ROADWORKS SUMMARY
Eastern Approach, Alfreds Way, BARKING, IG11 0AG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Eastern Approach, Alfreds Way, IG11 0AG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Eastern Approach, Alfreds Way, BARKING, IG11 0AG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Eastern Approach, Alfreds Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ripple Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2021 and could run through until 1 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 20:07.

Thames Water logo
LONG TERM
Between
31 Oct 2022 and 30 Jan 2025
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Oct 2022 at 04:47.

LONG TERM
Until
30 Sep 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 08:00 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:35.

Transport for London (TfL) logo
LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2023 at 18:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Sep 2024 at 12:33.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2023 at 08:00 and could run through until 31 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 8 May 2024 at 09:17.

Thames Water logo
LONG TERM
Between
24 Jul 2023 and 31 Jan 2026
Details
View Map
Share
Follow
Westwood Lane

Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.

LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 September 2023 at 08:00 and could run through until 30 November 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:39.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Queens Market

London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 September 2023 at 22:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2024 at 11:59.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.

Royal Borough Of Greenwich logo
LONG TERM
Until
6 Nov 2024
Details
View Map
Share
Follow
Plumstead High Street

Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Plumstead High Street, Plumstead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 11:00 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Mar 2024 at 10:28.

LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 08:00 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 16 Aug 2024 at 12:36.

LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 22 November 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 21 Oct 2024 at 12:05.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Thames Road

London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Booth Road

London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.

LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 12:12.

LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Burt Road

London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Charles Street

London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.

Transport for London (TfL) logo
LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 05:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Aug 2024 at 15:10.

LONG TERM
Until
28 Apr 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.

LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 April 2024 at 08:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Apr 2024 at 11:07.

LONG TERM
Until
4 Oct 2025
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 May 2024 at 08:00 and could run through until 4 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 Sep 2024 at 16:00.

LONG TERM
Between
13 May and 22 Nov 2024
Details
View Map
Share
Follow
Jenkins Lane

London Borough Of Newham are proposing to carry out Section 50 on Jenkins Lane, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 11:41.

LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Jenkins Lane

London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:16.

LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Jenkins Lane

London Borough Of Newham are carrying out Section 50 on Jenkins Lane, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 May 2024 at 09:00 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 10 Oct 2024 at 16:15.

Thames Water logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Barking Road

Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2024 at 08:05 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 16:15.

LONG TERM
Between
27 May 2024 and 1 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.

LONG TERM
Between
27 May 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.

LONG TERM
Until
27 Dec 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:13.

LONG TERM
Until
29 Nov 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:13.

Thames Water logo
LONG TERM
Until
11 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 July 2024 at 08:10 and could run through until 11 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:46.

London Borough Of Bexley logo
LONG TERM
Between
5 Aug 2024 and 31 Jan 2025
Details
View Map
Share
Bronze Age Way

London Borough Of Bexley were proposing to carry out Highway improvement works on Bronze Age Way, Erith.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2024 and run through until 31 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by London Borough Of Bexley on 30 Jul 2024 at 12:15.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
2 Dec 2024
Details
View Map
Share
Follow
Highbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Highbridge Road, Barking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 20 Aug 2024 at 13:10.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.

LONG TERM
Between
14 Aug 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

LONG TERM
Between
15 Aug and 27 Dec 2024
Details
View Map
Share
Follow
Sheringham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:12.

LONG TERM
Between
15 Aug and 27 Dec 2024
Details
View Map
Share
Follow
Dersingham Avenue

London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 August 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:13.

Thames Water logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Woolwich Manor Way

Thames Water are carrying out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.

The works started on 19 August 2024 at 08:00 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:35.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Heigham Road

Thames Water are carrying out Utility repair and maintenance works on Heigham Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 11:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:57.

Thames Water logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Chaucer Road

Thames Water are carrying out Utility asset works on Chaucer Road, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 12:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 12:22.

Thames Water logo
LONG TERM
Between
26 Aug and 29 Nov 2024
Details
View Map
Share
Ramsay Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Ramsay Road, Forest Gate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Aug 2024 at 12:06.

LONG TERM
Until
8 Nov 2024
Details
View Map
Share
Follow
Bradfield Road

London Borough Of Newham are carrying out Section 50 on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 10:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 11:25.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Jul 2024 at 11:31.

Southern Gas Networks logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Belvedere Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Belvedere Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:45 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 12:00.

Thames Water logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are proposing to carry out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:44.

Thames Water logo
LONG TERM
Until
2 Mar 2025
Details
View Map
Share
Follow
Beechfield Road

Thames Water are carrying out Utility asset works on Beechfield Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:46.

Thames Water logo
LONG TERM
Until
2 Sep 2025
Details
View Map
Share
Follow
Lesney Park

Thames Water are carrying out Utility asset works on Lesney Park, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.

LONG TERM
Between
2 Sep and 27 Dec 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 27 December 2024. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 13:14.

Cadent Gas logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Inglehurst Gardens

Cadent Gas are carrying out Utility asset works on Inglehurst Gardens, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 September 2024 at 13:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 13:11.

Thames Water logo
LONG TERM
Between
3 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Gordon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gordon Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 07:45.

London Borough Of Bexley logo
LONG TERM
Between
9 Sep 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.

LONG TERM
Between
9 Sep and 15 Nov 2024
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Jun 2024 at 14:35.

Thames Water logo
LONG TERM
Between
9 Sep and 11 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are proposing to carry out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 November 2024. The works will impact the footway, carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:50.

Thames Water logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Jupp Road West

Thames Water are carrying out Utility repair and maintenance works on Jupp Road West, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 11:15 and could run through until 18 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 16:17.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.

LONG TERM
Between
9 Sep 2024 and 11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Sep 2024 at 15:10.

London Borough Of Barking And Dagenham logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Freshwater Road

London Borough Of Barking And Dagenham are carrying out roadworks on Freshwater Road, Dagenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 10 Sep 2024 at 14:59.

Thames Water logo
LONG TERM
Until
20 Nov 2024
Details
View Map
Share
Follow
Gordon Road

Thames Water are carrying out Disconnection or alteration of supply on Gordon Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 09:15 and could run through until 20 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:28.

LONG TERM
Between
14 Sep 2024 and 2 Sep 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.

Thames Water logo
LONG TERM
Between
16 Sep and 20 Dec 2024
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 September 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:06.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
High Street North

Thames Water are carrying out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2024 at 10:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.

