ROADWORKS SUMMARY
Fair Street, HUDDERSFIELD, HD1 3QB
Introduction

View current and future planned roadworks and road closures for Fair Street, HD1 3QB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Fair Street, HUDDERSFIELD, HD1 3QB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fair Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Jun 2026
Network Rail are carrying out roadworks on Car Park Railway Station Forecourt, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 07:00 and could run through until 30 June 2026. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 Jan 2024 at 09:18.
30 Jun 2026
Network Rail are carrying out Works for Rail Purposes on Leeds Road, Deighton, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 08:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Aug 2025 at 09:15.
2 Mar 2026
Calderdale Metropolitan Borough Council are carrying out Highway repair and maintenance works on Long Wall, West Vale, Elland.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 February 2024 at 13:00 and could run through until 2 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 23 Jul 2025 at 13:57.
30 Jun 2026
Network Rail are carrying out Works for Rail Purposes on Bradford Road, Huddersfield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 Jan 2025 at 13:38.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Water Street, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 14:07.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Albert Street, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 13:46.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Bridge Street, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 13:48.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Meltham Road, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 14:01.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Lockwood Road, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 13:54.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Swan Lane, Lockwood, Huddersfield.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 14:06.
30 Sep 2024 and 31 Jul 2026
Kirklees Council were proposing to carry out Highway improvement works on Crowther Street, Lockwood, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 September 2024 and run through until 31 July 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 13:52.
1 Nov 2024 and 1 Nov 2025
Network Rail were proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 November 2024 and run through until 1 November 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Aug 2024 at 14:26.
31 Jul 2026
Network Rail are carrying out roadworks on Whitacre Street, Deighton, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 February 2025 at 06:00 and could run through until 31 July 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Aug 2025 at 08:26.
17 Mar 2025 and 30 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Water Street, Lockwood, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 January 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 20 Dec 2024 at 13:47.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Water Street, Lockwood, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 08:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 19 May 2025 at 11:00.
17 Mar 2025 and 30 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Lockwood Road, Lockwood, Huddersfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 January 2027. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 16 Jan 2025 at 12:56.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Lockwood Road, Lockwood, Huddersfield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Kirklees Council on 29 Sep 2025 at 11:47.
17 Mar 2025 and 30 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Crowther Street, Lockwood, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 January 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 20 Dec 2024 at 13:45.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Crowther Street, Lockwood, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 17 Mar 2025 at 10:03.
17 Mar 2025 and 30 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Albert Street, Lockwood, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 30 January 2027. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 6 Jan 2025 at 13:51.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Albert Street, Lockwood, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 March 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 8 Apr 2025 at 11:54.
31 Dec 2025
Network Rail are carrying out roadworks on Bog Green Lane, Colne Bridge, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 March 2025 at 07:00 and could run through until 31 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Jul 2025 at 14:02.
21 Apr 2025 and 1 Jun 2026
Network Rail are proposing to carry out Works for Rail Purposes on Whitacre Street, Deighton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 1 June 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 24 Feb 2025 at 11:37.
17 Oct 2025
Network Rail are carrying out roadworks on Station Road, Mirfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 April 2025 at 07:00 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 16 Sep 2025 at 09:11.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Meltham Road, Lockwood, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 29 Sep 2025 at 11:59.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Bridge Street, Lockwood, Huddersfield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 19 May 2025 at 12:06.
30 Jan 2027
Kirklees Council are carrying out Highway improvement works on Swan Lane, Lockwood, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 May 2025 at 07:00 and could run through until 30 January 2027. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 19 May 2025 at 12:05.
30 Nov 2025
Calderdale Metropolitan Borough Council are carrying out Section 50 on Stainland Road, Elland.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 10 Sep 2025 at 12:09.
Today
Kirklees Council are carrying out Highway repair and maintenance works on Manchester Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The works started on 7 July 2025 at 08:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 23 Sep 2025 at 08:53.
25 Dec 2025
Network Rail are carrying out Works for Rail Purposes on Fitzwilliam Street, Huddersfield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2025 at 22:00 and could run through until 25 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 8 Jul 2025 at 08:58.
