ROADWORKS SUMMARY
Ripple Road, BARKING, IG11 0AE
Introduction

View current and future planned roadworks and road closures for Ripple Road, IG11 0AE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Ripple Road, BARKING, IG11 0AE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Ripple Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.
24 Jul 2023 and 31 Jan 2026
Thames Water are proposing to carry out New service connection on Westwood Lane, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2023 and could run through until 31 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Mar 2023 at 17:35.
1 Oct 2023 and 10 Oct 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.
These works are categorised as Major.
The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 07:39.
Friday
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 14:45.
Monday
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 29 Apr 2024 at 15:17.
30 May 2025
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 April 2024 at 09:00 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 13:33.
19 Nov 2025
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 May 2024 at 08:00 and could run through until 19 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:26.
27 May 2024 and 1 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 1 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:56.
27 Jun 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.
27 May 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 May 2024 at 07:57.
27 Jun 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2025 at 08:06.
7 Apr 2026
Thames Water are carrying out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:10 and could run through until 7 April 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 12:27.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
14 Aug 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 May 2024 at 09:47.
15 Aug 2024 and 31 May 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Sheringham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:37.
15 Aug 2024 and 31 May 2025
London Borough Of Newham are proposing to carry out Works for road purposes on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:36.
31 May 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:00 and could run through until 31 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 5 Mar 2025 at 09:41.
2 Sep 2025
Thames Water are carrying out Utility asset works on Lesney Park, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:00 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 08:44.
9 Sep 2024 and 18 Jul 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Walnut Tree Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 18 July 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 14 May 2024 at 08:26.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Aug 2024 at 12:09.
9 Sep 2024 and 11 Dec 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 11 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 21 Aug 2024 at 14:14.
14 Sep 2024 and 2 Sep 2025
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 September 2024 and could run through until 2 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 May 2024 at 07:00.
Friday
Transport for London (TfL) are carrying out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Sep 2024 at 08:07.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Sep 2024 at 10:27.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 2 May 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 24 Sep 2024 at 08:11.
31 Aug 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 31 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 23 Apr 2025 at 15:42.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:16.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The works started on 4 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 20 Nov 2024 at 14:32.
18 Jul 2025
London Borough Of Bexley are carrying out Highway improvement works on Walnut Tree Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 16 Apr 2025 at 14:39.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 11:22.
19 Nov 2024 and 28 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 28 May 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 12:36.
Friday
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works will start on or after 19 November 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 13:24.
Friday
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The works started on 19 November 2024 at 00:00 and could run through until 2 May 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 06:58.
28 Nov 2024 and 6 Mar 2026
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 6 March 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 30 Aug 2024 at 12:16.
Wednesday
Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:25.
Wednesday
Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:10.
2 Jan and 12 May 2025
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.
11 Dec 2025
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Forest Gate, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 08:00 and could run through until 11 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 16 Jan 2025 at 08:13.
22 Jan and 9 May 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 11:44.
16 May 2025
Thames Water are carrying out Disconnection or alteration of supply on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 January 2025 at 08:00 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 15:33.
27 Jan and 29 May 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 20 Dec 2024 at 13:28.
1 Feb and 8 May 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Ashburnham Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 8 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:36.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 09:29.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Sep 2024 at 13:30.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:15.
Tomorrow
Cadent Gas are carrying out Utility asset works on Brisbane Road, Ilford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:19 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Feb 2025 at 09:50.
10 Feb and 31 Aug 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 31 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 11:53.
10 Feb and 31 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 August 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 12:12.
10 Feb and 27 Jun 2025
Thames Water were proposing to carry out Utility asset works on Romford Road, Manor Park, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 27 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 12:19.
12 Feb and 31 Oct 2025
Thames Water were proposing to carry out Utility asset works on Frinsted Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 February 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.
15 Feb and 29 Aug 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Vincent Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 29 August 2025. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Greenwich on 20 Jan 2025 at 16:29.
30 May 2025
Thames Water are carrying out Utility asset works on Avenue Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 February 2025 at 14:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Feb 2025 at 14:11.
Friday
Thames Water were proposing to carry out Utility asset works on Mayfield Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Aug 2024 at 16:44.
Monday
Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:39.