Cadent Gas logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Abbotsford Road

Cadent Gas are carrying out Utility asset works on Abbotsford Road, Goodmayes, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2024 at 08:58 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 12:30.

Transport for London (TfL) logo
LONG TERM
Between
23 Sep 2024 and 2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.

Transport for London (TfL) logo
LONG TERM
Until
2 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.

Cadent Gas logo
LONG TERM
Between
23 Sep and 8 Nov 2024
Details
View Map
Share
Perth Road

Cadent Gas were proposing to carry out Utility asset works on Perth Road, Gants Hill, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 16:01.

Thames Water logo
LONG TERM
Between
24 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 06:57.

Thames Water logo
LONG TERM
Between
24 Sep and 9 Dec 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are proposing to carry out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 13:42.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:24.

Thames Water logo
LONG TERM
Between
26 Sep 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Sheridan Road

Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 14:00.

Transport for London (TfL) logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are carrying out Highway improvement works on Orchard Place, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Oct 2024 at 14:39.

Thames Water logo
LONG TERM
Until
11 Nov 2024
Details
View Map
Share
Follow
Faringford Road

Thames Water are carrying out Utility asset works on Faringford Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 11:00 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:21.

LONG TERM
Until
11 Dec 2025
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Sep 2024 at 09:04.

London Borough Of Barking And Dagenham logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

The works started on 30 September 2024 at 09:30 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 24 Oct 2024 at 13:07.

LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Burges Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2024 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 4 Jul 2024 at 08:51.

Thames Water logo
LONG TERM
Between
2 Oct and 17 Dec 2024
Details
View Map
Share
Follow
Mayfield Road

Thames Water are proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 16:13.

Thames Water logo
LONG TERM
Between
2 Oct 2024 and 10 Jan 2025
Details
View Map
Share
Sheridan Road

Thames Water were proposing to carry out Utility asset works on Sheridan Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 October 2024 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 16:21.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Long Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Long Lane, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 October 2024 at 12:50 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 09:17.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Canberra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Canberra Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Canberra Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:57.

Southern Gas Networks logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Canberra Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Canberra Road, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 October 2024 at 09:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:25.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:13.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Woolwich Road

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:38.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:53.

Transport for London (TfL) logo
LONG TERM
Until
7 Nov 2024
Details
View Map
Share
Follow
Anchor And Hope Lane

Transport for London (TfL) are carrying out Highway improvement works on Anchor And Hope Lane, Charlton.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:38.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 7 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 12:14.

Transport for London (TfL) logo
LONG TERM
Until
24 Nov 2024
Details
View Map
Share
Follow
Woolwich Church Street

Transport for London (TfL) are carrying out Highway improvement works on Woolwich Church Street, Woolwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 21:00 and could run through until 24 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 06:37.

LONG TERM
Between
7 Oct and 15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 30 Sep 2024 at 11:47.

LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Oct 2024 at 12:42.

Finishing
Friday
Details
View Map
Share
Follow
Parsloes Avenue

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Parsloes Avenue, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 17 Jul 2024 at 18:41.

Finishing
Friday
Details
View Map
Share
Follow
Cornwallis Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Cornwallis Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 23 Jul 2024 at 14:02.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:16.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:56.

Transport for London (TfL) logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are carrying out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:45.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
7 Oct and 22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 09:49.

Transport for London (TfL) logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are carrying out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 08:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 09:44.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Jul 2024 at 15:05.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 5 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 16:21.

Thames Water logo
LONG TERM
Between
8 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Brigstock Road

Thames Water are proposing to carry out Utility asset works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2024 and could run through until 25 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 08:50.

Thames Water logo
LONG TERM
Until
26 Nov 2024
Details
View Map
Share
Follow
Brigstock Road

Thames Water are carrying out Utility asset works on Brigstock Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 14:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:11.

Thames Water logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are carrying out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 October 2024 at 10:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:26.

Southern Gas Networks logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Marley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:26.

Southern Gas Networks logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Heath Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:51.

Southern Gas Networks logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Heath Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heath Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:01.

Cadent Gas logo
Between
14 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Folkestone Road

Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 10 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Jul 2024 at 12:42.

Thames Water logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Shelley Avenue

Thames Water are carrying out Utility repair and maintenance works on Shelley Avenue, Manor Park, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 10:00 and could run through until 22 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:10.

Cadent Gas logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Aberdour Road

Cadent Gas are carrying out Utility asset works on Aberdour Road, Goodmayes, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 October 2024 at 12:06 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:28.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
Between
14 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Thames Water logo
LONG TERM
Until
15 Nov 2024
Details
View Map
Share
Follow
Paroma Road

Thames Water are carrying out Utility asset works on Paroma Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 12:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:35.

Transport for London (TfL) logo
Between
16 Oct and 8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 13:48.

Transport for London (TfL) logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are carrying out Highway improvement works on Aspen Way, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2024 at 10:00 and could run through until 8 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 10:02.

Cadent Gas logo
Between
16 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Hillcroft Road

Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 12:19.

Southern Gas Networks logo
LONG TERM
Until
18 Nov 2024
Details
View Map
Share
Follow
Heath Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Heath Avenue, Bexleyheath.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 13:09.

Finishing
Monday
Details
View Map
Share
Follow
Norman Road

Riverside Energy Park are proposing to carry out Utility asset works on Norman Road, Belvedere.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 October 2024 and could run through until 4 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 14 Oct 2024 at 15:35.

BT logo
Finishing
Friday
Details
View Map
Share
Shooters Hill Road

BT were proposing to carry out Utility asset works on Shooters Hill Road, Blackheath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jul 2024 at 13:45.

BT logo
Finishing
Friday
Details
View Map
Share
Zangwill Road

BT were proposing to carry out Utility asset works on Zangwill Road, Kidbrooke.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jul 2024 at 09:14.

Southern Gas Networks logo
Between
21 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Marley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:50.

Thames Water logo
Between
21 Oct and 7 Nov 2024
Details
View Map
Share
Follow
Crescent Road

Thames Water are proposing to carry out Utility repair and maintenance works on Crescent Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Aug 2024 at 16:17.

Thames Water logo
Until
7 Nov 2024
Details
View Map
Share
Follow
Crescent Road

Thames Water are carrying out Utility repair and maintenance works on Crescent Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:00 and could run through until 7 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 10:47.

Electricity Network Company logo
Between
21 Oct and 15 Nov 2024
Details
View Map
Share
Follow
West Street

Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 16:12.

Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Bronze Age Way

Riverside Energy Park were proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:26.