14 Jul and 19 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Fitzwilliam Street, Huddersfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 13 Feb 2025 at 10:49.
Today
Northern Gas Networks are carrying out Utility repair and maintenance works on Lidget Street, Lindley, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 July 2025 at 11:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 09:44.
28 Jul 2025 and 5 Sep 2026
Kirklees Council are proposing to carry out Highway improvement works on Northumberland Street, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 5 September 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 2 Jul 2025 at 12:29.
17 Oct 2025
Yorkshire Water are carrying out Utility asset works on Moorside Road, Kirkheaton, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 July 2025 at 09:00 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 1 Oct 2025 at 14:53.
11 Aug and 17 Oct 2025
Yorkshire Water were proposing to carry out Utility asset works on Dam Hill, Shelley, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Jun 2025 at 11:01.
11 Aug and 17 Oct 2025
Yorkshire Water were proposing to carry out Utility asset works on Dam Hill, Shelley, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 August 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 24 Sep 2025 at 14:39.
12 Dec 2025
Calderdale Metropolitan Borough Council are carrying out roadworks on Burnsall Road, Rastrick, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 August 2025 at 08:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 2 Oct 2025 at 16:30.
Today
Northern Gas Networks are carrying out Utility repair and maintenance works on Plover Road, Lindley, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 September 2025 at 12:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2025 at 15:26.
Thursday
Yorkshire Water are carrying out Utility repair and maintenance works on St Thomas' Road, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 August 2025 at 10:00 and could run through until 16 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Oct 2025 at 11:50.
Today
Kirklees Council are proposing to carry out Section 50 on Long Lane, Dalton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Kirklees Council on 1 Oct 2025 at 15:47.
Today
Kirklees Council are proposing to carry out Highway repair and maintenance works on Lingards Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 September 2025 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 25 Jul 2025 at 08:38.
Today
Network Rail are carrying out Works for Rail Purposes on Oxford Street, Huddersfield.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 September 2025 at 09:30 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Sep 2025 at 15:06.
6 Nov 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Green Lane, West Vale, Elland.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2025 at 12:00 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 12:06.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rosegarth Avenue, Wooldale, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 10:15.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Wooldale, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 13:49.
Today
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Matthew Lane, Meltham, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 15 Jul 2025 at 08:34.
Today
Northern Gas Networks are carrying out Utility repair and maintenance works on Matthew Lane, Meltham, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2025 at 10:00 and could run through until 10 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 13:18.
15 Sep 2025 and 29 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Lindley, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:20.
15 Sep 2025 and 29 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Lindley, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 08:03.
15 Sep 2025 and 29 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on Birkby Road, Birkby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 31 Jul 2025 at 11:25.
15 Sep 2025 and 29 Jan 2027
Kirklees Council are proposing to carry out Highway improvement works on East Street, Lindley, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 29 January 2027. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 31 Jul 2025 at 11:23.
15 Sep 2025 and 29 Jan 2027
Kirklees Council were proposing to carry out Highway improvement works on East Street, Lindley, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 29 January 2027. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 9 Sep 2025 at 10:38.
15 Sep 2025 and 30 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Yew Tree Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 9 Sep 2025 at 11:45.
15 Sep 2025 and 30 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Yew Tree Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 9 Sep 2025 at 13:02.
15 Sep 2025 and 30 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Yew Tree Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 31 Jul 2025 at 11:38.
15 Sep 2025 and 30 Jun 2026
Kirklees Council were proposing to carry out Highway improvement works on Yew Tree Road, Birchencliffe, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 30 June 2026. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 9 Sep 2025 at 11:06.
Wednesday
Kirklees Council were proposing to carry out Highway improvement works on Yew Tree Road, Birchencliffe, Huddersfield.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 September 2025 and run through until 15 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 23 Jun 2025 at 11:28.
15 Sep 2025 and 30 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:16.
15 Sep 2025 and 30 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 30 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 08:04.
15 Sep 2025 and 23 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Blackley New Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 23 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 1 Aug 2025 at 08:36.