20 Feb and 20 Jun 2025
Thames Water are proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 20 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 Jan 2025 at 12:11.
13 Jun 2025
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Longbridge Road, Barking.
These works are categorised as Major.
The works started on 3 March 2025 at 09:30 and could run through until 13 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 2 Apr 2025 at 16:03.
24 Feb and 30 May 2025
Thames Water are proposing to carry out Utility asset works on Avenue Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 6 Feb 2025 at 16:05.
24 Feb and 12 Jun 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Jan 2025 at 11:30.
25 May 2025
Riverside Energy Park are carrying out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 24 February 2025 at 08:00 and could run through until 25 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Riverside Energy Park on 25 Mar 2025 at 13:34.
Friday
London Borough Of Newham are proposing to carry out Section 50 on Leslie Road, Canning Town, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 February 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 24 Feb 2025 at 16:02.
6 May 2025
London Borough Of Newham are carrying out Section 50 on Leslie Road, Canning Town, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 February 2025 at 09:00 and could run through until 6 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 27 Feb 2025 at 12:53.
3 Mar and 7 May 2025
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.
3 Mar and 7 May 2025
Cadent Gas are proposing to carry out Utility asset works on Windsor Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
3 Mar and 30 May 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.
26 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Bellegrove Road, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 March 2025 at 12:30 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 13:25.
4 Mar and 26 May 2025
Thames Water were proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 26 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:00.
6 Mar and 4 Jun 2025
Thames Water are proposing to carry out Utility asset works on Lyndon Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 4 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 28 Jan 2025 at 16:41.
Friday
London Borough Of Bexley are proposing to carry out Section 50 on Crabtree Manorway North, Belvedere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 25 Mar 2025 at 10:41.
Friday
London Borough Of Bexley are proposing to carry out Section 50 on Crabtree Manorway North, Belvedere.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Bexley on 25 Mar 2025 at 11:01.
Monday
Cadent Gas are proposing to carry out Utility asset works on Gregory Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 15:46.
17 Mar and 30 May 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Leyton Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 13 Dec 2024 at 15:22.
1 Aug 2025
London Borough Of Newham are carrying out Highway improvement works on Leyton Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 07:00 and could run through until 1 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 7 Apr 2025 at 08:49.
Friday
Thames Water are carrying out Utility repair and maintenance works on Eastern Avenue, Ilford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 March 2025 at 06:00 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 09:01.
22 Mar and 30 May 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 March 2025 and run through until 30 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 14:04.
23 Mar and 8 Aug 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 14:34.
30 May 2025
Thames Water are carrying out Utility asset works on Kingsman Street, Woolwich.
The works started on 24 March 2025 at 13:45 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 14:16.
Tuesday
Southern Gas Networks are carrying out Utility repair and maintenance works on Haslemere Road, Bexleyheath.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2025 at 09:45 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 26 Mar 2025 at 10:16.
27 Mar and 26 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eastcote Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 26 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Mar 2025 at 09:12.
27 Mar and 9 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 09:37.
Today
London Borough Of Havering are carrying out roadworks on Winifred Avenue, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2025 at 08:00 and could run through until 26 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 28 Mar 2025 at 08:04.
12 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 March 2025 at 13:05 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Mar 2025 at 13:15.
Monday
Thames Water were proposing to carry out Utility asset works on Ward Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 March 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Feb 2025 at 15:29.
31 Mar and 19 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:20.
Thursday
Southern Gas Networks are carrying out Utility repair and maintenance works on Pinewood Road, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 April 2025 at 08:00 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 15:18.
7 Apr and 11 May 2025
Cadent Gas are proposing to carry out Utility asset works on Gascoigne Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 11 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 13:55.
7 Apr and 3 May 2025
London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 April 2025 and run through until 3 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:38.
26 Sep 2025
London Borough Of Newham are carrying out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 11:00 and could run through until 26 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Apr 2025 at 09:25.
6 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 21:00 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 08:46.
6 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 21:00 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 08:51.
6 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 21:00 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 08:50.
6 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 April 2025 at 21:00 and could run through until 6 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2025 at 08:51.
8 Apr and 6 Sep 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 April 2025 and run through until 6 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:02.