Between
21 Oct and 17 Nov 2024
Details
View Map
Share
Norman Road

Riverside Energy Park were proposing to carry out Utility asset works on Norman Road, Belvedere.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 17 November 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 16 Sep 2024 at 08:19.

Thames Water logo
LONG TERM
Until
25 Nov 2024
Details
View Map
Share
Follow
Wellington Road

Thames Water are carrying out Utility asset works on Wellington Road, East Ham, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 13:00 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:15.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Water Lane

Cadent Gas are proposing to carry out Utility asset works on Water Lane, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:00.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Water Lane

Cadent Gas are proposing to carry out Utility asset works on Water Lane, Seven Kings, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jul 2024 at 09:12.

Cadent Gas logo
Until
11 Nov 2024
Details
View Map
Share
Follow
Nutter Lane

Cadent Gas are carrying out Utility asset works on Nutter Lane, Wanstead, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 10:54 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:24.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Shelley Drive

Thames Water are proposing to carry out Utility asset works on Shelley Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:01.

Thames Water logo
Until
8 Nov 2024
Details
View Map
Share
Follow
Shelley Drive

Thames Water are carrying out Utility asset works on Shelley Drive, Welling.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 09:00 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:15.

Between
23 Oct and 14 Nov 2024
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 14 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 14 Oct 2024 at 15:37.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woolwich Road, Belvedere.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 02:30 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 11:00.

Thames Water logo
LONG TERM
Until
22 Jan 2025
Details
View Map
Share
Follow
Mayfield Road

Thames Water are carrying out Utility asset works on Mayfield Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 14:00 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:22.

Thames Water logo
LONG TERM
Between
24 Oct 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 October 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:05.

Thames Water logo
LONG TERM
Until
24 Feb 2025
Details
View Map
Share
Follow
Gertrude Road

Thames Water are carrying out Utility asset works on Gertrude Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 12:30 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:09.

Southern Gas Networks logo
LONG TERM
Between
25 Oct and 29 Nov 2024
Details
View Map
Share
Follow
Wickham Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 16:49.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out New service connection on Fraser Road, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 2 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:42.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Savage Gardens

Thames Water are carrying out Utility repair and maintenance works on Savage Gardens, Beckton, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 October 2024 at 16:00 and could run through until 1 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:07.

Transport for London (TfL) logo
Between
25 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:54.

Transport for London (TfL) logo
Between
25 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:46.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Billet Road

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Billet Road, Chadwell Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 October 2024 at 22:04 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 08:14.

London Borough Of Bexley logo
Finishing
Today
Details
View Map
Share
Follow
Belmont Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Belmont Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:11.

London Borough Of Bexley logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Belmont Road

London Borough Of Bexley are carrying out Highway improvement works on Belmont Road, Erith.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 29 Oct 2024 at 10:31.

BT logo
Between
28 Oct and 8 Nov 2024
Details
View Map
Share
Shooters Hill Road

BT were proposing to carry out Utility asset works on Shooters Hill Road, Blackheath.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 8 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Jul 2024 at 09:13.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Highbanks Close

Thames Water are proposing to carry out New service connection on Highbanks Close, Welling.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 11:03.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Highbanks Close

Thames Water are carrying out New service connection on Highbanks Close, Welling.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 13:48 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 13:51.

Southern Gas Networks logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Lessness Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lessness Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:49.

Southern Gas Networks logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Lessness Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lessness Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 14:00.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Powys Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Sep 2024 at 13:31.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Powys Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 15:50.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Follow
Powys Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 08:28.

Southern Gas Networks logo
Between
28 Oct and 25 Nov 2024
Details
View Map
Share
Powys Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 08:38.

Southern Gas Networks logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 14:20.

Southern Gas Networks logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 14:19.

Between
28 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 17 Oct 2024 at 14:51.

Between
28 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 17 Oct 2024 at 14:51.

Between
28 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 17 Oct 2024 at 14:51.

Between
28 Oct and 10 Nov 2024
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 10 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 28 Oct 2024 at 17:44.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Halt Robin Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 14:03.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Halt Robin Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:49.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Halt Robin Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 16:36.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Abbey Road

Thames Water are proposing to carry out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:11.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Abbey Road

Thames Water are carrying out Utility repair and maintenance works on Abbey Road, Belvedere.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 3 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:13.

Transport for London (TfL) logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Blackwall Lane

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Lane, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 15 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:08.

Between
28 Oct and 22 Nov 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 12:38.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:53.

Cadent Gas logo
Between
28 Oct and 18 Nov 2024
Details
View Map
Share
Follow
Hillcroft Road

Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:24.

Cadent Gas logo
Between
28 Oct and 24 Nov 2024
Details
View Map
Share
Follow
Beckton Road

Cadent Gas are proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 10:57.

Cadent Gas logo
Until
24 Nov 2024
Details
View Map
Share
Follow
Beckton Road

Cadent Gas are carrying out Utility asset works on Beckton Road, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:18 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 08:23.

Thames Water logo
Finishing
Today
Details
View Map
Share
Charlemont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 30 October 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 10:04.

Thames Water logo
Between
28 Oct and 16 Nov 2024
Details
View Map
Share
Manor Road

Thames Water were proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 16 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:50.

Thames Water logo
Until
8 Nov 2024
Details
View Map
Share
Follow
High Street South

Thames Water are carrying out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:06.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hartley Avenue

Thames Water are proposing to carry out New service connection on Hartley Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Jul 2024 at 09:06.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Dorset Road

Thames Water are carrying out Utility repair and maintenance works on Dorset Road, Forest Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:24 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
28 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Grange Road

Cadent Gas are proposing to carry out Utility asset works on Grange Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:45.

Cadent Gas logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 10:45.

Cadent Gas logo
Between
28 Oct and 11 Nov 2024
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 12:45.

Finishing
Friday
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 29 Jul 2024 at 14:04.

Finishing
Friday
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 5 Aug 2024 at 10:39.

Finishing
Friday
Details
View Map
Share
Mill Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 1 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 28 Aug 2024 at 15:23.

Finishing
Friday
Details
View Map
Share
Follow
Mill Road

Essex And Suffolk Water are carrying out Utility repair and maintenance works on Mill Road, Ilford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:00 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 28 Oct 2024 at 09:03.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 14 Aug 2024 at 10:21.

Network Rail logo
LONG TERM
Between
28 Oct and 12 Dec 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are proposing to carry out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 16 Sep 2024 at 14:45.