15 Sep 2025 and 23 Jun 2026
Kirklees Council are proposing to carry out Highway improvement works on Blackley New Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 September 2025 and could run through until 23 June 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 5 Sep 2025 at 09:08.
Tuesday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colders Drive, Meltham, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Aug 2025 at 11:03.
Tuesday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Colders Drive, Meltham, Holmfirth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2025 and could run through until 14 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 13:42.
23 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Miry Lane, Thongsbridge, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 September 2025 at 11:00 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Sep 2025 at 11:44.
23 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Longlands Bank, Thongsbridge, Holmfirth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 September 2025 at 11:00 and could run through until 23 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 26 Sep 2025 at 11:43.
22 Sep and 17 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernside Avenue, Almondbury, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Sep 2025 at 12:32.
Today
Yorkshire Water are carrying out Utility repair and maintenance works on Great Northern Street, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 September 2025 at 10:00 and could run through until 10 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Oct 2025 at 16:10.
Sunday
Yorkshire Water are proposing to carry out Utility asset works on Stainland Road, Sowood, Elland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2025 and could run through until 12 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 12 Aug 2025 at 12:23.
17 Oct 2025
Yorkshire Water are carrying out Utility asset works on Meadow Park, Kirkheaton, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2025 at 11:30 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 1 Oct 2025 at 14:54.
29 Sep and 24 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 5 Aug 2025 at 12:20.
24 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on New Mill Road, Holmfirth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 October 2025 at 09:00 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2025 at 10:48.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Highroyd Crescent, Moldgreen, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 September 2025 at 08:12 and could run through until 13 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Oct 2025 at 09:33.
Tuesday
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Sunnybank Drive, Greetland, Elland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 18 Sep 2025 at 17:34.
29 Sep and 17 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Reins Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 28 Jul 2025 at 08:59.
20 Oct 2025
Northern Powergrid (Yorkshire) are carrying out New service connection on Reins Road, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2025 at 16:45 and could run through until 20 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Oct 2025 at 09:21.
29 Oct 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Fernside Avenue, Almondbury, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 October 2025 at 09:00 and could run through until 29 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2025 at 10:47.
2 and 22 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lascelles Hall Road, Lascelles Hall, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Aug 2025 at 13:23.
6 and 31 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Mill Road, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Jul 2025 at 13:49.
6 Oct and 12 Dec 2025
Yorkshire Water were proposing to carry out Utility asset works on Thunder Bridge Lane, Kirkburton, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 12 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Sep 2025 at 14:40.
Tomorrow
Kirklees Council are proposing to carry out Highway repair and maintenance works on Arborary Lane, Meltham, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 13 Aug 2025 at 13:17.
Tuesday
Kirklees Council are carrying out Highway repair and maintenance works on Arborary Lane, Meltham, Holmfirth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 October 2025 at 09:00 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Oct 2025 at 09:12.
Tomorrow
Kirklees Council are proposing to carry out Highway repair and maintenance works on Nopper Road, South Crosland, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 13 Aug 2025 at 13:21.
Tuesday
Kirklees Council are carrying out Highway repair and maintenance works on Nopper Road, South Crosland, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 October 2025 at 07:48 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Oct 2025 at 07:48.
Today
Yorkshire Water were proposing to carry out Utility repair and maintenance works on James Street, Golcar, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 10 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 8 Aug 2025 at 10:25.
6 and 31 Oct 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:41.
18 Sep 2026
Kirklees Council are carrying out Highway improvement works on Northumberland Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 7 Oct 2025 at 09:23.
18 Sep 2026
Kirklees Council are carrying out roadworks on Wood Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 6 Oct 2025 at 09:45.
6 and 30 Oct 2025
Kirklees Council were proposing to carry out Highway improvement works on Friendly Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2025 and run through until 30 October 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 4 Jun 2025 at 11:37.
18 Sep 2026
Kirklees Council are carrying out roadworks on Friendly Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 6 Oct 2025 at 09:45.
18 Sep 2026
Kirklees Council are carrying out roadworks on Byram Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 6 Oct 2025 at 09:45.