9 Apr and 27 Jun 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 22 Apr 2025 at 12:55.
Tuesday
UK Power Networks Eastern & London are carrying out New service connection on Yewtree Avenue, Dagenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 April 2025 at 13:30 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 09:40.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:28.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 11:24.
Monday
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:48.
11 Apr and 7 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 08:24.
11 Apr and 7 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Newham Way, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 09:39.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Keswick Gardens, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.
14 Apr and 4 May 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 4 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:37.
Tuesday
Thames Water are proposing to carry out Utility asset works on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2025 at 10:35.
16 May 2025
Thames Water are carrying out Utility asset works on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 12:00 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 15:31.
Monday
Thames Water are carrying out Utility repair and maintenance works on Leigh Avenue, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 April 2025 at 10:00 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:10.
Today
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Lister Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 26 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 12 Feb 2025 at 16:41.
Today
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Lister Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 26 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 28 Feb 2025 at 16:18.
14 Apr and 19 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 12:50.
14 Apr and 3 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 5 Feb 2025 at 15:37.
14 Apr and 3 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 7 Feb 2025 at 09:20.
15 Apr and 27 May 2025
London Borough Of Newham are proposing to carry out Section 50 on Bidder Street, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 11 Apr 2025 at 13:46.
27 May 2025
London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 09:00 and could run through until 27 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 16 Apr 2025 at 12:33.
Thursday
Transport for London (TfL) are carrying out Highway improvement works on Bugsbys Way, Charlton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 21:00 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:34.
Thursday
Transport for London (TfL) are carrying out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 21:00 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:34.
Thursday
Transport for London (TfL) are carrying out Highway improvement works on Charlton Church Lane, Charlton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2025 at 21:00 and could run through until 1 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 09:34.
16 Apr and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Apr 2025 at 18:37.
Thursday
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 12 Mar 2025 at 13:30.
17 Apr and 20 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Burcharbro Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 09:27.
17 Apr and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Feb 2025 at 15:27.
Monday
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 4 Feb 2025 at 15:32.
21 Apr and 16 Jun 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.
21 Apr and 12 May 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 12 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Feb 2025 at 12:02.
22 Apr and 30 Aug 2025
Thames Water were proposing to carry out Utility asset works on Fraser Road, Erith.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 30 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 17:59.
22 Apr and 23 Jun 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 13:55.
22 Apr and 20 Jun 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 17:29.
22 Apr and 11 Jul 2025
Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:17.
Monday
Thames Water are proposing to carry out Utility repair and maintenance works on Panfield Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Mar 2025 at 09:11.
Monday
Thames Water are carrying out Utility repair and maintenance works on Panfield Road, Abbey Wood.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 08:47 and could run through until 28 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 08:48.
Monday
Thames Water were proposing to carry out Utility repair and maintenance works on Park View Road, Welling.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 28 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 08:54.
Monday
Thames Water are carrying out Utility repair and maintenance works on Lewis Road, Welling.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 14:59 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:12.
22 Apr and 6 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sandringham Drive, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 10:44.
13 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Rokesby Close, Welling.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 08:00 and could run through until 13 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Apr 2025 at 08:49.
22 Apr and 13 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2025 and could run through until 13 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:38.
10 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 22:00 and could run through until 10 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 08:28.
10 May 2025
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 22:00 and could run through until 10 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 08:28.
Tuesday
Thames Water are proposing to carry out Utility asset works on Francis Avenue, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Jan 2025 at 13:30.
23 Apr and 7 May 2025
Thames Water are proposing to carry out roadworks on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2025 and could run through until 7 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Mar 2025 at 12:05.
19 May 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hill View Drive, Welling.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 April 2025 at 08:00 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 08:41.
25 Apr and 19 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 April 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
Tuesday
Thames Water are carrying out Disconnection or alteration of supply on Stanmore Road, Belvedere.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2025 at 13:45 and could run through until 29 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 15:25.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Rippolson Road, Plumstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2025 at 10:54 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 16:40.
Friday
Cadent Gas are proposing to carry out roadworks on East Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 15:36.
Friday
Cadent Gas are proposing to carry out roadworks on East Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Apr 2025 at 11:17.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Feb 2025 at 15:39.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Marden Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2025 at 16:16.