Network Rail logo
Until
15 Nov 2024
Details
View Map
Share
Follow
Vicarage Lane

Network Rail are carrying out Works for Rail Purposes on Vicarage Lane, Ilford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Oct 2024 at 08:34.

Transport for London (TfL) logo
Between
28 Oct and 19 Nov 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 19 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 11:14.

Cadent Gas logo
LONG TERM
Between
28 Oct and 13 Dec 2024
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 09:45.

Southern Gas Networks logo
Between
29 Oct and 27 Nov 2024
Details
View Map
Share
Follow
Sandringham Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:11.

Southern Gas Networks logo
Between
29 Oct and 27 Nov 2024
Details
View Map
Share
Sandringham Drive

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandringham Drive, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 October 2024 and run through until 27 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:15.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Manor Road

Thames Water are carrying out Utility repair and maintenance works on Manor Road, Erith.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 09:17 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:16.

Southern Gas Networks logo
Between
29 Oct and 6 Nov 2024
Details
View Map
Share
Follow
Rainton Road

Southern Gas Networks are proposing to carry out New service connection on Rainton Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 06:43.

Southern Gas Networks logo
Until
6 Nov 2024
Details
View Map
Share
Follow
Rainton Road

Southern Gas Networks are carrying out New service connection on Rainton Road, Charlton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 11:00 and could run through until 6 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 11:44.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Jedburgh Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jedburgh Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Aug 2024 at 11:08.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Central Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Central Park Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jun 2024 at 08:29.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Central Park Road

Thames Water are carrying out Utility repair and maintenance works on Central Park Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:22.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jul 2024 at 10:47.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 14:58.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Boundary Road

Thames Water are carrying out Utility repair and maintenance works on Boundary Road, Plaistow, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 October 2024 at 08:00 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:24.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Terrace Road

Thames Water are proposing to carry out Utility repair and maintenance works on Terrace Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 09:56.

Southern Gas Networks logo
Between
30 Oct and 20 Nov 2024
Details
View Map
Share
Follow
Lessness Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lessness Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:41.

Southern Gas Networks logo
Between
30 Oct and 26 Nov 2024
Details
View Map
Share
Follow
Marley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Marley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 16:17.

Cadent Gas logo
Between
30 Oct and 20 Nov 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 20 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 14:50.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Hilda Road

Thames Water are proposing to carry out Utility repair and maintenance works on Hilda Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 09:14.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Charlemont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 11:13.

Finishing
Saturday
Details
View Map
Share
Follow
Cranbrook Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cranbrook Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 28 Oct 2024 at 13:45.

Finishing
Saturday
Details
View Map
Share
Follow
Cranbrook Road

London Borough Of Redbridge are proposing to carry out Highway improvement works on Cranbrook Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Redbridge on 29 Oct 2024 at 08:45.

Finishing
Saturday
Details
View Map
Share
Follow
Woolwich Manor Way

London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 2 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:18.

Between
31 Oct and 23 Nov 2024
Details
View Map
Share
Follow
Faraday Road

London Borough Of Newham are proposing to carry out Highway improvement works on Faraday Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 23 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 3 Oct 2024 at 12:01.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 12:45.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 11:00.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
1 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Powys Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Powys Close, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:37.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Follow
Mona Street

Cadent Gas are proposing to carry out Utility asset works on Mona Street, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 14 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 17:15.

Cadent Gas logo
Between
1 and 14 Nov 2024
Details
View Map
Share
Beckton Road

Cadent Gas were proposing to carry out Utility asset works on Beckton Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 November 2024 and run through until 14 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:48.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:38.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Glenavon Road

Thames Water are proposing to carry out Utility repair and maintenance works on Glenavon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 3 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:36.

Cadent Gas logo
Between
2 and 11 Nov 2024
Details
View Map
Share
Hazeldene Road

Cadent Gas were proposing to carry out Utility asset works on Hazeldene Road, Goodmayes, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 November 2024 and run through until 11 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 11:58.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Westbrooke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 10:12.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 12:41.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
New Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on New Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 10:02.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Alexander Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 11:07.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Alexander Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 14:55.

Southern Gas Networks logo
Between
4 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Alexander Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alexander Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 12:14.

Thames Water logo
Between
4 and 8 Nov 2024
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 14:04.

Between
4 and 18 Nov 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 18 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 14 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Aug 2024 at 10:31.

Southern Gas Networks logo
Between
4 and 25 Nov 2024
Details
View Map
Share
Follow
Victoria Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 07:29.

Electricity Network Company logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
West Street

Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Oct 2024 at 11:57.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Victoria Dock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Dock Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:07.

Thames Water logo
Between
4 and 7 Nov 2024
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 7 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:25.

Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Woolwich Manor Way

London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:30.

Cadent Gas logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Aug 2024 at 08:52.

Cadent Gas logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 12:01.

Cadent Gas logo
LONG TERM
Between
4 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 15:58.

Thames Water logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 09:08.

Thames Water logo
Between
4 and 22 Nov 2024
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 16:19.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Ernald Avenue

Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:29.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Bartle Avenue

Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Oct 2024 at 14:28.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Bartle Avenue

Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Barking Road

Thames Water were proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 10:16.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Barking Road

Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:04.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Navarre Road

Thames Water are proposing to carry out Utility asset works on Navarre Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 11:05.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Streatfeild Avenue

Thames Water are proposing to carry out Utility asset works on Streatfeild Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 15:38.

Thames Water logo
Between
4 and 29 Nov 2024
Details
View Map
Share
Follow
Katherine Road

Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:39.

Thames Water logo
Between
4 and 15 Nov 2024
Details
View Map
Share
Follow
Pilgrims Way

Thames Water are proposing to carry out Utility asset works on Pilgrims Way, East Ham, London.

These works are categorised as Major.

The works will start on or after 4 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Aug 2024 at 17:32.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:46.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.

Thames Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Clements Road

Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Aug 2024 at 19:54.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Trevelyan Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Trevelyan Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:00.

Thames Water logo
Between
4 and 6 Nov 2024
Details
View Map
Share
Follow
Romford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Romford Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 12:42.

Transport for London (TfL) logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Jun 2024 at 14:56.

Transport for London (TfL) logo
Between
4 and 27 Nov 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 27 November 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:41.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 3 Mar 2025
Details
View Map
Share
Gertrude Road

Thames Water were proposing to carry out Utility asset works on Gertrude Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 November 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:58.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:18.

Transport for London (TfL) logo
Between
5 and 30 Nov 2024
Details
View Map
Share
Follow
Orchard Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Orchard Place, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Sep 2024 at 10:40.

