane, Stratford, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 July 2024 and run through until 4 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 6 Aug 2024 at 10:09.
Today
London Borough Of Newham are proposing to carry out Highway improvement works on Penny Brookes Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 9 May 2024 at 12:08.
Today
London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 9 May 2024 at 12:17.
5 Aug 2024 and 31 Jan 2025
London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 11:13.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:05.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 10:24.
12 Aug 2024 and 2 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Jul 2024 at 13:12.
12 Aug and 15 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Highbridge Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 15 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:55.
2 Dec 2024
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Highbridge Road, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 20 Aug 2024 at 13:10.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
15 Aug and 31 Oct 2024
London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:28.
15 Aug and 31 Oct 2024
London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:27.
Today
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Limeharbour, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Tower Hamlets on 7 Aug 2024 at 12:09.
Today
London Borough Of Tower Hamlets are carrying out Highway improvement works on Limeharbour, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 09:30 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Aug 2024 at 10:33.
Today
London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Marsh Wall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Tower Hamlets on 7 Aug 2024 at 11:59.
Today
London Borough Of Tower Hamlets are carrying out Highway improvement works on Marsh Wall, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 09:30 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Aug 2024 at 10:33.
12 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
The works started on 19 August 2024 at 08:00 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:50.
15 Nov 2024
Thames Water are carrying out Utility repair and maintenance works on Heigham Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 11:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:57.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Hamilton Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 14:30 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:57.
4 Nov 2024
Thames Water are carrying out Utility asset works on Chaucer Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2024 at 12:00 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 13:26.
26 Aug and 11 Oct 2024
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Limeharbour, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2024 and run through until 11 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 19 Aug 2024 at 10:43.
26 Aug and 11 Oct 2024
London Borough Of Tower Hamlets were proposing to carry out Highway improvement works on Marsh Wall, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2024 and run through until 11 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Tower Hamlets on 4 Sep 2024 at 11:01.
26 Aug and 29 Nov 2024
Thames Water were proposing to carry out Disconnection or alteration of supply on Ramsay Road, Forest Gate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 August 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:06.
27 Aug and 11 Oct 2024
London Borough Of Newham are proposing to carry out Section 50 on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 08:53.
27 Aug and 11 Oct 2024
London Borough Of Newham are proposing to carry out Section 50 on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 09:36.
11 Oct 2024
London Borough Of Newham are carrying out Highway improvement works on Gibbins Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 08:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Sep 2024 at 11:07.
Today
London Borough Of Newham are proposing to carry out Highway improvement works on Angel Lane, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 August 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 12 Aug 2024 at 17:50.
29 Aug and 4 Nov 2024
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 4 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 11:31.
Sunday
Thames Water are proposing to carry out Utility asset works on Flintmill Crescent, Kidbrooke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Dec 2023 at 16:30.
18 Nov 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Belvedere Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:45 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 10:31.
2 Sep 2025
Thames Water are carrying out Utility asset works on Lesney Park, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.
2 Sep and 11 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Fresh Wharf Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 September 2024 and run through until 11 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:03.
2 Sep and 25 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jul 2024 at 08:28.
15 Nov 2024
Cadent Gas are carrying out Utility asset works on Inglehurst Gardens, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 13:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 13:11.
Monday
Southern Gas Networks are carrying out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 18:30 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 15:34.
3 Sep and 11 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Gordon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 11 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 07:45.
Monday
Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 7 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 08:46.
Monday
Thames Water are proposing to carry out Utility asset works on Thornton Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2024 and could run through until 7 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 11:55.
3 Sep and 19 Oct 2024
London Borough Of Newham were proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 September 2024 and run through until 19 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 08:05.
18 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Latimer Avenue, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 September 2024 at 09:00 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 09:24.
9 Sep and 15 Nov 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Jun 2024 at 14:35.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:46.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:42.
9 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 09:44.
9 Sep and 11 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Jupp Road West, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:50.
11 Nov 2024
Thames Water are carrying out Utility repair and maintenance works on Jupp Road West, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 11:15 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:24.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.
25 Nov 2024
London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Sep 2024 at 14:59.
20 Nov 2024
Thames Water are carrying out Disconnection or alteration of supply on Gordon Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 09:15 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:28.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
16 Sep and 14 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 11:08.
14 Oct 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Sandringham Drive, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 10:30 and could run through until 14 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 16:35.
16 Sep and 21 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chaucer Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 11:08.
16 Sep and 20 Dec 2024
Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:06.