28 Apr and 9 May 2025
Royal Borough Of Greenwich are proposing to carry out Section 50 on Plumstead High Street, Plumstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Greenwich on 4 Apr 2025 at 14:51.
Friday
London Borough Of Redbridge are proposing to carry out Highway improvement works on Horns Road, Barkingside, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 11 Apr 2025 at 16:00.
28 Apr and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:51.
28 Apr and 30 Aug 2025
Thames Water are proposing to carry out Utility asset works on Fraser Road, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 16:05.
28 Apr and 9 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Willenhall Road, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Jan 2025 at 09:43.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Station Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Feb 2025 at 12:59.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:55.
28 Apr and 25 May 2025
Riverside Energy Park are proposing to carry out Utility asset works on Queens Road, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 25 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Riverside Energy Park on 27 Mar 2025 at 10:49.
28 Apr and 10 May 2025
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Ferndale Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 12 Feb 2025 at 16:20.
28 Apr and 10 May 2025
London Borough Of Waltham Forest are proposing to carry out Highway improvement works on Ferndale Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 28 Feb 2025 at 16:13.
28 Apr and 19 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wickham Street, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Apr 2025 at 09:34.
29 Apr and 10 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnell Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Feb 2025 at 09:36.
29 Apr and 10 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Burnell Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:32.
30 Apr and 9 May 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 12 Mar 2025 at 13:30.
30 Apr and 14 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Macdonald Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Feb 2025 at 12:58.
30 Apr and 14 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Macdonald Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2025 and could run through until 14 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:19.
1 May and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.
1 May and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Poplar Mount, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 12:40.
1 May and 1 Jul 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:54.
2 and 16 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:12.
2 and 16 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Anchor And Hope Lane, Charlton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:52.
5 and 19 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Atherton Road, Clayhall, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.
6 May and 9 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Apr 2025 at 09:05.
6 May and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:52.
6 and 21 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 07:28.
6 and 21 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.
These works are categorised as Major.
The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 10:49.
6 and 21 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.
These works are categorised as Major.
The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 31 Mar 2025 at 13:08.
6 and 21 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 07:54.
6 and 21 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Royston Parade, Ilford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 6 May 2025 and could run through until 21 May 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 10:12.
6 and 17 May 2025
Thames Water were proposing to carry out roadworks on Thanet Road, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 May 2025 and run through until 17 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:38.
6 May and 4 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Welling Way, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2025 at 09:41.
6 May and 6 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Birling Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 15:47.
6 May and 10 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Lane, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 12:53.
7 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jun 2024 at 10:42.
7 May and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Richmond Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 26 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 13:57.
7 and 22 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:48.
7 and 22 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:46.
7 and 22 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 06:21.
7 and 22 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:21.
8 and 13 May 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Dorian Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 18 Apr 2025 at 16:30.
8 and 13 May 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Dorian Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 23 Apr 2025 at 10:18.
8 May and 18 Jul 2025
Thames Water were proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 May 2025 and run through until 18 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:06.
9 May and 23 Jul 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Perth Road, Gants Hill, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 13:00.
12 and 19 May 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 19 May 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 17 Apr 2025 at 12:05.
12 May and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on High Road Leytonstone, Leytonstone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 16:20.
12 May and 2 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on High Road Leytonstone, Leytonstone.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 00:10.
12 and 18 May 2025
Cadent Gas are proposing to carry out New service connection on York Place, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 10:45.
12 and 18 May 2025
Cadent Gas are proposing to carry out New service connection on Balaam Street, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Mar 2025 at 11:53.
12 and 14 May 2025
BT are proposing to carry out Utility repair and maintenance works on Anglian Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Mar 2025 at 12:05.
12 and 14 May 2025
BT are proposing to carry out Utility repair and maintenance works on Melon Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 14 Mar 2025 at 13:19.
12 and 16 May 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Flanders Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 10 Feb 2025 at 12:47.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Belgrave Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 17 Mar 2025 at 13:15.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 22 Apr 2025 at 14:45.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:45.
12 and 16 May 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 16 Apr 2025 at 12:46.
12 May and 31 Oct 2025
Thames Water are proposing to carry out Utility asset works on Frinsted Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 10:30.