Southern Gas Networks logo
LONG TERM
Between
6 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:36.

Southern Gas Networks logo
LONG TERM
Between
6 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Franklin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Franklin Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Oct 2024 at 10:36.

Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Woolwich Manor Way

London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:32.

Between
6 and 20 Nov 2024
Details
View Map
Share
Betterton Road

Essex And Suffolk Water were proposing to carry out Remedial works on Betterton Road, Rainham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 20 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 15 Aug 2024 at 13:18.

Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Betterton Road

Essex And Suffolk Water are proposing to carry out Remedial works on Betterton Road, Rainham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 20 Aug 2024 at 11:54.

Between
6 and 19 Nov 2024
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 09:03.

Between
6 and 19 Nov 2024
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 19 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:16.

Thames Water logo
Between
6 and 8 Nov 2024
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 08:58.

Thames Water logo
Between
8 and 16 Nov 2024
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out New service connection on Fraser Road, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 16 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 16:24.

Southern Gas Networks logo
Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Westbrooke Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 12:45.

London Borough Of Bexley logo
LONG TERM
Between
11 Nov 2024 and 18 Jul 2025
Details
View Map
Share
Follow
Walnut Tree Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Bexley on 29 Oct 2024 at 16:36.

Murphy Power Distribution logo
Between
11 and 17 Nov 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 17 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:11.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
East India Dock Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 07:13.

UK Power Networks Eastern & London logo
Between
11 and 30 Nov 2024
Details
View Map
Share
Follow
East India Dock Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 14:31.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Stonewall

Thames Water were proposing to carry out roadworks on Stonewall, Beckton, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 15 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 07:58.

Between
11 and 13 Nov 2024
Details
View Map
Share
Follow
Woolwich Manor Way

London Borough Of Newham are proposing to carry out Highway improvement works on Woolwich Manor Way, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 1 Aug 2024 at 10:34.

Cadent Gas logo
Between
11 and 25 Nov 2024
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:21.

Cadent Gas logo
Between
11 and 26 Nov 2024
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:25.

Cadent Gas logo
Between
11 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Oct 2024 at 12:21.

Between
11 and 29 Nov 2024
Details
View Map
Share
Follow
River Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:11.

Between
11 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Chequers Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Chequers Lane, Dagenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

Thames Water logo
Between
11 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Carpenters Road

Thames Water are proposing to carry out Utility asset works on Carpenters Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:16.

Thames Water logo
Between
11 and 15 Nov 2024
Details
View Map
Share
Follow
Bryant Street

Thames Water are proposing to carry out Utility asset works on Bryant Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 15 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Aug 2024 at 09:32.

Thames Water logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 12:07.

Thames Water logo
Between
11 and 18 Nov 2024
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 18 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Grove Park

Cadent Gas were proposing to carry out Utility asset works on Grove Park, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 23 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:01.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Jun 2024 at 07:49.

Cadent Gas logo
LONG TERM
Between
11 Nov 2024 and 23 Jan 2025
Details
View Map
Share
Follow
The Avenue

Cadent Gas are proposing to carry out Utility asset works on The Avenue, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 11:08.

Cadent Gas logo
Between
11 and 22 Nov 2024
Details
View Map
Share
Nutter Lane

Cadent Gas were proposing to carry out Utility asset works on Nutter Lane, Wanstead, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 22 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 10:02.

Royal Borough Of Greenwich logo
Between
12 Nov and 9 Dec 2024
Details
View Map
Share
Follow
John Harrison Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on John Harrison Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 12 Aug 2024 at 13:49.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Bethell Avenue

Thames Water were proposing to carry out roadworks on Bethell Avenue, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:22.

Thames Water logo
Between
12 and 14 Nov 2024
Details
View Map
Share
Kimberley Road

Thames Water were proposing to carry out roadworks on Kimberley Road, Canning Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:21.

Transport for London (TfL) logo
Between
12 Nov and 5 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Jul 2024 at 14:19.

Transport for London (TfL) logo
Between
12 Nov and 5 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:44.

Transport for London (TfL) logo
Between
12 Nov and 5 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 07:55.

Transport for London (TfL) logo
Between
12 Nov and 5 Dec 2024
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Newham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 14:13.

Between
12 and 14 Nov 2024
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 14 November 2024. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 21 Aug 2024 at 12:47.

Between
12 and 14 Nov 2024
Details
View Map
Share
Collier Row Road

Essex And Suffolk Water were proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 14 November 2024. The works were due to impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 27 Aug 2024 at 14:17.

Between
13 and 26 Nov 2024
Details
View Map
Share
Follow
Bexley Road

Riverside Energy Park are proposing to carry out Utility asset works on Bexley Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 11:48.

Between
13 and 26 Nov 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 11:46.

Between
13 and 26 Nov 2024
Details
View Map
Share
Follow
Bronze Age Way

Riverside Energy Park are proposing to carry out Utility asset works on Bronze Age Way, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 26 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Riverside Energy Park on 30 Oct 2024 at 11:44.

Thames Water logo
LONG TERM
Between
14 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Heigham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Heigham Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:33.

Thames Water logo
LONG TERM
Between
14 Nov and 31 Dec 2024
Details
View Map
Share
Follow
Burges Road

Thames Water are proposing to carry out Utility repair and maintenance works on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 10:32.

Network Rail logo
Between
16 and 18 Nov 2024
Details
View Map
Share
Charlton Lane

Network Rail were proposing to carry out Works for Rail Purposes on Charlton Lane, Charlton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 November 2024 and run through until 18 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 26 Sep 2024 at 11:22.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:11.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Orchard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:57.

Southern Gas Networks logo
Between
18 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Clifton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 13:33.

Southern Gas Networks logo
Between
18 Nov and 1 Dec 2024
Details
View Map
Share
Follow
Victoria Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Victoria Road, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:02.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Christchurch Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Christchurch Avenue, Erith.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 15:50.

Thames Water logo
Between
18 and 26 Nov 2024
Details
View Map
Share
Fraser Road

Thames Water were proposing to carry out New service connection on Fraser Road, Erith.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 26 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 15:39.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:44.

Southern Gas Networks logo
Between
18 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Tallis Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tallis Grove, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 07:23.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 22 Dec 2024
Details
View Map
Share
Follow
Bramhope Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramhope Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 12:45.

Murphy Power Distribution logo
Between
18 and 24 Nov 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 24 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:17.