18 Sep 2026
Kirklees Council are carrying out roadworks on Lord Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 08:00 and could run through until 18 September 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 6 Oct 2025 at 09:44.
6 and 24 Oct 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Lascelles Hall Road, Lascelles Hall, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Aug 2025 at 11:17.
28 Oct 2025
Northern Powergrid (Yorkshire) are carrying out New service connection on Lascelles Hall Road, Lascelles Hall, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 October 2025 at 09:00 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 8 Oct 2025 at 09:00.
8 Jan 2026
Network Rail are carrying out roadworks on Fitzwilliam Street, Huddersfield.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 22:00 and could run through until 8 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 7 Oct 2025 at 08:42.
6 Oct 2025 and 11 Jan 2026
Kirklees Council are proposing to carry out Highway repair and maintenance works on New Hey Road, Salendine Nook, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 11 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 12 Aug 2025 at 16:08.
11 Jan 2026
Kirklees Council are carrying out Highway repair and maintenance works on New Hey Road, Salendine Nook, Huddersfield.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2025 at 08:00 and could run through until 11 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 7 Oct 2025 at 09:17.
6 Oct and 6 Nov 2025
Kirklees Council are proposing to carry out Highway improvement works on Birkby Road, Birkby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 6 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 5 Sep 2025 at 08:25.
6 Oct and 8 Nov 2025
Calderdale Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Lyndhurst Road, Brighouse.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Calderdale Metropolitan Borough Council on 3 Oct 2025 at 17:52.
6 Oct and 21 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Malham Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 1 Sep 2025 at 09:07.
6 Oct and 21 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Malham Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 14:45.
6 Oct and 21 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Malham Road, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 13:43.
21 Nov 2025
Northern Powergrid (Yorkshire) are carrying out New service connection on Malham Road, Brighouse.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 October 2025 at 15:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 6 Oct 2025 at 15:17.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Penistone Road, Kirkburton, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2025 at 16:33 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Oct 2025 at 09:24.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Penistone Road, Kirkburton, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2025 at 16:33 and could run through until 14 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 8 Oct 2025 at 11:17.
Tomorrow
Kirklees Council are proposing to carry out Highway improvement works on Wooldale Road, Wooldale, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 14:36.
Tomorrow
Kirklees Council are proposing to carry out Highway improvement works on Wooldale Road, Wooldale, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 23 Sep 2025 at 09:15.
Tomorrow
Kirklees Council are proposing to carry out Highway improvement works on Cartwright Gardens, Crosland Moor, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 October 2025 and could run through until 11 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 6 Aug 2025 at 16:00.
7 Nov 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 October 2025 at 12:30 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2025 at 14:16.
Wednesday
Yorkshire Water are carrying out Utility repair and maintenance works on Access To Rear Of 21-69 Calton Street, Fartown, Huddersfield.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 October 2025 at 11:10 and could run through until 15 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 9 Oct 2025 at 14:44.
10 and 24 Oct 2025
BT were proposing to carry out Utility repair and maintenance works on Leeds Road, Deighton, Huddersfield.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 October 2025 and run through until 24 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2025 at 15:59.
13 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Horn Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Aug 2025 at 12:04.
13 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Sude Hill, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 14 Aug 2025 at 12:03.
13 and 19 Oct 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Lingards Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Quickline Commucations on 7 Aug 2025 at 12:15.
13 and 19 Oct 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Lingards Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 19 October 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 19 Aug 2025 at 12:08.
13 and 21 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollins Row, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 12:01.
13 and 21 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hollins Row, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 21 Aug 2025 at 11:47.
13 and 17 Oct 2025
GTC Pipelines are proposing to carry out Utility asset works on Rowley Lane, Fenay Bridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 17 Jul 2025 at 10:43.
13 Oct and 7 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:42.
13 Oct and 24 Nov 2025
Network Rail are proposing to carry out roadworks on Bradford Road, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Sep 2025 at 14:30.
13 Oct and 21 Nov 2025
BT are proposing to carry out Utility repair and maintenance works on Leeds Road, Deighton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by BT on 13 Jun 2025 at 09:08.