12 and 16 May 2025
Thames Water were proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Apr 2025 at 09:27.
12 and 16 May 2025
Thames Water are proposing to carry out New service connection on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 09:45.
12 and 16 May 2025
Thames Water were proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:23.
12 and 16 May 2025
Fulcrum Pipelines are proposing to carry out Utility repair and maintenance works on Montfichet Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Fulcrum Pipelines on 11 Feb 2025 at 14:35.
12 and 30 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ha Ha Road, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 10:43.
12 May and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:06.
12 May and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Exmouth Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2025 at 15:31.
12 and 16 May 2025
Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 15:03.
12 and 16 May 2025
Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 13:50.
12 and 16 May 2025
Southern Gas Networks are proposing to carry out New service connection on Woolwich Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Apr 2025 at 11:07.
12 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2025 at 13:25.
12 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2025 at 11:12.
12 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2025 at 09:30.
12 and 31 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 31 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2025 at 09:27.
13 May and 3 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mascalls Road, Charlton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:41.
14 May and 28 Jul 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Battle Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Dec 2024 at 13:37.
14 and 16 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Apr 2025 at 14:04.
14 and 16 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2025 at 14:31.
15 and 17 May 2025
Thames Water were proposing to carry out Utility asset works on Burrage Road, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 May 2025 and run through until 17 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Feb 2025 at 12:54.
15 and 17 May 2025
Thames Water were proposing to carry out Utility asset works on Burrage Road, Plumstead.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 May 2025 and run through until 17 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2025 at 10:02.
15 and 17 May 2025
Thames Water are proposing to carry out Utility asset works on Bloomfield Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Feb 2025 at 09:06.
19 May and 8 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 8 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:48.
19 and 21 May 2025
London Borough Of Havering are proposing to carry out Highway improvement works on Bush Elms Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 18 Apr 2025 at 16:30.
19 and 23 May 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Capel Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 17 Feb 2025 at 12:54.
19 and 30 May 2025
London Borough Of Newham are proposing to carry out Highway improvement works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 25 Feb 2025 at 11:36.
19 and 25 May 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Manor Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 25 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:52.
19 and 30 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Mar 2025 at 14:10.
19 May and 3 Jun 2025
Thames Water are proposing to carry out roadworks on Olyffe Avenue, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 14:28.
19 May and 3 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Olyffe Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 10:39.
19 May and 3 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Olyffe Avenue, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 12:02.
19 May and 16 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Little Heath, Charlton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:54.
19 May and 9 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stadium Road, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Dec 2024 at 11:09.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:09.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:46.
22 May and 18 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2025 and could run through until 18 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 13:52.
23 May and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hythe Avenue, Bexleyheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 10:37.
23 May and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ightham Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 14:35.
23 May and 27 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bedonwell Road, Bexleyheath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Feb 2025 at 16:43.
23 May and 2 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 May 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:14.
24 May and 1 Jun 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Crook Log, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2025 and could run through until 1 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 12 Mar 2025 at 16:29.
24 May and 1 Jun 2025
Harlaxton Energy Networks were proposing to carry out Utility asset works on Crook Log, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 May 2025 and run through until 1 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Harlaxton Energy Networks on 8 Apr 2025 at 15:55.
26 May and 11 Oct 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 11 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 12:10.
26 May and 11 Oct 2025
Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 May 2025 and run through until 11 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 14:13.
26 and 30 May 2025
Cadent Gas are proposing to carry out New service connection on Henley Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:15.
26 and 30 May 2025
Cadent Gas are proposing to carry out New service connection on Mayville Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 10:15.
26 May and 28 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on South Crescent, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 28 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:17.
26 May and 15 Jun 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wellington Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:37.
27 May and 2 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bexley Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 2 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:34.
27 and 29 May 2025
BT are proposing to carry out Utility repair and maintenance works on Fairlop Gardens, Hainault, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 2 Apr 2025 at 09:45.
27 May and 23 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Danson Mead, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Mar 2025 at 08:54.
27 May and 24 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Roseacre Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 13:43.
28 May and 3 Jun 2025
Thames Water are proposing to carry out Utility asset works on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 09:25.