Cadent Gas logo
Between
18 Nov and 8 Dec 2024
Details
View Map
Share
Follow
Gooseley Lane

Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 15:56.

LONG TERM
Between
18 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Choats Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2024 at 12:18.

Thames Water logo
Between
18 and 29 Nov 2024
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:30.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.

Transport for London (TfL) logo
LONG TERM
Between
19 Nov 2024 and 28 May 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.

Thames Water logo
Between
19 and 26 Nov 2024
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out New service connection on High Street North, Manor Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 26 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Aug 2024 at 15:36.

Between
20 and 30 Nov 2024
Details
View Map
Share
Follow
Queens Road

Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Riverside Energy Park on 22 Oct 2024 at 10:45.

Thames Water logo
LONG TERM
Between
20 Nov 2024 and 12 Feb 2025
Details
View Map
Share
Mayfield Road

Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 15:39.

Between
20 Nov and 3 Dec 2024
Details
View Map
Share
Dyson Road

London Borough Of Newham were proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 11:54.

Between
20 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 13:51.

Cadent Gas logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Alpine Way

Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:06.

Cadent Gas logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Whitings Way

Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:07.

Cadent Gas logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:08.

Thames Water logo
Between
21 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Kingswood Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingswood Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:07.

London Borough Of Barking And Dagenham logo
On
24 Nov 2024
Details
View Map
Share
Follow
East Street

London Borough Of Barking And Dagenham are proposing to carry out Works for road purposes on East Street, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 24 November 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 30 Oct 2024 at 09:12.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:00.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Carlton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carlton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:43.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Orchard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2024 at 15:06.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Orchard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 09:33.

Southern Gas Networks logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Follow
Clifton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:49.

Thames Water logo
LONG TERM
Between
25 Nov 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Wickham Street

Thames Water are proposing to carry out Utility asset works on Wickham Street, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 12:22.

Thames Water logo
Between
25 Nov and 14 Dec 2024
Details
View Map
Share
Follow
Fraser Road

Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 15:00.

Murphy Power Distribution logo
Between
25 Nov and 1 Dec 2024
Details
View Map
Share
Connaught Bridge

Murphy Power Distribution were proposing to carry out New service connection on Connaught Bridge, Silvertown, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 1 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Oct 2024 at 12:29.

Thames Water logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Ron Leighton Way

Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 16:33.

Thames Water logo
LONG TERM
Between
25 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
High Street North

Thames Water are proposing to carry out Utility asset works on High Street North, East Ham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 09:44.

London Borough Of Barking And Dagenham logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Longbridge Road

London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Longbridge Road, Barking.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Barking And Dagenham on 29 Aug 2024 at 09:33.

Thames Water logo
Between
25 and 27 Nov 2024
Details
View Map
Share
Follow
Clarence Road

Thames Water are proposing to carry out Utility repair and maintenance works on Clarence Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 09:05.

BT logo
Between
25 and 28 Nov 2024
Details
View Map
Share
Follow
Abbotsford Road

BT are proposing to carry out Utility repair and maintenance works on Abbotsford Road, Goodmayes, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Sep 2024 at 11:48.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
25 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Redcliffe Gardens

Cadent Gas are proposing to carry out Utility asset works on Redcliffe Gardens, Cranbrook, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

Cadent Gas logo
Between
25 Nov and 15 Dec 2024
Details
View Map
Share
Follow
Grosvenor Road

Cadent Gas are proposing to carry out Utility asset works on Grosvenor Road, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 10:00.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:39.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Valley Road

Thames Water are proposing to carry out Utility asset works on Valley Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 14:13.

Thames Water logo
Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Norman Road

Thames Water are proposing to carry out Utility repair and maintenance works on Norman Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:58.

Between
27 and 29 Nov 2024
Details
View Map
Share
Follow
Thorold Road

Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Thorold Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Essex And Suffolk Water on 3 Sep 2024 at 13:57.

Southern Gas Networks logo
LONG TERM
Between
28 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Preston Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Preston Drive, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 15:30.

Between
28 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Bradfield Road

Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 5 Sep 2024 at 12:59.

Thames Water logo
Between
28 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Essex Road

Thames Water are proposing to carry out Utility repair and maintenance works on Essex Road, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 10:59.

LONG TERM
Between
28 Nov 2024 and 6 Mar 2026
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.

Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:09.

Between
28 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Oaklands Avenue

London Borough Of Havering are proposing to carry out Highway improvement works on Oaklands Avenue, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 23 Sep 2024 at 16:07.

Cadent Gas logo
Between
29 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:09.

Cadent Gas logo
Between
29 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:10.

Thames Water logo
Between
1 and 3 Dec 2024
Details
View Map
Share
Follow
Charlemont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 09:26.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Hill View Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 16:22.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Rippolson Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rippolson Road, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 11:46.

Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:42.

Cadent Gas logo
Between
2 and 5 Dec 2024
Details
View Map
Share
Follow
Plymouth Road

Cadent Gas are proposing to carry out New service connection on Plymouth Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 11:46.

Thames Water logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Altmore Avenue

Thames Water are proposing to carry out Utility asset works on Altmore Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 14:04.

Thames Water logo
Between
2 and 19 Dec 2024
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:15.

Thames Water logo
Between
2 and 19 Dec 2024
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 15:56.

Thames Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Hollybush Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Hollybush Hill, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 14:00.

Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Foxlands Road

Essex And Suffolk Water are proposing to carry out Remedial works on Foxlands Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex And Suffolk Water on 18 Sep 2024 at 11:06.

Transport for London (TfL) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 08:05.

Transport for London (TfL) logo
Between
4 and 20 Dec 2024
Details
View Map
Share
Follow
Eastern Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:02.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Alpine Way

Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:14.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Alpine Way

Cadent Gas are proposing to carry out Utility asset works on Alpine Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Whitings Way

Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:24.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Whitings Way

Cadent Gas are proposing to carry out Utility asset works on Whitings Way, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.

Cadent Gas logo
Between
5 and 30 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:33.

Cadent Gas logo
Between
5 and 30 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:37.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 16:19.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:02.

Cadent Gas logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 10:32.

Between
6 and 13 Dec 2024
Details
View Map
Share
Follow
Bradfield Road

Squire Energy are proposing to carry out Statutory Infrastructure Works on Bradfield Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 13 Sep 2024 at 11:36.

Thames Water logo
Between
6 and 10 Dec 2024
Details
View Map
Share
Follow
Osborne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Osborne Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Sep 2024 at 11:03.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 14:12.