13 Oct and 21 Nov 2025
BT are proposing to carry out Utility repair and maintenance works on Leeds Road, Deighton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by BT on 2 Oct 2025 at 08:28.
13 and 31 Oct 2025
Network Rail are proposing to carry out roadworks on Wood Lane, Mirfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 7 Oct 2025 at 10:51.
17 and 31 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Leeds Road, Deighton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 20 Aug 2025 at 16:31.
17 and 31 Oct 2025
BT are proposing to carry out Utility repair and maintenance works on Leeds Road, Deighton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 22 Aug 2025 at 13:46.
20 and 24 Oct 2025
BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Aug 2025 at 11:22.
20 and 24 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Charles Street, Crosland Moor, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 22 Aug 2025 at 12:28.
20 and 24 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Charles Street, Crosland Moor, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 24 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 1 Sep 2025 at 09:23.
20 Oct and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 44-76 Birkhouse Lane, Moldgreen, Huddersfield.
These works are categorised as Major.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:43.
20 Oct and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 44-76 Birkhouse Lane, Moldgreen, Huddersfield.
These works are categorised as Major.
The works will start on or after 20 October 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 12:19.
20 Oct and 28 Nov 2025
Kirklees Council were proposing to carry out Highway improvement works on Byram Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 4 Jun 2025 at 11:40.
20 Oct and 28 Nov 2025
Kirklees Council were proposing to carry out roadworks on Lord Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 28 November 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 30 Sep 2025 at 14:16.
20 Oct and 7 Nov 2025
Energy Assets Networks (formerly Utility Distribution Networks) are proposing to carry out Utility asset works on Edgerton Road, Edgerton, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 18 Sep 2025 at 09:37.
20 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway improvement works on Bradley Mills Road, Rawthorpe, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 29 Jul 2025 at 12:16.
20 and 31 Oct 2025
Kirklees Council were proposing to carry out Highway improvement works on Bradley Mills Road, Rawthorpe, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 16 Sep 2025 at 09:08.
20 Oct and 7 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Green Royd, West Vale, Elland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Oct 2025 at 15:30.
24 Oct and 7 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Kirkroyds Lane, New Mill, Holmfirth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Jul 2025 at 13:12.
24 Oct 2025 and 16 Jul 2026
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 16 July 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 11 Aug 2025 at 10:17.
24 Oct and 2 Nov 2025
Kirklees Council are proposing to carry out Highway improvement works on Halifax Road, Birchencliffe, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 October 2025 and could run through until 2 November 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Kirklees Council on 25 Sep 2025 at 14:04.
25 Oct and 2 Nov 2025
GTC Pipelines are proposing to carry out Utility asset works on Rowley Lane, Fenay Bridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 29 Jul 2025 at 08:05.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out roadworks on Derwent Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Jul 2025 at 10:49.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out roadworks on Moorside Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 3 Jul 2025 at 10:50.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Bradshaw Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 9 Jul 2025 at 11:02.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Bradshaw Road, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 16 Jul 2025 at 09:14.
27 and 31 Oct 2025
GTC Pipelines are proposing to carry out Utility asset works on Rowley Lane, Fenay Bridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by GTC Pipelines on 21 Jul 2025 at 13:53.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Lower Wellhouse Road, Wellhouse, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Aug 2025 at 11:01.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Lower Wellhouse Road, Wellhouse, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 10:57.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Share Hill Road, Wellhouse, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Aug 2025 at 11:00.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Share Hill Road, Wellhouse, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 10:55.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Share Hill Road, Golcar, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 18 Aug 2025 at 10:59.
27 and 31 Oct 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Share Hill Road, Golcar, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 10:56.
27 and 31 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Birkhouse Lane, Paddock, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 14:35.
27 and 31 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Birkhouse Lane, Paddock, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 1 Sep 2025 at 09:34.
27 and 31 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Market Place, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Aug 2025 at 14:36.
27 and 31 Oct 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Market Place, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 7 Oct 2025 at 09:34.
27 Oct and 2 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spaines Road, Fartown, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 2 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 12 May 2025 at 09:20.