28 and 30 May 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brook Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 10:10.
28 and 30 May 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Brook Street, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Apr 2025 at 09:21.
28 May and 10 Jun 2025
Thames Water are proposing to carry out roadworks on Thanet Road, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2025 at 11:06.
28 May and 17 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2025 and could run through until 17 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:41.
2 and 5 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:32.
2 and 5 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Halt Robin Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 19 Mar 2025 at 12:13.
2 and 5 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brigstock Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.
2 and 5 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Bunkers Hill, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:37.
2 and 5 Jun 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Gideon Close, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Jun 2024 at 09:38.
2 and 19 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 14:09.
2 and 19 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Roding Road, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 19 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Apr 2025 at 14:11.
2 Jun and 13 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:43.
2 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Folkestone Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.
2 and 16 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Footpath 13 Wood Lane Civic Centre Roundabout South To Trefgarne Road, Dagenham.
These works are categorised as Major.
The works will start on or after 2 June 2025 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:11.
2 Jun and 8 Aug 2025
Thames Water are proposing to carry out Utility asset works on Bullbanks Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:21.
2 Jun and 18 Oct 2025
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 18 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 17 Feb 2025 at 12:30.
3 Jun and 1 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 1 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.
4 and 9 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sandhurst Drive, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2025 at 14:00.
4 and 6 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Flanders Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.
5 Jun and 11 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 Jun and 11 Jul 2025
Cadent Gas were proposing to carry out Utility asset works on Forest Road, Hainault, Ilford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 11 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 14:18.
5 Jun and 4 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cameron Road, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 and 26 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Norfolk Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 Jun and 3 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
5 and 10 Jun 2025
Thames Water are proposing to carry out New service connection on Esk Road, Plaistow, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:55.
5 and 10 Jun 2025
Thames Water are proposing to carry out New service connection on Gardner Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 11:54.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 07:47.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Frances Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2025 at 09:17.
6 and 11 Jun 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 June 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:15.
9 and 12 Jun 2025
London Borough Of Bexley are proposing to carry out Section 50 on Picardy Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2025 at 11:36.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 13:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2025 at 11:00.
9 Jun and 15 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Meldrum Road, Goodmayes, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:02.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 and 30 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Mayesbrook Road, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2025 at 11:45.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Mar 2025 at 14:00.
9 Jun and 15 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Goodmayes Lane, Goodmayes, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Mar 2025 at 11:00.
9 and 22 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Heron Mews, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 22 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 10:00.
9 Jun and 7 Aug 2025
Thames Water are proposing to carry out Utility asset works on Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 14:57.
9 and 13 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Woolwich Manor Way, Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 6 Mar 2025 at 16:16.
9 and 11 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dore Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:19.
9 and 20 Jun 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:15.
9 and 11 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Dersingham Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 11 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Mar 2025 at 11:38.
9 and 11 Jun 2025
Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:49.
9 and 27 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Mar 2025 at 08:30.
9 and 27 Jun 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 14 Mar 2025 at 13:09.
9 Jun and 14 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Heath Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 10 Apr 2025 at 15:58.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:17.
9 Jun and 7 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sheridan Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 16:48.
10 Jun and 4 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 4 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Feb 2025 at 11:38.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:42.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:45.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 10 Mar 2025 at 20:42.
12 Jun and 2 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 2 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 14 Mar 2025 at 14:44.
16 Jun and 6 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Gooseley Lane, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 6 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Feb 2025 at 11:44.
16 Jun and 8 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Feb 2025 at 14:04.
16 Jun and 7 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Padnall Road, Chadwell Heath.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2025 at 11:09.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Pedley Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 27 Feb 2025 at 09:15.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Felstead Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Beattyville Gardens, Barkingside, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Cambridge Park, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Blake Hall Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 6 Mar 2025 at 08:30.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Arran Drive, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Brook Road, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 09:00.
16 Jun and 21 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Gaysham Avenue, Gants Hill, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 4 Mar 2025 at 08:45.
16 Jun and 21 Jul 2025
London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Northbrook Road, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 25 Apr 2025 at 16:05.
16 Jun and 21 Jul 2025
London Borough Of Redbridge were proposing to carry out Highway repair and maintenance works on Atherton Road, Clayhall, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 21 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 3 Mar 2025 at 16:55.