Tomorrow
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Stansfeld Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 5 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jun 2024 at 13:34.
16 Sep and 28 Oct 2024
Thames Water are proposing to carry out Utility asset works on Nelson Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jul 2024 at 19:24.
16 Sep and 28 Oct 2024
Thames Water are proposing to carry out Utility asset works on Wellington Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Jul 2024 at 19:24.
15 Nov 2024
Thames Water are carrying out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 10:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.
17 Oct 2024
Cadent Gas are carrying out Utility asset works on Broomhill Road, Goodmayes, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 September 2024 at 10:03 and could run through until 17 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 10:23.
30 Oct 2024
Cadent Gas are carrying out Utility asset works on Abbotsford Road, Goodmayes, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2024 at 08:58 and could run through until 30 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 10:08.
17 Oct 2024
Cadent Gas are carrying out Utility asset works on Broomhill Road, Goodmayes, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 September 2024 at 09:58 and could run through until 17 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 10:22.
Thursday
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 10 October 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 11 Jul 2024 at 15:17.
Sunday
UK Power Networks Eastern & London are carrying out Utility asset works on Stansfeld Road, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 16:35 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 09:02.
17 Sep and 28 Oct 2024
Thames Water are proposing to carry out Utility asset works on Faringford Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Jun 2024 at 08:22.
Today
Cadent Gas are proposing to carry out Utility asset works on Beechwood Park, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:30.
Tuesday
Cadent Gas are carrying out Utility asset works on Beechwood Park, South Woodford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 12:15 and could run through until 8 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:16.
Today
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 09:30.
Sunday
Cadent Gas are carrying out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 12:15 and could run through until 6 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 15:00.
Thursday
Cadent Gas are carrying out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 13:00 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:14.
Thursday
Cadent Gas are carrying out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 13:00 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:14.
Thursday
Cadent Gas are carrying out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 September 2024 at 13:00 and could run through until 10 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 13:15.
19 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Aug 2024 at 14:15.
18 Oct 2024
Thames Water are carrying out Utility asset works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:30 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 09:38.
Today
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stanhope Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 4 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 13:17.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Stanhope Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 18:30 and could run through until 8 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:55.
23 Sep and 18 Oct 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 16 Aug 2024 at 10:48.
23 Sep and 18 Oct 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 21 Aug 2024 at 13:55.
23 Sep and 18 Oct 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 4 Sep 2024 at 15:02.
Sunday
Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 6 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 5 Sep 2024 at 15:12.
23 Sep 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.
2 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.
2 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.
23 Sep and 18 Oct 2024
London Borough Of Redbridge were proposing to carry out Core Sampling on Ilford Lane, Ilford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 18 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 23 Sep 2024 at 11:33.
23 Sep and 28 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Aberdour Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 11:02.
23 Sep and 14 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Thorold Road, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 14 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:02.
23 Sep and 8 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 September 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:01.
24 Sep and 9 Dec 2024
Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 06:57.
24 Sep and 9 Dec 2024
Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:42.
24 Oct 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Harding Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 September 2024 at 09:15 and could run through until 24 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:38.
25 Sep and 15 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:40.
15 Nov 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Tunnel Avenue, Greenwich.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 07:30 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 08:07.
25 Sep and 11 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Edmund Halley Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 September 2024 and could run through until 11 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 06:32.
11 Oct 2024
Transport for London (TfL) are carrying out Highway improvement works on Edmund Halley Way, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2024 at 07:00 and could run through until 11 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Sep 2024 at 08:29.
26 Sep and 11 Dec 2024
Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 14:53.
26 Sep 2024 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:24.
26 Sep 2024 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:00.
Today
Thames Water were proposing to carry out New service connection on Charlton Road, Charlton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 4 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 13:19.
30 Sep and 21 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 08:20.
6 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Prestons Road Roundabout, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:10.
Today
Transport for London (TfL) are carrying out Highway improvement works on Tidal Basin Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 22:00 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 08:36.
Today
Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:41.
Today
Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 13:09.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Bow Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:05.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:06.
30 Sep 2024 and 16 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 10:02.
16 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:04.
16 Jan 2025
Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Northern Approach, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 08:08.
11 Nov 2024
Thames Water are carrying out Utility asset works on Faringford Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 11:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:21.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 7 October 2024. The works will impact the footway and cycleway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:31.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.
11 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Cross Road, Mawneys, Romford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 09:30 and could run through until 11 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:38.