27 Oct and 7 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Spaines Road, Fartown, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 7 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Sep 2025 at 08:57.
27 Oct and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Malham Avenue, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 15 Sep 2025 at 15:35.
27 Oct and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Malham Avenue, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 13:40.
28 Oct and 4 Nov 2025
Kirklees Council are proposing to carry out Section 50 on Upperthong Lane, Upperthong, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2025 and could run through until 4 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 27 Aug 2025 at 15:07.
29 Oct and 4 Nov 2025
Yorkshire Water are proposing to carry out Utility asset works on Moor Top Road, Kirkheaton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 8 Oct 2025 at 09:22.
29 Oct and 4 Nov 2025
Yorkshire Water are proposing to carry out New service connection on Old Lane, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2025 and could run through until 4 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 08:12.
3 and 7 Nov 2025
BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 26 Aug 2025 at 08:41.
3 and 7 Nov 2025
BT are proposing to carry out Utility asset works on St George's Road, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 8 Oct 2025 at 11:49.
3 and 7 Nov 2025
BT are proposing to carry out Utility asset works on Ryefields, Scholes, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Sep 2025 at 09:16.
3 and 21 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Horn Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 11:24.
3 and 21 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Sude Hill, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 11:25.
3 and 8 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on North Road, Kirkburton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 4 Sep 2025 at 12:13.
3 and 8 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on North Road, Kirkburton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 8 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Aug 2025 at 08:55.
3 and 9 Nov 2025
Kirklees Council are proposing to carry out Remedial works on Penistone Road, Kirkburton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 1 Sep 2025 at 13:44.
3 and 9 Nov 2025
Kirklees Council are proposing to carry out Remedial works on Penistone Road, Kirkburton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 9 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 2 Sep 2025 at 15:33.
3 and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 43-87 Senior Street, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 15:32.
3 and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 43-87 Senior Street, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Oct 2025 at 10:36.
3 Nov and 5 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Slack Lane, Outlane, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2025 at 12:23.
3 Nov and 5 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Slack Lane, Outlane, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2025 at 13:04.
3 and 21 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Hey Road, Outlane, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 11:38.
3 and 21 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Hey Road, Outlane, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 November 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2025 at 09:02.
4 and 6 Nov 2025
BT are proposing to carry out Utility asset works on Stainland Road, Elland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2025 and could run through until 6 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Sep 2025 at 14:41.
5 Nov 2025 and 14 Jan 2026
Kirklees Council are proposing to carry out Highway improvement works on Crescent Road, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 14 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 8 Sep 2025 at 13:48.
5 Nov 2025 and 14 Jan 2026
Kirklees Council are proposing to carry out Highway improvement works on Crescent Road, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 November 2025 and could run through until 14 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 7 Oct 2025 at 09:13.
10 and 12 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 14:14.
10 and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Long Lane, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 3 Sep 2025 at 11:37.
10 and 14 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Long Lane, Honley, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 14 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 16 Sep 2025 at 11:06.
10 and 18 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Varley Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 16 Sep 2025 at 15:19.
10 and 18 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Varley Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 18 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 29 Sep 2025 at 08:53.
10 and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:45.
10 and 28 Nov 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 17 Sep 2025 at 12:18.
10 and 12 Nov 2025
BT are proposing to carry out Utility asset works on Stainland Road, Elland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Sep 2025 at 13:50.
17 and 21 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Cinder Hills Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 12:08.
17 and 21 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Cinder Hills Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 26 Sep 2025 at 11:10.
17 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Birkhouse Lane, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:46.
17 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Birkhouse Lane, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2025 at 15:55.
18 Nov and 22 Dec 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Hey Road, Scammonden, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 22 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 29 Sep 2025 at 11:35.
18 Nov and 22 Dec 2025
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Hey Lane, Scammonden, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 22 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 22 Sep 2025 at 09:30.
18 Nov 2025 and 15 Jan 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Burnsall Road, Rastrick, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 15 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 17 Sep 2025 at 10:15.
18 Nov 2025 and 15 Jan 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Burnsall Road, Rastrick, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2025 and could run through until 15 January 2026. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 19 Sep 2025 at 14:46.