16 Jun and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 14:49.
16 Jun and 5 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 07:55.
16 and 18 Jun 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Feb 2025 at 11:13.
17 Jun and 7 Jul 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on High Street North, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 4 Mar 2025 at 09:23.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Ruston Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:47.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Road, Greenwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:13.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Warspite Road, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:46.
19 Jun and 4 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 9 Jan 2025 at 14:12.
20 Jun and 16 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
23 Jun and 14 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Benton Road, Ilford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
23 Jun and 9 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 14:49.
23 Jun and 9 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Acacia Road, Leytonstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 15:17.
23 Jun and 9 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Cecil Road, Leytonstone.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 9 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 15:17.
23 and 25 Jun 2025
London Borough Of Newham were proposing to carry out roadworks on Ferns Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 31 Mar 2025 at 19:35.
23 Jun and 30 Sep 2025
Thames Water were proposing to carry out Utility asset works on Colyers Lane, Erith.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 17:03.
23 Jun and 30 Sep 2025
Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 14:13.
23 Jun and 30 Sep 2025
Thames Water are proposing to carry out Utility asset works on Colyers Lane, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 30 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 15:32.
23 Jun and 22 Aug 2025
Thames Water are proposing to carry out Utility asset works on Methuen Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:18.
23 and 25 Jun 2025
Thames Water were proposing to carry out roadworks on Tavistock Road, Stratford, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 11:43.
23 and 25 Jun 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Altmore Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2025 at 09:48.
23 and 25 Jun 2025
Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Mar 2025 at 08:36.
23 and 26 Jun 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Strait Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 26 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 26 Feb 2025 at 11:15.
23 Jun and 7 Nov 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2025 at 14:23.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Mar 2025 at 11:08.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:26.
23 Jun and 4 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Seaton Road, Welling.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2025 at 09:10.
24 and 28 Jun 2025
London Borough Of Newham are proposing to carry out Section 50 on Gibbins Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 28 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 6 Mar 2025 at 14:59.
24 Jun and 1 Sep 2025
Thames Water were proposing to carry out Utility asset works on Monarch Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 June 2025 and run through until 1 September 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:12.
24 Jun and 2 Jul 2025
Thames Water are proposing to carry out New service connection on Colchester Avenue, Manor Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Mar 2025 at 12:37.
26 Jun and 18 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Jul 2024 at 10:21.
26 Jun and 18 Sep 2025
Cadent Gas are proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 18 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 10:47.
26 Jun and 18 Sep 2025
Cadent Gas were proposing to carry out Utility asset works on Sunnyside Road, Ilford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 18 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:50.
26 Jun and 26 Jul 2025
London Borough Of Newham were proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 June 2025 and run through until 26 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 26 Mar 2025 at 09:42.
26 Jun and 26 Jul 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Dock Road, Silvertown, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2025 and could run through until 26 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 4 Apr 2025 at 17:16.
27 Jun and 29 Sep 2025
Thames Water were proposing to carry out Utility asset works on Coleman Road, Belvedere.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 29 September 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2025 at 11:11.
28 Jun and 1 Sep 2025
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2025 at 11:45.
30 Jun and 19 Sep 2025
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Dagenham Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Apr 2025 at 14:01.
30 Jun and 31 Dec 2025
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Bronze Age Way, Erith.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 31 December 2025. The works will impact the verge only.
This roadwork event was last updated by London Borough Of Bexley on 11 Sep 2024 at 11:34.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Aldborough Road South, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
30 Jun and 21 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Colenso Road, Newbury Park, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Mar 2025 at 13:31.
30 Jun and 4 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.
30 Jun and 5 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Apr 2025 at 11:31.
30 Jun and 7 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Mar 2025 at 11:26.
30 Jun and 11 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Northdown Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Apr 2025 at 11:02.
30 Jun and 8 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 11:53.
30 Jun and 8 Jul 2025
Southern Gas Networks are proposing to carry out New service connection on West Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 10:38.
1 and 7 Jul 2025
Thames Water are proposing to carry out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 7 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:24.
1 and 3 Jul 2025
Thames Water are proposing to carry out Remedial works on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 3 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:28.