1 and 31 Oct 2024
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Burges Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 4 Jul 2024 at 08:51.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Dunkeld Road, Dagenham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 October 2024 at 08:12 and could run through until 7 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 1 Oct 2024 at 16:04.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on New Wanstead, Wanstead, London.
The works started on 1 October 2024 at 09:00 and could run through until 9 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:15.
2 Oct and 17 Dec 2024
Thames Water are proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 16:13.
2 Oct 2024 and 10 Jan 2025
Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 October 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:21.
Today
London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 4 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 27 Aug 2024 at 12:55.
2 and 16 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 15:00.
2 and 16 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:57.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Mansfield Road, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 October 2024 at 13:39 and could run through until 8 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 14:00.
3 and 26 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Long Lane, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:21.
26 Oct 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Long Lane, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 12:50 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 14:59.
3 and 26 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rydal Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:25.
3 and 25 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 25 October 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.
3 and 21 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Rochester Way Relief Road, Eltham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 21 October 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 10:48.
3 and 26 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cloudesley Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:22.
26 Oct 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Cloudesley Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 12:50 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:10.
3 and 28 Oct 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Lane, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 October 2024 and could run through until 28 October 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jun 2024 at 14:06.
11 Oct 2024
Cadent Gas are carrying out Utility repair and maintenance works on Bow Common Lane, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 08:52 and could run through until 11 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 12:53.
16 Oct 2024
Thames Water are carrying out Utility repair and maintenance works on Rainham Road, Rainham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 October 2024 at 09:10 and could run through until 16 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:30.
4 Oct and 4 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:51.
4 Oct and 4 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:57.
4 Oct and 4 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Sep 2024 at 16:03.
7 and 14 Oct 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 12 Jul 2024 at 08:27.
7 and 14 Oct 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 15:03.
7 and 14 Oct 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Red Lion Lane, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 15:48.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Southern Approach, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:14.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Siebert Road, Blackheath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:33.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Siebert Road, Blackheath.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Oct 2024 at 07:17.
7 Oct and 7 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:13.
7 Oct and 7 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 19:37.
7 Oct and 7 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:53.
7 Oct and 7 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 19:40.
7 Oct and 7 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:14.
7 Oct and 24 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 10:23.
7 Oct and 15 Nov 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Sep 2024 at 11:47.
7 Oct and 15 Nov 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 12:07.
7 Oct and 15 Nov 2024
Thames Water are proposing to carry out Utility asset works on Nelson Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:37.
7 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:37.
7 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:37.
7 and 24 Oct 2024
Thames Water were proposing to carry out New service connection on John Street, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Aug 2024 at 11:17.
7 and 12 Oct 2024
Thames Water are proposing to carry out New service connection on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Jun 2024 at 09:14.
7 and 12 Oct 2024
Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Jun 2024 at 09:18.
7 Oct and 1 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Parsloes Avenue, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 17 Jul 2024 at 18:41.
7 Oct and 1 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Cornwallis Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 23 Jul 2024 at 14:02.
7 and 13 Oct 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Cornwallis Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 13 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 4 Sep 2024 at 08:59.
7 and 21 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Alloa Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 15:15.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:16.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:56.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 11:38.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:15.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:49.
7 Oct and 22 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Sep 2024 at 11:23.
7 and 12 Oct 2024
Thames Water are proposing to carry out New service connection on Rodney Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 October 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jul 2024 at 13:25.
8 and 21 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oldfield Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 21 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 14:38.
8 Oct and 5 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:05.
8 Oct and 5 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 16:21.
8 Oct and 25 Nov 2024
Thames Water are proposing to carry out Utility asset works on Brigstock Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 08:50.
8 Oct and 25 Nov 2024
Thames Water are proposing to carry out Utility asset works on Brigstock Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:47.
8 Oct and 8 Nov 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:26.
8 and 22 Oct 2024
Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:00.
8 and 22 Oct 2024
Cadent Gas were proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 October 2024 and run through until 22 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 08:58.
9 Oct and 6 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:45.
14 Oct and 18 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Jul 2024 at 13:59.
14 Oct and 11 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:26.
14 and 24 Oct 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Parsonage Manorway, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 22 Mar 2024 at 11:23.
14 and 24 Oct 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Parsonage Manorway, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 10:54.
14 Oct and 11 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:51.
14 Oct and 11 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:01.
14 and 27 Oct 2024
Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 27 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 3 Oct 2024 at 07:56.
14 and 17 Oct 2024
Thames Water were proposing to carry out New service connection on Rippolson Road, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 17 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 08:20.