19 and 23 Nov 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Victoria Street, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:10.
19 and 23 Nov 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Victoria Street, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 23 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 24 Sep 2025 at 08:49.
19 and 21 Nov 2025
BT are proposing to carry out Utility asset works on Wooldale Road, Wooldale, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Sep 2025 at 14:26.
19 and 21 Nov 2025
BT are proposing to carry out Utility asset works on Out Lane, Netherthong, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2025 and could run through until 21 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 16 Sep 2025 at 13:57.
20 and 22 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 27 Aug 2025 at 08:25.
20 and 22 Nov 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Huddersfield Road, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 November 2025 and could run through until 22 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 2 Sep 2025 at 08:23.
22 and 28 Nov 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Town Gate, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:14.
22 and 28 Nov 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Town Gate, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 24 Sep 2025 at 08:42.
24 and 26 Nov 2025
Quickline Commucations are proposing to carry out Utility asset works on Laund Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 29 Sep 2025 at 10:28.
24 and 26 Nov 2025
Quickline Commucations are proposing to carry out Utility asset works on Laund Road, Slaithwaite, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 6 Oct 2025 at 11:11.
24 and 28 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Lockwood, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 24 Sep 2025 at 17:24.
24 and 26 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Factory Lane, Milnsbridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Sep 2025 at 09:26.
24 and 26 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Factory Lane, Milnsbridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 30 Sep 2025 at 11:12.
24 and 26 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Bankwell Road, Milnsbridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 22 Sep 2025 at 09:25.
24 and 26 Nov 2025
Kirklees Council are proposing to carry out Highway repair and maintenance works on Bankwell Road, Milnsbridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the carriageway only.
This roadwork event was last updated by Kirklees Council on 30 Sep 2025 at 11:10.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on View Street, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:51.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on View Street, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2025 at 15:56.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravens Avenue, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Sep 2025 at 08:50.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravens Avenue, Moldgreen, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2025 at 15:55.
24 and 28 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chesil Bank, Quarmby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 18 Sep 2025 at 09:31.
24 and 28 Nov 2025
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chesil Bank, Quarmby, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 25 Sep 2025 at 14:08.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Ings Road, Outlane, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2025 at 13:08.
24 Nov and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Round Ings Road, Outlane, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 19 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2025 at 13:05.
24 Nov and 8 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Hey Road, Outlane, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 November 2025 and could run through until 8 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 11:30.
28 Nov and 6 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2025 and could run through until 6 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 25 Jun 2024 at 08:55.
28 Nov and 13 Dec 2025
Network Rail are proposing to carry out Works for Rail Purposes on Colne Bridge Road, Colne Bridge, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2025 and could run through until 13 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 9 Sep 2024 at 11:54.
1 and 13 Dec 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Huddersfield Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 17 Sep 2025 at 14:21.
1 and 13 Dec 2025
Kirklees Council are proposing to carry out Permanent reinstatement on Huddersfield Road, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 13 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 24 Sep 2025 at 08:26.
1 and 5 Dec 2025
Quickline Commucations are proposing to carry out Utility asset works on Dean Road, Upperthong, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 1 Oct 2025 at 09:52.
1 and 5 Dec 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodlands Avenue, Thongsbridge, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 December 2025 and could run through until 5 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 9 Sep 2025 at 14:19.
1 Dec 2025 and 6 Feb 2026
Yorkshire Water were proposing to carry out Utility asset works on Birks Lane, Stocksmoor, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 December 2025 and run through until 6 February 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 24 Sep 2025 at 14:41.
2 and 8 Dec 2025
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Spaines Road, Fartown, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2025 and run through until 8 December 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 26 Sep 2025 at 13:44.
4 and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbottom Road, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 19 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 6 Oct 2025 at 13:33.
4 and 19 Dec 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodbottom Road, Netherton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2025 and could run through until 19 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 7 Oct 2025 at 10:37.
8 and 12 Dec 2025
Quickline Commucations are proposing to carry out Utility asset works on Wickins Lane, Upperthong, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 1 Oct 2025 at 09:54.