Thames Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Lansdowne Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lansdowne Lane, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 14:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Nelson Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Nelson Street, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Sep 2024 at 17:56.

Thames Water logo
LONG TERM
Between
9 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 15:18.

Between
9 and 19 Dec 2024
Details
View Map
Share
Follow
Gibbins Road

London Borough Of Newham are proposing to carry out Highway improvement works on Gibbins Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 9 Aug 2024 at 16:14.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 26 Jul 2024 at 08:31.

Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
The Broadway

London Borough Of Havering are proposing to carry out Highway improvement works on The Broadway, Hornchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Havering on 20 Sep 2024 at 14:03.

Southern Gas Networks logo
LONG TERM
Between
10 Dec 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Berkeley Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Berkeley Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:06.

Thames Water logo
LONG TERM
Between
10 Dec 2024 and 21 Apr 2025
Details
View Map
Share
Follow
Coleman Road

Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 21 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 09:20.

Cadent Gas logo
Between
10 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Hillcroft Road

Cadent Gas are proposing to carry out Utility asset works on Hillcroft Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 15:35.

Cadent Gas logo
Between
13 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:12.

Cadent Gas logo
Between
13 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:00.

Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Boxley Street

London Borough Of Newham are proposing to carry out Highway improvement works on Boxley Street, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Sep 2024 at 15:41.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Heigham Road

Cadent Gas are proposing to carry out roadworks on Heigham Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:13.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Burges Road

Cadent Gas are proposing to carry out roadworks on Burges Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 10:12.

Thames Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Claremont Road

Thames Water were proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:17.

Thames Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Dersingham Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:57.

BT logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Ferndale Road

BT are proposing to carry out Utility repair and maintenance works on Ferndale Road, Leytonstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Oct 2024 at 13:27.

Thames Water logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Wolsey Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Wolsey Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 13:04.

Virgin Media logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
High Street

Virgin Media are proposing to carry out Remedial works on High Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 15:27.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Ethel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 11:45.

Thames Water logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Dorset Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 09:22.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Fairlawn Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairlawn Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Herbert Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Herbert Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:31.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Hudson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:28.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Mayfair Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfair Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 15:22.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Pinewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pinewood Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 17 Feb 2025
Details
View Map
Share
Follow
West Heath Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:06.

Cadent Gas logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:11.

Cadent Gas logo
Between
3 and 24 Jan 2025
Details
View Map
Share
Follow
Eastbury Road

Cadent Gas are proposing to carry out Utility asset works on Eastbury Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:01.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Movers Lane

Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 15:36.

Cadent Gas logo
Between
4 Jan and 3 Feb 2025
Details
View Map
Share
Movers Lane

Cadent Gas were proposing to carry out Utility asset works on Movers Lane, Barking.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:23.

Between
6 and 29 Jan 2025
Details
View Map
Share
Follow
Brampton Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Brampton Road, Bexleyheath.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Harlaxton Energy Networks on 9 Oct 2024 at 15:29.

London Borough Of Bexley logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Honiton Road

London Borough Of Bexley are proposing to carry out Highway improvement works on Honiton Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 9 Oct 2024 at 14:39.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Central Avenue

London Borough Of Bexley were proposing to carry out Highway improvement works on Central Avenue, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:05.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Wickham Street

London Borough Of Bexley were proposing to carry out Highway improvement works on Wickham Street, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 11:57.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Awliscombe Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Awliscombe Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:08.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Monkton Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Monkton Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:14.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Glenmore Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Glenmore Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:11.

London Borough Of Bexley logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Edison Road

London Borough Of Bexley were proposing to carry out Highway improvement works on Edison Road, Welling.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 3 Oct 2024 at 12:16.

Southern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Wyndcliff Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wyndcliff Road, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 14:13.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Freemasons Road

Cadent Gas are proposing to carry out Utility asset works on Freemasons Road, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 15:30.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Barking Road

Cadent Gas were proposing to carry out Utility asset works on Barking Road, Canning Town, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:40.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Manor Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manor Road, Canning Town, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Oct 2024 at 11:50.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Woodside Road

BT are proposing to carry out Utility repair and maintenance works on Woodside Road, Plaistow, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 17 Oct 2024 at 11:01.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Charlemont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlemont Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 12:43.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dongola Road

BT were proposing to carry out Utility repair and maintenance works on Dongola Road, Plaistow, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 13:43.

LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Renwick Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 9 Sep 2024 at 12:12.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
High Street South

Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:53.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ernald Avenue

Thames Water are proposing to carry out Utility asset works on Ernald Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:37.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Bartle Avenue

Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:38.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Katherine Road

Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:47.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
London Road

Cadent Gas are proposing to carry out Utility asset works on London Road, Barking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:40.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Dorset Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dorset Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 09:55.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Dames Road

Thames Water were proposing to carry out Utility repair and maintenance works on Dames Road, Forest Gate, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 13:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Richmond Road

Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Richmond Road

Cadent Gas were proposing to carry out Utility asset works on Richmond Road, Ilford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 08:31.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Fels Farm Avenue

Cadent Gas are proposing to carry out New service connection on Fels Farm Avenue, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 14:25.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Blake Hall Crescent

Thames Water are proposing to carry out Utility asset works on Blake Hall Crescent, Wanstead, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 11:30.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:37.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 12:47.

Cadent Gas logo
LONG TERM
Between
6 Jan and 2 Mar 2025
Details
View Map
Share
Follow
Clarendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Clarendon Gardens, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 11:00.

UK Power Networks Eastern & London logo
Between
8 and 17 Jan 2025
Details
View Map
Share
Follow
Red Lion Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Red Lion Lane, Plumstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Heathside Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathside Avenue, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 13:19.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Thanet Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Oct 2024 at 12:47.

Southern Gas Networks logo
Between
13 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Burcharbro Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 11:44.

London Borough Of Bexley logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Brook Street

London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 8 Oct 2024 at 15:50.

Thames Water logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 10:29.

Thames Water logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Park Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jun 2024 at 14:46.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Claremont Road

Thames Water are proposing to carry out Utility repair and maintenance works on Claremont Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Sep 2024 at 11:03.

BT logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Durham Road

BT are proposing to carry out Utility repair and maintenance works on Durham Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Oct 2024 at 08:48.

Network Rail logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Strode Road

Network Rail are proposing to carry out Works for Rail Purposes on Strode Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Jun 2024 at 11:33.

BT logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
Ronald Avenue

BT are proposing to carry out Utility asset works on Ronald Avenue, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Oct 2024 at 10:29.

Thames Water logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Follow
Monmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Monmouth Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Oct 2024 at 15:01.