14 and 17 Oct 2024
Thames Water are proposing to carry out New service connection on Rippolson Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 08:42.
14 and 17 Oct 2024
Thames Water are proposing to carry out New service connection on Rippolson Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 17 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 08:49.
14 and 28 Oct 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Church Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Oct 2024 at 14:23.
14 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 10:16.
14 Oct and 10 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 12:42.
14 and 18 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:30.
14 Oct and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.
14 Oct and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.
14 Oct and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
14 and 16 Oct 2024
BT are proposing to carry out Utility asset works on Westminster Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 16 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Jul 2024 at 08:01.
14 and 16 Oct 2024
BT were proposing to carry out Utility asset works on Westminster Gardens, Barkingside, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 16 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 20 Sep 2024 at 13:43.
15 and 18 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:32.
16 and 18 Oct 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Sedgemere Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 11 Jun 2024 at 10:34.
16 and 18 Oct 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Sedgemere Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 1 Oct 2024 at 09:40.
16 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 13:48.
16 Oct and 8 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 08:41.
16 and 20 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fulmer Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 20 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Sep 2024 at 11:06.
16 and 20 Oct 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fulmer Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 20 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Sep 2024 at 10:09.
16 Oct and 6 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 12:19.
16 and 22 Oct 2024
Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 22 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:15.
16 and 18 Oct 2024
BT are proposing to carry out Utility repair and maintenance works on Overton Drive, Chadwell Heath, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 October 2024 and could run through until 18 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Jul 2024 at 14:04.
17 Oct and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 12:12.
18 Oct and 4 Nov 2024
Riverside Energy Park are proposing to carry out Utility asset works on Norman Road, Belvedere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 October 2024 and could run through until 4 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:20.
21 Oct and 1 Nov 2024
BT were proposing to carry out Utility asset works on Shooters Hill Road, Blackheath.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Jul 2024 at 13:45.
21 Oct and 1 Nov 2024
BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Jul 2024 at 09:14.
21 Oct and 18 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:50.
21 and 29 Oct 2024
Thames Water are proposing to carry out New service connection on Fraser Road, Erith.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 29 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 14:10.
21 and 24 Oct 2024
Thames Water were proposing to carry out New service connection on Lord Roberts Terrace, Woolwich.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 24 October 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 14:13.
21 and 24 Oct 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Lord Roberts Terrace, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 24 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 16:30.
21 Oct and 15 Nov 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 16:12.
21 and 28 Oct 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 12:03.
21 Oct and 17 Nov 2024
Riverside Energy Park were proposing to carry out Utility asset works on Bronze Age Way, Erith.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:26.
21 Oct and 17 Nov 2024
Riverside Energy Park were proposing to carry out Utility asset works on Norman Road, Belvedere.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:19.
21 and 25 Oct 2024
Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Jul 2024 at 10:36.
21 and 26 Oct 2024
Thames Water are proposing to carry out New service connection on Hampton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 26 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Jul 2024 at 11:39.
21 and 25 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Leyton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 25 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 15:27.
21 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Water Lane, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:00.
21 Oct and 4 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Water Lane, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 09:12.
21 Oct and 7 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:04.
21 Oct and 7 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:41.
22 and 24 Oct 2024
Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 24 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 3 Oct 2024 at 12:22.
23 Oct and 14 Nov 2024
Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:33.
24 Oct 2024 and 19 Jan 2025
Thames Water are proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:41.
24 Oct 2024 and 19 Feb 2025
Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.
25 Oct and 2 Nov 2024
Thames Water are proposing to carry out New service connection on Fraser Road, Erith.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:42.
25 Oct and 19 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:54.
25 Oct and 19 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:46.
27 and 29 Oct 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wilton Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2024 and could run through until 29 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 13:02.
28 and 31 Oct 2024
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Rochester Way, Eltham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 October 2024. The works will impact the verge only.
This roadwork event was last updated by T-Mobile (UK) on 2 Aug 2024 at 18:13.
28 and 30 Oct 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Belmont Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:11.
28 Oct and 8 Nov 2024
BT were proposing to carry out Utility asset works on Shooters Hill Road, Blackheath.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 30 Jul 2024 at 09:13.
28 Oct and 4 Nov 2024
Thames Water are proposing to carry out New service connection on Highbanks Close, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 11:03.
28 Oct and 4 Nov 2024
Thames Water are proposing to carry out New service connection on Highbanks Close, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 21:39.