1 and 21 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chestnut Drive, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 21 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 11:35.
3 and 17 Jul 2025
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 Apr 2025 at 21:51.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich High Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:19.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2025 at 08:44.
3 and 17 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on John Wilson Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 17 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2025 at 09:09.
9 Jul and 7 Aug 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Ilford Lane, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 7 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
9 and 23 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on York Road, Ilford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
9 and 23 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Atherton Road, Clayhall, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Enfield were proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 17 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Enfield on 10 Apr 2025 at 12:54.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Water Lane, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 12:59.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Lynford Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Audley Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Woodstock Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Cardigan Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Charlbury Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Oakwood Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Breamore Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Arundel Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Nutfield Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Leamington Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 10:30.
10 and 17 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Talbot Gardens, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 10 Apr 2025 at 11:15.
10 and 14 Jul 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Ravenhill Road, Upton Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 July 2025 and run through until 14 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 10:28.
14 Jul and 8 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 23 Apr 2025 at 16:48.
14 Jul and 8 Aug 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Merrielands Crescent, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 24 Apr 2025 at 08:17.
14 Jul and 19 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Apr 2025 at 08:58.
14 Jul and 19 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Arden Crescent, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 19 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:49.
14 and 28 Jul 2025
Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 10:28.
14 Jul and 1 Aug 2025
Cadent Gas are proposing to carry out Utility asset works on Seton Gardens, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 1 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2025 at 15:50.
14 and 24 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:18.
14 and 23 Jul 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Royal Docks Road, Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 23 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2025 at 14:09.
14 and 18 Jul 2025
London Borough Of Redbridge are proposing to carry out Highway improvement works on Belgrave Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Redbridge on 11 Apr 2025 at 15:15.
14 Jul and 12 Sep 2025
Thames Water are proposing to carry out Utility asset works on Beltwood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 12 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Jun 2024 at 14:17.
14 and 17 Jul 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Ethel Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Jan 2025 at 20:27.
14 and 18 Jul 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 14:00.
14 and 18 Jul 2025
Thames Water were proposing to carry out roadworks on Tree Road, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Apr 2025 at 09:30.
14 and 24 Jul 2025
Electricity Network Company are proposing to carry out Utility asset works on Victoria Dock Road, Canning Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 7 Apr 2025 at 16:36.
14 and 16 Jul 2025
Virgin Media are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 1 Apr 2025 at 09:48.
16 and 18 Jul 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Forty Acre Lane, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Transport for London (TfL) on 23 Apr 2025 at 14:00.
17 Jul and 7 Aug 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 7 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2025 at 13:38.
21 and 27 Jul 2025
London Borough Of Bexley are proposing to carry out Highway improvement works on Brook Street, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 4 Mar 2025 at 12:38.
21 Jul and 19 Sep 2025
Thames Water are proposing to carry out Utility asset works on Edwards Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 19 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2025 at 12:08.
21 and 27 Jul 2025
Thames Water are proposing to carry out roadworks on Tree Road, West Beckton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2025 at 13:23.
21 Jul and 1 Aug 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Prince Regent Lane, West Beckton, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Apr 2025 at 15:28.
21 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2025 at 13:36.
21 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Charlton Park Road, Charlton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:43.
21 Jul and 27 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plymstock Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 27 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Apr 2025 at 13:33.
23 Jul and 5 Aug 2025
Thames Water are proposing to carry out Utility repair and maintenance works on St Helens Road, Cranbrook, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 5 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2025 at 08:31.
23 Jul and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on South Gipsy Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Apr 2025 at 10:14.
23 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickford Lane, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:10.
23 Jul and 11 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hudson Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Apr 2025 at 10:25.
23 Jul and 8 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Shakespeare Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 1 Jul 2024 at 10:11.
23 Jul and 8 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 8 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:25.
23 Jul and 8 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bristow Road, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 13:43.
23 Jul and 22 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westbrooke Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 2 Apr 2025 at 12:38.
24 and 26 Jul 2025
Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Hackney To M11 Link Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2025 at 10:06.
Roadworks Map near to Ripple Road, BARKING, IG11 0AE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Ripple Road, BARKING, IG11 0AE (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 24 Apr 2025 - 28 Apr 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data