Southern Gas Networks logo
LONG TERM
Between
17 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Bristow Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 12:54.

Cadent Gas logo
Between
17 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:20.

Cadent Gas logo
Between
17 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 11:59.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 24 Oct 2024 at 15:34.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:15.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:42.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway repair and maintenance works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 16 Oct 2024 at 15:13.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Crescent Road

Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Sep 2024 at 08:52.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Crescent Road

Thames Water are proposing to carry out Remedial works on Crescent Road, Woolwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 16:40.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
New Road

London Borough Of Bexley are proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 17 Oct 2024 at 16:50.

London Borough Of Bexley logo
Between
20 and 23 Jan 2025
Details
View Map
Share
New Road

London Borough Of Bexley were proposing to carry out Highway improvement works on New Road, Abbey Wood.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Bexley on 19 Sep 2024 at 14:51.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Manorway

Southern Gas Networks are proposing to carry out New service connection on Church Manorway, Erith.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 09:20.

Cadent Gas logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Highbridge Road

Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 12:39.

Cadent Gas logo
Between
20 and 25 Jan 2025
Details
View Map
Share
Follow
Station Parade

Cadent Gas are proposing to carry out Remedial works on Station Parade, Barking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:27.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:53.

Cadent Gas logo
Between
20 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Oglethorpe Road

Cadent Gas are proposing to carry out Utility asset works on Oglethorpe Road, Dagenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 16:10.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 12:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 12:45.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Mafeking Avenue

Cadent Gas are proposing to carry out Utility asset works on Mafeking Avenue, Newbury Park, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 12:16.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:47.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 14:00.

Cadent Gas logo
Between
20 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Wards Road

Cadent Gas are proposing to carry out Utility asset works on Wards Road, Newbury Park, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 12:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 10 Apr 2025
Details
View Map
Share
Follow
Beehive Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Beehive Lane, Ilford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:15.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Jan and 25 Feb 2025
Details
View Map
Share
Follow
Woodford Bridge Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Woodford Bridge Road, Ilford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.

Transport for London (TfL) logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
North Circular Road

Transport for London (TfL) are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 10:27.

Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Collier Row Road

Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Collier Row Road, Romford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the verge only.

This roadwork event was last updated by Essex And Suffolk Water on 25 Oct 2024 at 12:48.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 11:53.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Oct 2024 at 17:12.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 12:09.

Transport for London (TfL) logo
Between
22 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 14:13.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 09:00.

Southern Gas Networks logo
LONG TERM
Between
24 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Falconwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Falconwood Avenue, Welling.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 16:07.

Thames Water logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Fords Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fords Park Road, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:57.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are proposing to carry out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:58.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Carnarvon Road

London Borough Of Newham are proposing to carry out Highway improvement works on Carnarvon Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 23 Oct 2024 at 12:41.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Warwick Road

London Borough Of Newham are proposing to carry out Highway improvement works on Warwick Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 30 Oct 2024 at 10:01.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Atherton Road

London Borough Of Newham are proposing to carry out Highway improvement works on Atherton Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 08:47.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Palmerston Road

London Borough Of Newham are proposing to carry out Highway improvement works on Palmerston Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 15:09.

Between
24 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Westbury Road

London Borough Of Newham are proposing to carry out Highway improvement works on Westbury Road, Forest Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 29 Oct 2024 at 15:01.

Transport for London (TfL) logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Tidal Basin Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Tidal Basin Road, Silvertown, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 14:57.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Stonewall

Thames Water are proposing to carry out roadworks on Stonewall, Beckton, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:04.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:21.

Cadent Gas logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Roding Road

Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 12:03.

Thames Water logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Waghorn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Waghorn Road, Upton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 14:49.


Roadworks Map near to Eastern Approach, Alfreds Way, BARKING, IG11 0AG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Oct 2024 12:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Eastern Approach, Alfreds Way, BARKING, IG11 0AG (26 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Its Technology Group logo
ALFREDS WAY 
(0.1 miles)
Its Technology Group
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 29 Oct 2024 22:17
(Scheduled: 29 Oct 2024 - 31 Oct 2024)
0.1
Details
Share
Follow
2
London Borough Of Barking And Dagenham logo
MAJOR
  
MAYBURY ROAD 
(0.1 miles)
London Borough Of Barking And Dagenham
Highway improvement works - Footway -
In Progress
Since: 21 Oct 2024 08:00
(Scheduled: 21 Oct 2024 - 1 Nov 2024)
0.1
Details
Share
Follow
3
Virgin Media logo
ROXWELL ROAD 
(0.2 miles)
Virgin Media
Utility asset works - Footway, Carriageway - Give and take
Cancelled
(Scheduled: 29 Oct 2024 - 30 Oct 2024)
0.2
Details
Share
4
Transport for London (TfL) logo
MAJOR
  
RIPPLE ROAD 
(0.3 miles)
Transport for London (TfL)
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 31 Oct 2021 - 1 Nov 2024
0.3
Details
Share
Follow
5
London Borough Of Barking And Dagenham logo
MAYESBROOK ROAD 
(0.3 miles)
London Borough Of Barking And Dagenham
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 31 Oct 2024 - 4 Nov 2024
0.3
Details
Share
Follow
6
UK Power Networks Eastern & London logo
URGENT
  
MAPLESTEAD ROAD 
(0.3 miles)
UK Power Networks Eastern & London
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 29 Oct 2024 08:25
(Scheduled: 29 Oct 2024 - 4 Nov 2024)
0.3
Details
Share
Follow
7
Cadent Gas logo
EMERGENCY
  
RIPPLE ROAD 
(0.4 miles)
Cadent Gas
Utility repair and maintenance works - Footway, Verge - No carriageway incursion
Complete
24 Oct 2024 09:36 - 25 Oct 2024 22:36
0.4
Details
Share
8
London Borough Of Barking And Dagenham logo
MAJOR
  
PELHAM AVENUE 
(0.4 miles)
London Borough Of Barking And Dagenham
Highway improvement works - Footway -
In Progress
Since: 25 Oct 2024 08:00
(Scheduled: 25 Oct 2024 - 8 Nov 2024)
0.4
Details
Share
Follow
9
THAMES ROAD 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 28 Oct 2024 - 30 Oct 2024
0.5
Details
Share
Follow
10
THAMES ROAD 
(0.5 miles)
Essex And Suffolk Water
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
28 Oct 2024 09:45 - 15:00
0.5
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data