28 Oct and 18 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lessness Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:49.
28 Oct and 18 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lessness Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:00.
28 Oct and 25 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:31.
28 Oct and 25 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:50.
28 Oct and 25 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 08:28.
28 Oct and 25 Nov 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 08:38.
28 Oct and 22 Nov 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 2 Oct 2024 at 13:46.
28 Oct and 1 Nov 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 14:03.
28 Oct and 1 Nov 2024
Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 14:12.
28 Oct and 3 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:11.
28 Oct and 22 Nov 2024
London Borough Of Newham are proposing to carry out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 1 Oct 2024 at 13:38.
28 Oct and 11 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:07.
28 Oct and 12 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:08.
28 Oct and 21 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:04.
28 Oct and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:53.
28 Oct and 24 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Beckton Road, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 10:57.
28 and 30 Oct 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:04.
28 Oct and 1 Nov 2024
Thames Water are proposing to carry out New service connection on Hartley Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Jul 2024 at 09:06.
28 Oct 2024 and 13 Jan 2025
Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.
28 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Alexandra Road, Leyton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Aug 2024 at 15:59.
28 Oct and 1 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 29 Jul 2024 at 14:04.
28 Oct and 1 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 5 Aug 2024 at 10:39.
28 Oct and 1 Nov 2024
Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 28 Aug 2024 at 15:23.
28 Oct and 1 Nov 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 4 Sep 2024 at 16:30.
28 Oct and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 14 Aug 2024 at 10:21.
28 Oct and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:45.
28 Oct and 15 Nov 2024
Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Sep 2024 at 14:15.
28 Oct and 19 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 19 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 11:14.
29 Oct and 6 Nov 2024
Southern Gas Networks are proposing to carry out New service connection on Rainton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 06:43.
29 Oct and 6 Nov 2024
Southern Gas Networks are proposing to carry out New service connection on Rainton Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 07:41.
29 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Jedburgh Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:08.
29 Oct and 2 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Central Park Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Jun 2024 at 08:29.
29 Oct and 2 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:47.
29 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Terrace Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:56.
30 Oct and 20 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:50.
30 Oct and 1 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hilda Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:14.
31 Oct and 2 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:18.
31 Oct and 23 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Faraday Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 23 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 3 Oct 2024 at 12:01.
1 and 3 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Sep 2024 at 08:17.
1 and 14 Nov 2024
Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:15.
1 and 14 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Beckton Road, Canning Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:48.
1 and 3 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:38.
4 and 25 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 12:41.
4 Nov and 2 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 11:07.
4 and 25 Nov 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 10:31.
4 and 6 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Dock Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:07.
4 and 6 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:30.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:52.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 12:01.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 15:58.
4 and 22 Nov 2024
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Aug 2024 at 16:19.
4 and 29 Nov 2024
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.
4 and 29 Nov 2024
Thames Water were proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:16.
4 and 29 Nov 2024
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.
4 and 29 Nov 2024
Thames Water are proposing to carry out Utility asset works on Navarre Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:05.
4 and 29 Nov 2024
Thames Water are proposing to carry out Utility asset works on Streatfeild Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:38.
4 and 15 Nov 2024
Thames Water are proposing to carry out Utility asset works on Pilgrims Way, East Ham, London.
These works are categorised as Major.
The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 17:32.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:46.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.
4 Nov and 13 Dec 2024
Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.
4 and 8 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 11:12.
4 and 8 Nov 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Wallis Road, Hackney, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:20.
4 and 6 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Trevelyan Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:00.
4 and 6 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Romford Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:42.
4 and 15 Nov 2024
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 15 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 20 Aug 2024 at 13:58.
4 and 9 Nov 2024
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Goodall Road, Leytonstone.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 9 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by T-Mobile (UK) on 19 Sep 2024 at 08:49.
4 and 8 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 14:51.
4 and 27 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:56.
4 and 27 Nov 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:41.
5 Nov 2024 and 3 Mar 2025
Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.
5 and 30 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.
5 and 30 Nov 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 10:40.
6 and 8 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:32.
6 and 20 Nov 2024
Essex And Suffolk Water were proposing to carry out Remedial works on Betterton Road, Rainham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 15 Aug 2024 at 13:18.
6 and 8 Nov 2024
Essex And Suffolk Water are proposing to carry out Remedial works on Betterton Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 20 Aug 2024 at 11:54.
6 and 8 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 08:58.
11 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 12:45.