8 Dec 2025 and 7 Jan 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravensknowle Road, Dalton, Huddersfield.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 7 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 14:44.
8 Dec 2025 and 26 Jan 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Taylor Lane, Scapegoat Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 11:19.
8 Dec 2025 and 16 Jan 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Taylor Lane, Scapegoat Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2025 at 12:11.
8 Dec 2025 and 26 Jan 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Scapegoat Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 26 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 29 Sep 2025 at 11:18.
8 Dec 2025 and 16 Jan 2026
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Scapegoat Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 16 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2025 at 12:08.
8 and 12 Dec 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on St John's Avenue, Kirkheaton, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Yorkshire Water on 15 Sep 2025 at 10:51.
8 and 22 Dec 2025
Northern Gas Networks are proposing to carry out Utility asset works on New Hey Road, Ainley Top, Elland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2025 and could run through until 22 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 18 Aug 2025 at 11:09.
10 and 16 Dec 2025
Quickline Commucations are proposing to carry out Utility repair and maintenance works on Butterley Lane, New Mill, Holmfirth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 16 December 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Quickline Commucations on 8 Oct 2025 at 15:55.
10 Dec 2025 and 14 Aug 2026
Network Rail are proposing to carry out Works for Rail Purposes on Fitzwilliam Street, Huddersfield.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2025 and could run through until 14 August 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 13 Feb 2025 at 11:09.
15 and 17 Dec 2025
BT are proposing to carry out Utility asset works on Pike Law Lane, Scapegoat Hill, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2025 and could run through until 17 December 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Sep 2025 at 14:02.
2 and 25 Jan 2026
Kirklees Council were proposing to carry out Highway improvement works on Byram Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2026 and run through until 25 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 4 Jun 2025 at 11:41.
2 and 25 Jan 2026
Kirklees Council were proposing to carry out roadworks on Byram Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2026 and run through until 25 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 30 Sep 2025 at 14:13.
2 and 25 Jan 2026
Kirklees Council were proposing to carry out roadworks on Lord Street, Huddersfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2026 and run through until 25 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Kirklees Council on 30 Sep 2025 at 14:16.
5 and 19 Jan 2026
Northern Gas Networks are proposing to carry out Utility asset works on New Hey Road, Ainley Top, Elland.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 19 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2025 at 11:48.
5 and 19 Jan 2026
Northern Gas Networks are proposing to carry out Utility asset works on West Lodge Crescent, Ainley Top, Elland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 19 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2025 at 12:20.
5 and 19 Jan 2026
Northern Gas Networks are proposing to carry out Utility asset works on West Lodge Crescent, Ainley Top, Elland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 19 January 2026. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 7 Oct 2025 at 09:22.
5 and 9 Jan 2026
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Castlefields Drive, Rastrick, Brighouse.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 January 2026 and run through until 9 January 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Oct 2025 at 10:39.
5 and 9 Jan 2026
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Castlefields Drive, Rastrick, Brighouse.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2026 and could run through until 9 January 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 6 Oct 2025 at 10:40.
6 Jan and 10 Feb 2026
Northern Powergrid (Yorkshire) are proposing to carry out New service connection on New Hey Road, Scammonden, Huddersfield.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2026 and could run through until 10 February 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 30 Sep 2025 at 14:37.
6 Jan and 10 Feb 2026
Northern Powergrid (Yorkshire) are proposing to carry out Utility asset works on Hey Lane, Scammonden, Huddersfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2026 and could run through until 10 February 2026. The works will impact the carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Yorkshire) on 2 Oct 2025 at 10:36.
Roadworks Map near to Fair Street, HUDDERSFIELD, HD1 3QB (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Fair Street, HUDDERSFIELD, HD1 3QB (45 Events)
(Scheduled Dates)
(miles)
(Scheduled: 17 Mar 2025 - 30 Jan 2027)
(Scheduled: 17 Mar 2025 - 30 Jan 2027)
(Scheduled: 17 Mar 2025 - 30 Jan 2027)
Contains public sector information licensed under the Open Government Licence v3.0.