11 and 17 Nov 2024
Murphy Power Distribution are proposing to carry out New service connection on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 17 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 25 Sep 2024 at 12:45.
11 and 13 Nov 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:34.
11 and 29 Nov 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:11.
11 Nov and 9 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Chequers Lane, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.
11 and 15 Nov 2024
Thames Water are proposing to carry out Utility asset works on Bryant Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:32.
11 and 18 Nov 2024
Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 12:07.
11 and 18 Nov 2024
Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:47.
11 and 15 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Warren Road, Leyton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 15:11.
11 Nov 2024 and 23 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Grove Park, Wanstead, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 23 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:01.
11 Nov 2024 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.
11 Nov 2024 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.
11 Nov 2024 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
11 and 22 Nov 2024
Cadent Gas were proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:02.
12 Nov and 9 Dec 2024
Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2024 at 14:19.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:44.
12 Nov and 5 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 12:59.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.
14 Nov and 31 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.
16 and 18 Nov 2024
Network Rail were proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 November 2024 and run through until 18 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Sep 2024 at 11:22.
18 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 13:33.
18 and 26 Nov 2024
Thames Water were proposing to carry out New service connection on Fraser Road, Erith.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:39.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.
18 Nov and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.
18 and 24 Nov 2024
Murphy Power Distribution are proposing to carry out New service connection on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 24 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 25 Sep 2024 at 12:45.
18 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:56.
18 Nov 2024 and 17 Jan 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.
18 and 29 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, South Woodford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 10:21.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.
19 and 26 Nov 2024
Thames Water are proposing to carry out New service connection on High Street North, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:36.
20 Nov 2024 and 12 Feb 2025
Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:06.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:07.
21 Nov and 6 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:08.
21 Nov and 6 Dec 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Kingswood Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:07.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:00.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:43.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:06.
25 Nov and 16 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:33.
25 and 29 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Calvert Road, Greenwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 05:44.
25 Nov and 1 Dec 2024
Murphy Power Distribution are proposing to carry out New service connection on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 25 Sep 2024 at 12:46.
25 Nov and 23 Dec 2024
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 16:33.
25 Nov 2024 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.
25 Nov and 13 Dec 2024
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 29 Aug 2024 at 09:33.
25 and 27 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 09:05.
25 and 28 Nov 2024
BT are proposing to carry out Utility repair and maintenance works on Abbotsford Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Sep 2024 at 11:48.
25 Nov and 27 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.
25 Nov and 27 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.
25 Nov and 27 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jul 2024 at 14:04.
25 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Woodford Road, South Woodford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 10:41.
26 Nov 2024 and 10 Feb 2025
Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.
27 and 29 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Norman Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:58.
27 and 29 Nov 2024
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Sep 2024 at 13:57.
28 Nov 2024 and 20 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.
28 Nov and 6 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 5 Sep 2024 at 12:59.
28 Nov and 2 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:59.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:09.
29 Nov and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:10.
1 and 3 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:26.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:22.
2 and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Rippolson Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 11:46.
2 and 13 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:42.
2 and 5 Dec 2024
Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:46.
2 and 23 Dec 2024
Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:04.
2 and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 14:00.
4 and 6 Dec 2024
Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2024 at 11:06.
4 and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 12:51.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:24.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.
5 and 30 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:19.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.
5 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:32.
6 and 13 Dec 2024
Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Squire Energy on 13 Sep 2024 at 11:36.
6 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:03.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.
9 and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Devons Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Sep 2024 at 15:36.
9 Dec 2024 and 10 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 17:56.
9 and 17 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Tredegar Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:49.
9 Dec 2024 and 3 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.
9 and 19 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.
10 Dec 2024 and 17 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 12:06.
10 Dec 2024 and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 21 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 09:20.
10 Dec 2024 and 3 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.
13 Dec 2024 and 10 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.
16 and 18 Dec 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.
16 and 20 Dec 2024
Cadent Gas are proposing to carry out roadworks on Heigham Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:13.
16 and 20 Dec 2024
Cadent Gas are proposing to carry out roadworks on Burges Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:12.
16 and 20 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:17.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:57.
16 and 20 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Ferndale Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Oct 2024 at 10:09.
16 and 20 Dec 2024
BT are proposing to carry out Utility repair and maintenance works on Fletcher Lane, Leyton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 1 Oct 2024 at 10:34.
17 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:04.
17 and 19 Dec 2024
Virgin Media are proposing to carry out Remedial works on High Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 15:27.
17 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wallwood Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 10:28.
23 and 30 Dec 2024